(Tarura) Ruvuma Region

(Tarura) Ruvuma Region

TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) RUVUMA REGION _______________________________________________________________ ____________ Invitation for Tenders Date: 12th July, 2019 1. This Invitation for Tenders follows the General Procurement Notice for these Projects which appeared in Tanzania Procurement Journal [TPJ] Vol. XII- No.24 2. The Government of Tanzania has set aside funds for the operation of the Tanzania Rural and Urban Roads Agency (TARURA) in Ruvuma Region during the financial year 2019/2020. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contracts as detailed in the table below:- S/ Name of Tender Major Works Tender CRB N No Class i. Street Light -21Nos ii. Fill pot holes-60m3 iii. Cement stabilized materials (C1)-300m3 iv. Prime coat on base coarse Routine and Periodic Maintenance (MCO 30, MCO 70)- 670m2 AE/092/20 of Mskitini-zanzibar 19- street,Zimanimoto- v. Bituminous Surface layer VII (new Pavement) First seal 2020/RVM 1. sovi,Zimanimoto0 - 2 /W/04 and mjimwema,Ruhuwiko - -670m above Airport,Delux -Mpambalyoto and vi. Bituminous Surface layer Old Tanesco-Mpate (Street light) (new Pavement) second seal -670m2 vii. Concrete in drainage structure class 20-60m3 viii. Stone masonry -30m3 i. Cut or borrow to fill- 2. Periodic Maintenance, Spot AE/092/20 VI Improvement and Rotuine 800m3 19- and Maintenance of Mshangano ii. Light Grading and 2020/RVM above Chandarua - Mkuzo road Proof Rolling- /W/05 13.39km,Mshangano - Mletele 69.04km road 8.5km,Ruhuwiko- iii. Heavy Reshaping - Mwengemshindo road 2.5km 10.9km,Ruhuwiko Heroes iv. Gravel Materials- 2.7km,Tanga -Mlete 2,275m3 9.23km,Tanga-Masigira- v. Tree remove -42No Nonganonga 12.53km,Shule ya vi. Concrete pipe Tanga-mhombezi-Mpandangindo culvert 900mm dia 4.5km,Kibaoni mariani-Njombe 45M JCT 1.76km,Liwumbu Kanisani - vii. Stone masonry - Mjimwema 2.0km,Msamala - 90m3 Mwengemshindo 6.3km,Njombe JCT-Chandarua 2.93km. Routine and Periodic i. Cut or borrow to fill Maintenance of Namanditi - 700m3 Mwanamonga - Parangu road 9.0 ii. Light Grading and km,Mwanamonga - Lilambo road Proof Rolling 5.0km,Mang;ua - Luwawasi road 47.03km AE/092/20 3.4km,Sinai - Ngurumo road iii. Gravel Materials 19- 3 0.8km, Mang'ua - Muungano road 250m 2020/RVM VII 3. 2.3km, Londoni - Lupapila road iv. Concrete pipe /W/06 and 12.0km, Londoni - Subira - culvert 900Mmm dia above Nangwai road 10.0 31M .0km,Muungano JCT-Liwena v. Stone masonry 40m3 Dispensary,Mbulani PR-Misufin vi. Bridge work 5m PR 2km,Construction of Bridge long along Muungano JCT-Liwena Dispensary. i. Cut or borrow to fill Spot Improvement and Routine 3 Maintenance of SOUWASA - 450m Mashujaa road 1.9km,Mifugo - ii. Light Grading and Kimoro - JCT Tunduru road Proof Rolling AE/092/20 0.1km,FFU - Matogoro - Mahiro 11.1km 19- VII road 6.2km,Makambi Kibaoni - iii. Gravel Materials 2020/RVM 4. 3 and Duka la Dawa 1.5km,Mateka - 675m /W/07 above Ndilimalitembo road iv. Concrete pipe 10.0km,Songea girls - Mateka - culvert 750mm dia 7m Matogoro road 2.7km, Songea 3 boys streets 0.9km,Songea boys v. Stone masonry 25m streets - Songea boys jct road 1.4km. Periodic,Spot Improvement and i. Cut or borrow to Routine Maintenance of Madizini fill 600m3 - Pachanne - Lizaboni Sec ii. Light Grading and 2.1km,Bohari - Open University Proof Rolling 0.55km,Sangawani - Bohari 16.08km 1.1km,Majimaji Stadium - Sabena iii. Gravel Materials road 0.3km,Manzese B - TAG 700m3 Church road 0.3km,Lizaboni Sec. iv. Concrete pipe AE/092/20 - Sapientier road 1.6km,Madizini - culvert 900mm 19- VII TFC road 1.5km,Tigo tower - dia 29M 2020/RVM and 5. Lizaboni road 0.8km,Mjimwema- v. Stone masonry /W/08 3 above msamala 2km,Tigo tower- 105m mjimwema amani SM 0.43KM, Kiwanjani -Tigo Tower 0.6km,Pacha ya Heroes - Misufin,Mjimwema sokoni- Migombani 0.59km,Mkuzo- luwawasi Darajani 1.18km,Lizaboni-Matarawe Sec 2.1km i. Cut or borrow to fill Routine and Periodic Maintenance 590m3 of Mkuzo JCT-Muslimu Sec- ii. Light Grading and Mkuzo 2.1km,Taif Sec-iliuli sec Proof Rolling 0.82km,Njombe Jct-Madzin 14.06km AE/092/20 1.13km,Mshangano-Makinginda iii. Gravel Materials 19- 2.66km,Mshangano-Ruhila 1150m3 2020/RVM VII 6. 3.26km,Chandarua Jct-Mkuzo Jct iv. Concrete pipe W/09 and 1km,Pacha ya Ukomboz- culvert 900mm dia above Montesory 0.59km,Chaulembo- 67M Montesory Pr 0.16km,Mjimwem v. Stone masonry 90m3 JCT-Mkuzo 2.05km, Construction vi. Bridge Work 5m of Bridge along Mjimwem JCT- Mkuzo. i. Cut or borrow to fill AE/092/20 Routine and Periodic Maintenance 3 VII 7. 550m 19- of Ottawa-Msamala Sec-Mtazamo ii. Light Grading and 2020/RVM and 2.65km, Moonlight-Tembo1km, Proof Rolling W/10 above MakingindaBombambili-Seedfarm 12.8km 2.72km,Miembeni-Sokoine Pr iii. Concrete pipe 1.67km, culvert 900mm dia 28M Mwalibwa-Mwembechai 1.17km, iv. Stone masonry Mkeso-Mashati Mwalibwa, 125m3 Zimanimoto-JCT -Mwakinosya 0.65km Routine Maintenance, Spot i. Heavy grading-45.0km Improvement and Periodic ii. Gravelling 6750cum Maintenance works along Liweta - iii. Construction of Litowa, Peramiho - Lundusi, Storm water drains- Maposeni - Mdunduwalo - 2100sqm AE/092/20 Likingo, Litisha - Mtopesi - iv. Excavate for mitre 19- VI 8. Nakahuga - Mgowa , Matogoro - drains-11,700Lm 2020/RVM and Kiheo - Liula and Mpandangindo - v. Installation of 90cm dia W/13 above Sanangula 51.0km roads, culvert-8Nos Installation of culverts along Peramiho-Namatanda-Parangu and Liganga-Serekano-Mborongo- Mwimbasi i. Heavy grading-64.9km Routine Maintenance , Spot ii. Gravelling-9,183cum Improvement and Periodic iii. Excavate mitre drains- Maintenance works along 8,650Lm AE/092/20 Masangu - chipole, Matomondo - iv. Installation of 90cm dia Magagura - Kizuka, Chipole - 19- culvert-5Nos VI Lusonga -Lihale, Lipokera - 2020/RVM 9. and Nakahegwa,Litapwasi - W/14 above Lyangwene - Mbingamhalule,Manguchiro - Litapwasi, Subira - Mpitimbi "A" and Mpitimbi "A"- Mpitimbi Secondary 59.90km Roads i. Patchworks-140sqm Spot Improvement, Routine and ii. Concrete works-123cum Periodic Maintenance Works and iii. Stone masonry-238sqm AE/092/20 Construction of Small Span iv. Grouted Stone pitching 19- Bridges at Mbinga Town Council for lined ditch-379cum 2020/RVM VI and 10. Roads v. Pipe culvert 90mm- W/16 above 56Lm vi. Overlay - Double surface dressing- 2870sqm vii. Heavy grading-4.81km viii. Heavy reshaping- 14.29km ix. Gravelling-1600cum x. Bridge 10m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill-2Nos i. Concrete works-28cum Spot Improvement and Periodic ii. Stone masonry-112sqm Maintenance Works and iii. Grouted Stone Construction of Small Span pitching for lined ditch- Bridges at Mbinga Town Council 64cum Roads iv. Concrete drifts 15Nos-85cum v. Pipe Culvert-40Lm vi. Heavy grading- 4.38km vii. Bridge 10m span AE/092/20 19- (Composite) including VII Slab deck, Beams, Stone 2020/RVM 11. W/18 and abutments and wing walls above & Fill-1No viii. Bridge 8m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill-1No ix. Bridge 5m span (Slab deck) including Slab deck, Stone abutments and wing walls & Fill-1No i. Concrete works-10cum Periodic Maintenance Works and ii. Stone masonry-560sqm Construction of Small Span iii. Grouted Stone pitching AE/092/20 Bridges at Mbinga Town Council for lined ditch-16cum 19- Roads VII iv. Pipe Culvert-42Lm 2020/RVM 12. /W/19 and v. Heavy grading-0.8km above vi. Heavy reshaping-13.4km vii. Gravelling-720cum viii. Bridge 7.5m span (Composite) including Slab deck, Beams, Stone abutments and wing walls & Fill1No ix. Bridge extension 5m span (Slab deck 5.7m length) including Slab deck, Stone abutments and wing walls & Fill- 1No x. Bridge 5m span (Slab deck) including Slab deck, Stone abutments and wing walls & Fill- 1No i. Heavy reshaping- Routine maintenance along Muhongozi - Sara - Paradiso and 22.60km Spot Improvement along Amani ii. Heavy grading- makolo - Kiwombi 13.00km AE/092/20 19- iii. Earth works- 2020/RVM VI and 13. 10,787cum W/21 above iv. Rock excavation - 134cum Concrete culverts 900mm- 70m i. Heavy reshaping- Periodic Maintenance along Matiri-Kindimba juu- 12.70km Mkongotingisa nda Construction ii.Heavy grading-7.50km of One concrete Bridge along AE/092/20 Kindimba chini - Kizota - iii.Tree felling-302Nr 19- Mnywamaji iv.Earth works-12,190cum 2020/RVM VI and 14. W/22 v.Construction of small above span bridge-1Nr vi.Rock excavation- 134cum vii.Concrete culverts 900mm-168m i. Heavy reshaping- 7.50km ii. Tree felling-103Nr AE/092/20 Periodic Maintenance along iii. Earth works-8,160cum 19- Litoho - Linda, Construction of iv. Construction of small 2020/RVM VI 15. two Concrete Bridges along span brudge-3Nr W/23 and Matekela - Kikuli - Makonga and v. Rock Excavation- above Preventive Bridges maintenances 92cum vi. Concrete culverts 900mm-42m i. Site clearance -93,200m2 Routine Maintenance Along ii. Concrete class 20- Kingerikiti - Kikole- Mtipwili 164.05m3 24.1km, Spot Improvement Alongiii. Stone masonry-56m3 Tingi - Lulimbo - Mtuha 5km, iv. Loose stone pitching- AE/092/20 Kingerikiti - Kikole - Mtipwili 174m3 19- 5km, Periodic Maintenance Along 2020/RVM VII 16. v. Grouted stone pitching- and Tingi - Lulimbo - Mtuha 3.5km, 275m3 W/24 Kingerikiti - Kikole - Mtipwili 2 above vi. BRC Mesh-870m 2km, Luhangarasi - Ukuli 1km vii. Light reshaping-5.1Km viii. Gravelling-2,475m3 ix. Fill with selected materials-870m3 i. Site clearance-20,225m2 Routine Maintenance Along ii. Loose stone pitching- Luhindo - Mpepo - Darpori 10km, 125m3 Spot Improvement Along Luhindo iii. Grouted stone pitching- - Mpepo - Darpori 5km, Mtuha - 198m3 AE/092/20 Liparamba 4km, Ndondo - iv. Concrete class 15- 19- VII 17.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us