Numerical and Experimental Study of the Dynamic Factor of the Dynamic

Total Page:16

File Type:pdf, Size:1020Kb

Numerical and Experimental Study of the Dynamic Factor of the Dynamic Journal of the Mechanical Behavior of Materials 2020; 29:195–202 Research Article Tran Anh Dung*, Mai Van Tham, Do Xuan Quy, Tran The Truyen, Pham Van Ky, and Le Hai Ha Numerical and experimental study of the dynamic factor of the dynamic load on the urban railway https://doi.org/10.1515/jmbm-2020-0020 (1972) had used dynamic load factor for high speed railway Received Jul 30, 2020; accepted Dec 24, 2020 track that incorporates train speed and the condition of the track [4]. The Office of Research and Experiments (ORE) of Abstract: This paper presents simulation calculations and the International Union of Railways and Birmann [5] had experimental measurements to determine the dynamic load proposed dynamic load factor for speeds up to 200 km/h factor (DLF) of train on the urban railway in Vietnam. Sim- incorporates the track geometry, vehicle suspension, ve- ulation calculations are performed by SIMPACK software. hicle speed, vehicle center of gravity, age of track, curve Dynamic measurement experiments were conducted on radius, super-elevation, and cant deficiency. The Germany Cat Linh – Ha Dong line. The simulation and experimental Railways (1943) using an equation with the train speed is no results provide the DLF values with the largest difference of more than 200 km/h to calculate the dynamic load factor 2.46% when the train speed varies from 0 km/h to 80 km/h only using train speed [6]. The dynamic load factor formula Keywords: dynamic load, dynamic load factor, urban rail- is used for South African Railways is similar to the Talbot way, train speed, track stiffness formula, but is calculated for narrow gauge track [2]. Clarke formula algebraically combines the Talbot and Indian Rail- ways dynamic load factors [7]. In 1968, a dynamic load fac- 1 Introduction tor only depended on the train speed was prepared for the Washington Metropolitan Area Transit Authority (WMATA) and used in subsequently recommended standards for tran- Dynamic load is an important value in the railway design sit trackwork [8]. In 2010, Sadeghi had proposed a dynamic process. Thus, accurate study of the DLF will lead to safe load factor in Iran. This factor depends on train speed [9]. and economical designs. However, determining the DLF is The speed of the train is no more 200km/h. The use of the a rather complicated problem because of the interaction AREMA recommendation for dynamic impact factor is sug- between rail and moving vehicles. gested for the railway with the train speed from 32 km/h The dynamic load is generally expressed as a function to 193 km/h [10]. The China Railways proposed dynamic of the static load (Eq. 1) [1] load factors that depend on train speed and wheel load Pd = ? · Ps (1) shift coefficient in curves. This factor is used for high speed railway [11]. In 2017, Leonid and Andrey had researched dy- Where Pd is the dynamic wheel load, ? is the dynamic namic live load factor for bridge structures on High speed wheel load factor (? > 1), and Ps is the static wheel load. railway [12]. Studies by authors around the world have published In this study, the authors studied the DLF for the ur- research results on dynamic load of railway. In 1953, Tal- ban railway based on field measurement and simulation bot [2] had given a dynamic load factor that relates to train calculations. The strain gage is used to measure relative speed and wheel diameter for heavy haul railway with the deformation. Simulation calculations are implemented by train speed less than 80 km/h. In 1969, Indian Railways SIMPACK software. had proposed dynamic load factor for narrow gauge track incorporates track modulus and train speed [3]. Eisenmann *Corresponding Author: Tran Anh Dung: University of Transport and Communications, Hanoi, Vietnam; Email: [email protected] Mai Van Tham, Do Xuan Quy, Tran The Truyen, Pham Van Ky, Le Hai Ha: University of Transport and Communications, Hanoi, Vietnam Open Access. © 2020 T. Anh Dung et al., published by De Gruyter. This work is licensed under the Creative Commons Attribution 4.0 License 196 Ë T. Anh Dung et al. Figure 1: The strain gage 2 Experimental method to determinate DLF 2.1 Test equipments The rail is mounted the equipment to measure deformation. Relative deformation was measured by the strain gage with length 10mm. Strain gage was placed at the bottom center of the rail foot (Figure 1). Figure 2: The train of Cat Linh – Ha Dong urban railway line 2.2 Load test arrangements Test loads are trains on Cat Linh – Ha Dong urban railway Figure 3: Model of the train line as Figure 2. Each train includes 4 cars [13] with the following set-up method: + Tc-M + M-Tc such as Figure 3, in which: “M”: motor car “+”: semi-automatic central buffer coupler “Tc”: trailer car “−”: Semi-permanent central buffer coupler Load arrangement of the train is set up such as Figure 4 Figure 4: Model of test train load Numerical and experimental study of the dynamic factor of the dynamic load on the urban railway Ë 197 2.3 Test results Figure 5 shows the dynamic deformation time-history curves of the rail foot in the first test point on Cat Linh – Ha Dong urban railway line with train speed V = 30 km/h. The maximum of dynamic deformation is 0.00011732. Figure 7: Dynamic deformation versus time for train speed V = 80km/h Table 1: Table of results of static deformation No. Measurement times Static deformation Figure 5: Dynamic deformation versus time for train speed V = 1 The first 0.00010735 30km/h 2 The second 0.00010519 3 The third 0.00010004 Average value 0.00010419 Figure 6 shows the dynamic deformation time-history curves of the rail foot in the second test point on Cat Linh – Ha Dong urban railway line with train speed V = 50 km/h. Some typical results of the dynamic load factors are The maximum of dynamic deformation is 0.000127. depicted in the form of graphs comprising load histories under different train speeds (Figure 8). Figure 6: Dynamic deformation versus time for train speed V = 50km/h Figure 7 shows the dynamic deformation time-history Figure 8: Dynamic load factors increasing due to speed for urban railway curves of the rail foot in the third test point on Cat Linh – Ha Dong urban railway line with train speed V = 80 km/h. The maximum of dynamic deformation is 0.000145. Measuring the static deformation of the rail we have the following results: 198 Ë T. Anh Dung et al. By using linear regression analysis of the DLF. Using 3 Application of software to Minitab simulation software. The results from the minitab software are as follows simulate dynamic model vehicle-track interactions Regression equation 3.1 Numerical simulation process Φ = 0.9909 + 0.004853.V The model of vehicles is included 3 parts: car body, bogie and wheel set. Each part of the system has five degrees of Coeflcients freedom: bouncing, lateral, rolling, yawing and pitching. So, each car has 35 degrees of freedom as follows in Table 2. The model of track structure with the continuous elas- Term Coef SE Coef T-Value P-Value VIF Constant 0.9909 0.0124 79.94 0.000 tic point support model uses a series of point support spac- V 0.004853 0.000250 19.38 0.003 1.00 ing intervals of the discrete elastic (Figure 9, 10). Model Summary Figure 9: Track structure lateral view S R-sq R-sq(adj) R-sq(pred) 0.0146026 99.47% 99.21% 96.25% Analysis of variance Figure 10: Track structure side view Source DF Adj SS Adj MS F-Value P-Value Regression 1 0.080074 0.080074 375.52 0.003 These models are established using SIMPACK software V 1 0.080074 0.080074 375.52 0.003 to simulate the model of urban railway dynamic such as Error 2 0.000426 0.000213 Figure 11 to 14. Total 3 0.080500 The equation of DLF is proposed such as Eq. 2. Φ = 0.9909 + 0.004853.V (2) Where V is velocity (km/h) It can be seen that the values of dynamic load factor in- creasing due to speed such as Eq. 2. It was created based on support stiffness, rail material, train load and train speed. Figure 11: Simulation of wheel model of Cat Linh – Ha Dong line Numerical and experimental study of the dynamic factor of the dynamic load on the urban railway Ë 199 Table 2: Vehicle vibration model degrees of freedom Freedom Bouncing Lateral Rolling Yawing Pitching Car body Zc Yc ϕc ψc βc Front bogie Zt1 Yt1 ϕt1 ψt1 βt1 Rear bogie Zt2 Yt2 ϕt2 ψt2 βt2 First wheel set Zw1 Yw1 ϕw1 ψw1 βw1 Second wheel set Zw2 Yw2 ϕw2 ψw2 βw2 Third wheel set Zw3 Yw3 ϕw3 ψw3 βw3 Fourth wheel set Zw4 Yw4 ϕw4 ψw4 βw4 Table 3: The specifications of the urban railway train No. Technical parameters Symbols, units Values 1 Mass of car body Mc [ton] 22.4 2 Mass of frame Mt [ton] 3.52 3 Mass of wheel set Mw [ton] 1.539 2 4 The car body around the X axes’ rotational inertia; Icx [ton.m ] 23.2 2 5 The car body around the Y axes’ rotational inertia; Icy [ton.m ] 943 2 6 The car body around the Z axes’ rotational inertia; Icz [ton.m ] 941 2 7 The bogie around the X axes’ rotational inertia; Itx [ton.m ] 1.43 2 8 The bogie around the Y axes’ rotational inertia; Ity [ton.m ] 1.76 2 9 The bogie around the Z axes’ rotational inertia; Itz [ton.m ] 2.96 2 10 The wheel set around the X axes’ rotational inertia Iwx [ton.m ] 0.801 2 11 The wheel set around the Y axes’ rotational inertia Iwy [ton.m ] 0.104 2 12 The wheel set around the Z axes’ rotational inertia Iwz [ton.m ] 0.814 13 The distance between two bogie centre plates 2L [mm] 12,600 14 The distance between two wheel axes Lt [mm] 2,200 15 The hight from the rail surface to the center of the body Hc [mm] 1,800 16 The height from the rail surface to the center of the bogie Hf [mm] 500 17 The lateral distance
Recommended publications
  • Annual Report of the Board of Regents of the Smithsonian Institution
    THE DEVELOPMENT OF THE AMERICAN RAIL AND TRACK, AS ILLUS- TRATED BY THE COLLECTION IN THE U. S, NATIONAL MUSEUM. By J. Elfreth Watkins, Curator of the Department of Transportation and Engineering. In the brief report upon the section of steam transportation for the year 1887, a statement was made to the effect that considerable in- formation had been secured which it was hoped to use "in preparing- a series of models to illustrate the beginnings and development of the English and American systems of track. "While illustrated histories of the steamboat and locomotive are numerous, I am not aware that any systematic attempt has been made to preserve the history of the development of the systems of permanent way which, after many years of experiment, are now being reduced to a series of standards depending on the traffic." (Report of U. S. National Museum, 1887, p. 79.) These expectations were realized to a sufficient extent to warrant the preparation of the series of original rail sections, models, and drawings to illustrate the origin and development of American perma- nent way for the Exposition at Cincinnati in 1888. The interest manifested in that collection led me to present a paper entitled "The Development of the American Rail and Track" at the annual convention of the American Society of Civil Engineers, at Sea Bright, New Jersey, June 21, 1889. This will appear in the transac- tions of that society during the coming year.* At the conclusion of that paper I took occasion to state that in its preparation " I preferred to confine myself to a description of such rails as are represented by original sections, models, or drawings in the section of transportation and engineering in the U.
    [Show full text]
  • the Swindon and Cricklade Railway
    The Swindon and Cricklade Railway Construction of the Permanent Way Document No: S&CR S PW001 Issue 2 Format: Microsoft Office 2010 August 2016 SCR S PW001 Issue 2 Copy 001 Page 1 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS 1 Document Status Record Status Date Issue Prepared by Reviewed by Document owner Issue 17 June 2010 1 D.J.Randall D.Herbert Joint PW Manager Issue 01 Aug 2016 2 D.J.Randall D.Herbert / D Grigsby / S Hudson PW Manager 2 Document Distribution List Position Organisation Copy Issued To: Copy No. (yes/no) P-Way Manager S&CR Yes 1 Deputy PW Manager S&CR Yes 2 Chairman S&CR (Trust) Yes 3 H&S Manager S&CR Yes 4 Office Files S&CR Yes 5 3 Change History Version Change Details 1 to 2 Updates throughout since last release SCR S PW001 Issue 2 Copy 001 Page 2 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS Table of Contents 1 Document Status Record ....................................................................................................................................... 2 2 Document Distribution List ................................................................................................................................... 2 3 Change History .....................................................................................................................................................
    [Show full text]
  • Component Parts of a Permanent Way
    RAILWAY ENGINEERING Dept. of Civil Engineering - KLU COMPONENT PARTS OF A PERMANENT WAY Following are the components of a permanent way. (i) Subgrade (ii) Ballast (iii) Sleepers (iv) Rails (v) Fixture and Fastening In a permanent way, rails are joined either by welding or by using fish plates and are fixed with sleepers by using different types of fastenings. Sleepers are properly placed and packed with ballast. Ballast is placed on the prepared subgrade called formation. REQUIREMENTS OF AN IDEAL PERMANENT WAY Following are the basic requirements of a permanent way: (i) The guage should be uniform and correct. (ii) Both the rails should be at the same level in a straight track. (iii) On curves proper superelevation should be provided to the outer rail. (iv) The permanent way should be properly designed so that the load of the train is uniformly distributed over the two rails. (v) The track should have enough lateral strength. (vi) The radii and superelevation, provided on curves, should be properly designed. (vii) The track must have certain amount of elasticity. (viii) All joints, points and crossings should be properly designed. (ix) Drainage system of permanent way should be perfect. (x) All the components of permanent way should satisfy the design requirements. (xi) It should have adequate provision for easy renewals and repairs. B.G.Rahul RAILWAY ENGINEERING Dept. of Civil Engineering - KLU TYPES OF RAILS The rails used in the construction of railway track are of following types: 1. Double headed rails(D.H. Rails) 2. Bull headed rails(B.H.Rails) 3. Flat footed rails(F.F.Rails) DOUBLE HEADED RAILS The rail sections, whose foot and head are of same dimensions, are called Double headed or Dumb-bell rails.
    [Show full text]
  • A Round up of Recent Activities in Our Sections
    Section Activities A round up of recent activities in our Sections AS PUBLISHED IN The Journal April 2018 Volume 136 Part 2 Sections BIRMINGHAM CROYDON & BRIGHTON DARLINGTON & NORTH EAST EDINBURGH Our online events calendar holds all GLASGOW of our Section meetings. IRISH LANCASTER, BARROW & CARLISLE You’ll also find full contact details on LONDON our website. MANCHESTER & LIVERPOOL MILTON KEYNES NORTH WALES NOTTINGHAM & DERBY SOUTH & WEST WALES THAMES VALLEY WESSEX WEST OF ENGLAND WEST YORKSHIRE YORK SECTION ACTIVITIES lighting Towers that sprang up on the railway organisation. On one occasion, John was landscape during the modernisation days of called into to record Pickfords moving the A round up the 1960s and 70s. Dickens Inn from one end of St. Catherine’s Dock in London to the other. Photographers were based at the regional of recent offices and in the various railway workshops A less glamorous assignment, but nonetheless which were around at that time. John was fascinating (and unnerving) was recording called in to take pictures of work in progress on the water jets spraying out of the brickwork in activities in new trains and then at their launch. Abbotscliffe Tunnel. This required elaborate lighting to ensure a clear shot could be On some occasions, it was just a case of recorded. Works for the opening of the our Sections. being in the right place at the right time. On Channel Tunnel including over bridge deck his way to another job in Gloucester he was raising and tunnel floor lowering provided a lot able to get in position on a signal gantry at of work in the early 1990s.
    [Show full text]
  • GUIDANCE NOTE PERMANENT WAY – Planning, Inspection
    Ref No: HGR-A0401 Issue No: 01 Issue Date: April 2018 HERITAGE RAILWAY ASSOCIATION GUIDANCE NOTE PERMANENT WAY – Planning, Inspection & Maintenance Purpose This document describes good practice in relation to its subject to be followed by Heritage Railways, Tramways and similar bodies to whom this document applies. Endorsement This document has been developed with, and is fully endorsed by, Her Majesty’s Railway Inspectorate (HMRI), a directorate of the Office of Rail and Road (ORR). Disclaimer The Heritage Railway Association has used its best endeavours to ensure that the content of this document is accurate, complete and suitable for its stated purpose. However it makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. Accordingly the Heritage Railway Association will not be liable for its content or any subsequent use to which this document may be put. Supply This document is published by the Heritage Railway Association (HRA). Copies are available electronically via its website https://www.hra.uk.com/guidance-notes Issue 01 page 1 of 11 © Heritage Railway Association 2018 The Heritage Railway Association, Limited by Guarantee, is Registered in England and Wales No. 2226245 Registered office: 2 Littlestone Road, New Romney, Kent, TN28 8PL HGR-A0401-Is01 ______ Permanent Way - Planning, Inspection & Maintenance Users of this Guidance Note should check the HRA website https://www.hra.uk.com/guidance-notes to ensure that they have the
    [Show full text]
  • The Evolution of Permanent
    TECHNICAL ARTICLE AS PUBLISHED IN The Journal January 2018 Volume 136 Part 1 If you would like to reproduce this article, please contact: Alison Stansfield MARKETING DIRECTOR Permanent Way Institution [email protected] PLEASE NOTE THE OPINIONS EXPRESSED IN THIS JOURNAL ARE NOT NECESSARILY THOSE OF THE EDITOR OR OF THE INSTITUTION AS A BODY. TECHNICAL The evolution of AUTHOR: Charles E. Lee permanent way Associate Fellow PWI PAPER READ TO THE PERMANENT WAY INSTITUTION, LONDON, ON MONDAY MARCH 8TH 1937. PART 5 This seems to be the period that the word renewed. This was done on a new plan; and it railway came into use on Tyneside. The “Term is now acknowledged to be the most complete This is the fifth and final part of this Reports” for 1798 give details of an appeal in Britain. The sleepers are very broad, and fascinating paper. I have not edited this against a poor rate assessed on “a piece or only 18 in. from centre to centre. A rail of paper due to its historical nature. parcel ground called a wagon-way situate at foreign fir, 4 in. Square, is pinned down to Wallsend and leading from a colliery there to them and another rail, of the same dimensions, Returning to the main channel of development, the River Tyne.” In this report is the following is laid over it, and the whole well beat up in we find that, after the introduction of cast-iron statement: “The appellants . made and laid good clay; on the top of the upper rail is laid facings on wagon-ways, the next step was to a wagon-way in, through, and over .
    [Show full text]
  • Track Report 2002
    TRACK SUPPORT SYSTEMS Testing the PANDROL VANGUARD Baseplate on Hong Kong’s MTRCL Test Track by David England, Design Manager (Permanent Way), MTR Corporation Ltd, Hong Kong Hong Kong’s Mass Transit Railway this is both costly and slow to construct. web of the rail with resilient blocks held in place Corporation operates metro railway services An alternative to FST is Isolated Slab Track by cast side plates transferring the load to the in one of the most densely populated areas in (IST), a mass spring system employing a rubber track invert, provides another trackform option the world. Owing to the proximity of the ballast mat. IST trackform is quicker and easier to for vibration sensitive areas. This development is railway to residential, commercial, install but does not provide the exceptional level the Pandrol ‘VANGUARD’ which supports the rail educational and hospital developments it is of vibration attenuation of the FST. However above the track base rather than supporting the often necessary to attenuate noise and there are many locations where IST performance rail on resilient elements beneath it, allowing the vibration levels to a minimum in order to is sufficient to meet requirements and this system to achieve a lower stiffness than any satisfy Hong Kong’s stringent Noise Control trackform was extensively used on the recently conventional baseplate. Ordinance. The foremost method of ensuring opened Tseung Kwan O Extension. MTRCL operates a policy of installing only that railway vibration transmission is tried and tested components on the rail network minimised in environmentally sensitive areas PANDROL VANGUARD and it was agreed to test the Pandrol VANGUARD has been, in MTRCL’s experience, to employ The recent development of a revolutionary on the Test Track located adjacent to Siu Ho Wan sections of Floating Slab Track (FST).
    [Show full text]
  • The Permanent Way Institution South Australian Section Incorporated ABN 78 940 577 192 GPO Box 318 Belair SA 5052
    The Permanent Way Institution South Australian Section Incorporated ABN 78 940 577 192 GPO Box 318 Belair SA 5052 NEWSLETTER FOR SEPTEMBER 2014 Next Meeting – 4th September 2014 The next meeting of the PWI SA Section will be held on Thursday 4th September 2014 and, being a joint meeting with and hosted by the IRSE, will be held at Fedoras Restaurant, Hilton Hotel Corner Sir Donald Bradman Drive and South Road, Hilton commencing at 5.45pm. Two presentations will be made at the meeting, being: i) Spencer Junction to Tarcoola CTC Several years ago, ARTC had identified that the current method of Train Order Working, between Spencer Junction and Tarcoola, would need to be replaced due to the projected increase in Traffic, and limitations on the number of Train Orders that could be written by a Train Controller in one shift. Following consideration of available technologies, it was decided to install CTC Signalling, with Microlok CBI equipment, Frauscher “advanced” axle counters for Train Detection and use of the existing ARTC Communications system along the Rail Corridor for vital links between Crossing Loops and equipment monitoring. The first CTC loop at Tent Hill was commissioned on Monday 2 September 2013, with the last site, Tarcoola, commissioned on Tuesday 1 July 2014. This presentation looks at the system architecture and equipment used, performance to date, benefits and challenges. Presented by Michael Forbes – Signalling Design Engineer, ARTC. ii) The Advanced Train Management System (ATMS) from Proof of Concept to Implementation ARTC first set out on its journey toward ATMS in the early 2000s when it scoured the market for a Communications Based Safeworking System to replace its current systems.
    [Show full text]
  • American Railway Engineering and Maintenance of Way Association Letter Ballot
    American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 33 – Electrical Energy Utilization, no subcommittee 2. Letter Ballot Number: 19-33-01 3. Assignment: 33-02 4. Ballot Item: Revise Part 2 – Clearances 5. Rationale: General updates Draft Not yet Approved Clearances AREMA American Railway Engineering and Maintenance-of-Way Association Part 2 Clearances --- 20102020 --- TABLE OF CONTENTS Section/Article Description Page 2.0 Changes from 1995, and 2005 & 2010 Editions (20102020) . 33-2-2 . 2.0.1 General (20102020) . 33-2-2 . 2.1 Third Rail Arrangements (Draft20102020) . 33-2-3 . 33-2-3 2.1.1 General (20102020) . Approved. 33-2-4 . 2.1.2 Design, Construction and Maintenance Issues (2010) . 2.2 Recommended Clearance Specifications Criteria to Provide for Overhead 33-2-8 Electrification (2020) . 2.2.1 General (20102020) . 33-2-8 . 2.2.2 Design and Construction yetClearance (20102020 ) . 33-2-9 . 2.2.3 Vertical Clearance (20102020) . 33-2-9 . 2.2.4 Tolerances in the OCS System and Position of Track (20102020) . 33-2-10 . 2.2.5 Electrical Clearances from Energized Parts to Grounded Parts (Air Clearances) 33-2-11 (20102020) . 2.2.6 ClearancesNot from Energized Ancillary Conductors (2010) . 33-2-14 2.2.7 Altitude Compensation (20102020) . 33-2-14 . 2.2.8 Depth of Construction of the OCS at Supports (D) (20102020) . .. 33-2-16 AREMA Manual for Railway Engineering 33-2-1 Electrical Energy Utilization . 2.2.9 OCS Clearance Requirement at Overhead Structures (H) (20102020) . 33-2-17 . 2.2.10 Vertical Clearance Requirements at Overhead Structures (2010) .
    [Show full text]
  • On the Fault Detection and Diagnosis of Railway Switch and Crossing Systems: an Overview
    applied sciences Review On the Fault Detection and Diagnosis of Railway Switch and Crossing Systems: An Overview Moussa Hamadache * , Saikat Dutta, Osama Olaby , Ramakrishnan Ambur , Edward Stewart and Roger Dixon School of Engineering, Birmingham Centre for Railway Research and Education (BCRRE), University of Birmingham, Edgbaston, Birmingham B15 2TT, UK; [email protected] (S.D.); [email protected] (O.O.); [email protected] (R.A.); [email protected] (E.S.); [email protected] (R.D.) * Correspondence: [email protected] Received: 24 October 2019; Accepted: 22 November 2019; Published: 27 November 2019 Abstract: Railway switch and crossing (S&C) systems have a very complex structure that requires not only a large number of components (such as rails, check rails, switches, crossings, turnout bearers, slide chair, etc.) but also different types of components and technologies (mechanical devices to operate switches, electrical and/or electronic devices for control, etc.). This complexity of railway S&C systems makes them vulnerable to failures and malfunctions that can ultimately cause delays and even fatal accidents. Thus, it is crucial to develop suitable condition monitoring techniques to deal with fault detection and diagnosis (FDD) in railway S&C systems. The main contribution of this paper is to present a comprehensive review of the existing FDD techniques for railway S&C systems. The aim is to overview the state of the art in rail S&C and in doing so to provide a platform for researchers, railway operators, and experts to research, develop and adopt the best methods for their applications; thereby helping ensure the rapid evolution of monitoring and fault detection in the railway industry at a time of the increased interest in condition based maintenance and the use of high-speed trains on the rail network.
    [Show full text]
  • CP-TS-961 Issue: 2 Date: 07/10/08 Page: 1 of 58
    CODE OF PRACTICE - VOLUME TWO - TRAIN SYSTEM [CP2] TRANSADELAIDE INFRASTRUCTURE SERVICES PART 11: RAIL AND RAIL JOINTS DOC. NO. CP-TS-961 Issue: 2 Date: 07/10/08 Page: 1 of 58 TRACK AND CIVIL INFRASTRUCTURE CODE OF PRACTICE VOLUME TWO - TRAIN SYSTEM [CP2] RAIL AND RAIL JOINTS C:\Users\lettonla\Desktop\CPTS961-rails_rail_joints_.doc © 2004 No part of this document may be reproduced without prior written consent from TransAdelaide CODE OF PRACTICE - VOLUME TWO - TRAIN SYSTEM [CP2] TRANSADELAIDE INFRASTRUCTURE SERVICES PART 11: RAIL AND RAIL JOINTS DOC. NO. CP-TS-961 Issue: 2 Date: 07/10/08 Page: 2 of 58 TABLE OF CONTENTS 1.0 PURPOSE AND SCOPE ................................................................................................. 5 1.1 PURPOSE ................................................................................................................... 5 1.2 PRINCIPLES ................................................................................................................ 5 1.3 SCOPE ........................................................................................................................ 5 1.4 REFERENCES ............................................................................................................. 5 2.0 NEW RAIL ....................................................................................................................... 7 2.1 STANDARD NEW RAIL TYPES .................................................................................. 7 2.2 NON-STANDARD NEW RAIL TYPES ........................................................................
    [Show full text]
  • Railway Renewal and Maintenance Cost Modelling
    Cranfield University Daniel Ling Railway Renewal and Maintenance Cost Estimating School of Applied Sciences PhD Thesis THIS PAGE IS INTENTIONALLY LEFT BLANK Cranfield University School of Applied Sciences PhD Thesis Academic Year 2002-2005 Daniel Ling Railway Renewal and Maintenance Cost Estimating Supervisor : Professor Rajkumar Roy & Dr Esam Shehab This thesis is submitted in partial fulfilment of the requirements for the degree of Doctor of Philosophy ©Cranfield University 2005. All rights reserved. No part of this document may be reproduced without the written permission of the copyright owner. THIS PAGE IS INTENTIONALLY LEFT BLANK ABSTRACT The aim of this thesis is to present a structured methodology which estimates Railway Infrastructure renewal and maintenance costs when there is a lack of quantitative cost data at the early stages of the project life cycle. Furthermore, this thesis presents renewal and maintenance infrastructure cost estimating issues and investigates current Railway renewal and maintenance cost estimating practice using an industrial case study approach. A flexible design using a case study strategy is described as the most appropriate approach to the successful completion of this study. Industrial case studies using workshops and interview techniques are the primary sources of data whereas literature is used as the secondary sources of data. Following the identification of Railway renewal and maintenance cost estimating issues, a further review of literature leads to the development of a hypothesis. In order to investigate the hypothesis a structured cost estimating methodology is developed which comprises four main stages: creating a project structure that composes the goal, project criteria and alternatives; collecting the necessary data in the form of pairwise comparisons made by a domain expert; producing alternative weights using a geometric mean; and finally employing an algorithmic method using the produced alternative weights and the known cost of one alternative per criteria.
    [Show full text]