ESR GMR Brochure
Total Page:16
File Type:pdf, Size:1020Kb
ABOUT US ESR is the largest Asia-Pacific focused logistics real estate platform by gross floor area (GFA) and by value of the assets owned directly and by the funds and investment vehicles it manages. Co-founded by its senior management team and Warburg Pincus, ESR and it's funds and investment vehicles are backed by some of the world’s preeminent investors including APG, SK Holdings, JD.com, Goldman Sachs, CPPIB, OMERS, Ping An and Allianz Real Estate. The ESR platform spans across the People’s Republic of China, Japan, South Korea, Singapore, Australia and India. ESR has been listed on the Main Board of The Stock Exchange of Hong Kong Limited since 1 November 2019. US$22.1 Billion 185 Million 6 Countries Assets Under Management SQ. FT. Gross Floor Area of Operation (AUM) (GFA) 150 Million 600+ SQ. FT. Development Industry Inhouse Experts Pipeline (GFA) ESR GMR SHAMSHABAD USP’s OF THE FACILITY A state-of-the-art industrial and logistics park at Rajiv Gandhi International Airport, Hyderabad. Well connected by air, road and SITE ADDRESS ACCESS rail and robust connectivity to ports. The park features enhanced Manidipally, Shamshabad, Proximity to the Hyderabad security due to its proximity to the airport. Hyderabad, Telangana- 500409. city with easy access to the outer ring road. SITE ADVANTAGE PEOPLE POWER The location enjoys the benefits Availability of manpower in of the existing ecosystem of Shamshabad town, 10 mins away Rajiv Gandhi International Airport. from the park and from Hyderabad, 30 mins from the site. QUALITY DELIVERY Grade ‘A’ rated highly specified BTS buildings to be delivered as green buildings. per design. IGBC Silver rated building. Standard buildings can be delivered between 10-12 months. CENTRALLY LOCATED Air : 5 mins from RGI Airport,connected to over 50 international and domestic destinations. Outer Ring Road 8-lane Road : National Highway 7 to the East and Srisailam State Highway to the West. Hyderabad city center is a Kukatpally Gachibowli 40 minute drive via an elevated express way. Madhapur Nanakramguda HITEC CITY : The IT hub of Hyderabad is a 30 minute Hitec City drive via the Outer Ring Road. Financial Secunderabad Distinct Rail : Secunderabad – the twin city of Hyderabad is Uppal Banjara Hills the Divisional Headquarters of South Central Railways and an important junction in the Indian rail network. PVR Express Highway Umadnagar is the nearest railway station, 7 km 4-lane elevated road from the location. LB Nagar Sea : Hyderabad is a land locked city. However a Outer Ring Road robust rail and road network feeds into important 8-lane seaports in India. Inner Ring Road Adibhatla RGIA Google Coordinates LOCATION ADVANTAGE HOUSING WORKFORCE Low cost housing at 280 engineering colleges produces 90,000 Shamshabad and affordable engineers every year. Skilled manpower housing available in Hyderabad. available in Shamshabad. 0.6 million sq. ft. of cinema, retail 0.8 million sq. ft. of connected smart spaces. HOSPITALS SCHOOLS and entertainment. Apollo Hospitals run a 17 bed emergency Santinos Global School treatment center at the airport. A stand-by ambulance fitted with advanced life-saving equipment is also available for emergencies. 300+ keys operating at ~85% occupancy. 250 acre Aerospace & Industrial Park Annexed by 80,000 sq. ft. Convention Centre, (Multi-product SEZ) with access to with seating capacity 3,000 pax., Operational Runway. Car park spaces 2,000 nos. JALAPALLI NH-7 Cross Linking NH-7 To NH-765 Srisailam Highway CONNECTIVITY ADVANTAGE SATHMARAI SATAMRAI VILLAGE MB NAGAR Hyderabad Airport - Direct flights to 50+ domestic & international destinations. Airport Road Airport Outer Ring Road - Elevated corridor and upcoming airport express metro. SHAMSHABAD NH-765 Public Transport - AC and non-AC public transport organised by TSRTC. Cross Linking Ring road KURMAGUDA Nehru Outer NH-7 To NH-765 FRRO Office 3 metro stations proposed within the airport campus. UMDANAGAR MUDIRAJ Airport metro will connect Biodiversity park, Raidurgam to Airport Terminal. UMDANAGAR COLONY RAILWAY STATION Gollapalle New proposed sector Road Shivalayam Khurd Decathalon Novotel Airport main access Road Proposed Amazon Hyderabad Airport Metro Station Rajiv Gandhi International Airport Airport DG Yard MansanPalli Highway Connecting ORR & NH-7 NH-765 CHINNA GOLCONDA Nehru Outer Ring road 8 Lane Express Highway PEDDA Connecting the periphery of Hyderabad city GOLCONDA Secondary road network for truck movement SREENAGAR UMDANAGAR Railway Station National Highways State Highways BUILDING AREAS BUILDING 1 BUILDING 2 RAMP DOWN 607.00 FRL 603 FRL 15M WIDE1:25 ROAD 4,03,450 SQ. FT. 2,76,666 SQ. FT. 6M 8M RMG AREA FOR COMMON UTILITIES UTILITY BUILDING 603 FRL 6M WIDE ROAD (ROAD SLOPE AS PER SITE) RAMP DOWN 602 FRL 12M WIDE ROAD 1:100 603 FRL MEZZANINE UP OFFICE 162.33M 603 FRL 36 M W I D E R O A D MANDATORY OSR BUILDING 3 1:113 RAMP DOWN 12M WIDE ROAD 1 230.9M 602 FRL 6,58,290 SQ. FT. 601.5 LVL STP DRIVER'S REST ROOM 7 AVENUE OF TREES AS BUFFER AVENUE OF TREES AS BUFFER 7.5 M WIDE ROAD 601.5 LVL MEZZANINE STP OFFICE 7.5 M WIDE ROAD UP 341.08M 12M WIDE ROAD 602 FRL RAMP DOWN 601.5 LVL 1:290 7.5 M WIDE ROAD 25.65M 104.02M 215.38M 7.5 M WIDE ROAD CAR ENTRY EXIT 601.5 LVL TRUCK PARKING ENTRY 601.5 LVL CAR 143.39M 3 PARKING 117.74M 9M WIDE ROAD 2 1:25 7.5 M WIDE ROAD PARKING DOWN RAMP 7.5 M WIDE ROAD AMENITY AREA 12M WIDE ROAD WIDE 12M 36 M W I D E R O A 600.0 FRL 6 M WIDE ROAD UTILITY AREA TWO WHEELER PARKING 9 NOS 15 M WIDE ROAD 15 M WIDE ROAD KERB MEZZANINE MEZZANINE GATE 6M WIDE ROAD WITH INTERLOCKING PAVER FRL +601.50 OFFICE OFFICE KERB 2 M WIDE PASSAGE UP OFFICE FOR PMC PROJECT OFFICE AC Outdoor unit AC Outdoor unit DRIVER'S REST FENCE LINE UP UP ROOM 10 15 M WIDE ROAD TRUCK 601.5 LVL 12M WIDE ROAD EXIT 601.5 LVL 12M WIDE ROAD 12M WIDE ROAD 601.5 LVL 3 6 M W I D E R O A D Building Features Description Building Features Description PEB Structure Building Utilities Design Code Standard Design, fabrication & erection of structural steel to comply with AISC (American Institute of Internal Sprinkler System Roof sprinkler system of K115 std as per local norms/ NBC 2016. Steel Construction)/ IS code. All welding work shall be as per AWS (American Welding Society). Fire Water Tank And Pump Fire water tank of required capacity to be considered in the central UG tank. Fire tank capacity Roof Collateral Load 30 ggs/ sq. mt collateral load considered on the roof to install sprinklers, electrical system & and fire pump shall be as per NBC norms. other utility services/ additional 20kg/ sq mt design load on the roof for solar panel installation. Building Aspect Ratio Provision of wet block at both the end of building. Male to female toilet ratio to be as per Building Aspect Ratio Building length to the width ratio to be 21. building norms. Tap off in the Mezzanine/ Office area for Toilets. Water Supply One water tap-off point shall be provided; Flushing water shall be supplied from the STP Building Height at Eave Standard building clear height of 10 m. recycle water. Roofing Type Standing seam roof system (Screw less roof system), Bare Galvalume (no paint). Power Load 1 KVA per 1000 sq. ft. Skylight 3%-4% roof area shall be provided with skylight for natural daylight. Approx. one skylight at each DG and Transformer Yard Provision of area allocation for DG and Transformer, equipment and MEP in tenants scope. bay on either side. Skylight panel will be of polycarbonate sheet fixed to avoid water leakage. Parking Provision of 5 car parking spaces & 10 two wheeler parking spaces will be provided for 1.0 lac sqft built up area. No dedicated space for truck parking except dock area. Air Changes 3-6 Air changes/ 8 air changes for Industrial buildings with windows. Canopy Width 4m from the PEB wall cladding. Canopy Height Canopy at 5.2 m height from the corresponding road level. External Infra at Park Level Lightening Arrestor Lightening arrestor at the roof ridge to be installed as per NBC 2016. STP Park level central STP shall be provided as per NBC norms. Arrangement Water Supply Local source for domestic water for flushing treated water from STP shall be recycled. Docking Apron Size 16.5 m wide docking apron provided for the 40ft vehicular movement. Concrete WTP, if required to be considered as tenants scope. road shall be provided at the docking area with reversed slope towards the building. Boundary Wall 7' height boundary to be provided at park level. Boundary wall shall be masonry/ precast Dock Door Size 2.4m (W) x 3m (H), numbers shall be one rolling shutter per 12000 sq. ft. of wall up to 5' height from ground level and 2' height concertina wire. building area/ one in each bay. one knockout panel in each bay shall be provided. Gate House/ Security Cabin Gate house shall be provided with sliding gate for entry and exit. Width of the sliding gate to be of 4.5m/ 6m wide. RCC & Civil Structure Area Allocation Space/ Location to be marked out for Scrap yard, LT, DG, Compressor, Utility area etc for each Building on Master plan. Building Plinth Height 1.2m plinth height from the finish docking road level. Signages Park Level signages like Emergency, Directional etc. will be provided only for fire exit.