Radioactivity in Food and the Environment, 2002

Total Page:16

File Type:pdf, Size:1020Kb

Radioactivity in Food and the Environment, 2002 RIFE - 8 Radioactivity in Food and the Environment, 2002 2003 ENVIRONMENT AGENCY ENVIRONMENT AND HERITAGE SERVICE FOOD STANDARDS AGENCY SCOTTISH ENVIRONMENT PROTECTION AGENCY Radioactivity in Food and the Environment, 2002 RIFE - 8 October 2003 1 This report was compiled by the Centre for Environment, Fisheries and Aquaculture Science on behalf of the Environment Agency, Environment and Heritage Service, Food Standards Agency and the Scottish Environment Protection Agency. © Crown Copyright, 2003 Requests for the reproduction of materials contained in this report and for other information should be addressed to: • In England and Wales, Radiological Monitoring and Assessment, Monitoring and Assessment Process Group of the Environment Agency ([email protected]) or the Radiological Protection and Research Management Division of the Food Standards Agency ([email protected]) • In Scotland, the Radioactive Substances Unit of SEPA ([email protected]) and • In Northern Ireland, the Industrial Pollution and Radiochemical Inspectorate of EHS ([email protected]) 2 FOREWORD We are pleased to present the 8th annual Radioactivity in Food and the Environment (RIFE) report, which contains radiological monitoring data for 2002. This report is a major step forward in the reporting of radiological monitoring. For the first time, the RIFE report contains data from monitoring of food and the environment throughout the UK. This work is a collaboration among four Agencies: the Food Standards Agency, the Scottish Environment Protection Agency, the Environment Agency and the Environment and Heritage Service of Northern Ireland. The collaboration enables the Agencies to present a better assessment of the overall impact of radioactive discharges on food safety and the environment. The partnership also shows the commitment of the Agencies to provide a comprehensive report of monitoring data and their intention to work closely together to ensure protection of the public. The report shows that in 2002 radiation doses to the public resulting from radioactive discharges to the environment were well below national and international limits in all parts of the UK. An essential part of assessing the impact of radiological discharges is the estimation of dose to the public. We are pleased to note that significant progress is being made on an improved method of calculating doses. The improved methodology takes account of all public exposure routes in a realistic way, leading to an improved and more reliable assessment of dose to the public from discharges to the environment. The development of this new method is being overseen by a national body, the National Dose Assessment Working Group, whose membership includes consumer representatives, officials from the Agencies, Government and the nuclear industry. We look forward to presenting assessments of doses to the public using the new method in future editions of RIFE. We hope you will find this new format of report comprehensive and informative and we would like to take this opportunity to thank you for interest in the work of our Agencies. Sir John Harman Mr Ken Ledgerwood Chairman, Environment Agency Chief Industrial Pollution and Radiochemical Inspector, Environment and Heritage Service for Northern Ireland Professor Sir John Krebs Sir Ken Collins Chairman, Food Standards Agency Chairman, Scottish Environment Protection Agency 3 4 CONTENTS Page LIST OF TABLES ...................................................................................................................................... 7 EXECUTIVE SUMMARY ............................................................................................................................ 9 1. Introduction ................................................................................................................................. 15 1.1 Background ........................................................................................................................... 15 1.2 Disposals of radioactive waste.............................................................................................. 16 1.2.1 Radioactive waste disposal from nuclear sites.......................................................... 16 1.2.2 Radioactive waste disposal at sea ............................................................................. 18 1.2.3 Other sources of radioactivity ................................................................................... 19 1.2.4 Food irradiation ......................................................................................................... 19 2. Sampling and measurement ......................................................................................................... 21 2.1 Sampling programme ............................................................................................................ 21 2.1.1 Nuclear sites ..............................................................................................................21 2.1.2 Industrial and landfill sites ........................................................................................ 23 2.1.3 Chernobyl fallout....................................................................................................... 24 2.1.4 Additional monitoring ............................................................................................... 24 2.2 Methods of measurement ...................................................................................................... 26 2.2.1 Sample analysis ......................................................................................................... 26 2.2.2 Measurement of dose rates and contamination ......................................................... 27 3. Presentation and assessment ........................................................................................................ 31 3.1 Temporal averaging of monitoring data................................................................................ 31 3.2 Spatial averaging of monitoring data .................................................................................... 31 3.3 Detection limits ..................................................................................................................... 32 3.4 Additional information ......................................................................................................... 32 3.5 Radiation protection standards ............................................................................................. 32 3.6 Assessment methods and data............................................................................................... 34 3.6.1 Radionuclide concentrations in foodstuffs, drinking water, sediments and air ........ 34 3.6.2 Consumption, drinking and inhalation rates ............................................................. 35 3.6.3 Dose coefficients ....................................................................................................... 36 3.6.4 External exposure ...................................................................................................... 37 3.6.5 Subtraction of ‘background’ levels ........................................................................... 37 3.6.6 Summation of doses from different pathways .......................................................... 38 3.6.7 Uncertainties in dose assessment .............................................................................. 38 4. British Nuclear Fuels plc .............................................................................................................. 39 4.1 Sellafield, Cumbria ............................................................................................................... 39 4.1.1 The aquatic monitoring programme .......................................................................... 39 4.1.2 The terrestrial monitoring programme ...................................................................... 52 4.2 Drigg, Cumbria ..................................................................................................................... 54 4.3 Springfields, Lancashire ....................................................................................................... 55 4.4 Capenhurst, Cheshire ............................................................................................................ 56 4.5 Chapelcross, Dumfries and Galloway .................................................................................. 57 5. United Kingdom Atomic Energy Authority ............................................................................... 91 5.1 Dounreay, Highland .............................................................................................................. 91 5.2 Harwell, Oxfordshire ............................................................................................................ 93 5.3 Winfrith, Dorset .................................................................................................................... 94 5.4 Culham, Oxfordshire............................................................................................................. 94 6. Nuclear power stations operated by electricity generating companies ................................. 101 6.1 Berkeley, Gloucestershire and Oldbury, South Gloucestershire ........................................ 101 6.2 Bradwell, Essex..................................................................................................................
Recommended publications
  • Appendix G Green Infrastructure: Figures
    Appendix F Natural Capital and Ecosystem Services: Figures Local Plan Climate Change and Natural Capital Study AJanuarypp 2021en dix G Green Infrastructure: Figures LUC I F-5 Local Plan Environmental Study for Blackburn with Darwen Council 13 New woodland / tree-belt habitat links along M65 creating contiguous habitats with river corridors and bolstering GI connections into the urban cores of Blackburn and Darwen 14 Connect development allocation site with surrounding GI 15 Development within Green Belt will require clear GI improvements 16 GI opportunities in accordance with Holden Fold Masterplan Proposals (2020) 17 Urban greening opportunity along A666 «¬12 18 GI opportunities in accordance with Bank Hey Masterplan Proposals (2020) «¬12 2 3 3 5 «¬12 4 «¬12 ¬«14 ¬«14 «¬12 «¬17 ¬«11 18 13 13 13 13 13 «¬12 ¬«14 16 6 «¬12 ¬«14 1 ¬«14 1 1 1 1 «¬12 1 «¬7 1 1 «¬7 «¬12 «¬12 8 8 1 ¬«10 8 8 1 8 8 1 8 «¬9 8 1 1 1 1 10 8 ¬«15 1 8 0 2.5 5 F km Map scale 1:65,000 @ A3 © Crown copyright and database rights 2020. Ordnance Survey licence number: 100019493. CB:EL EB:lendak_e LUC APXG_G1_11238_r1_GIOpsHabitats_A3P 21/12/2020 Source: Blackburn with Darwen Borough Council, LUC Figure G.1: Green Infrastructure Opportunity Mapping Theme 1 - Important Habitats Blackburn with Darwen Borough Council Habitat opportunity: (! 1 Revert all Unfavourable SSSI Units to Fabourable Condition 9 Habitat and recreational improvements along the Witton Weavers Way to strengthen links between reservoirs 2 Enhance and expand deciduous woodland and semi-improved grassland at
    [Show full text]
  • Billinge Hill & Pleasington
    Billinge Hill & Pleasington Distance: 11km Height: 270m General description: Suitable for: Mountain bikes - Intermediate level You may not realise you are only a few (n.b. other tracks around Witton Park are suitable for families and miles from the centre of Blackburn P beginners) on this lovely country route through Start / Finish Witton Country Park Parking: A large free car park is native woodlands, open country and the 50 Point: available at the main entrance attractive village of Pleasington. into Witton Park off Preston Old Road (A674) A great mountain-biking route, suitable 200 for all levels. An equal mix of road and Arrival by Distance to Witton Park Cycle Centre: 150 off-road riding. train: Cherry Tree 1.2km, Mill Hill 1.5km, Pleasington 2.5km Refreshments: Pavilion in the Park Cafe is Toilets: Located next to the Pavilion located next to the Witton in the Park Cafe Park Cycle Centre. 50 For further information please contact 01254 697307 150 P Paradise Wood P 200 100 P 3 TRICKY SIXTY Blackburn B6447 P ad nd Ro TRAIL OF 2 P nge E P Billi P 150 TWO TREES Billinge Wood 150 P P e an P ge L llin Bi P der Un B6447 Buncer Lane P Knuzden Brook P 150 P r P e Witton Country Park t a P w e k a l P B r e 100 v i 4 R 150 P 1 d oa 100 R ld 5B O 100 n 100 sto Hoghton re P P 74 P 5A A6 P 200 Cherry Tree 150 P R Station i v e Leeds and L nal r iverpool Ca 200 D a r w 100 e Pleasington n Station 100 Fishmoor Reservoir © OpenStreetMap contributors - openstreetmap.org Guide P 150 100 150 P 150 P 100 150 200 Lower Darwen P 200 150 Belthorn Stanworth Woods Billinge Hill & Pleasington Route Description: 1 From the car park head along the path beside the 3 Turn right and follow the road as it descends Athletic stadium towards the Witton Park Cycle gradually through open countryside for approx 2km.
    [Show full text]
  • Ramblers Gems a Spring Vale Rambling Class Publication
    Ramblers Gems A Spring Vale Rambling Class Publication Volume 1, Issue 22 3rd October 2020 For further information or to submit a contribution email: [email protected] Web Site http://www.springvaleramblers.co.uk/ One such example, named ‘Limersgate’ traversed from I N S I D E T H I S I SSUE Haslingden Grane into the Darwen valley, over to Tockholes and on towards Preston. The trail entered 1 A Local Packhorse Trail Darwen at Pickup Bank Heights, and down into Hoddlesden via Long Hey Lane, past Holker House 2 Wordsearch (1591), and over Heys Lane, crossing Roman Road. It 3 Walking in South Lakeland then dropped down Pole Lane to Sough, crossing the River Darwen by a ford at Clough, and climbing to pass 4 Alum Scar White Hall (1557). The trail then dropped into Print 5 Harriers and Falcons Shop crossing Bury Fold and past Kebbs Cottage to Radfield Head, thence into the wooded valley that became Bold Venture Park. A Local Packhorse Trail In the 16th-18th centuries, Darwen was at the crossroads of several packhorse trails that crisscrossed the region. These were narrow, steep and winding, being totally unsuitable for wheeled traffic. Much earlier, the Roman XX (20th) Legion had built a road from Manchester to Ribchester and onward to The Old Bridge at Cadshaw Hadrian’s Wall. However, due to frequent marauding The carters and carriers who oversaw the packhorses attacks by local brigands they constructed few East to and mules, overnighted in Inns at strategic distances West roads. The packhorse trails were developed to enable trains of packhorses and mules, sometimes as along the trails.
    [Show full text]
  • Central Area Fisheries Annual Report 1996
    Central area fisheries annual report 1996 Item Type monograph Publisher Environment Agency North West Download date 30/09/2021 01:07:41 Link to Item http://hdl.handle.net/1834/25204 CENTRAL AREA FISHERIES ANNUAL REPORT 1996 CENTRAL AREA FISHERIES PERSONNEL MANAGERS AND TECHNICAL STAFF Mr P Greifenberg Area General Manager Mr J Shatwell Area Fisheries, Recreation and Ecology Manager Mr M Atherton Area Fisheries and Recreation Manager Mr D Cliftan-Dey Fisheries Technical Officer Mr G Talbot Fisheries Technical Assistant Mrs E Cummings Technical Liaison Assistant FISH FARM STAFF Levland Fish Farm Mr R Taylor Fish Farm Manager Mr J Stone/Mr R Oldfleld (from 01/11/96) Technical Assistant Witcherwell Fish Farm Mr J Jacques Fish Farm Manager Mr G Talbot Technical Assistant BAILIFF TEAMS River Lune Bailiffs Mr P Horner Fisheries Inspector Mr J Staveley (to 28/02/96) Senior Bailiff Mr J Cizdyn (from 15/10/96) Bailiff Mr M Browne Bailiff Mr J Burton Bailiff Mr A Clarke Bailiff/Coxswain Mr M Moore (to 30/6/96) Bailiff Mr R Bevins (from 01/11/96) Bailiff River Rihhle Bailiffs Mr S Whittam Fisheries Inspector Mr S Leech Senior Bailiff Mr I Bentley Bailiff Mr A Blezard Bailiff Mr P Glover Bailiff Mr N Handy Bailiff Mr J Johnson Bailiff Mr G Wharton Bailiff USEFUL TELEPHONE NUMBERS 24 hour Freephone Emergency Line 0800 807060 24 hour River call Service 0891 500999 (Rivers Irwell, Goyt, Dane, Weaver, Ribble, Lune and Eden) Flood Warning Line 0645 881188 Lutra House, Preston 01772 339882 Fax 01772 627730 Richard Fairclough House, Warrington 01925 653999 Environment Agency Regional Office CONTENTS 1.
    [Show full text]
  • Ribble Catchment Flood Management Plan Summary Report December 2009 Managing Flood Risk We Are the Environment Agency
    Ribble Catchment Flood Management Plan Summary Report December 2009 managing flood risk We are the Environment Agency. It’s our job to look after your environment and make it a better place – for you, and for future generations. Your environment is the air you breathe, the water you drink and the ground you walk on. Working with business, Government and society as a whole, we are making your environment cleaner and healthier. The Environment Agency. Out there, making your environment a better place. Published by: Environment Agency Richard Fairclough House Knutsford Road Warrington WA4 1HT Tel: 0870 8506506 Email: [email protected] www.environment-agency.gov.uk © Environment Agency All rights reserved. This document may be reproduced with prior permission of the Environment Agency. December 2009 Introduction I am pleased to introduce our summary of the Ribble Catchment Flood Management Plan (CFMP). This CFMP gives an overview of the flood risk in the Ribble catchment and sets out our preferred plan for sustainable flood risk management over the next 50 to 100 years. The Ribble CFMP is one of 77 CFMPs for England and parts of Preston are also at risk of tidal flooding. and Wales. Through the CFMPs, we have assessed We estimate 6400 properties in the catchment have inland flood risk across all of England and Wales for a 1% annual probability of flooding from rivers or a the first time. The CFMP considers all types of inland 0.5% annual probability of flooding from the tide. We flooding, from rivers, groundwater, surface water estimate that by 2100 approximately 12,400 properties and tidal flooding, but not flooding directly from the will be at risk of flooding (fluvial and tidal).
    [Show full text]
  • Employment Land Review Study Blackburn with Darwen Borough Council
    Employment Land Review Study Blackburn with Darwen Borough Council B102(e)/May 2019/ Final Report /BE Group 1 Employment Land Review Study Blackburn with Darwen Borough Council CONTENTS EXECUTIVE SUMMARY ........................................................................................... 3 1.0 INTRODUCTION ............................................................................................. 7 2.0 STRATEGIC CONTEXT ................................................................................ 11 3.0 ECONOMIC ANALYSIS ................................................................................ 32 4.0 PROPERTY MARKET ASSESSMENT .......................................................... 42 5.0 STAKEHOLDER CONSULTATIONS ............................................................ 60 6.0 EMPLOYMENT LAND ASSESSMENT ......................................................... 72 7.0 CONCLUSIONS .......................................................................................... 103 8.0 RECOMMENDATIONS ............................................................................... 115 Appendix 1 – List of Consultees Appendix 2 – Vacant Property Schedules Appendix 3 – Business Survey Appendix 4 – Blackburn with Darwen Site Proformas Appendix 5 – Sites Scoring Results Appendix 6 – Site Scoring System Appendix 7 – Blackburn with Darwen Employment Area Maps B102(e)/May 2019/ Final Report /BE Group 2 Employment Land Review Study Blackburn with Darwen Borough Council EXECUTIVE SUMMARY Introduction i. This report provides an Employment
    [Show full text]
  • A585 Windy Harbour to Skippool Improvement Scheme TR010035
    A585 Windy Harbour to Skippool Improvement Scheme [Scheme NumberTR010035 TR100xx] 6.9.1 ES Appendix 9.1: National Character Area 32 APFP Regulation 5(2)(a) Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 6 October 2018 Volume [x] A585 Windy Harbour to Skippool Improvement Scheme Appendix 9.1: National Character Area 32 Page Left Intentionally Blank Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/6.9.1 A585 Windy Harbour to Skippool Improvement Scheme Appendix 9.1: National Character Area 32 Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 A585 Windy Harbour to Skippool Improvement Scheme Development Consent Order 201[ ] ES APPENDIX 9.1: NATIONAL CHARACTER AREA 32 Regulation Number: Regulation 5(2)(a) Planning Inspectorate Scheme TR010035 Reference Application Document Reference TR010035/APP/6.9.1 Author: A585 Windy Harbour to Skippool Improvement Scheme Project Team, Highways England Version Date Status of Version Rev 0 October 2018 DCO submission Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/6.9.1 A585 Windy Harbour to Skippool Improvement Scheme Appendix 9.1: National Character Area 32 Page Left Intentionally Blank Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/6.9.1 National Character 32. Lancashire and Amounderness Plain Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 32. Lancashire and Amounderness Plain Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment 1 2 3 White Paper , Biodiversity 2020 and the European Landscape Convention , we are North revising profiles for England’s 159 National Character Areas (NCAs).
    [Show full text]
  • Blackburn West
    BLACKBURN WEST Significant Very High High Medium Low Very Low risks Extreme Heavy Snow/ Drought Storms & gales Weather Heatwave Local accident Transport Railway accident on motorway Canal breaches Leeds / Liverpool Canal (British Waterways) This is the longest canal in Britain built as a single waterway with 162.5 kilometres within Lancashire. One of three trans-Pennine waterways, landmarks includes the Burnley Embankment and Foulridge Tunnel. Canals are not often recognised as a flood risk, however its raised nature and proximity of the canal to the urban areas does present a potential flood risk. Major Rivers There are 3 major rivers: Darwen runs through Darwen and Blackburn and it is joined by the River Blakewater near Witton Country Park. Blakewater joins the River Darwen at Witton and continues on to join the River Ribble at Walton-le-Dale. It rises on the moors above Guide as Knuzden Brook. Roddlesworth runs through a wooded valley close to Tockholes, Roddlesworth, Abbey Village and Stanworth before joining the River Darwen at Moulden Brow close to Feniscowles. The river continues through Livesey where it is met by Stockclough Brook In 1998, the M65 linked East Lancashire to the national motorway network. This provided a further opportunity to bring new investment to the borough and to being the task of restructuring the economy and tackling the worse effects of economic decline. The M65 has improved access to the area and a significant amount of development has taken place to the M65 motorway, the authority includes a number of well-established local employers and a range of other public and private organisations that add to the employment mix.
    [Show full text]
  • Lancashire: a Chronology of Flash Flooding
    LANCASHIRE: A CHRONOLOGY OF FLASH FLOODING Introduction The past focus on the history of flooding has been mainly with respect to flooding from the overflow of rivers and with respect to the peak level that these floods have achieved. The Chronology of British Hydrological Events provides a reasonably comprehensive record of such events throughout Great Britain. Over the last 60 years the river gauging network provides a detailed record of the occurrence of river flows and peak levels and flows are summaried in HiflowsUK. However there has been recent recognition that much flooding of property occurs from surface water flooding, often far from rivers. Locally intense rainfall causes severe flooding of property and land as water concentrates and finds pathways along roads and depressions in the landscape. In addition, intense rainfall can also cause rapid rise in level and discharge in rivers causing a danger to the public even though the associated peak level is not critical. In extreme cases rapid rise in river level may be manifested as a ‘wall of water’ with near instantaneous rise in level of a metre or more. Such events are usually convective and may be accompanied by destructive hail or cause severe erosion of hillsides and agricultural land. There have been no previous compilations of historical records of such ‘flash floods’or even of more recent occurrences. It is therefore difficult to judge whether a recent event is unusual or even unique in terms of the level reached at a particular location or more broadly of regional severity. This chronology of flash floods is provided in order to enable comparisons to be made between recent and historical floods, to judge rarity and from a practical point of view to assess the adequacy of urban drainage networks.
    [Show full text]
  • The Textile Mills of Lancashire the Legacy
    ISBN 978-1 -907686-24-5 Edi ted By: Rachel Newman Design, Layout, and Formatting: Frtml Cover: Adam Parsons (Top) Tile wcnving shed of Queen Street Mill 0 11 tile day of Published by: its clo~urc, 22 September 2016 Oxford Ar.:haeology North, (© Anthony Pilli11g) Mill 3, Moor Lane Mills, MoorLnJ1e, (Bottom) Tile iconic, Grade Lancaster, /-listed, Queen Street Mill, LAllQD Jlnrlc S.lfke, lire last sun,ini11g example ~fan in fad steam­ Printed by: powered weaving mill with its Bell & Bain Ltd original loom s in the world 303, Burn field Road, (© Historic England) Thornlieba n k, Glasgow Back Cover: G46 7UQ Tlrt' Beer 1-ln/1 at Hoi till'S Mill, Cfitlwroe ~ Oxford Archaeolog)' Ltd The Textile Mills of Lancashire The Legacy Andy Phelps Richard Gregory Ian Miller Chris Wild Acknowledgements This booklet arises from the historical research and detailed surveys of individual mill complexes carried out by OA North during the Lancashire Textile Mills Survey in 2008-15, a strategic project commissioned and funded by English Heritage (now Historic England). The survey elicited the support of many people, especial thanks being expressed to members of the Project Steering Group, particularly Ian Heywood, for representing the Lancashire Conservation Officers, Ian Gibson (textile engineering historian), Anthony Pilling (textile engineering and architectural historian), Roger Holden (textile mill historian), and Ken Robinson (Historic England). Alison Plummer and Ken Moth are also acknowledged for invaluable contributions to Steering Group discussions. Particular thanks are offered to Darren Ratcliffe (Historic England), who fulfilled the role of Project Assurance Officer and provided considerable advice and guidance throughout the course of the project.
    [Show full text]
  • River Ribble the River Ribble Is One of the Longest Rivers in the North West of England
    River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? • The tidal limit of the Ribble is 11 miles inland (above Preston); • The River Ribble is home to a variety of protected species, including the Eurasian otter, Atlantic salmon and white- clawed crayfish; • The mouth of the Ribble Estuary is 10 miles (16 km) wide; • An average of 340,000 water birds over-winter on the Ribble Estuary, making it the most important wetland site in Britain; • The Ribble estuary is the 7th largest estuary in the UK; • The Ribble marked the ancient northern boundary of Mercia, and at the time of the Domesday Book was the northern boundary of Cheshire; • The Ribble catchment is the pilot basin for the implementation of the EU Water Framework Directive in the UK. Location and Basic Geography Map showing the catchment of the River Ribble in North West England. Location and Basic Geography The Ribble Basin, located in the North West of England, includes all of the land that drains into the Ribble Estuary. This includes five main rivers and all their tributaries (the Ribble, Hodder, Calder, Darwen, and Douglas) and the Crossens drainage system. The River Ribble rises in the Pennines in the Yorkshire Dales at the confluence of Gayle Beck and Cam Beck. It flows east 100km before running into the Irish Sea. It is one of the longest rivers in the North West, draining a catchment of 2128 km2 (860 miles2) and covering a distance of 110 km from source to sea.
    [Show full text]
  • Bird Report 18
    CHORLEY & DISTRICT NATURAL HISTORY SOCIETY Chorley & District Natural History Society is a Registered Charity Registration Number 513466 ANNUAL REPORT 2011 Editor N.T.Southworth, 9, Queensgate, Chorley PR7 2PX (01257 276065) ******************* 1 The Society's recording area follows the boundary of the Chorley Borough in the north, west and south but extends beyond the boundary in the east to include Belmont reservoir plus the whole of the Roddlesworth reservoir system and Tockholes Plantations. 2 CONTENTS Review of the Year 4 Secretary's Report 7 Flora Report 8 Fungi Report 9 Invertebrate Report 11 Flight periods of Dragonflies 16 Flight periods of Butterflies 17 Bird Report 18 Rookery Census 61 Waterfowl Counts 61 Ringing Report 62 Mammal, Reptile and Amphibia Report 67 Fish Report 73 RECORDERS Flora David Beattie Fungi Joyce Riley Insects Phil Kirk Birds Neil Southworth Mammals and Joyce Riley Amphibia 3 REVIEW OF THE YEAR The new year started with a damp, foggy day, but the following two days were fine with overnight frost, then snow on the 4th. This led to fears that January might bring a repeat of the freezing conditions of December. This was not to be as milder weather arrived mid-month, with temperatures climbing into double figures with a maximum of 11°C on the 15th. However, as the weather turned fine, the temperatures fell and sharp frosts returned with -5°C on the 20th, and apart from a wet day on the 25th, dry, fine weather persisted to the end of the month 4ith frosts of -4°C on 28th and 29th.
    [Show full text]