Strathalbyn Station

Total Page:16

File Type:pdf, Size:1020Kb

Strathalbyn Station Post Conference Field Trip 26 - 27 July 2019 Lower Burdekin and Bowen River Acknowledgements Firstly, I would like to acknowledge the Birriah People, the traditional owners of the land we will be traversing over the two-day field trip. Thanks to the following for their assistance with the organisation of this field trip and the rehabilitation works at the various sites: Field Guide Authors: Andrew Brooks1, James Daley1, Justin Stout1, John Spencer1, Robin Thwaites1, Nic Doriean1, Damon Telfer2, Rebecca Bartley3; Glenn Dale4, Rod Kerr5 1 Griffith University; 2Fruition Environmental; 3 CSIRO; 4 Verterra, 5NQ Dry Tropics Field Trip Organisation: Tracey Rehbein and Amy Warnick, CSIRO To Strathalbyn Station landholders Bristow and Uriesha Hughes for facilitating the large-scale gully rehabilitation works on their property; to the Queensland Government and Greening Australia’s Reef Aid program for funding the gully rehabilitation trials; to Lynise Wearne and Sunny Behzadnia from Greening Australia for overseeing the project and for the monitoring equipment setup and sample collection (along with Damon Telfer); To Paul and Sally Fry from Strathmore Station; Owen and Michele Howard from Hell’s Gate Station & Warren Woodhouse from Mt Wickham Station; The rehabilitation at Mt Wickham Station was undertaken as part of the Qld Government/NQ Dry Tropics Land Holders Driving Change project. The project design and oversight were undertaken by the Verterra/Alluvium Joint Venture, and the monitoring was undertaken by Aaron Hawdon from CSIRO. A very special thank you to Clare and Ringo, our wonderful hosts at the Bowen River Hotel. And finally, to all our sponsors and collaborators as listed below. : The Conference Sponsors are listed at the end of this document. 2 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Program Day 1 (Friday 26th July) Townsville to Strathalbyn – via Tondara Rd 3.5 hrs driving + 15 mins rest stops Time Details 8:00 Depart Rydges Hotel Stop 1 11:45 Strathalbyn Station Gully Rehab Site Schedule on Site: 11:45 – 12:30 Introduction to Site & Background – Location - Site Office • A/Prof. Andrew Brooks – Introduction of Key Participants – incl. Landowner Bristow Hughes; Why this site was selected; Overall Significance of site to GBR Water Quality. • Dr Lynise Wearne (Greening Australia) – Background to Innovative Gully Project & Overview of Site Treatments; • Damon Telfer (Fruition Environmental) Detailed descriptions of Site Treatments and Monitoring Strategy. • Rod Kerr (NQ Dry Tropics) Cattle Stomping Project. Nic Doriean (Griffith University) Time integrated sampling. 12:30 – 13:00 Lunch 13:00 – 15:00 Damon Telfer/Rod Kerr - Tour of site with explanation of the various treatments and the issues confronted and lessons learnt with each along the way. 15:00 Depart Northern Gully Rehab Site Stop 2 15:15 Strathalbyn Black soil gullies 15:30 Depart Strathalbyn for Bowen River Hotel via Johnny Cake Road 17:00 Arrive Bowen River Hotel Figure 1 Overview of Strathalbyn Gully Rehabilitation Site October 2018, immediately post-construction (Andrew Brooks) | 3 Figure 2 Dawn at the Bowen River Hotel (Andrew Brooks) Day 2 (Saturday 27th July) Bowen River sites Time Details 8:00 Depart Bowen River Hotel Stop 1 8:05 Bowen River Hotel Airstrip alluvial gullies • Griffith University PrESM Team – overview of Semi-automated gully mapping and baseline sediment yield quantification Stop 2 9:15 – 10:30 Hell’s Gate Station Hillslope Colluvial gully systems • Welcome – Landholder Owen Howard. • Griffith University PrESM Team – Over of site & challenges associated with managing extensive distributed gully systems in Granodiorite colluvium. Stop 3 11:00 – 12:30 Mt Wickham Gully Rehabilitation Site • Overview of Site – Dr Glen Dale & Peter Wilkinson (Verterra) • Site Monitoring – Dr Rebecca Bartley (CSIRO) 12:35 Depart for Bowen River Hotel 13:00 – 14:00 Lunch 14:00 Depart Bowen River Hotel for Townsville – via Strathmore Road and Bowen Development Rd. 18:00 Arrive Townsville 17:00 Arrive Bowen River Hotel 4 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Figure 3 Location Map showing the sites visited during the field trip | 5 Overview and Introduction A warm welcome to you all on the 8ISGE Post conference field trip. Strap in for what will be, at times, a slightly bumpy ride on some back roads, where we will visit some unique gullied landscapes and experience some great Aussie country hospitality at one of the original old country pubs in the Bowen River district. As you have heard throughout the symposium over the last few days, poor water quality from catchment sediment and nutrient runoff is one of the major threats to the Great Barrier Reef (GBR), and a large proportion of this pollution (40-50 % on average) is sourced from gully erosion. In some sub-catchments this proportion is even greater than 50 % of the catchment sediment sources. Where we are heading on this trip is one of the major hotspots for gully erosion in the GBR catchments. Over the next two days we will be touring through the lower Burdekin catchment and into the Bowen River sub- catchment, which has been identified from both sediment-tracing and monitoring studies (Bainbridge et al., 2014) as being the highest sediment yielding sub-catchment in the Burdekin river, and indeed the entire Great Barrier Reef (Table 1). We also know that there are high concentrations of extremely active gullies in this catchment, and as such gully rehabilitation is a high priority within this area. During this trip we will visit two gully rehabilitation sites where we will see a broad array of different approaches that have been used to stabilise large alluvial gully systems (see separate document from Fruition Environmental). In addition, we will discuss the pros and cons of different gully treatments, as well as issues associated with scaling up these projects to such an extent that will make a quantifiable difference to sediment loads at the catchment scale. A big ask, considering the stated aim of the Australian and Queensland Government’s water quality targets for the Burdekin catchment by 2022 is to reduce mean annual fine sediment loads (< 20 µm) by 890,000 tonnes at the coast (Table 2)! Efforts to date have achieved perhaps 1% of this target. We will also visit a number of other sites to witness the diversity of gullies in the area and discuss some of the methods we are using to map the distribution of gullies, and to quantify their sediment yields. This is a key component in the unique challenges in managing the sediment loads from these very complex gullied landscapes. The team from Griffith University who are your hosts for the next two days, wish you all the very best on your gully tour through the backblocks of the Bowen River, and look forward to good times and many stimulating conversations. Best Regards, Andrew Brooks – Griffith University 6 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Table 1 summary of the relative contributions of various sediment size fractions from the Bowen and lower Burdekin to the Burdekin River outlet. Table 2 Reef 2050 Water Quality Targets (for 2025) | 7 Figure 4 Extent of gullies mapped across the Strathalbyn LiDAR block (2016) and underlying 1:100000 surface geology 8 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Figure 5 Extent of gullies mapped across the Mt Wickham LiDAR block (2017) and underlying 1:100000 surface geology | 9 Site 1 | Strathalbyn Station This site was identified from a 2015 aerial survey along the Bowen and lower Burdekin rivers as being an aggregation of active alluvial gullies within a relatively confined area (Figure 6). Closer inspection and subsequent analysis of the evolutionary trajectory of these gullies showed them to be producing large amounts of sediment. Figure 6 locality map – Strathalbyn Station Alluvial gully aggregation 10 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Figure 7 Map of the same gullies shown in Figure 6, showing the catchment area to each of the gullies. The active gully area is depicted in yellow | 11 10000 A 1000 100 YIELD (T/YR) 10 1 South_11 South_36 South_41 South_47 South_49 South_51 South_53 South_55 South_57 South_59 South_61 South_63 South_65 South_67 South_69 North_05 North_07 Central_27 Central_30 Central_38 Central_40 Central_42 Central_48 Central_63 Central_65 Central_72 Central_74 Central_76 Central_78 800 B 700 600 500 400 300 YIELD (T/HA/YR) 200 100 0 Central_… Central_… Central_… Central_… Central_… Central_… Central_… Central_… Central_… Central_… Central_… Central_… South_11 South_36 South_41 South_47 South_49 South_51 South_53 South_55 South_57 South_59 South_61 South_63 South_65 South_67 South_69 North_05 North_07 Figure 8 Graphs of the mean annual sediment yield from the 29 gullies shown in Figure 6(A) and the specific sediment yield (B). Note the disparity between total and specific yield. 20 y = 0.5469x0.8145 R² = 0.9802 15 10 gully area (ha) area gully 5 0 0 20 40 60 80 100 gully catchment area (ha) Figure 9 Relationship between active gully area and gully catchment area at the Strathalbyn site (as per Figure 7) 12 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER Historical Sediment Yields – Strathalbyn Gullies 2016 1985 1972 2013 2003) + Google Earth imagery (2013) and LiDAR (2016) of the northern gully group. – 1956 2003 Historical airphoto sequence (1956 10 Figure Figure 10 Historical airphoto sequence | 13 Figure 11 Digitised changes in gully area for the historical airphoto sequence (1945 – 1995) and LiDAR extent for the 2016 time slice in the northern gully group showing the growth of the gullies over the last 72 years. 14 | POST CONFERENCE FIELD TRIP | LOWER BURDEKIN AND BOWEN RIVER B A Figure 12 DEM of Difference (A) derived from the reconstructed gullied landform (B) | 15 Table 3 Mean annual sediment yield derived from the historical reconstruction of the gully expansion ( 70 y = 10.087e4E-05x 60 R² = 0.9929 Total 50 North Central 40 South 3E-05x Hectares 30 y = 6.9089e Expon.
Recommended publications
  • Surface Water Ambient Network (Water Quality) 2020-21
    Surface Water Ambient Network (Water Quality) 2020-21 July 2020 This publication has been compiled by Natural Resources Divisional Support, Department of Natural Resources, Mines and Energy. © State of Queensland, 2020 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. Note: Some content in this publication may have different licence terms as indicated. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Summary This document lists the stream gauging stations which make up the Department of Natural Resources, Mines and Energy (DNRME) surface water quality monitoring network. Data collected under this network are published on DNRME’s Water Monitoring Information Data Portal. The water quality data collected includes both logged time-series and manual water samples taken for later laboratory analysis. Other data types are also collected at stream gauging stations, including rainfall and stream height. Further information is available on the Water Monitoring Information Data Portal under each station listing.
    [Show full text]
  • Sunwater Irrigation Price Review: 2012-17 Volume 2 Bowen Broken Rivers Water Supply Scheme
    Draft Report SunWater Irrigation Price Review: 2012-17 Volume 2 Bowen Broken Rivers Water Supply Scheme November 2011 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222 0599 [email protected] www.qca.org.au © Queensland Competition Authority 2011 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Queensland Competition Authority Submissions SUBMISSIONS This report is a draft only and is subject to revision. Public involvement is an important element of the decision-making processes of the Queensland Competition Authority (the Authority). Therefore submissions are invited from interested parties. The Authority will take account of all submissions received. Written submissions should be sent to the address below. While the Authority does not necessarily require submissions in any particular format, it would be appreciated if two printed copies are provided together with an electronic version on disk (Microsoft Word format) or by e-mail. Submissions, comments or inquiries regarding this paper should be directed to: Queensland Competition Authority GPO Box 2257 Brisbane QLD 4001 Telephone: (07) 3222 0557 Fax: (07) 3222 0599 Email: [email protected] The closing date for submissions is 23 December 2011. Confidentiality In the interests of transparency and to promote informed discussion, the Authority would prefer submissions to be made publicly available wherever this is reasonable.
    [Show full text]
  • Surface Water Section 11 Surface Water
    Vol 3 Tab Dividers:Layout 1 16/9/10 10:17 AM Page 11 11 Alpha Coal Project Environmental Impact Statement 11 Surface Water Section 11 Surface Water 11.1 Introduction This section describes the existing environment for water resources that may be affected by the Alpha Coal Project (Rail) (herein referred to as the Project) in the context of environmental values as defined in such documents as the Environmental Protection Act 1994 (EPA), Environmental Protection (Water) Policy 2009 (EPP Water), the National Water Quality Management Strategy 2000 (NWQMS) Australian and New Zealand Environment and Conservation Council (ANZECC), the Environmental Protection Agency (EPA) Guideline: Establishing Draft Environmental Values and Water Quality Objectives and the Queensland Water Quality Guidelines 2006. The definition of waters in the EPP (Water) includes the bed and banks of waters, so this section shall address impacts on benthic environment, as well as the water column. For the purposes of this assessment, the study area refers to all waterways and related catchments that are intersected by the Project, both upstream and downstream from the Alpha Coal Mine to the Port of Abbot Point. The majority of the Project is located within the approximately 130,000 km2 Burdekin Basin catchment. The northern part of the Project is located within the much smaller Don River catchment which spans across 3,885 km2 of land (refer to Figure 11-1). The Burdekin Basin catchment is divided into six sub- catchments or sub-basins, three of which are crossed by the Project: x Belyando Suttor sub-basin; x Bowen Broken sub-basin; and x Lower Burdekin sub-basin.
    [Show full text]
  • Erosion Processes and Sources in the Burdekin Dry Tropics Catchment (RP65G)
    Erosion processes and sources in the Burdekin Dry Tropics catchment (RP65G) Synthesis Report Chemistry Centre, Landscape Sciences June 2015 Identifying erosion processes and sources in the Burdekin Dry Tropics catchment (RP65G) – Synthesis Report Prepared by Project team members Joanne Burton a (Project Leader) Taka Furuichi a (KG2 Section Leader) Stephen Lewis b (KG3 Section Leader) Jon Olley c Scott Wilkinson d (KG1 Section Leader) Zoe Bainbridge b a: Department of Science, IT, Innovation and Arts, Brisbane, QLD b: Centre for Tropical Water and Aquatic Ecosystem Research, James Cook University, Townsville, QLD c: Australian River Institute, Griffith University, Nathan, QLD d: CSIRO Land and Water, Canberra, ACT Landscape Sciences Science Division Department of Science, Information Technology and Innovation PO Box 5078 Brisbane QLD 4001 © The State of Queensland (Department of Science, Information Technology and Innovation) 2015 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 3.0 Australia (CC BY) licence Under this licence you are free, without having to seek permission from DSITI, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland, Department of Science, Information Technology and Innovation as the source of the publication. For more information on this licence visit http://creativecommons.org/licenses/by/3.0/au/deed.en Disclaimer This document has been prepared with all due diligence and care, based on the best available information at the time of publication. The department holds no responsibility for any errors or omissions within this document.
    [Show full text]
  • Surface Water Network Review Final Report
    Surface Water Network Review Final Report 16 July 2018 This publication has been compiled by Operations Support - Water, Department of Natural Resources, Mines and Energy. © State of Queensland, 2018 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. Note: Some content in this publication may have different licence terms as indicated. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Interpreter statement: The Queensland Government is committed to providing accessible services to Queenslanders from all culturally and linguistically diverse backgrounds. If you have difficulty in understanding this document, you can contact us within Australia on 13QGOV (13 74 68) and we will arrange an interpreter to effectively communicate the report to you. Surface
    [Show full text]
  • Background Briefing on Environmental Protection and Development
    Background Briefing on Environmental Protection and Development Great Barrier Reef World Heritage Area Prepared by the Queensland LNG Industry | May 2013 Contents Purpose 1 Context 2 Key Themes 3 General 3 1. LNG Safety 3 2. Economic Contribution 3 3. Environmental Management 4 4. Environmental Protection and Development 4 5. Gladstone Harbour Historical Context 4 6. Australia’s Exemplary Record on World Heritage 5 7. Fair Treatment of Australia 5 LNG Safety 6 Economic Contribution 8 Environmental Management 9 Environmental Protection and Development 10 Gladstone Harbour Historical Context 11 Australia’s Exemplary Record on World Heritage 12 Fair Treatment of Australia 13 Questions and Answers 15 Contacts BC 142°E 144°E 146°E 148°E 150°E 152°E 154°E S ° 0 1 TORRES STRAIT Ashmore Reef Thursday Island Ja rd in e R iver Jardine River NP River unty lh S u S ° D Cape Grenville ° 2 er 2 1 Riv 1 Olive W enloc k R iv e r Iron Range NP L o ck h a C O R A L S E A r t R i ve r Mungkan Archer Rive Kandju r Great Barrier Reef NP Marine Park KULLA (excludes harbours and islands) (McIlwraith Range) Osprey Reef S er S ° v NPA ° Ri Flinders Group 4 l 4 al 1 Ken d NP 1 r d Rive Holro y Ann r ie R e iver Cape iv R Melville E in dw k ard u r NP R ive r L e iv Cole ma n River R ad he re Lakefield Jack River o Starcke M NP NP NP r Mitchell- e iv COOKTOWN Alice Rivers R a % r C A P E Y O R K u NP a L e Cedar Bay P E N II N S U L A tl it L NP iver r R Palmer Goldfield S me S ° P al RSR ° 6 Daintree 6 1 NP 1 Cape Tribulation Holmes Reef r Mount Windsor ive ll
    [Show full text]
  • Legislative Assembly Hansard 1876
    Queensland Parliamentary Debates [Hansard] Legislative Assembly TUESDAY, 31 AUGUST 1876 Electronic reproduction of original hardcopy 584 Stamp Duties Amendment Bill. [ASSEMBLY.] Adjou-rnment, LEGISLATIVE ASSEMBLY. Tuesda,IJ, 31 August, 1876. Adjournment.-Railway Survey to the Border.-The late Judge Blakeney.-Parliamentary Buildings.-Bridge across the Burdekin River.-Gowrie Railway Acci­ dent.-Adjournment.-Railway Survey from Bowen to Bowen River.-Queensland Nationai Bank Bill • .A.DJOURNM:ENT. Mr. MAcRoss.A.N said he rose to move the adjournment of the House for the purpose o[ bringing a matter of some importance under the notice of the Government and of horror­ able members. It was within the recollec­ tion of honorable members no doubt, that on the previous day he had asked the Premier whether the Government had taken any steps to discover the practicability of making a road from Trinity Bay to the Hodgkinson Gold Field ; and if so, what steps ; and that the answer then given by the honorable gen­ tleman was that no steps had been taken. Now, he thought it must be plainly intelli­ gible to every honorable member that the Government were hardly aware of the im­ portance of opening up a road between those places ; ihey did not seem to be aware that the distance from the Hodgkinson Gold Fields to Trinity Bay was, according to the reports of men who had gone to within a distance of only a few miles from the port, only eighty miles, whilst the distance by the present road from Cooktown to the Hodgkinson was two hundred miles. On the present road there were also several large rivers to be crossed, whilst on the other track there were none.
    [Show full text]
  • Great Barrier Reef Catchment Loads Monitoring Report 2010-2011
    Total suspended solids, nutrient and pesticide loads (2010-2011) for rivers that discharge to the Great Barrier Reef Great Barrier Reef Catchment Loads Monitoring 2010-2011 Prepared by: Department of Science, Information Technology, Innovation and the Arts © The State of Queensland (Science, Information Technology, Innovation and the Arts) 2013 Copyright inquiries should be addressed to [email protected] or the Department of Science, Information Technology, Innovation and the Arts, Brisbane Qld 4000 Published by the Queensland Government, 2013 Water Sciences Technical Report Volume 2013, Number 1 ISSN 1834-3910 ISBN 978-1-7423-0996 Disclaimer: This document has been prepared with all due diligence and care, based on the best available information at the time of publication. The department holds no responsibility for any errors or omissions within this document. Any decisions made by other parties based on this document are solely the responsibility of those parties. Citation: Turner. R, Huggins. R, Wallace. R, Smith. R, Vardy. S, Warne. M St. J. 2013, Total suspended solids, nutrient and pesticide loads (2010-2011) for rivers that discharge to the Great Barrier Reef Great Barrier Reef Catchment Loads Monitoring 2010-2011 Department of Science, Information Technology, Innovation and the Arts, Brisbane. This publication can be made available in alternative formats (including large print and audiotape) on request for people with a vision impairment. Contact (07) 3170 5470 or email <[email protected]> August 2013 #00000 Executive summary Diffuse pollutant loads discharged from rivers of the east coast of Queensland have caused a decline in water quality in the Great Barrier Reef lagoon.
    [Show full text]
  • Urannah Project Initial Advice Statement
    Initial Advice Statement Document number: BRU.1.4.1_IAS This study is supported by funding from the Australian Government National Water Infrastructure Development Fund, an initiative of the Northern Australia and Agricultural Competitiveness White Papers. For further information please contact: Bowen River Utilities Pty Ltd Preferred citation: Bowen River Utilities Initial Advice Statement Document History: Author Reviewer Approved for Issue Revision Name Signature Name Signature Date 1 S Jensen G Squires J Skene 30/03/2020 R Clemmey L Rolfe 0 B Laxman R Robertson On file J Skene On file S Jensen G Squires Executive Summary The Mackay, Isaac and Whitsunday Region is one of Queensland’s most productive regions. While coastal communities support a strong tourism sector, the regional economy is primarily founded on agriculture and mining in western areas where the region takes in the coal-rich Bowen Basin. Water security is critical in this part of Queensland, which experiences a highly variable climate and regular droughts and cyclones. Safe, accessible and reliable water supplies are an essential regional resource and underpin both community health and economic growth. The Urannah Project is being investigated to harness the unallocated water held as strategic reserve for water infrastructure in the Bowen and Brocken sub-catchments under the Water Plan (Burdekin Basin) 2007 (Burdekin Water Plan). The Urannah Project provides a unique opportunity due to its location and proximity to the electricity grid, topography, catchment hydrology, and landholdings to support a large scale, multifaceted water supply and renewable energy project. The Urannah Project comprises the proposed construction and operation of a new dam on the Broken River at Urannah in Central Queensland, a water distribution network including connecting water pipelines and instream distribution and storage of water, an irrigation precinct and a pumped hydro- electric scheme, together with supporting ancillary infrastructure and associated works.
    [Show full text]
  • Early North Queensland
    EARLY DAYS IN NORTH QUEENSLAND EARLY DAYS IN NORTH QUEENSLAND BY THE LATE EDWARD PALMER SYDNEY ANGUS & ROBERTSON MELBOURNE: ANGUS, ROBERTSON & SHENSTONE 1903 This is a blank page TO THE NORTH-WEST. I know the land of the far, fa y away, Where the salt bush glistens in silver-grey ; Where the emit stalks with her striped brood, Searching the plains for her daily food. I know the land of the far, far west, Where the bower-bird builds her playhouse nest ; Where the dusky savage from day to day, Hunts with his tribe in their old wild way. 'Tis a land of vastness and solitude deep, Where the dry hot winds their revels keep ; The land of mirage that cheats the eye, The land of cloudless and burning sky. 'Tis a land of drought and pastures grey, Where flock-pigeons rise in vast ark ay ; Where the " nardoo" spreads its silvery sheen Over the plains where the floods have beeh. 'Tis a land of gidya and dark boree, Extended o'er plains like an inland sea, Boundless and vast, where the wild winds pass, O'er the long rollers and billows of grass. I made my home in that thirsty land, Where rivers for water are filled with sand ; Where glare and heat and storms sweep by, Where the prairie rolls to the western sky. Cloncurry, 1897. —" Loranthus." W. C. Penfold & Co., Printers, Sydney. PREFACE. HE writer came to Queensland two years before T separation, and shortly afterwards took part in the work of outside settlement, or pioneering, looking for new country to settle on with stock.
    [Show full text]
  • Stream Gauging Station Network
    Stream Gauging Station Network 2019–20 October 2019 This publication has been compiled by Natural Resources Divisional Support – Water, Department of Natural Resources Mines and Energy. © State of Queensland, 2019 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. Note: Some content in this publication may have different licence terms as indicated. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Interpreter statement: The Queensland Government is committed to providing accessible services to Queenslanders from all culturally and linguistically diverse backgrounds. If you have difficulty in understanding this document, you can contact us within Australia on 13QGOV (13 74 68) and we will arrange an interpreter to effectively communicate the report to you. Summary This document lists the stream gauging station sites which make up the Department of Natural Resources, Mines and Energy’s stream height and stream flow monitoring network (the Stream Gauging Station Network).
    [Show full text]
  • Bowen Collinsville Enterprise Inc. DELIVERING LONG TERM ECONOMIC BENEFITS to the BOWEN & COLLINSVILLE COMMUNITIES
    bowen collinsville enterprise inc. DELIVERING LONG TERM ECONOMIC BENEFITS TO THE BOWEN & COLLINSVILLE COMMUNITIES bowen collinsville enterprise inc. DELIVERING LONG TERM ECONOMIC BENEFITS TO THE BOWEN & COLLINSVILLE COMMUNITIES This Strategic Business Case (SBC) has been prepared creation of the Enterprise Whitsundays (EW) in by Bowen Collinsville Enterprise Group Inc. to provide February 2009 to function as the peak regional a summary of the key elements of the proposed economic organisation. EW was disbanded in 2013 Urannah Dam project. and Whitsunday Marketing and Development The report brings together a range of data from (WMDL) took over this role previous studies and investigations into the Urannah BCE continues to operate in an advisory capacity to Dam project, reflecting this pre-existing data in the Whitsunday Regional Council (WRC) and Whitsunday context of current industry needs and development Marketing and Development (WMDL) on strategic opportunities. and community issues relating to the Bowen and The purpose of this SBC is to establish high level need Collinsville communities. for a Preliminary Business Case (PBC) with the Strengths of BCE as a group: financial support of Australian Government National • BCE is an apolitical Organisation – Water Infrastructure Development Fund. The further preparedness to talk government and works will be to undertake a detailed feasibility private sector agencies; groups and individuals; regardless of their political analysis and engineering design scoping study into orientation the Urannah Dam project. • Strong community and industry links – board Bowen Collinsville Enterprise Group Inc. members bring to the table a wide range of Bowen Collinsville Enterprise (BCE) was established in industry knowledge, experience and networks within the Bowen and Collinsville 1997 to formulate and implement an Economic communities.
    [Show full text]