Cow Creek Cont’D Introduction the Problems Publicly

Total Page:16

File Type:pdf, Size:1020Kb

Cow Creek Cont’D Introduction the Problems Publicly Cow Creek cont’d Introduction the problems publicly. The etween 1940 and 1970, towns and cit engineers presented differ- ies across the nation grew and ex ent approaches to the B panded rapidly. Often these communi- problems at the meetings, GIVING NEW LIFE TO ties were nestled alongside a stream or river. As and listened to the the towns grew, so did a number of problems as- community’s suggestions. What is sociated with the nearby rivers. For instance, if a The folks of Hutchinson STREAMS IN RURAL “daylighting”? town’s industrial and human wastes were dumped liked the daylighting idea. Many communities into a river, public health risks grew along with the When they heard that the CITY CENTERS are confronting the town. If a nearby stream flooded its banks easily, costs for daylighting the problems associated construction near the stream was difficult. stream and creating a new with the streams Many communities dug trenches to contain park in the downtown area buried under their were less than the costs of downtowns. One these streams during flooding, or buried the option they have is streams in pipes underground to avoid associated unearthing and replacing to return these health risks. Once the streams were buried under- Until 1997, Cow Creek the underground pipes and bridge, they supported streams to a more ground, the towns also found it easier to grow. was buried under the the daylighting project. The Cow Creek design even- natural, open state. They built streets, housing, and industrial plants streets of Hutchinson, tually included a water play area, a merry-go-round This is often referred over the buried streams. And the public health Kansas. Now it provides and a festival site. a park setting enjoyed to as “daylighting” a problems also disappeared--at least for awhile. Three city blocks of Avenue “A” were exca- stream. by tourists and Today many towns and cities are beginning to residents alike. vated for the project. Four commercial buildings think differently about the streams buried under were also moved, and Cow Creek now flows though their streets. Several reasons account for this. For 800 feet of frontage in a park-like setting. Today, instead of declining property some towns, the pipes that encase the streams values and diminishing business activity in Hutchinson’s downtown, property val- have rusted and must be replaced. For other ues have increased by 10% in the area. Concerts and music festivals are held towns, the volume of water flowing into the under- regularly, and public use and business activity has increased. ground pipes has increased, and now, during Is the City of Hutchinson glad it daylighted Cow Creek? A local bank has winter storms, the pipes back up and water over- been so pleased with the change in the area, and the increased business and flows onto streets and other places. And in some civic use, that it now sponsors a “brown bag in the park” concert series in the The communities cities, people are asking whether the stream bur- summer with musical groups performing during the lunch hour. profiled here have ied underground could be excavated and turned experienced a revival of into a park setting that may attract new business their downtown and and activities to declining and poorly used down- FOR MORE INFORMATION, CONTACT THE RIVERS & TRAILS business districts as a town areas. Often communities are struggling with PROGRAM A former parking lot is now a Festival Site at the end of the recently daylighted Arcadia Rivers & Trails Program result of daylighting a combination of these factors. Creek in Kalamazoo, Michigan streams that were National Park Service Many communities are finding that the costs formerly underground. 909 First Avenue They are excited by the associated with “daylighing” a stream (see new look of their sidebar) can be less than designing new pipes and Seattle, WA 98104 downtown areas and re-burying the stream. They are also discovering Phone the renewed interest of that their communities can gain other benefits (206) 220-4113 local citizens, tourists from a daylighted stream. Website: http://www.nps.gov/rtca and businesses since Here is the story of two communities that cho- they daylighted these se to daylight their streams. You’ll learn why they THE RIVERS & TRAILS PROGRAM'S MISSION streams. is to advocate and assist community based conservation action. We build excavated streams that were buried underground The National Park Service cares for the special places saved by the and support partnerships that conserve natural and cultural resources, provide for decades. You’ll also learn where you can get American people so that all may experience our heritage. more information about daylighting streams and recreational opportunities, and contribute to economic and social well-being. whether it’s a good choice for your community. construction along Arcadia Creek. The city also offerred to renew the leases at $1.00/ year after Cow Creek the initial leases expired. Downtown Hutchinson, Kansas experienced a To gain public support, the city passed out host of problems in the 1980s and early 1990s. booklets in local schools explaining the Arcadia The underground pipes that encased Cow Creek Creek project, as well as the reasons why the busi- below the city’s streets were deteriorating. The ness district needed rennovating. City staff downtown streets flooded during heavy winter discussed the problems at public meetings and storms, and a major bridge into downtown needed workshops as well as the proposal for how to ad- replacing. The general public avoided downtown’s dress them. The community learned how Avenue A in Hutchinson, vacant, abandoned buildings and run-down envi- daylighting Arcadia Creek could revive the down- Kansas with Cow Creek’s ronment, allowing crime and other problems to town area and address the increasing flooding streambed outlined develop. problems. They also learned about the costs of the project, as well as the expected benefits. The The city’s engineers worried about the rusting citizens of Kalamazoo soon rallied behind the idea. underground pipes and decaying bridge. They looked at two different approaches to the prob- Today, Arcadia Creek drives an economic re- Arcadia Creek after lems: excavate the old pipes, encase Cow Creek in Arcadia Creek as it flows into the stormwater pond/fesitval site in Kalamazoo vival in the business district. Five festivals are dayligfhting as it runs new un- through Kalamazoo’s scheduled at the amphitheater site each year, and derground Why do Buried business district. new businesses continue to locate in the Arcadia pipes, and Streams Cause Creek district. Flooding? Think of a Arcadia Creek then seek For Kalamazoo, gaining firm commitments city’s streets and state and Over a century ago, Kalamazoo, Michigan bur- from local businesses and public institutions be- rooftops as a big wash ied Arcadia Creek underground. By the 1980s, federal tub that catches all of fore starting to daylight Arcadia Creek was key to grants to downton Kalamazoo had become a depressed area the project’s success. As Ken Nacci, director of the the rainwater falling Avenue A in Hutchinson, replace the on the city. The hard with boarded up, vacant buildings, high crime and downtown development agency said, don’t pro- declining public use. The streets also flooded of- Kansas before daylighting bridge. surfaces prevent the Cow Creek. This area ceed on a “build it and they will come basis.” He The other water from soaking ten, because the underground pipes backed up as fequently flooded during advised that, “Getting commitments from local option into the ground. a result of the city’s growth (see sidebar). In winter storms. businesses and institutions early is critical.” Instead, the rainwater 1986, Kalamazoo began a major rennovation of was to dig runs down the city’s the downtown area. “Daylighting” Arcadia Creek up the streets and rain (see introduction) gained support as a way to re- pipes and gutters and eventually store the declining downtown area, as well as create a flows into the pipes address the flooding problems. park with buried under the the re- Kalamazoo daylighted five blocks of Arcadia streets. As a city stored creek running through it. The city could Creek. To address the flooding problems the city Daylighting Cow Creek grows, the “wash tub” then re-route traffic and eliminate the need for the created a large retention pond that holds the high created an attractive place also grows, catching bridge. The city found the costs of excavating, re- winter flows and releases the water gradually into for residentsand tourists more rain and placing and re-burying the pipes, plus replacing channeling it into the the stormwater system. In the summer, the city to enjoy. the bridge were higher than daylighting the stream underground pipes. uses the pond area as an amphitheater for outdoor and creating a park along its banks. The city’s en- Eventually, more concerts. The amphitheater is popular with local gineers also designed a stormwater pond to water is directed into residents and out-of-town tourists. The summer absorb the high winter storm flows and stop the the pipes than they festivals generate about $12 million annually. can carry, and the flooding. To ensure a strong economic base for the excess water spills out Hutchinson prides itself on having a high level project, the city encouraged local businesses to in- in unexpected places- of public involvement in its community affairs. vest in the area before daylighting and rennovation -such as backed up City staff held a number of town meetings to share storm drains and began. The city offerred 30-year leases at low in- flooded city streets.
Recommended publications
  • Why Daylight Padden Creek?
    Daylighting Bellingham Public Works Natural Resources has completed a major habitat restoration project on Padden PADDEN CREEK Creek to help restore healthy water quality and habitat to our community for people, salmon, and wildlife. Why daylight Padden Creek Padden Creek? Daylighting Project Map Daylighting Padden Creek opens up over a mile of upstream habitat for a variety No longer a fi sh passage barrier or a detriment of salmon and trout species including A new road bridge over the creek on to stream habitat , the tunnel now serves as a Chinook, chum, and coho. The project Old Fairhaven Parkway and a fi sh- safeguard for stormwater overfl ows beyond the friendly culvert under 22nd Street allow 100-year storm level. also reduces fl ooding risks to the nearby upstream fi sh migration while reducing residential community. A tunnel built in the 1890s constricted high fl ooding risks to 159 nearby residences. fl ows during salmon migration season in the fall and winter, creating a barrier for fi sh passage. In addition, Padden Creek does not meet Clean Water Act standards for dissolved Blockages at each end of oxygen or temperature, putting a strain OOldld FFairhavenairhaven ParkwayParkway the old tunnel ensure that on salmon, which need clean, cold, Padden Creek’s base fl ow oxygenated water to survive. The habitat remains in it’s new channel. restoration components of this project have been carefully designed and constructed Gravel beds and large woody to help improve the water quality issues in 18th Street debris in the restored stream channel help oxygenate the stream Padden Creek.
    [Show full text]
  • Lighting for Schools
    Lighting for Schools National Clearinghouse for Educational Facilities James R. Benya, PE The concept of cool daylighting is a systematic approach Benya Lighting Design to daylighting design that ensures that the daylight is December 2001 controlled through a combination of glazing systems (such as low-e), shading systems, and architectural ighting is and always has been an important factor design. The result is a building that uses significantly less in designing and operating schools. Until the energy than an ordinary school by simultaneously reduc- L1950s, natural light predominated as a means of ing electric lighting and cooling loads. However, to be illuminating most school spaces. Classroom design was effective, daylighting must be supplemented by automati- based in large part on time-honored relationships cally controlled electric lighting that dims in response to between window sizes and room dimensions. As electric daylight levels. power costs declined and designers began to take There is a side benefit to daylighting: by turning off the advantage of the increased flexibility provided by electric electric lights when they are not needed, the life of the lighting, daylighting took a secondary role. Now, highly electric lighting system is extended and maintenance energy efficient windows and skylights and a renewed costs are reduced. A simple automatic photo-control recognition of the positive psychological and physiologi- system can switch off one, two, or three fluorescent cal effects of daylighting (Heschong Mahone Group) lamps per light fixture, depending upon the amount of allow a healthy and economical mix of natural and elec- daylight present. By reducing the use of the electric tric illumination in new and renovated schools.
    [Show full text]
  • Urban Evolution: the Role of Water
    Water 2015, 7, 4063-4087; doi:10.3390/w7084063 OPEN ACCESS water ISSN 2073-4441 www.mdpi.com/journal/water Review Urban Evolution: The Role of Water Sujay S. Kaushal 1,*, William H. McDowell 2, Wilfred M. Wollheim 2, Tamara A. Newcomer Johnson 1, Paul M. Mayer 3, Kenneth T. Belt 4 and Michael J. Pennino 5 1 Department of Geology & Earth System Science Interdisciplinary Center, University of Maryland, College Park, MD 21201, USA; E-Mail: [email protected] 2 Department of Natural Resources and the Environment, University of New Hampshire, Durham, NH 03824, USA; E-Mails: [email protected] (W.H.M.); [email protected] (W.M.W.) 3 US Environmental Protection Agency, National Health and Environmental Effects Research Lab, Western Ecology Division, Corvallis, OR 97333, USA; E-Mail: [email protected] 4 United States Department of Agriculture Forest Service, Northern Research Station, Baltimore, MD 21228, USA; E-Mail: [email protected] 5 Department of Civil and Environmental Engineering, Princeton University, Princeton, NJ 08544, USA; E-Mail: [email protected] * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +1-301-405-7048. Academic Editor: Fabio Masi Received: 21 April 2015 / Accepted: 17 July 2015 / Published: 27 July 2015 Abstract: The structure, function, and services of urban ecosystems evolve over time scales from seconds to centuries as Earth’s population grows, infrastructure ages, and sociopolitical values alter them. In order to systematically study changes over time, the concept of “urban evolution” was proposed. It allows urban planning, management, and restoration to move beyond reactive management to predictive management based on past observations of consistent patterns.
    [Show full text]
  • Human–River Encounter Sites: Looking for Harmony Between Humans and Nature in Cities
    sustainability Review Human–River Encounter Sites: Looking for Harmony between Humans and Nature in Cities Aude Zingraff-Hamed 1,2,* , Mathieu Bonnefond 2,3 , Sebastien Bonthoux 2,4, Nicolas Legay 2,4 , Sabine Greulich 2 , Amélie Robert 2 , Vincent Rotgé 2,5, José Serrano 2,5, Yixin Cao 2 , Raita Bala 5, Alvin Vazha 2, Rebecca E. Tharme 6,7 and Karl M. Wantzen 2,8 1 Strategic Landscape Planning and Management, Center of Life and Food Sciences Weihenstephan, Technical University of Munich, Emil-Ramann-Str. 6, 85354 Freising, Germany 2 Interdisciplinary Research Center Cities, Territories, Environment and Society (UMR CNRS 7324 CITERES), University of Tours, 37204 Tours, France; [email protected] (M.B.); [email protected] (S.B.); [email protected] (N.L.); [email protected] (S.G.); [email protected] (A.R.); [email protected] (V.R.); [email protected] (J.S.); [email protected] (Y.C.); [email protected] (A.V.); [email protected] (K.M.W.) 3 Conservatoire National des Arts et Métiers/National Conservatory of Arts and Crafts, EA 4630 G"F–Laboratoire Géomatique et Foncier/Geomatic and Land Tenure Laboratory, 292 rue St Martin, 75003 Paris, France 4 INSA Centre Val de Loire, Campus de Blois, 3 Rue de la Chocolaterie, 41000 Blois, France 5 POLYTECH Tours, 64 Avenue Jean Portalis, 37200 Tours, France; [email protected] 6 LE STUDIUM Loire Valley Institute for Advanced Studies, Orléans & Tours, and CITERES, CNRS, University of Tours, 37204 Tours, France; [email protected] 7 Citation: Zingraff-Hamed, A.; Riverfutures, Cressbrook, Derbyshire SK17 8SA, UK 8 Chair of Applied Aquatic Ecology and UNESCO Chair “River Culture-Fleuves et Patrimoine”, Bonnefond, M.; Bonthoux, S.; Legay, CNRS UMR CITERES, University of Tours, 37000 Tours, France N.; Greulich, S.; Robert, A.; Rotgé, V.; * Correspondence: [email protected]; Tel.: +49-8161-71-4671 Serrano, J.; Cao, Y.; Bala, R.; et al.
    [Show full text]
  • Daylighting in Halifax's Urban Core
    PLAN 5000 Darryl McGrath B00689518 Instructor: Ahsan Habib Daylighting in Halifax’s Urban Core A case study-based analysis of the proposed daylighting of Sawmill River in Dartmouth, Nova Scotia Executive Summary River daylighting projects are becoming an increasingly popular way for cities to reshape their urban environment in an attempt to achieve multi-faceted beneficial outcomes. Several high- profile daylighting projects in recent years (such as those in Seoul, South Korea and Yonkers, New York) have brought this type of urban restoration closer to the mainstream consciousness. These cases and others are reviewed to gain an understanding of the processes, potential benefits and challenges, motivations, and common results that might be expected from the undertaking of a river daylighting project. This is done specifically to inform what the potential might be for a daylighting initiative in the Halifax urban core area. Sawmill River in Dartmouth is a timely candidate for daylighting and the push is on during the formation of this report for the city to decide how to proceed. After reviewing the local conditions in Dartmouth (the suitability of the site, the specific relevant goals of the proposed project, the policy context, the financial case and the local climate of the citizenry) this report confidently recommends the Sawmill River for daylighting. This project has the potential to provide Dartmouth with an array of significant benefits as the city contemplates how to reinvigorate itself. It is high time for the Halifax government to take a bold step and enable Dartmouth to engage in this unique endeavour that aligns Figure 1: Conceptual rendering of historical river course.
    [Show full text]
  • Flood Prevention and Daylighting of Ladegårdsåen
    Flood Prevention and Daylighting of Ladegårdsåen A Project to Create Green Space and to Provide Better Drainage of Rainwater SUBMITTED BY: Nésa-Maria Anglin Anthony Hassan Shane Ruddy SUBMITTED TO: Project Advisor: Prof. Lorraine Higgins Project Liaison: Anders Jensen May 4th, 2012 An Interactive Qualifying Project submitted to the faculty of Worcester Polytechnic Institute in partial fulfillment of the requirements for the Degree of Bachelor of Science i Acknowledgements There are many people that we would like to thank for all of their support and input. Their help was invaluable and made our report much more complete and thorough. Many of our ideas and designs were adapted and developed from the guidance and suggestions we received. Anders Jensen: Miljøpunkt Nørrebro employee Ove Larsen: Miljøpunkt Nørrebro employee Lars Barfred: Miljøpunkt Nørrebro employee Søren Gabriel: Orbicon engineer Stefan Werner: Copenhagen Municipality employee, Water and Parks Division Aske Benjamin Akraluk Steffensen: Copenhagen Municipality intern, Water and Parks Division Thorkild Green: Municipality of Aarhus’ Department Architect Marina Jensen: Professor, Forest and Landscape at the University of Copenhagen Ole Helgreen: Aarhus Municipality Engineer, Water and Parks Division Oliver Bühler: Assistant Professor, Forest and Landscape at the University of Copenhagen Eigil Nybo: Architect Scott Jiusto: Professor at Worcester Polytechnic Institute Lorraine Higgins: Professor, Director of Writing Across the Curriculum (WAC) at Worcester Polytechnic Institute Suzanne LePage: Professor, Civil and Environmental Engineering at Worcester Polytechnic Institute ii Authorship Page For our report, each team member worked on revising and editing all sections of this paper. Nésa-Maria Anglin Nésa-Maria transcribed and organized the previous proposal made by Orbicon which served as a basis for our design features and options for the canal.
    [Show full text]
  • Watershed Bmps Reestablish Downstream Baseflows and Attenuate Peak Flows to Improve Stream Integrity
    Watershed BMPs Reestablish Downstream Baseflows and Attenuate Peak Flows to Improve Stream Integrity Nora Korth, P.E. Kurt Cooper, P.E. EcoStream 2018 Watersheds We Work In Hoff Run ~0.67 sq. mi. 10 basins Dysart Run ~4.5 sq. mi. 61 basins Northern Kentucky ~581 sq. mi. 1,570+ basins Watersheds We Work In The Urban Flow Regime Increases Bed Material Mobility and Channel Instability Adapted from Lane (1955). Figure from www.researchgate.net Biological Physicochemical Geomorphology Qcritical Hydraulics Hydrologic Adapted from Harman et al. 2012 Watershed BMPs to Restore Stream Hydrology Toyota North American Parts Center of Kentucky – Hebron, KY • Simple detention basin retrofit Gateway Community & Technical College – Florence, KY • Complex detention basin retrofit SPUI Intersection Improvements – Burlington, KY • Bioretention basin design Acacia Reservation Improvements – Lyndhurst, OH • Complex detention basin retrofit • Stream daylighting Simple Detention Basin Retrofit Toyota North American Parts Center of Kentucky Headwater stream with large impervious area Simple Detention Basin Retrofit Toyota North American Parts Center of Kentucky Top of Basin 90c 3.29 m m Base of Concrete Spillway 1.78m Bypa 46c ss m Bypa 61c ss m 69cm 30c m 61c 61c m 22cm m Existi Propos ng ed Retrofit Optimized to Reduce Downstream Erosion Based on Hydrogeomorphic Data Retrofit Modeled for Qcritical Benefits • Maintain Flood Control • Reduce frequency of discharges > Qcritical Adapted from Hawley et al. (2017) Detention Basin Retrofit Post-retrofit Monitoring Total Precip = 1.3 inches Peak Intensity = 2.60 in/hr Outflow = 4 cfs Adapted from Hawley et al. (2017) Post-retrofit Adapted from Hawley et al. (2017) Post-retrofit Adapted from Hawley et al.
    [Show full text]
  • This Is a Repository Copy of Case Study Website Supporting Research Into Daylighting Urban Rivers
    This is a repository copy of www.daylighting.org.uk: case study website supporting research into daylighting urban rivers. White Rose Research Online URL for this paper: http://eprints.whiterose.ac.uk/75870/ Article: Broadhead, A.T. and Lerner, D.N. (2013) www.daylighting.org.uk: case study website supporting research into daylighting urban rivers. Hydrological Processes, 27 (12). pp. 1840-1842. ISSN 0885-6087 https://doi.org/10.1002/hyp.9781 Reuse Unless indicated otherwise, fulltext items are protected by copyright with all rights reserved. The copyright exception in section 29 of the Copyright, Designs and Patents Act 1988 allows the making of a single copy solely for the purpose of non-commercial research or private study within the limits of fair dealing. The publisher or other rights-holder may allow further reproduction and re-use of this version - refer to the White Rose Research Online record for this item. Where records identify the publisher as the copyright holder, users can verify any specific terms of use on the publisher’s website. Takedown If you consider content in White Rose Research Online to be in breach of UK law, please notify us by emailing [email protected] including the URL of the record and the reason for the withdrawal request. [email protected] https://eprints.whiterose.ac.uk/ wwwdaylightingorguk case study website supporting research into daylighting urban rivers Adam T. Broadhead and David N. Lerner Catchment Science Centre, Kroto Research Institute, University of Sheffield, Broad Lane, Sheffield, UK. In many towns and cities around the world, watercourses flow in culverts for great lengths, barely seeing daylight and almost completely forgotten by the people living there.
    [Show full text]
  • Ecosystem Structure and Function in an Urban, Piped Stream
    University of New Hampshire University of New Hampshire Scholars' Repository Master's Theses and Capstones Student Scholarship Spring 2012 Ecosystem structure and function in an urban, piped stream Amanda Hope University of New Hampshire, Durham Follow this and additional works at: https://scholars.unh.edu/thesis Recommended Citation Hope, Amanda, "Ecosystem structure and function in an urban, piped stream" (2012). Master's Theses and Capstones. 701. https://scholars.unh.edu/thesis/701 This Thesis is brought to you for free and open access by the Student Scholarship at University of New Hampshire Scholars' Repository. It has been accepted for inclusion in Master's Theses and Capstones by an authorized administrator of University of New Hampshire Scholars' Repository. For more information, please contact [email protected]. ECOSYSTEM STRUCTURE AND FUNCTION IN AN URBAN, PIPED STREAM BY AMANDA HOPE B.S., Eastern Nazarene College, 2002 THESIS Submitted to the University of New Hampshire in Partial Fulfillment of the Requirements for the Degree of Master of Science in Natural Resources May, 2012 UMI Number: 1518004 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. UMI 1518004 Published by ProQuest LLC 2012. Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC. All rights reserved. This work is protected against unauthorized copying under Title 17, United States Code.
    [Show full text]
  • Broaching the Brook: Daylighting, Community and the 'Stickiness' of Water
    The University of Manchester Research Broaching the brook: daylighting, community and the 'stickiness' of water DOI: 10.1177/2514848620959589 Document Version Accepted author manuscript Link to publication record in Manchester Research Explorer Citation for published version (APA): Usher, M., Huck, J., Clay, G., Shuttleworth, E., & Astbury, J. (2020). Broaching the brook: daylighting, community and the 'stickiness' of water. Environment and Planning E: Nature and Space, 1-28. https://doi.org/10.1177/2514848620959589 Published in: Environment and Planning E: Nature and Space Citing this paper Please note that where the full-text provided on Manchester Research Explorer is the Author Accepted Manuscript or Proof version this may differ from the final Published version. If citing, it is advised that you check and use the publisher's definitive version. General rights Copyright and moral rights for the publications made accessible in the Research Explorer are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. Takedown policy If you believe that this document breaches copyright please refer to the University of Manchester’s Takedown Procedures [http://man.ac.uk/04Y6Bo] or contact [email protected] providing relevant details, so we can investigate your claim. Download date:05. Oct. 2021 Highlights • This paper explores the case for waterway deculverting, comparing professional and community perspectives on scheme design and potential benefits. • The paper addresses the lack of social scientific work in waterway restoration, emphasizing the social and emotional benefits of deculverting.
    [Show full text]
  • Final Report of Stream Daylighting
    Executive Summary Trout Unlimited Canada has proposed a project to daylight a stream reach that is located on the northeast corner of the Yorklands Green Hub property in Guelph, ON. The Yorklands Green Hub is located on the former Guelph Correctional Centre property; the land was heavily engineered while the facility was in operation. Before, Clythe Creek used to be a coldwater trout stream with smaller headwater streams feeding into it (O’Flanagan, 2014). Human interference is likely the main cause for the changes in the characteristics of the creek, including the loss of riparian vegetation, disconnection of headwater streams and addition of manmade waterfalls (O’Flanagan, 2014). Currently, the buried stream is conveyed in a culvert with no opportunity for aquatic species, like Brook Trout, and minimal habitat. Brook Trout are native to eastern North America and are commonly used as an indicator species for coldwater habitats. This species is sensitive to temperature changes, decreased dissolved oxygen levels and high flow rates during juvenile development (Ficke et al, 2009). To address these challenges, daylighting, a practice of uncovering buried waterways to restore the natural channel, is used. This design must meet all regulations and guidelines for natural channel design outlined by the Ministry of Natural Resources. Various designs have been explored based on available information set out by the Ministry of the Environment, Grand River Conservation Authority, and City of Guelph. A feasibility and cost- benefit analysis was performed on all possible designs that meet the outlined constraints. The final design was modelled in EPA SWMM and HEC-RAS and all technical drawings were done in AutoCAD.
    [Show full text]
  • What Is Stream Daylighting? Why Do This Here? the Project Also Includes
    What is Stream Daylighting? In urban design and urban planning, daylighting is the redirection of a stream into an above-ground channel. Typically, the goal is to restore a stream of water to a more natural state. Daylighting is intended to improve the environment for a stream which had been previously diverted into a culvert, pipe, or a drainage system. Outlet of Willard Pond. Willard Stream below North Street. Why Do This Here? Temporary Impacts to Trail: Project Schedule: The existing Willard Woods stone drainage culvert was failing and required replacement. • The trails around the stream daylighting project • Start This effort will both accommodate drainage needs but also improve habitat value. The Willard’s (area around Willard’s Pond) will be temporarily Late August/Early September 2015 Woods stream daylighting project was identified as a priority project during Town-wide closed during construction. • End watershed and stream assessment planning and is a part of Lexington Public Works efforts • The trail from Brent Road into Willard’s Woods Late Fall, 2015 across the community to enhance drainage systems in an ecologically-appropriate way. will be closed for the Fall. Thank you for your • Final Plantings and Invasive Plant Management Find out more here: http://www.lexingtonma.gov/conservation/stormwater.cfm patience. – Through Spring 2016 Lexington Public Works Director: Bill Hadley The Project Lexington Town Engineer: John Livsey Lexington Conservation Administrator: Karen Mullins Also Includes: Construction Contractor: SumCo Engineer: Woodard & Curran, Inc. • Construction of a pedestrian bridge across Landscape Architect: Regina S. Leonard Landscape Architecture & Design the “new” stream. Funding: Town of Lexington • Construction of a vehicular bridge (for fire For More Information, contact John Livsey [email protected] access) on the trail to Brent Road.
    [Show full text]