UNIQUE TREES OPEN SPACE SHELTER LANDFORM TRAIL EXERCISE Striker Field Park PUBLIC WORKSHOP #2 April 24, 2019

IRRIGATEDNEED PARKING COURT LAWN SPORTS NO PARKING SITE FURNITURE Help CreatePLAYGROUND theNATURAL Vision AREA PLUMBED RESTROOM for Striker Field Park

Community Workshop #2 Wednesday, April 24 from 6–8 p.m. Eugene Christian School 2895 Chad Drive, Eugene

If you cannot join us for the meeting, take the survey at eugene-or.gov/strikerfield

Parks & Open Space

eugene-or.gov/parks @EUGparks Introductions & Purpose Purpose of workshop to provide an update on what we have learned since the last meeting. It is also to clarify and understand the needs and expectations for the park from all of you.

TODAY WE WILL COVER THE FOLLOWING TOPICS: Budget Survey #1 Results Park Access, Transportation & Planning Site Context Site Analysis Space Planning Options Time line and Decision Making Process Break Out Session Summary & Next Steps

Workshop Agenda Striker Field Park Prepared for Workshop on April 24, 2019 2 what are your current reasons for to a public park? lawn activities sports skills, frisbee, picnic socialize

exercise Striker Field Park - Survey #1 Q4 What are your current reasons for travelling to a public park? (select all that apply)

playground equipmentAnswered: 168 Skipped: 3

programmed event Exercise Outdoor lawn activities t...

Socialize with friends and...

Playground equipment

Other (please specify)

Attend a programmed...

Participate in or watch a...

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Summary of Survey Results ANSWER CHOICES Striker Field Park RESPONSES Exercise 58.33% 98 Prepared for Workshop on April 24, 2019 Outdoor lawn activities that need space such as frisbee, picnic, sports skills (catch, soccer , etc) 3 51.19% 86 Socialize with friends and neighbors 49.40% 83

Playground equipment 41.07% 69

Other (please specify) 29.76% 50

Attend a programmed event or group activity 23.81% 40

Participate in or watch a sporting event 17.86% 30 Total Respondents: 168

1 / 1 which of the following are the most important basic amenities? soft trail playground equipment Striker Field Park - Survey #1

Q7 Which of the following would you consider as the most important basic amenities at Striker Field? (Please rank in priority order)

open irrigated Answered:lawn 155 Skipped: 16 sports skills, frisbee, picnic walking circuit 10 8 natural area 6 4

2

0 Open Childre Soft- Paved Natural Childre Roofed Lightin Event/G lawn n’s su walking areas n's shelter g atherin area Play rface circuit (non- sand/wa (amount g (irr... equi... trail s ir ter... ,... space riga... (inf... 1 2 3 4 5 6 7 8 9 TOTAL SCORE

Summary of Survey Results Open lawn area 11.72% 20.69% 23.45% 13.10% 7.59% 8.28% Striker6.90% 4.14% Field 4.14%Park (irrigated-mowed) 17 30 34 19 11 12 10 6 6 145 6.18 Prepared for Workshop on April 24, 2019 Children’s Play 30.14% 8.22% 9.59% 6.85% 17.12% 7.53% 5.48% 4.79% 10.27% 4 equipment 44 12 14 10 25 11 8 7 15 146 5.97 Soft-surface trail 17.33% 14.00% 16.00% 14.67% 9.33% 9.33% 9.33% 6.00% 4.00% 26 21 24 22 14 14 14 9 6 150 5.96

Paved walking 10.27% 11.64% 7.53% 17.12% 10.27% 14.38% 7.53% 13.01% 8.22% circuits 15 17 11 25 15 21 11 19 12 146 5.07 Natural areas 14.00% 12.00% 10.67% 8.67% 10.67% 8.00% 8.67% 10.00% 17.33% (non-irrigated, 21 18 16 13 16 12 13 15 26 150 4.97 rarely mowed).

Children's 3.55% 17.73% 10.64% 9.22% 5.67% 14.18% 13.48% 14.18% 11.35% sand/water play 5 25 15 13 8 20 19 20 16 141 4.69 Roofed shelter 2.76% 6.90% 13.10% 11.03% 17.93% 11.72% 15.86% 14.48% 6.21% 4 10 19 16 26 17 23 21 9 145 4.57 Lighting (amount, 8.33% 7.64% 8.33% 10.42% 13.19% 13.19% 9.03% 10.42% 19.44% locations and 12 11 12 15 19 19 13 15 28 144 4.43 intensity to be determined)

Event/Gathering 6.04% 6.04% 4.03% 12.08% 9.40% 11.41% 18.79% 18.79% 13.42% space (informal, 9 9 6 18 14 17 28 28 20 149 4.03 less than 40 people)

1 / 1 excluding basic amenities, what additional features should we consider?

sport courts parking Striker Field Park - Survey #1 want parking lot, don’t want parking lot, ok on street, notQ8 on In additionthe street to the basic amenities described above, what additional features would you consider a priority for Striker Field Park? (Please rank in priority order) plumbed restroomAnswered: 154 Skipped: 17 Permanently plumbed...

landform Off-street flat big site needs something parking Landform (berms and...

Unpaved court sports...

Interactive children’s...

Dog off leash park

Paved court sports (tenn...

Marked/Striped recreation...

Artistic features

Event/Gathering space (more...

01 2345678910

1 2 3 4 5 6 7 8 9 10 TOTAL SCORE Summary of Survey Results Permanently 42.14% 15.00% 7.14% 10.00% 4.29% 5.00% Striker2.14% 2.14%Field 3.57%Park 8.57% plumbed 59 21 10 14 6 7 3 3 5 12 140 7.65 restroom Prepared for Workshop on April 24, 2019 building 5 Off-street 18.12% 15.22% 14.49% 8.70% 7.97% 8.70% 7.25% 3.62% 7.25% 8.70% parking 25 21 20 12 11 12 10 5 10 12 138 6.49

Landform 8.33% 15.28% 12.50% 16.67% 10.42% 9.72% 6.25% 13.89% 3.47% 3.47% (berms and 12 22 18 24 15 14 9 20 5 5 144 6.26 natural landscape drifts)

Unpaved court 10.87% 7.25% 11.59% 10.87% 10.14% 16.67% 15.22% 9.42% 7.25% 0.72% sports 15 10 16 15 14 23 21 13 10 1 138 5.91 (volleyball, bocce ball, petanque)

Interactive 5.93% 12.59% 11.11% 11.85% 8.89% 9.63% 10.37% 9.63% 14.07% 5.93% children’s water 8 17 15 16 12 13 14 13 19 8 135 5.50 spray play

1 / 2 Irrigated Lawn & Typical Lawn Activities Striker Field Park Prepared for Workshop on April 24, 2019 6 Playground Activity Striker Field Park Prepared for Workshop on April 24, 2019 7 Gathering Spaces Striker Field Park Prepared for Workshop on April 24, 2019 8 Court Sports Striker Field Park Prepared for Workshop on April 24, 2019 9 Shelter & Restroom Striker Field Park Prepared for Workshop on April 24, 2019 10 Trails & Unirrigated Open Space Striker Field Park Prepared for Workshop on April 24, 2019 11 GAME FARM RD

COBURG RD LOW DENSITY RESIDENTIAL 4J SCHOOL STRIKER PROPERTY FIELD

CRESCENT PARK HIGH DENSITY RESIDENTIAL

CRESCENT AVE

Neighborhood Park Context Striker Field Park Prepared for Workshop on April 24, 2019 12 GRAND CAYMAN CHURCH

EWEB MARTINIQUE

4J STRIKER FUTURE School FIELD SPECTRUMCROSSING RD ANTIGUA Neighborhood Property (8.37 Ac.) GAME FARM RD Collector

BARBADOS Future Master Planned Extension COBURG RD SENIOR CENTER LOW HIGH DENSITY CRESCENT DENSITY RESIDENTIAL PARK RESIDENTIAL

LORD BYRON G

SHADOW VIEW L o R c a A l N N e D ig h C b A o r Y h M o o A d

N S

t r D e

e R t

CRESCENT AVE

CRESCENT AVE

Park Access, Transportation & Planning Striker Field Park Prepared for Workshop on April 24, 2019 13 Existing Park Existing/Future Existing Natural Hydric Site Existing Code Traffic Access Road Access Features Soils Drainage Utilities Setbacks Concerns

BARBADOS

SUNRISE DEC 21 SUNRISE LOW DENSITY JUNE 21 RESIDENTIAL ANTIGUA MARTINIQUE

GRAND CAYMAN

LOW DENSITY EWEB LORD BYRON RESIDENTIAL EASEMENT STRIKER FIELD (8.37 Ac.) HIGH DENSITY RESIDENTIAL

CHURCH WETLAND MILKWEED PROPERTY (LIMITS TBD) STAND

Property Boundary Potential Park Access Through 4J Property SHADOW VIEW (CONNECTS TO COMMERCIAL)

SUNSET JUNE 21

SUNSET 4J School DEC 21 Property Future Master Planned Extension of SPECTRUM RD

Site Analysis 0 60 120 240’ Striker Field Park Prepared for Workshop on April 24, 2019 14 Irrigated Turf

Un Irrigated Turf Wetland Wetland Wetland

Playground

UN-IRRIGATED UN-IRRIGATED TRAIL NETWORK TRAIL NETWORK Trees PLAYGROUND Restroom

Shelter

Petanque PLAYGROUND Pickleball IRRIGATED LAWN UN-IRRIGATED Future Future Pedestrian TRAIL NETWORK Pedestrian Access Access COURT IRRIGATED SPORTS LAWN Croquet (for space planning PLAYGROUND needs only) IRRIGATED LAWN COURT SPORTS COURT Future SPORTS Pedestrian Access

Potential Pedestrian Potential Pedestrian Potential Pedestrian A Access B Access C Access to Lord Byron to Lord Byron to Lord Byron

Concept Options - Organization of Major Elements 0 40 80 160’ Striker Field Park Prepared for Workshop on April 24, 2019 15 Martinique Martinique Grand Cayman Drive Grand Cayman Drive

Striker Field Striker Field Park 8.37 Ac Park 8.37 Ac

4J School Property On Street Parking 4J School Property On Street Parking

Antigua Antigua

Parking Lot for 40 Vehicles +/- location TBD

ON STREET PARKING WITH ON STREET PARKING ONLY Barbados OVERFLOW IN PARKING LOT Barbados

Potential Pedestrian Potential Pedestrian Access Access A to Lord Byron B to Lord Byron

Parking Scenarios - Large Group Gathering in the Park 0 40 80 160’ Striker Field Park Prepared for Workshop on April 24, 2019 16 (for spaceplanning Barbados (shared space) Basketball (shared space) Trees Restroom Shelter Petanque Pickleball Croquet needs only) (RR) Irrigated Turf Un irrigated TurfPlayground Martinique Antigua

Grand Cayman Drive

Potential Pedestrian Access Only Lord Byron COURT PLAYGROUND SPORTS RR IRRIGATED LAWN

Landform Landform UN-IRRIGATED TRAIL NETWORK Potential Wetland Milkweed Stand Future Pedestrian Connector

0 20 40 80’

Concept A Striker Field Park Prepared for Workshop on April 24, 2019 17 Existing Wetland

UN-IRRIGATED PLAYGROUND TRAIL NETWORK SHELTER Grand Cayman Drive

RESTROOM Landform

COURT SPORTS

IRRIGATED LAWN

Potential Pedestrian Access Only Potential Future Pedestrian Connector

Lord Byron

Concept A Striker Field Park Prepared for Workshop on April 24, 2019 18 Existing Wetland UN-IRRIGATED Landform TRAIL NETWORK SHELTER PLAYGROUND Landform

Grand Cayman Drive

Landform RESTROOM

COURT SPORTS IRRIGATED LAWN

Concept A Striker Field Park Prepared for Workshop on April 24, 2019 19 Grand Cayman Drive Existing Wetland

PLAYGROUND SHELTER AMPHITHEATER UN-IRRIGATED TRAIL NETWORK Landform

Landform IRRIGATED LAWN

RESTROOM

Concept A Striker Field Park Prepared for Workshop on April 24, 2019 20 (for spaceplanning Barbados Basketball Trees Restroom Shelter Petanque Pickleball Croquet needs only) (RR) Irrigated Turf Un irrigated TurfPlayground Martinique Antigua

Grand Cayman Drive

Potential COURT Pedestrian SPORTS Access Only Lord Landform Byron

PLAYGROUND IRRIGATED LAWN UN-IRRIGATED TRAIL NETWORK

Landform RR Amphitheater

Potential Landform Wetland Milkweed Stand Future Pedestrian Connector

0 20 40 80’

Concept B Striker Field Park Prepared for Workshop on April 24, 2019 21 Grand Cayman Drive

COURT SPORTS Potential Pedestrian Access SHELTER Only

IRRIGATED PLAYGROUND LAWN

RESTROOM AMPHITHEATER Landform

UN-IRRIGATED Potential TRAIL NETWORK Future Pedestrian Connector

Concept B Striker Field Park Prepared for Workshop on April 24, 2019 22 Existing Wetland UN-IRRIGATED Landform TRAIL NETWORK SHELTER

Grand Cayman Drive RESTROOM PLAYGROUND

Potential Future Pedestrian Connector IRRIGATED COURT LAWN SPORTS

AMPHITHEATER

Potential Pedestrian Access Only

Concept B Striker Field Park Prepared for Workshop on April 24, 2019 23 (for spaceplanning Barbados Basketball Trees Restroom Shelter Petanque Pickleball Croquet needs only) (RR) Irrigated Turf Un irrigated TurfPlayground

Barbados Martinique Antigua Antigua

Martinique Grand Cayman Drive

Grand Cayman Drive

Lord Byron IRRIGATED COURT LAWN SPORTS Potential PedestrianLord Byron Access Only UN-IRRIGATED TRAIL NETWORK RR Amphitheater

+ High PLAYGROUND

Potential Wetland Milkweed Stand Future Pedestrian Connector

0 20 40 80’ Shadowview Concept C Striker Field Park Prepared for Workshop on April 24, 2019 24 Lord Byron Potential Pedestrian Access Only COURT SPORTS

SHELTER RESTROOM Grand Cayman Drive

IRRIGATED LAWN PLAYGROUND

AMPHITHEATER

UN-IRRIGATED TRAIL NETWORK

Concept C Striker Field Park Prepared for Workshop on April 24, 2019 25 Existing Wetland

UN-IRRIGATED TRAIL NETWORK

PLAYGROUND Potential IRRIGATED Future Pedestrian LAWN Connector RESTROOM

SHELTER COURT Grand Cayman Drive SPORTS

Potential Pedestrian Access Only

Concept C Striker Field Park Prepared for Workshop on April 24, 2019 26 PUBLIC Overview, Listen, Prioritize February MEETING 6-8PM February 21 @ Gilham Church on 3633 Gilham Road March Survey #1 PUBLIC Survey Priorities, Present Options April MEETING 6-8PM April 24 @ Eugene Christian School 2895 Chad Drive DESIGN May Survey #2 2019 June/July PUBLIC Final Design Drawings MEETING 6-8PM xxxx xx @ July Survey #3

August Construction Documentation Spring Bidding

Construction ENGINEERING

2021 Park Soft Opening 2021

Project Schedule & Process Striker Field Park Prepared for Workshop on April 24, 2019 27 PUBLIC INPUT

Safety & Maintenance Budget Other Design Requirements Considerations Considerations City Decision Filters

BUILD-ABLE PROJECT

Project Schedule & Process Striker Field Park Prepared for Workshop on April 24, 2019 28 UNIQUE TREES OPEN SPACE LANDFORM SHELTER TRAIL EXERCISE

IRRIGATEDNEED PARKING COURT LAWN SPORTS NO PARKING SITE FURNITURE PLAYGROUND NATURAL AREA PLUMBED RESTROOM

Striker Field Park

Prepared for Workshop on April 24, 2019 29 Striker Field Park

Prepared for Workshop on April 24, 2019 30