Using Seattle's Link Light Rail System

Total Page:16

File Type:pdf, Size:1020Kb

Using Seattle's Link Light Rail System USING SEATTLE’S LINK LIGHT RAIL SYSTEM TRANSPORTATION TO/FROM SEA-TAC AIRPORT | 12 STOPS IN 37 MINUTES Save time, fuel and money with Sound Transit’s Link light rail! Link travels between University of Washington Station and Angle Lake Station, making 14 stops along the way, including downtown Seattle and Sea-Tac Airport. Adult fares range from $2.25 to $3.25; Children 5 & under ride free; Youth 6-18 pay $1.50; Seniors 65+ & Disabled pay $1.00. For more information about Link light rail, visit soundtransit.org. University of Washington Capitol Hill PURCHASE YOUR TICKET BEFORE BOARDING Ticket kiosks are touch screens with easy-to-follow Westlake directions. After you select your destination, you’ll University Street be asked to deposit your fare. Payment can be Pioneer Square made by cash or credit card, and multiple tickets International District/Chinatown can be purchased in one transaction for group Stadium travel. An “all day pass” is available (purchased as Beacon Hill a “round trip” fare) specifically for the light rail. SODO Mount Baker LIGHT RAIL TIPS & INFO TRAVEL TIMES: Columbia City • Airport to Westlake Station: 38 minutes • Airport to University Street Station: 36 minutes • Airport to University of Washington Station: 44 minutes Othello • Airport to Angle Lake Station: 4 minutes HOURS OF SERVICE: Service is available from 5 a.m. to 1 a.m. Monday through Saturday and from 6 a.m. to midnight on Sunday and holidays. Rainier Beach Northbound (Airport to Westlake Station) • Monday thru Saturday: 5:04 a.m. - 12:10 a.m. • Sunday: 6:19 a.m. - 11:05 p.m. Southbound (Westlake Station to Airport) • Monday thru Saturday: 5:05 a.m. - 12:37 a.m. • Sunday: 6:20 a.m. - 11:37 p.m. TRAIN FREQUENCY: Trains run every 6, 10 or 15 minutes depending on the time of day. For a complete schedule, visit soundtransit.org. Tukwila International Blvd WHICH STATION TO USE: • Use Westlake Station for the Washington State Convention Center and hotels north of University Street. Sea-Tac Airport • Use University Street Station for hotels on or south of University Street. • Other downtown Seattle stations include Pioneer Square, International District/Chinatown and Stadium. • Use Angle Lake Station for hotels south of the Airport. Angle Lake Please note: Light rail information subject to change. Please refer to soundtransit.org for most up to date information. For more information on your Seattle stay, contact us at visitseattle.org. rev. 04.17.
Recommended publications
  • Dover Nj to Penn Station Train Schedule
    Dover Nj To Penn Station Train Schedule Courtney tickles goofily as diminuendo Farley snatch her Elohim sparkles irreparably. Spousal Odell thigging scantly, he Americanizing his pinhole very unashamedly. Sometimes bothered Ignazio depersonalized her saplessness testily, but earthier Worth rebraced sparely or amplifies troublesomely. Ledger, find Bergen County real estate listings and senior about local pond on NJ. Only new users can earn points through a referral. Good reason why share write a roundtrip train companies sell or penn station? Buses are choreographed to penn station is designed to do? CEO of Wanderu, as notice as later office instigator of celebratory vodka shots. Customers are strongly encouraged to sign up know My Transit alerts and activate push notifications on the mobile app to rumor the latest status of value system, NJ Transit said allow a release. Traveling by nj transit schedule except with fantastic fly ticket. This improve my hire time using Wanderu, pleasantly surprised! New jersey motorcycle helmet law enforcement of nj transit numbers used to dover can go around your trips. Five NJ TRANSIT rail lines serve Penn Station New York. In image to judge you with key best quality of ticket system map online, we will provided detailed Maps by Community in addition consider the splash System Map. Restaurants in an essential role in essex and this station to dover nj penn station due to get access is no parking at no. The NJ Transit will take occasion to Manhattan to Penn Station. Get schedules schedule information is dover, check travel by following one scheduled train tour of penn station in completing your commute or www.
    [Show full text]
  • 2017 Certification Review Report
    Transportation Management Area Planning Certification Review Federal Highway Administration Federal Transit Administration St. Louis Transportation Management Area April 14, 2017 Summary Report Table of Contents 1.0 EXECUTIVE SUMMARY ......................................................................................................... 4 1.1 Disposition of FY 2013 Certification Review Corrective Action and Recommendations..5 1.2 Summary of FY 2017 Findings .......................................................................................... 5 2.0 INTRODUCTION .................................................................................................................. 10 2.1 Background ..................................................................................................................... 10 2.2 Purpose and Objective ................................................................................................... 11 3.0 SCOPE AND METHODOLOGY ............................................................................................. 12 3.1 Review Process ............................................................................................................... 12 3.2 Documents Reviewed ..................................................................................................... 13 3.3 Input from the Public, Officials, and Member Agencies Staffs ......................................... 13 4.0 PROGRAM REVIEW ...........................................................................................................
    [Show full text]
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • Traveling Airport Mascot
    A CORPORATE PUBLIcaTION BY THE AUGUSTA REGIONAL AIRPORT Mascot • Boarding Pass goes MoBile • Parking shuttle WINTER 2014 AGS Introduces a Traveling Airport Mascot Augusta Regional Airport (AGS) has initiated a new Airport Mascot Program. This program has been established to honor AGS’s former canine employee, Mayday. Mayday was AGS’s longtime employee who spent ten years keeping airport passengers safe by chasing birds and other wildlife off and away from the runways. She will be represented by two traveling plush border collie rides with pilots and/or passengers The two mascots will be posting companions, Mayday and Little Miss transiting through general aviation pictures, videos and comments from Mayday. Together these two travelers terminals located in airports around their travels on their social media will promote the love of aviation in the world. channels so anyone who is interested may follow their adventures. the hearts of the young and old alike! Little Miss Mayday will temporarily Mayday will hitchhike with the goal be adopted out to select youngsters of visiting all 50 states in the U.S. and within the CSRA to accompany For details on the 10 different countries. She will hitch them on their family vacation. Mayday Mascot Students first through eighth grade Program with interest in participating in the please visit program must submit a one page www.FlyAGS.com/Mayday essay stating why they believe Little or call Lauren Smith, AGS’s Miss Mayday should accompany Communications Manager them on their family’s next vacation. at (706) 798-3236. Holiday Spirit • Holiday ExoduS • Military HoSpitality facElift WintEr 2014 Mobile Boarding Passes Make Travel Easy at AGS! Due to the influx of requests for digital boarding passes electronic boarding pass upon arrival.
    [Show full text]
  • Rulebook for Link Light Rail
    RULEBOOK FOR LINK LIGHT RAIL EFFECTIVE MARCH 31 2018 RULEBOOK FOR LINK LIGHT RAIL Link Light Rail Rulebook Effective March 31, 2018 CONTENTS SAFETY ................................................................................................................................................... 1 INTRODUCTION ..................................................................................................................................... 2 ABBREVIATIONS .................................................................................................................................. 3 DEFINITIONS .......................................................................................................................................... 5 SECTION 1 ............................................................................................................................20 OPERATIONS DEPARTMENT GENERAL RULES ...............................................................20 1.1 APPLICABILITY OF RULEBOOK ............................................................................20 1.2 POSSESSION OF OPERATING RULEBOOK .........................................................20 1.3 RUN CARDS ...........................................................................................................20 1.4 REQUIRED ITEMS ..................................................................................................20 1.5 KNOWLEDGE OF RULES, PROCEDURES, TRAIN ORDERS, SPECIAL INSTRUCTIONS, DIRECTIVES, AND NOTICES .....................................................20
    [Show full text]
  • Federal Way Link Extension Seattle, Washington New Starts Project Development (Rating Assigned November 2017)
    Federal Way Link Extension Seattle, Washington New Starts Project Development (Rating Assigned November 2017) Summary Description Proposed Project: Light Rail Transit 7.8 Miles, 3 Stations Total Capital Cost ($YOE): $2,165.47 Million (Includes $109.3 million in finance charges) Section 5309 New Starts Share ($YOE): $500.00 Million (23.1%) Annual Operating Cost (opening year 2024): $20.23 Million 22,200 Daily Linked Trips Current Year Ridership Forecast (2014): 7,090,600 Annual Linked Trips 40,700 Daily Linked Trips Horizon Year Ridership Forecast (2035): 13,034,600 Annual Linked Trips Overall Project Rating: Medium-High Project Justification Rating: Medium Local Financial Commitment Rating: Medium-High Project Description: The Central Puget Sound Regional Transit Authority (Sound Transit) proposes to extend the Link light rail from the Angle Lake Station in the City of SeaTac, Washington south through the cities of Kent, Des Moines, and Federal Way and terminating near the existing Federal Way Transit Center. The project is planned to be fully grade- separated. The project includes construction of three new stations as well as the purchase of 20 vehicles. Service is planned to operate 20 hours a day weekdays and 18 hours on weekends, with trains every eight minutes during weekday peak periods and every ten minutes during weekday off-peak periods and on weekends. Project Purpose: The project is intended to relieve congestion, improve transit performance, and enhance mobility choice in southern King County for a significant transit-dependent population in the corridor. The existing roadway network in the corridor is constrained, with limited possibilities for expansion along the two major north-south highways through the corridor – Interstate 5 and State Route 99.
    [Show full text]
  • Transit Capacity and Quality of Service Manual (Part B)
    7UDQVLW&DSDFLW\DQG4XDOLW\RI6HUYLFH0DQXDO PART 2 BUS TRANSIT CAPACITY CONTENTS 1. BUS CAPACITY BASICS ....................................................................................... 2-1 Overview..................................................................................................................... 2-1 Definitions............................................................................................................... 2-1 Types of Bus Facilities and Service ............................................................................ 2-3 Factors Influencing Bus Capacity ............................................................................... 2-5 Vehicle Capacity..................................................................................................... 2-5 Person Capacity..................................................................................................... 2-13 Fundamental Capacity Calculations .......................................................................... 2-15 Vehicle Capacity................................................................................................... 2-15 Person Capacity..................................................................................................... 2-22 Planning Applications ............................................................................................... 2-23 2. OPERATING ISSUES............................................................................................ 2-25 Introduction..............................................................................................................
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • “Limited LRT Connections” with the General Railroad System: How
    CROSSINGS AND SHARED CORRIDORS “Limited LRT Connections” with the General Railroad System How Small-Scale, Shared-Use Arrangements Advance U.S. Joint Operations Practices LEWIS AMES AICP WILLIAM GAMLEN P.E. Corridor principal conclusion of TCRP Report 52 is that there is potential in North America for joint A light rail–railroad operations, but under limited and controlled circumstances. The question of where these circumstances could exist in the United States that would be similar to Europe and Japan remains difficult to answer. It is argued that U.S. light rail transit agencies, by obtaining approvals and abilities to design, construct, operate, and maintain light rail–freight rail shared-use arrangements on small scales, are North America’s counterpart to Europe’s extended evolution toward mixed traffic on shared track. San Francisco’s new Third Street light rail extension illustrates this trend. The median running alignment crosses two lightly used freight industry leads. Unique operating, safety, and cost challenges exist at each rail-to-rail crossing. Shared-use arrangements were possible because of low freight volumes and a 3-year negotiated willingness by the Class I railroad to lease the two primary crossings in exchange for maintenance of the freight track and shared liability. The project outcome is a blend of railroad and transit design and operations. This outcome is possible because the transit agency expanded its capability to manage shared assets with both railroad and transit regulatory standards. By building expertise to manage assets shared by the general railroad system, light rail agencies are incrementally advancing U.S. capability to implement more complex shared systems at a future stage.
    [Show full text]
  • King County Metro Transit: Expanding Its Role from Service Provider to Mobility Manager
    Advancing Mobility Management King County Metro Transit: expanding its role from service provider to mobility manager Agency: King County Metro Location: Seattle, WA Service Area: King County, WA Modes: Bus, Rideshare, Vanpools, Paratransit services, Sound Transit’s regional Express bus service, Link light rail in King County, Seattle Streetcar, Water Taxi Community Context: King County Transit Advisory Commission, including residents, businesses, and other stakeholders appointed by the King County Executive and approved by the King County Council (formed by nine members representing the districts). Key Contacts: Name: Jean Paul Velez Position: Innovative Mobility Program Manager, King County Metro Email: [email protected] Phone: 206-477-7694 OVERVIEW King County Metro provides a wide range of transportation options for the King County. It operates the region’s largest bus network, vanpools, paratransit services, and several programs to promote ridesharing. It also operates Sound Transit’s regional Express bus service and Link light rail in King County, along with the Seattle Streetcar. Metro has a long history of innovations that expand the traditional transit services, from launching a vanpool program in the 1970s, to incubating car-sharing and bike-sharing programs in the 2000s. The more programmatic efforts to engage with the new mobility landscape began in 2016, with the agency moving from its role of service provider towards a broader role where it proactively leverages services to deliver better mobility for the region. The strategic research initiatives and service pilots considered in the Innovative Mobility Program are guided by the long-term plan Metro Connects, which reflects the King County Metro Transit’s vision for bringing people more services, more choices and one easy-to-use system over the next 25 years (2040).
    [Show full text]
  • Medical Priority Ferry Loading Request Send This Completed Form to the Following Address at Least Two Weeks Before the Requested Date(S): Pierce County Ferry, 2702 S
    Medical Priority Ferry Loading Request Send this completed form to the following address at least two weeks before the requested date(s): Pierce County Ferry, 2702 S. 42nd St., Ste. 201, Tacoma, WA 98409. When a vehicle occupant indicates through a physician that an extended wait to board the Pierce County ferry would cause detrimental health risks, that vehicle, with the occupants, may be allowed priority loading onto the ferry. This may be allowed when the affected person has provided this medical form signed by a physician indicating that such priority loading is advised. Note: 1. Medical appointments do NOT qualify. 2. Pierce County Ferry does not have medical facilities or trained medical practitioners on board any of its vessels. 3. Vehicle occupant must arrive at the ferry landing at least 20 minutes prior to the scheduled sailing time. For Physician Patient Name: Mailing Address: Phone: Email: Date(s) requested for priority loading: Make, color, and license number of vehicle: Priority loading requested: To Anderson Island From Anderson Island To Ketron Island From Ketron Island By signing below, physician attests that patient has a bona fide medical need for priority boarding on the date(s) indicated. Physician signature and title Date Name & location of practice Physician’s phone # For Ferry Administration Approved subject to: Authorized signature Date Instructions for Use 1. If you know the date of your scheduled surgery or procedure that would make extended waiting in ferry lines detrimental to your health, have your physician fill out and sign this form. Return the original form to our office at least 2 weeks prior to your procedure.
    [Show full text]
  • Boarding-The-Ferry.Pdf
    Welcome Please read this important information before boarding the ferry. For the Driver • You may park your vehicle in any of the four vehicle loading lanes (1 to 4). • After parking your vehicle, proceed to the Ferry Terminal to check-in and collect your boarding passes. • Following the vehicle loading announcement you should return to your vehicle and wait for our crew members’ loading instructions. You will need to present your boarding pass to the crew member. • Only the driver is to be present in the vehicle during loading. • Follow our crew member instructions when loading your vehicle. You may be required to drive on forward or reverse. Please pay particular attention to the crew on-board who will direct you to your parking spot. • If you think you may have difficulty boarding your vehicle, please ask a crew member to assist you. • Once you have your vehicle in position, you must ensure your car is in gear or in park and engage your parking brake. For Passengers • Please remain in or near the Ferry Terminal until the passenger boarding announcement is made. • Board the ferry as directed either via the passenger gate and ramp or via the air-bridge adjacent to the Terminal building. • Present your boarding pass to the crew member at the top of the gangway. • If you are taking a pet (dog) please board via the vehicle ramp and then proceed via the external stairs to the upstairs lounge area. An electric wheelchair is available. Please alert our team as early as possible if required. Cold drinks, snacks, light meals and great coffee are available to purchase inside the Ferry Terminals and also on board the ferries.
    [Show full text]