~Jl 100 (1) Clearing & Grubbing (With Stripping) 0.37 Ha
Total Page:16
File Type:pdf, Size:1020Kb
1 j • ....,_ .••• .,!r Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CAMARINES SUR 5TH DISTRICT ENGINEERING OFFICE REGIONAL OFFICE V Sta. Teresita, Baao, Camarines Sur Contract ID: 20FN0039 Contract Name: 001: Ensure Safe and Reliable National Road System Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads Construction of Road Slope Protection Structure along Nabua-Balatan Road (S03549LZ), Salatan, Camarines Sur / Location: Balatan, Camarines Sur Limits: K0487+020.00 - K0487+380.00 CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS:fEB 1 l 2\120 This CONTRACTAGRE EMENT, made this __ day of .J 2020, by and between: The GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES through the Deparbnent of Public Works and Highways, Camarines Sur 5th District Engineering Office, represented herein by NESTOR P. GORIMBAO, duly authorized for this purpose, with main office address at Sta. Teresita, Baao, Camarines Sur, hereinafter referred to as the "PROCURING ENTITY"; -and- JURASSIC CONSTRUCTION AND SUPPLIES a single proprietorship I partnership I corporation I joint venture organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at San Isidro, Baao, Camarines ~ represented herein by ALEXANDER B. GAITE, duly authorized for this purpose, hereinafter referred to as the "CONTRACTOR". WITNESSETH: WHEREAS, the PROCURINGE NTITY is desirous that the CONTRACTORe xecute the Works under 20FN0039 .: 001: Ensure ~ and Reliable National Road System Asset Preservation Rehabilitation/Reconstruction Qf National Roads with ~ ~ Collapse, and Landslide = Tertiary Roads .: Construction of ~ Slope Protection structure along Nabua-Balatan Road (S03549LZ1, Balatan, camarines Sur herein after called "the Works", to be rompleted within 187 calendar days and the PROCURINGENTI TY has accepted the Calculated Bid of the CONTRACTORfor the execution and Z o w completion of the Works at the calculated unit bid prices shown in the Bill of Quantities, or a total Contract price 6 of Eighteen Million Five Hundred Sixty-Five Thousand Two Hundred Eighty-Three Pesos and Thirty- Two Centavos Only (P 18,565,283.321. / ~ Z OUJ ac:1 u:l uo. ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT •...• 0. -- If)::I z .•.• If)lf) ~o =wOo.~ PART A. FACILITIES FOR THE ENGINEER ,::I...,ZC( ..Ie ~ CCo. A.l.l (8) Provision of Field Office for the Engineer 6.23 mo. P 11,550.00 P 71,956.50 /' (Rental Basis) PART B. OTHER GENERAL REQUIREMENTS B.5 Project Billboard/Signboard 2.00 ea. P 3,900.00 P 7,800.00 ~ B.7 (1) Occupational Safety & Health Program 6.23 mo. P 39,000.00 P 242,970.00 ::E B.8 (2) Traffic Management 1.00 I.s. P 260,000.00 P 260,000.00 B.9 Mobilization/Demobilization 1.00 I.s. P 126,000.00 P 126,000.00 PART C. EARTHWQRKS ~Jl 100 (1) Clearing & Grubbing (with Stripping) 0.37 ha. P 203,125.03 P 75,156.26 b~t 100 (3) ai Individual Removal of Trees (Small 6, above 60.00 ea. P 2,195.96 P 131,757.60 ;:c: \....~.-wtl 300 mm 0 up to 500 mm 0) is: zi:5 101 (6) Removal of Structures and Obstruction 229.96 cu. m. P 479.41 P 110,245.12 DPWH-INFR-SI-2016 Page 1 of4 If'.__..... ", f 'l, Contract ID: 20FN0039 Contract Name: 001: Ensure Safe and Reliable National Road System Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads Construction of Road Slope Protection Structure along Nabua-Balatan Road (S03549LZ), Balatan, Camarines Sur Location: Balatan, Camarines Sur Limits: K0487+020.00- K0487+380.00 ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT 101 (3) b3 Removal of Actual Structures/Obstructiom - 661.50 sq. m. P 148.97 P 98,543.66 0.23m thick Unreinforced 102 (2) Surplus Common Excavation 2,745.31 cu. m. P 188.60 P 517,765.47 103 (3) Foundation Fill 9.22 cu. m. P 2,176.00 P 20,062.72 104 (1) a Embankment from Roadway Excavation 392.30 cu. m. P 276.82 P 108,596.49 104 (7) Embankment from Structure Excavation 449.27 cu. m. P 305.32 P 137,171.12 104 (2) a Embankment (from Borrow) 2,581.35 cu. m. P 1,522.91 P 3,931,163.73 105 (1) a Subgrade Preparation (Common Material) 3,239.60 sq. m. P 19.77 P 64,046.89 PART D. SUBBASE AND BASE COURSE 200 (1) Aggregate Subbase Course 647.92 cu. m. P 1,094.92 P 709,420.57 201 (1) Aggregate Base Course 147.84 cu. m. P 1,301.18 P 192,366.45 PART E. SURFACE COURSE 311 (1) el PCC Pavement (Unreinforced) - 0.28m thick 2,711.60 sq. m. P 1,681.53 P 4,559,636.75 PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES 404 (1) a Reinforced Steel Bar, Grade 40 (Minor 24,242.04 kg. P 56.63 P 1,372,826.73 Structures) 405 (1) a2 Structural Concrete Class A (Minor Structures) 212.33 cu. m. P 8,658.90 P 1,838,544.24 500 (1) a3 Pipe Culvert, 910 mm 0 (36" 0) 5.00 m. P 6,091.44 P 30,457.20 505 (2) a Grouted Riprap (Class A) 816.38 cu. m. P 3,455.56 P 2,821,050.07 PART H. MISCELLANEOUS STRUCTURES 603 (3) al Metal Guardrails (Metal beam) Including 278.50 m. P 3,135.65 P 873,278.53 Concrete Post 603 (4) a Metal Beam End Piece 8.00 ea. P 2,088.60 P 16,708.80 605 (6) el Hazard Marker (450 mm x 600 mm) - Chevron 8.00 ea. P 22,915.48 P 183,323.84 Signs 612 (1) Reflectorized Thermoplastic Pavement 71.20 sq. m. P 904.98 P 64,434.58 z Markings (White) TOTAL p 18,565,283.32 ~ ~ z NOW, THEREFORE, for and consideration of the foreqoinq premises, the parties hereto agree as follows: uo..8 •....• 0.. Ul:=> 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are ~~ " respectively assigned to them in the Conditions of Contract hereinafter referred to. ~«~ 2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority: a. This Contract Agreement b. Documents forming part of the Contract Agreement: (1) Notice of Award(NOA) with the Contractor's signed "conforme" (2) Contractor's Bid in the Form of Bid, including its Technical and Financial •... Proposals, as calculated by the Procuring Entity and conformed to by aJ the Contractor through NOA . • . S (3) Bidding Documents with Bulletins (4) Specifications (5) Drawings (6) Special Conditions of Contract (SCC) DPWH-INFR-Sl-2016 Page 2 of 4 " . " . " Contract ID: 20FN0039 Contract Name: 001: Ensure Safe and Reliable National Road System Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads Construction of Road Slope Protection Structure along Nabua-Balatan Road (S03549LZ), Balatan, camarines Sur Location: Balatan, Camarines Sur limits: K0487+020.00 - K0487+380.00 (7) General Conditions of Contract (GCC) (8) Performance Security (9) Integrity Pledge Under Department Order No. 86 series of 2013 (lO)Other Document (a) Construction Methods (b) Construction Schedule in the form of PERT/CPM Diagram or PrecedenceDiagram (c) Manpower Schedule (d) Equipment Utilization Schedule (e) Construction Safety and Health Program initially approved by the Head of the Procuring Entity (f) Contractors All Risk Insurance (CARI) 3. In consideration of the payments to be made by the PROCURING ENTITY to the CONTRACTORas hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all respects. 4. In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTITY hereby covenants to pay the CONTRACTOR the unit prices in the CONTRACTOR'sCa lculated Bid, as applied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of this CONTRACT AGREEMENT, at the times and in the manner prescribed by this CONTRACT AGREEMENT. IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, month and year first above written. PROCURING ENTITY: CONTRACTOR: Represented by: Represented by: Witnessed by: \ DPWH-I N FR-51-2016 Page 3 of4 Contract ID: 20FN0039 Contract Name: 001: Ensure Safe and Reliable National Road System Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse. and Landslide - Tertiary Roads Construction of Road Slope Protection Structure along Nabua-Balatan Road (503549l2), Balatan, Camarines Sur Location: Balatan. Camarines Sur Limits: K0487+020.00 - K0487+380.00 REPUBUCOF E~~PmNES) JP. ~~,n 'II ) 5.5. ACKNOWLEDGEMENT Before me Notary for and in the personally appeared NESTOR P. GORIMBAO with Community Tax Certificate No. 171183 issued on January ~ 2020 at Tigaon, Camarines Sur in his official capacity as District Engineer, Department of Public Works and Highways, Camarines Sur 5th District Engineering Office, Sta. Teresita, Baao, Camarines Sur, representing the Republic of the Philippines and ALEXANDER B. GArTE. with Community Tax Certificate No. 5537789 issued on January ~ 2020 at Baao, Camarines Sur who are also known to me and to be the same persons who executed the foregoing CONTRACT AGREEMENT and they acknowledged to me same are their true act and deed for and behalf of the parties they represent. / This instrument consist of four ffi pages including this page on which the acknowledgment is written duly signed by the Contracting Parties and their witnesses on the left margin of the other pages.