(Tarura) Ruvuma Region
Total Page:16
File Type:pdf, Size:1020Kb
TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) RUVUMA REGION _______________________________________________________________ ____________ Invitation for Tenders Date: 12th July, 2019 1. This Invitation for Tenders follows the General Procurement Notice for these Projects which appeared in Tanzania Procurement Journal [TPJ] Vol. XII- No.24 2. The Government of Tanzania has set aside funds for the operation of the Tanzania Rural and Urban Roads Agency (TARURA) in Ruvuma Region during the financial year 2019/2020. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contracts as detailed in the table below:- S/ Name of Tender Major Works Tender CRB N No Class i. Street Light -21Nos ii. Fill pot holes-60m3 iii. Cement stabilized materials (C1)-300m3 iv. Prime coat on base coarse Routine and Periodic Maintenance (MCO 30, MCO 70)- 670m2 AE/092/20 of Mskitini-zanzibar 19- street,Zimanimoto- v. Bituminous Surface layer VII (new Pavement) First seal 2020/RVM 1. sovi,Zimanimoto0 - 2 /W/04 and mjimwema,Ruhuwiko - -670m above Airport,Delux -Mpambalyoto and vi. Bituminous Surface layer Old Tanesco-Mpate (Street light) (new Pavement) second seal -670m2 vii. Concrete in drainage structure class 20-60m3 viii. Stone masonry -30m3 i. Cut or borrow to fill- 2. Periodic Maintenance, Spot AE/092/20 VI Improvement and Rotuine 800m3 19- and Maintenance of Mshangano ii. Light Grading and 2020/RVM above Chandarua - Mkuzo road Proof Rolling- /W/05 13.39km,Mshangano - Mletele 69.04km road 8.5km,Ruhuwiko- iii. Heavy Reshaping - Mwengemshindo road 2.5km 10.9km,Ruhuwiko Heroes iv. Gravel Materials- 2.7km,Tanga -Mlete 2,275m3 9.23km,Tanga-Masigira- v. Tree remove -42No Nonganonga 12.53km,Shule ya vi. Concrete pipe Tanga-mhombezi-Mpandangindo culvert 900mm dia 4.5km,Kibaoni mariani-Njombe 45M JCT 1.76km,Liwumbu Kanisani - vii. Stone masonry - Mjimwema 2.0km,Msamala - 90m3 Mwengemshindo 6.3km,Njombe JCT-Chandarua 2.93km. Routine and Periodic i. Cut or borrow to fill Maintenance of Namanditi - 700m3 Mwanamonga - Parangu road 9.0 ii. Light Grading and km,Mwanamonga - Lilambo road Proof Rolling 5.0km,Mang;ua - Luwawasi road 47.03km AE/092/20 3.4km,Sinai - Ngurumo road iii. Gravel Materials 19- 3 0.8km, Mang'ua - Muungano road 250m 2020/RVM VII 3. 2.3km, Londoni - Lupapila road iv. Concrete pipe /W/06 and 12.0km, Londoni - Subira - culvert 900Mmm dia above Nangwai road 10.0 31M .0km,Muungano JCT-Liwena v. Stone masonry 40m3 Dispensary,Mbulani PR-Misufin vi. Bridge work 5m PR 2km,Construction of Bridge long along Muungano JCT-Liwena Dispensary. i. Cut or borrow to fill Spot Improvement and Routine 3 Maintenance of SOUWASA - 450m Mashujaa road 1.9km,Mifugo - ii. Light Grading and Kimoro - JCT Tunduru road Proof Rolling AE/092/20 0.1km,FFU - Matogoro - Mahiro 11.1km 19- VII road 6.2km,Makambi Kibaoni - iii. Gravel Materials 2020/RVM 4. 3 and Duka la Dawa 1.5km,Mateka - 675m /W/07 above Ndilimalitembo road iv. Concrete pipe 10.0km,Songea girls - Mateka - culvert 750mm dia 7m Matogoro road 2.7km, Songea 3 boys streets 0.9km,Songea boys v. Stone masonry 25m streets - Songea boys jct road 1.4km. Periodic,Spot Improvement and i. Cut or borrow to Routine Maintenance of Madizini fill 600m3 - Pachanne - Lizaboni Sec ii. Light Grading and 2.1km,Bohari - Open University Proof Rolling 0.55km,Sangawani - Bohari 16.08km 1.1km,Majimaji Stadium - Sabena iii. Gravel Materials road 0.3km,Manzese B - TAG 700m3 Church road 0.3km,Lizaboni Sec. iv. Concrete pipe AE/092/20 - Sapientier road 1.6km,Madizini - culvert 900mm 19- VII TFC road 1.5km,Tigo tower - dia 29M 2020/RVM and 5. Lizaboni road 0.8km,Mjimwema- v. Stone masonry /W/08 3 above msamala 2km,Tigo tower- 105m mjimwema amani SM 0.43KM, Kiwanjani -Tigo Tower 0.6km,Pacha ya Heroes - Misufin,Mjimwema sokoni- Migombani 0.59km,Mkuzo- luwawasi Darajani 1.18km,Lizaboni-Matarawe Sec 2.1km i. Cut or borrow to fill Routine and Periodic Maintenance 590m3 of Mkuzo JCT-Muslimu Sec- ii. Light Grading and Mkuzo 2.1km,Taif Sec-iliuli sec Proof Rolling 0.82km,Njombe Jct-Madzin 14.06km AE/092/20 1.13km,Mshangano-Makinginda iii. Gravel Materials 19- 2.66km,Mshangano-Ruhila 1150m3 2020/RVM VII 6. 3.26km,Chandarua Jct-Mkuzo Jct iv. Concrete pipe W/09 and 1km,Pacha ya Ukomboz- culvert 900mm dia above Montesory 0.59km,Chaulembo- 67M Montesory Pr 0.16km,Mjimwem v. Stone masonry 90m3 JCT-Mkuzo 2.05km, Construction vi. Bridge Work 5m of Bridge along Mjimwem JCT- Mkuzo. i. Cut or borrow to fill AE/092/20 Routine and Periodic Maintenance 3 VII 7. 550m 19- of Ottawa-Msamala Sec-Mtazamo ii. Light Grading and 2020/RVM and 2.65km, Moonlight-Tembo1km, Proof Rolling W/10 above MakingindaBombambili-Seedfarm 12.8km 2.72km,Miembeni-Sokoine Pr iii. Concrete pipe 1.67km, culvert 900mm dia 28M Mwalibwa-Mwembechai 1.17km, iv. Stone masonry Mkeso-Mashati Mwalibwa, 125m3 Zimanimoto-JCT -Mwakinosya 0.65km Routine Maintenance, Spot i. Heavy grading-45.0km Improvement and Periodic ii. Gravelling 6750cum Maintenance works along Liweta - iii. Construction of Litowa, Peramiho - Lundusi, Storm water drains- Maposeni - Mdunduwalo - 2100sqm AE/092/20 Likingo, Litisha - Mtopesi - iv. Excavate for mitre 19- VI 8. Nakahuga - Mgowa , Matogoro - drains-11,700Lm 2020/RVM and Kiheo - Liula and Mpandangindo - v. Installation of 90cm dia W/13 above Sanangula 51.0km roads, culvert-8Nos Installation of culverts along Peramiho-Namatanda-Parangu and Liganga-Serekano-Mborongo- Mwimbasi i. Heavy grading-64.9km Routine Maintenance , Spot ii. Gravelling-9,183cum Improvement and Periodic iii. Excavate mitre drains- Maintenance works along 8,650Lm AE/092/20 Masangu - chipole, Matomondo - iv. Installation of 90cm dia Magagura - Kizuka, Chipole - 19- culvert-5Nos VI Lusonga -Lihale, Lipokera - 2020/RVM 9. and Nakahegwa,Litapwasi - W/14 above Lyangwene - Mbingamhalule,Manguchiro - Litapwasi, Subira - Mpitimbi "A" and Mpitimbi "A"- Mpitimbi Secondary 59.90km Roads i. Patchworks-140sqm Spot Improvement, Routine and ii. Concrete works-123cum Periodic Maintenance Works and iii. Stone masonry-238sqm AE/092/20 Construction of Small Span iv. Grouted Stone pitching 19- Bridges at Mbinga Town Council for lined ditch-379cum 2020/RVM VI and 10. Roads v. Pipe culvert 90mm- W/16 above 56Lm vi. Overlay - Double surface dressing- 2870sqm vii. Heavy grading-4.81km viii. Heavy reshaping- 14.29km ix. Gravelling-1600cum x. Bridge 10m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill-2Nos i. Concrete works-28cum Spot Improvement and Periodic ii. Stone masonry-112sqm Maintenance Works and iii. Grouted Stone Construction of Small Span pitching for lined ditch- Bridges at Mbinga Town Council 64cum Roads iv. Concrete drifts 15Nos-85cum v. Pipe Culvert-40Lm vi. Heavy grading- 4.38km vii. Bridge 10m span AE/092/20 19- (Composite) including VII Slab deck, Beams, Stone 2020/RVM 11. W/18 and abutments and wing walls above & Fill-1No viii. Bridge 8m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill-1No ix. Bridge 5m span (Slab deck) including Slab deck, Stone abutments and wing walls & Fill-1No i. Concrete works-10cum Periodic Maintenance Works and ii. Stone masonry-560sqm Construction of Small Span iii. Grouted Stone pitching AE/092/20 Bridges at Mbinga Town Council for lined ditch-16cum 19- Roads VII iv. Pipe Culvert-42Lm 2020/RVM 12. /W/19 and v. Heavy grading-0.8km above vi. Heavy reshaping-13.4km vii. Gravelling-720cum viii. Bridge 7.5m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill1No ix. Bridge extension 5m span (Slab deck 5.7m length) including Slab deck, Stone abutments and wing walls & Fill- 1No x. Bridge 5m span (Slab deck) including Slab deck, Stone abutments and wing walls & Fill- 1No i. Heavy reshaping- Routine maintenance along Muhongozi - Sara - Paradiso and 22.60km Spot Improvement along Amani ii. Heavy grading- makolo - Kiwombi 13.00km AE/092/20 19- iii. Earth works- 2020/RVM VI and 13. 10,787cum W/21 above iv. Rock excavation - 134cum Concrete culverts 900mm- 70m i. Heavy reshaping- Periodic Maintenance along Matiri-Kindimba juu- 12.70km Mkongotingisa nda Construction ii.Heavy grading-7.50km of One concrete Bridge along AE/092/20 Kindimba chini - Kizota - iii.Tree felling-302Nr 19- Mnywamaji iv.Earth works-12,190cum 2020/RVM VI and 14. W/22 v.Construction of small above span bridge-1Nr vi.Rock excavation- 134cum vii.Concrete culverts 900mm-168m i. Heavy reshaping- 7.50km ii. Tree felling-103Nr AE/092/20 Periodic Maintenance along iii. Earth works-8,160cum 19- Litoho - Linda, Construction of iv. Construction of small 2020/RVM VI 15. two Concrete Bridges along span brudge-3Nr W/23 and Matekela - Kikuli - Makonga and v. Rock Excavation- above Preventive Bridges maintenances 92cum vi. Concrete culverts 900mm-42m i. Site clearance -93,200m2 Routine Maintenance Along ii. Concrete class 20- Kingerikiti - Kikole- Mtipwili 164.05m3 24.1km, Spot Improvement Alongiii. Stone masonry-56m3 Tingi - Lulimbo - Mtuha 5km, iv. Loose stone pitching- AE/092/20 Kingerikiti - Kikole - Mtipwili 174m3 19- 5km, Periodic Maintenance Along 2020/RVM VII 16. v. Grouted stone pitching- and Tingi - Lulimbo - Mtuha 3.5km, 275m3 W/24 Kingerikiti - Kikole - Mtipwili 2 above vi. BRC Mesh-870m 2km, Luhangarasi - Ukuli 1km vii. Light reshaping-5.1Km viii. Gravelling-2,475m3 ix. Fill with selected materials-870m3 i. Site clearance-20,225m2 Routine Maintenance Along ii. Loose stone pitching- Luhindo - Mpepo - Darpori 10km, 125m3 Spot Improvement Along Luhindo iii. Grouted stone pitching- - Mpepo - Darpori 5km, Mtuha - 198m3 AE/092/20 Liparamba 4km, Ndondo - iv. Concrete class 15- 19- VII 17.