(Office) Building Project at Bommasandra Indushial Area, Hosur Road, Aftibele
Total Page:16
File Type:pdf, Size:1020Kb
OfFtCE COPY Proceedings of. the 2iltt'SEAC Meetine throush video conference held on 76th,l7th,79th, 2Fh&22ndlalv20zl Members Dresent L Shri. Venugopal V Chairman 2. Dr. Shekar H.S Member 3 Dr. J.B Raj Member 4 Shri. Nanda Kishore Member 5 Dr. S.K. Gali Member 6 Shri. Vyshak V Anand Member Shri. Dinesh MC Member 8 Shri. Devegowda Raju Member 9 Shri.Sharanabasava Chandrashekhar Pilli Member 10. Shri I G Kaveriappa Member 11. Shri. Mahendra Kumar M C Member 12. Shd. B V ByraReddy Member 13. Dr.SarvamangalaR. Patil Member 1.4. Shd. B. Ramasubba Reddy Member 15. Smt Saswati Mishra, IFS Member Secretary Officaials preseqt K8 1 RavikumarJ K Sc O-1 2 Kirankumar B S Sc O-1 J Suhas H S Sc O-1 The Chairman welcomed the members and initiated the discussion. The proceedings of the 262"d and 263'a meeting were read and accepted. Subiects Appraised - 1$t lsne 2027 Fresh Proiects 264.1. Expansion & Modification of ITITES and R&D (office) Building Project at Bommasandra Indushial Area, Hosur Road, Aftibele Page 1 of 219 Hobali, Anekal Taluk, Bengaluru Urban District by I\,I/s. Delta Elechonics India Pvt. Ltd., (SEIAA 35 CON 2021) About the Project 1. Name of the project proponent Mr. Ajay Kumar M/s. Delta Electronics India pvt. Ltd. Survey No. 56 & 57 of Bommasandra Village), Bommasandra Industrial Area, Hosur Road, AttibeleHobali, Anekal Taluk, Bengaluru- 560099. 2. Name & Location of the project Proposed Expansion & Modification ol ITIITES and R & D (OfIice) Building Project.At Plot No.69-A, 69-8, 69-C, & 69-D (Survey No. 56 & 57 of Bommasandra Village), Bommasandra Industrial Area, Hosur Road, AttibeleHobali, Anekal Taluk, Bengaluru- 560099. Type 3. of development Expansion & Modification of IT/ITES and R & D (office) Building prolect. a) Residential / Apartment/ villas/ Row IT,/ITES and R & D Office Building project houses / otfice/ lT / ITES/ Mall/ Hotel/ Hos ital /others b) Residential towrship/ area NA devel t ects 4. New/ expansion/ modification / Modification & Expansion. renewal 5. Water bodies /Nallas at the vicinitv of Kammasandra Lake -0.80 km (NE) proiect site Chandapura Lake-2.90 km (SE) Muthanallur Lake -4.45 km (E) Hennagara Lake-4.63 k- (SVV) Bommasandra lake-1.95 km (SE) Hebbagodi Lake Park-l.O km (NW) Thirupalya Lake-'1..62 k^ (1{) 6. Plot area -Sqm 28,747.00sqm 7. Built up area -Sqm 87,402.76 sqm 8. Buildingconfiguration a No of blocks/ Towers 4Blocks ( Office Block, Parking Block, GFB Lab, Dormitory) a No of basements & Upper Office Block -28+GF+10 UF floors Parking Block- 2B+GF+6 UF GFB t^ab-(G+2) Dormitory-(B+G+6) Page 2 of 219 9. Project cost - Rs in crores Rs. 149 Cr. 10. Ground coverage area 9473.139qm 11. Disposal of demolition waste and /or S. Excavated Soil Quantity excavated earth No Total 12,750cum 1 Excavation for 1350 cum Foundation 2 Excavation for 9000 cum Basement 3 Backfilling for 1800 cum foundation 4 Top soil used for 600.34 cum landscape (Top 0.2*) 12. FAR Permissible 2.50 Proposed 7.78 13.Water-operational phase o Source Bommasandra Industrial Water Supply .Quantity-KLD 280 KLD o Waste water generation-KlD 256 KLD 14.STP capacity-KLD 260KLD 15,Scheme of disposal of excess treated Excess treated water will be disposed to sewer water line. 16.Waste generated -inkg/ day 1,25tkg/day .Bio degradable waste and disposal 750 kg/ day converted in to organic manure and used for garden . Non-Bio degradable waste and 501 kg/day given to KSPCB authorized disposal recycler. Hazardous waste and disposal Spent Oil will be disposed to KSPCB authorized recycler. 17.CER activities proposed The budget for CER is Rs. 25 Lakhs which is proposed to be spent on the following activities in Bommasandra village. Total CER fund will be spent to below mentioned following activities with yearly wise budget allocations. S.No Activities Yeai - Year- Year- Total z}27 xt22 ma (Rs. In l,akhs) 1 Plantation in 1 lakhs I lakhs I lakhs 3lakhs KIADB and maintenance Page 3 of 219 for three years (1m0 saplings ) in asiooation with DFO Bannerghatta . 2 Provision of 5 5 5 15 solar street Ial:hs taLhs lakhs lakhs lights in the KIADB area in ass(Eiation with BIA (Bomrnasandra indu-strial associahon ) 3 Development 2.O 1.5 2 lakhs of compuher Lakhs lakhs laldrs lab in bommasandra industrial area aisociahon building for women skill development 95 E 7.5 B Lakhs Iakhs takhs Lakhs During Construction: 18.EMP Capital cost- 34.00 lakhs Recurring cost - lOlakhs/ annum During Operation: Capital cost- 135 lakhs Recurring cost - 18 lakhs/ annum EC was earlier issued on07/03/2017 for BlJAof 59,g03.95sqm and now proposed with BUA of 81,402.768m. obtained earlier CFE from KSpCB on 31/03/2017. As per the Certified Compliance Report issued by MOEF&CC on dated:23f 06/2021, compliance to EC conditions were satisfactory and all the conditions have been largely complied. The proponent affirmed that area of 7,7s0.61S,i,m (26.96%) will be Ieft for green belt development and had made provision for planting 359Nos of trees. Proponent informed 27Nos of recharge pits wilr be provided for RWH in the site area and assured to use maximum roof area for solar power generation. Excavated earth within the plot area will be utilized for land scaping. The proponent has made provisions for parking for 512Nos of Car and 52Nos of truck. 4 of 219 Proponent agreed to submit consent letter from KIADB for supply of water requirements before issual of EC to SEIAA. The committee decided to recommend the proposal to SEIAA for issue of EC with the condition that consent letter from KIADB should be submitted to SEIAA for supply of water during operational phase. Action: Member Secretary, SEAC to forward the proposal to SEIAA for further necessary action. 264.2 Residential Apartment Proiect at Kyalasanahalli Village, K.R. Puram Hobli, Bangalore East Taluk, Bengalore Urban District by M/r. LEWrS INFRA STRUCTURE &PROJECTS (SEIAA3TCON 2021) About the Project 1.Name of the project proponent Mr. Santhosh Lewis Partner M/s. Lewis Inlrastructure and Projects No.3A, Tawakkal Chancery, Banaswadi road, Cooke town, Bangalore- 560005 2.Name & Location of the project Proposed Residential Apartment Project by M/s. Lewis Infrastructure and Projects at Sy No. 79/2, Katha No.4, Kyalasanahalli Village, K R Puram Hobli, Bangalore East Taluk, Bangalore Urban District, Karnataka 3.Type of development a) Residential / Apartment/ villas/Row Proposed Residential Apartment houses/ office/ ITl ITES/Matl/ Hotel/Hospital /others b) Residential township/area development NA prolects 4.New / expansion/ modification / renewal New S.Water bodies /Nallas at the vicinity of project Doddagubbi Lake - 1.30 Kms (NE) site Kalkeri lake - 1.68 Kms (S) We Have 15m buffer left from the tertiary Nala at west and east side from the site 6.P1ot area -Sqm 10,116.87 sq.m T.Built up area -Sqm 29,253.41 sq.m. Page 5 of 219 8.Bui confi ation Construction of Residential Apartment project comprising of 2 Blocks "Block A having 1 Stilt Floor + Ground Floor + 3 Upper Floors + Terrace Floor "Block B having 1 Stilt Floor + Ground Floor + 3 Upper Floors + Terrace Floor and a Club house. 9. Pr t cost- Rs in crores Rs.58 Cr. 10. Ground coverage area 4,997.94 sq.m (49.40%) 11. Landscape area 3,450.0 sq.m (34.10%) 12. FAR FAR Area= 19,044.68 Sq.m Achieved FAR: 1.88 Permissible FAR : 3.25 l3.Disposal of demolition waste and /or Total quantity of Excavated earth excavated earth (in cubic meter) - 4,480.0 For back filling for footings= 2,240.W For Site filling = 51.19 For back filling for Retaining wall= 20.97 For Landscape = 1,333.37 For Internal Road makin = 834.47 14.Wa ational hase . Source BWSSB .guanti -KLD 111.60 KLD .Waste water eneration-KLD 106.02 KLD 15.STP ca cl -KLD 125 KLD 16.Scheme of disposal of excess treated water Excess treated water is used for avenue plantation and construction ose 17.Waste erated -in da 320.0 k da . Bio degradable waste and disposal 192.0 kg/ day converted in to organic manure and used for arden oNon-Bio degradable waste and disposal '128.0 kg/ day given to PCB authorized rec cler . Hazardous waste and disposal Waste oil: 100-500 L/year given to PCB authorized rec cler 18. Rain water harvesting 270Cum capacity storage tank and 10nos of rechar its Be 6 of 219 19.CER activities proposed Year Corporate Environmental Responsibility (CER) Budget (Rs.) 1st Rain Water Harvesting in Schools and colleges x,20,m0/- 2nd Avenue planation and planation in community places 23,20,000/ - 3rd Solar Panels Provision in nearby community places 23,20,000/ - 4th Drinking Water and Sanitation facility supply in nearby 23,20,000/ - community places 5th Health camp in nearby community places 23,20,000/ - 20.EMP (Conshuction & Operation) Construction phase capital Cost : 48.46lakhs recurring Cost : 10.93l,akhs Operation phase Capital Cost: 225 lakhs Recurring Cost : t14.2 lakhs The proposed project is for construction 160 units of Residential Apartmentshaving total BUA of 29,253.41fi.m. Proponent informed that there are tertiary nalas in westem and eastern side of the project area and they have proposed to leave buffer of 15mtrs for each of the nalas as Per applicable norrrrs. The proponent affirmed, of 3450Sqm area (34.1.0%) will be leftfor green belt development and made provision for planting 126Nos of trees.