Marine Biology Technical Study
North Coast Highway 101 Streetscape Project Leucadia Flood Abatement Design Marine Biology Technical Report May 8, 2020 Technical Memorandum PREPARED FOR: MICHAEL BAKER, INTERNATIONAL CARLSBAD, CALIFORNIA PREPARED BY: MBC AQUATIC SCIENCES COSTA MESA, CALIFORNIA North Coast Highway 101 Streetscape Storm Drain Improvement Project Marine Resources Review 2 North Coast Highway 101 Streetscape Project Leucadia Flood Abatement Design Marine Biology Technical Report SUMMARY The North Coast Highway 101 Streetscape Storm Drain Improvement Project will result in a smaller amount of stormwater runoff to the West Basin of Batiquitos Lagoon during 2-year storm events than presently occurs, but a larger discharge of stormwater runoff during 5-, 10-, 50, and 100-year storm events (MBI 2020). The West Basin supports sensitive vegetation habitats (e.g., pickleweed/cordgrass marsh and eelgrass beds), diverse fish, benthic invertebrate, and avian communities, including threatened and endangered bird species (Belding’s savannah sparrow, California least tern, light-footed clapper rail, Western snowy plover). Water quality potentially could be degraded, and biological resources potentially could be adversely impacted by these increased stormwater discharges into the basin. The analysis focused on the four primary effects of the increased runoff that would be expected to contribute to potential biological impacts within this unique setting: erosion from high velocity discharges; dilution and salinity depression; sedimentation in the West Basin; and increased pollutant load transported by runoff as a result of the project. No adverse impacts to water quality or biological resources would be expected to occur due to the discharge of stormwater runoff into the West Basin of Batiquitos Lagoon under any of the scenarios evaluated (2-, 5-, 10-, 50-, and 100-year storm events).
[Show full text]