on the edge). Key to this is increas- agreement can be reached to allow town. The largest project is likely to ing confidence in the quality that can these projects to proceed. The be the Mill Lane housing scheme on be achieved in new environmental SDF also includes proposals for the eastern bank of the river. How- adcaster is a historic town affordable housing and a weak retail works and housing development. If environmental improvements to the ever, the masterplan also includes that has retained much of its centre. The Charter set out a vision local people can be confident that valley, to incorporate the necessary opportunities for infill development Tunique character. The for Tadcaster as: development can take place without flood defence measures into a wider and living over the shop in the centre District Charter identified that, while damaging the character of the town landscaping scheme. of the town. Tadcaster and Sherburn are the ‘A historic brewing town with an then a range of projects can be The SDF has also addressed the Together these projects will not same size, Sherburn is a village that unspoilt character that is a good unlocked. issue of traffic calming and environ- transform Tadcaster – it does not has grown too quickly undermin- place to live and visit’ The SDF includes schemes that mental improvements to the main require transformation. They will, ing its village character. Tadcaster have been developed in the past for streets through the idea of Living however, strengthen and improve its by contrast is a town that has not This SDF sets out a strategy to the town such as the improvement Streets, which is common to all historic character and pave the way grown. This has had the positive achieve this by improving the quality of the main car park, the improve- three of the town masterplans. for new development around the effect that it remains largely unspoilt, of the environment and encouraging ment of Kirkgate and Robin Hood heart of the town that can secure its but also has created a number of new development in the heart of the Yard. These schemes are endorsed The aim is then to encour- long-term economic future. problems such as a shortage of town (but preventing development by the SDF and the hope is that age new housing in the heart of the 88

adcaster lies on the River era up to a hundred coaches a day famous for its beautiful white contested place for possession. held at the junction of Kirkgate and Wharfe between and passed through, many changing Magnesian limestone. The Romans During the War of the Roses the Bridge Street. TYork. Its Roman name is Cal- horses here. ‘The Ark’ was a meeting used Tadcaster stone to build their battle of Tadcaster was fought The town is still home to many caria – meaning ‘place of limestone’. place where the Pilgrim Fathers are Headquarters and medieval builders around the Tadcaster river bridge ancient treasures, such as the ‘Ark’ Once a small settlement, it served reputed to have met to plan their used the stone to build the city walls and at Townton 3 miles away where building, a motte and ditch of the as a resting place for travellers voyage to America. The building of and the . in 1461 a decisive battle was fought Norman castle, and the 1200s St. and a staging post on the originates from the late 1500s and The close proximity to York and its which ended the conflict. Tadcaster Mary’s Church. Originally built in (Londinium) to York () now houses the offices of Tadcaster position on the as the Market was initiated when Henry de 1150, alterations and additions road and became a noted meeting Town Council. key crossing point between York Percy obtained a charter from King were made to St. Mary’s at different place. In the heyday of the posting Tadcaster has always been and Leeds meant that it was often a Henry III in 1270, and was originally periods till the 1400s. It was finally

Tadcaster 2 89

across the river by rail, using this By 1378 five innkeepers are record- viaduct. The last time the viaduct ed as being in business in Tadcaster. was used to fetch and carry goods Today it is the home to Sam Smith’s, was in 1955. It was made a Grade the oldest brewery in , taken down in 1875 and rebuilt on mans built the small motte and area became pleasure-gardens, also 2 listed structure and purchased which has been brewing in Tadcaster foundations, which were 5 feet (150 bailey Castle in the 1300s. This was known as Tadcaster Beach. by the Tadcaster Town Council for since 1758 when Stephen Hartley cm) higher because it was subject to eventually demolished and the stone A viaduct of eleven arches spans pleasure uses. The Viaduct walk bought the Old Brewery. In 1847 the flooding. Floods have indeed been a was used to rebuild the bridge. The the river just north of Tadcaster now runs from Road, right famous Smith family acquired the fact of life in Tadcaster for centuries. northern embankments were used Bridge and was built by George across it with access to both banks brewery and a John Smith ran the A little chapel was built at the east as a gun emplacement at the time Hudson as part of his railway of the river. operation. In 1883, four years after side of the bridge for use during of the battle. The present bridge programme. However, he fell into Early mention of brewing in his death, John Smiths brewery was floods when people were unable to crossing was built around 1700, and financial difficulties before the line Tadcaster comes from tax lists, built, opened and began making reach the church. was based on the first stone bridge could be completed. It was not which show that there were brewer- the ale for which the area is now Using local rubble, the Nor- built in 1200. In the 1800s the whole until 1882 that goods were brought ies or brew houses as early as 1341. famous. 90

he plans on these two pages explore the urban form of Tadcaster town centre are the old breweries that dominate the town. Beyond this are a today. They show the classic bow-tie shape of a bridge town with series of lower density suburbs. The plan opposite combines this plan with Tthe knot of the tie being the bridge. the contours showing clearly the flood plain through the centre of the town that cuts it in two. Figure Ground Plan Street hierarchy The plan above left is a figure ground plan of the town. This shows just the buildings of the town and removes all other details. It shows the The reason for Tadcaster’s existence is its position on the Great North Road. compact nature of the town with the small town centre based around High Today, however, the A1 has been diverted well away from the town and the Street, Chapel Street and Kirkgate. However, covering an area equal to the A64 now bypasses Tadcaster. There is, however, concern that restrictions on

Tadcaster 3 91 turning movement and poor sign posting mean that a great deal of through traffic continues to use the centre of the town. The street network shows a series of pri- mary and secondary streets converging on the bridge. However, the local street network is much less well connected and a lot of minor streets are cul-de-sacs.

Land use

The plan to the left shows the main building uses in the town. The predominant land use is residential with a relatively small amount of retailing and commercial development. However, the plan shows clearly that the breweries are the other main land use including the modern Coors brewery to the north.

92 93 94

Tadcaster 4 95

he concept for Tadcaster is much less radical than the Tone for the other two towns. Tadcaster is a traditional and very beautiful town. It has retained its traditional character and resisted much of the poor quality develop- ment that has damaged Sherburn largely due to the benign influence of the brewery that owns large parts of the town.

To preserve what is special about To tame the car and create livable To create the highest quality To only build housing in the heart The brewery’s influence has been Tadcaster: The traditional high streets: To tame traffic and change environment: To coordinate a series of the town: To consolidate the posi- a check on development, which street, the relationship with the brew- the environment of the streets so of improvements to the heart of the tion of the town centre. means that Tadcaster has grown eries and the valley through the heart that they are reclaimed for people, town to transform the quality of the very little in recent decades. It of the town. and become more attractive as environment. therefore has the same population placed to shop and spend time. but fewer shops than Sherburn. However, Sherburn is actually an overgrown village whereas Tadcaster is a historic town that has not grown sufficiently to support a town’s range of facilities. This is Tadcaster’s dilemma – its character has been saved by restricting development but its town centre has suffered from lack of investment and a limited local catchment area.

The key to unlocking this dilemma is to make everyone more confident in the quality of development so that there is a willingness to allow mod- est growth. The concept is therefore to support and work with the town team and the brewery to improve the quality of the environment of the centre, including High Street and the central car park. As part of this infill housing should be promoted in and around the town centre while main- taining restrictions on development on the edge of the town.

The final part of the concept is to make the most of the valley as a central part of Tadcaster’s character by influencing the flood defence measures and creating a valley park. 96

7 9 6 8 2 10 13 5 1 12 11

Living Streets Quality environments Smart Growth Phase 1: Phase 1: Phase 1: 1. High Street improvements 5. Improvements to central car park 9. Reusing existing buildings 2. Implementation of traffic management strategy 6. Robin Hood Yard improvements 10. Infill development 3. Signing strategy for bypass Phase 2: 11. Living over the shop Phase 2: 7. Flood alleviation strategy Phase 2: 4. Junction improvements on the bypass to remove 8. Riverside landscaping and circular walk 12. Sheltered housing on the PowerPlus site through traffic 13. Development of Mill Lane for riverside housing

Tadcaster 5 97 98

Remove clutter such as rail- ings and introduce a simpler palette of street furniture (eg. lighting, signage and bus stops)

Material Change to carriage- way such as setts or cobbles and a change in colour

Parking bays defined by change in material and colour and contained by kerb line

Tadcaster 6 99

Dropped kerb at pedestrian crossings Raised table announces access to shared surface along Kirkgate

Pedestrian crossings marked by a double row of setts

Carriageway deflection and on street parking acting as a traffic calming measure

s with the other towns a the calming of Chapel Street. are designed to make it more pe- Illustrative treatment Parallel parking introduced in central part of the Tadcaster destrian friendly. This includes wider High Street. Bays indicated Amasterplan is the transforma- The Living Streets programme pavements, partial pedestrianisa- Based on the guidelines set out through surface material. tion of the quality of the streetscape involves the following elements: tion of Kirkgate and crossing points above, an indicative design has been through the Living Streets pro- marked by a change in material. produced for High Street to illustrate Use of appropriate surface mate- gramme. This includes the calming Historic Character how these concepts could be inter- rials to create historic character. of High Street / Bridge Street using a Taming traffic preted in the design and treatment change of surfaces and carriageway The design of the streets is based of the street. Proposals made to Carriageway deflection and alignment instead humps. It also on recreating the town’s historic Rather than using speed bumps, this improve the pedestrian environment, on-street parking to create traffic involves the part pedestrianisation of character. We have not, for example, is achieved by changing the road widen footways, tame traffic and calming events. Kirkgate and traffic calming meas- included street trees and the materi- surface, narrowing the carriageway recreate historic character. ures in Chapel Street. als would be locally sourced. and introducing on-street parking Improved pedestrian crossing and pedestrian crossings. This is Carriageway realigned and points. This includes the calming of High Pedestrian environment designed to reduce traffic speeds to reduced to 6.0m. Street by narrowing the carriageway 20mph. Change of materials to illustrate but not using humps. It also involves While we cannot remove through Increased footpath widths (3.0 to 20mph zone. the pedestrianisation of Kirkgate and traffic from the town the proposals 5.0m). Removal of street clutter and in- troduction of a simplified palette of street furniture. 100

Illustration of the potential impact of the Living Streets proposals on High Street (right) and what it looks like today (above). 101 102

Tadcaster 7 103

design and quality materials this to Bridge Street) will be fully acces- The second element to the scheme housing designed as a mews. need not detract from the character sible to traffic throughout the day. is the part-pedestrianisation of Kirk- of the town. Having reviewed this The unification of space will be key gate to create an attractive setting for These proposals are important to masterplan we believe that it is well design objective for this area. a street market. the functioning of the town centre in founded and remains valid today. that they will increase the amount of With the introduction of a quality The third element of the scheme is town centre parking. Too often this The SDF has not therefore revisited environment in the central car park, Robin Hood’s Yard. This is the centre parking is unattractive and poorly the design of the scheme and the visitors and shoppers alike will of an urban block fronting onto maintained undermining the historic layout of the car park and green have a safe, secure and attractive High Street, Kirkgate and the river. character of the town. By creating shown on the plan overleaf is environment as their introduction to This was originally the location for an environment of the highest quality broadly the same as the earlier plan. the town. Local businesses will be in small-scale workshops but is now and using the best local materials he most important project a good position to take advantage of underused. The proposals would see these proposals can provide for relates to the central car park, The scheme will introduce a part the opportunities that this supports. this area improved to create further parking while enhancing the town TKirkgate and Robin Hood’s pedestrianised area within Kirkgate parking together with some infill centre environment. yard. This takes in the areas to the (from the Ark to Pegg Lane) using The part pedestrianisation of Kirk- north of High Street, which is cur- high quality materials in keeping with gate connects the river and associat- rently a rather uneasy mixture of car the historic character of the town, ed environmental and social benefits park and village green. which will unify the central car park to the town centre providing a sense and the remainder of the town cen- of connectivity. In addition, it also A number of years ago a masterplan tre. The pedestrianised area will only affords an opportunity to relocate for the area was commissioned. be accessible to traffic out of peak the market back to the centre of the This recognised the need for park- hours. The remainder of Kirkgate town. ing but suggested that with careful (Westgate to the Ark and Pegg Lane 104 105 106

Tadcaster 8 107

Tadcaster stands on a point where As part of this SDF we have explored the River Wharfe could be forded the idea of planting a forest in the and later bridged. The river is there- valley. This would return the valley fore central to the town, its history to its original wooded character and its character. However, the river and would serve to mask the flood is also a threat and on a number defence walls. of occasions in the last 100 years floods have devastated the town. The flood defence scheme should be As a result of this the Environment brought forward within a landscape Agency is proposing flood alleviation masterplan for the valley that creates works in the valley. This is likely to a series of wooded walks as well as involve the construction of walls to a picnic site on the Tadcaster beach. increase the height of the current defences. The danger is that in pro- tecting itself from the river, Tadcaster blocks the view of the valley that is so much part of its character.

The valley is also a major recreation- al resource for the town. The viaduct was acquired by the Town Council as part of a circular walk and earlier still the Tadcaster beach drew bath- ers from a wide area. 108

he most important opportunity the flood defence wall. The accom- for new housing in the centre modation would be above the flood Tof Tadcaster is the Mill Lane level and the wall would protect the site on the eastern bank of the river. housing to the rear. This includes the PowerPlus site on the Commercial Street frontage and The housing would be high quality a larger site to the rear. The latter urban housing similar in character is owned by the brewery and has to Tadcaster town centre. It would outline planning consent for hous- be stone built and include a range of ing. The plan on the opposite page accommodation from family housing develops this into a scheme that can to smaller apartments. The scheme create an attractive edge to the val- incorporates a riverside walk. ley. This housing would incorporate