An Introduction to Well Integrity Rev 0, 04 December 2012

Total Page:16

File Type:pdf, Size:1020Kb

An Introduction to Well Integrity Rev 0, 04 December 2012 An Introduction to Well Integrity Rev 0, 04 December 2012 0 Preface This document has been prepared as a joint project between members of the Norwegian Oil and Gas Association's Well Integrity Forum (WIF) and professors at NTNU and UiS. The intention with the document is to provide a document that can be used in educating personnel in well integrity and especially students at the universities. Authors of this document have been: Hans-Emil Bensnes Torbergsen, Eni Norge Hilde Brandanger Haga, Statoil Sigbjørn Sangesland, NTNU Bernt Sigve Aadnøy, UiS Jan Sæby, Shell Ståle Johnsen, Total Marvin Rausand, NTNU Mary Ann Lundeteigen NTNU 0 04.12.12 Original document Revision Date of issue Reason for Issue 1 Index Preface ................................................................................................................................................ 1 List of Abbreviations ................................................................................................................................ 6 List of figures ............................................................................................................................................ 1 List of Tables ............................................................................................................................................ 4 1. What is well integrity? (Well integrity – concepts and terminology) ........................................... 5 2. Background and History ................................................................................................................... 8 2.1 What can go wrong in wells? ................................................................................................. 9 2.2 How likely is loss of well integrity? ...................................................................................... 10 2.3 What are the consequences of loss of well integrity? ........................................................ 11 2.4 Some cases of loss of well integrity ..................................................................................... 12 2.4.1 Case 1: Failure of surface casing and drop of wellhead.............................................. 12 2.4.2 Case 2: Failure of production casing hanger ............................................................... 15 2.4.3 Case 3: Loss of wellbore .............................................................................................. 17 2.4.4 Case 4: Gas leaks in tubing strings .............................................................................. 20 2.4.5 Case 5: Production casing failure ............................................................................... 25 2.4.6 Case 6: Well failure .................................................................................................... 26 3. Well Construction and Field Development .................................................................................... 29 3.1 Well Types and Well Life Cycle ............................................................................................ 29 3.2 Subsea drilling ..................................................................................................................... 29 3.3 Platform drilling .................................................................................................................. 35 3.4 Subsea Well Completion ..................................................................................................... 35 3.4.1 Types of X-mas trees for subsea wells ........................................................................ 36 3.5 Surface well completion ...................................................................................................... 40 4. Well Barriers – definitions, classification, and requirements.................................................. 45 4.1 Key concepts and definitions ............................................................................................... 45 2 4.2 Well Barrier Requirements .................................................................................................. 46 4.3 Well Barrier Functions ......................................................................................................... 47 4.4 Well barrier schematics and diagrams ................................................................................ 49 4.4.1 Well barrier schematics .............................................................................................. 50 4.4.2 Well barrier diagrams ................................................................................................. 51 4.5 Reliability analysis and methods ......................................................................................... 53 4.5.1 Reliability analysis of well barriers .......................................................................... 53 4.5.2 Analysis steps .............................................................................................................. 53 4.6 Identification of barrier functions ....................................................................................... 55 4.7 Failure and failure analysis ................................................................................................ 56 4.7.1 Key terms and definitions ........................................................................................... 56 4.7.2 Classification of failure modes .................................................................................... 58 4.8 FMECA ................................................................................................................................. 60 4.8.1 FMECA procedure ....................................................................................................... 61 4.9 Fault tree analysis ................................................................................................................ 68 4.9.1 Fault tree programs .................................................................................................... 70 4.9.2 Fault tree construction ............................................................................................... 70 4.9.3 Fault tree pros and cons ............................................................................................. 74 4.9.4 Qualitative analysis of the fault tree........................................................................... 74 4.9.5 Failure rate, mean time to failure, and survival probability ....................................... 75 4.9.6 Well barrier performance data ................................................................................... 76 4.9.7 Quantitative analysis .................................................................................................. 77 5. Technical well barriers ................................................................................................................... 80 5.1 Well barrier philosophy ....................................................................................................... 80 5.1.1 Fail-safe functions: ...................................................................................................... 80 5.1.2 Safety systems ............................................................................................................ 81 5.1.3 Fire resistance ............................................................................................................. 81 3 5.1.4 Well barrier schematics .............................................................................................. 82 5.1.5 Drilling phase .............................................................................................................. 87 5.1.6 Completion phase ....................................................................................................... 89 5.1.7 Production phase ........................................................................................................ 91 5.1.8 Intervention phase ...................................................................................................... 93 5.1.9 P&A phase ................................................................................................................... 95 5.2 Barrier design, construction and qualification of barriers for life cycle ........................... 97 5.2.1 MWDP or MSDP .......................................................................................................... 97 5.3 Description of typical barrier elements and important qualification issues ...................... 98 5.3.1 Formation ................................................................................................................... 98 5.3.2 Casing Cement .......................................................................................................... 101 5.3.3 Casing Cement Plug .................................................................................................. 103 5.3.4. Casing/Tubing ........................................................................................................... 104 5.3.5. Production packer ..................................................................................................... 106 5.3.6. DHSV ......................................................................................................................... 107 5.3.7. CIV ............................................................................................................................
Recommended publications
  • Wellcap® IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS – SNUBBING CORE CURRICULUM and RELATED JOB SKILLS
    WellCAP® IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS – SNUBBING CORE CURRICULUM AND RELATED JOB SKILLS FORM WCT-2SS SUPERVISORY LEVEL The purpose of the core curriculum is to identify a body of knowledge and a set of job skills that can be used to provide well control skills for well servicing operations. The curriculum is divided into three certification types: Coiled Tubing, Snubbing, and Wireline (Wireline is presented in document WCT – 2WSW) and within each certification, three levels: Introductory, Fundamental, and Supervisory. Students may complete an individual certification (e.g., Coiled Tubing) or combination certifications (e.g., Coiled Tubing and Snubbing). All knowledge and skills for each individual certification must be addressed when combining certifications. The suggested target students for each core curriculum level are as follows: INTRODUCTORY: New Hires (May also be appropriate for non-technical personnel) FUNDAMENTAL: Helpers, Assistants, “Hands” involved with the operational aspects of the unit and who may act/operate the unit under direct supervision of a certified Unit Operator or Supervisor. SUPERVISORY: Unit Operators, Supervisors, Superintendents, and Project Foreman Upon completion of a well control training course based on curriculum guidelines, the student should be able to perform the job skills in italics identified by a "!" mark (e.g., ! Identify causes of kicks). Form WCT-2SS WellCAP Curriculum Guidelines – Well Servicing - Snubbing Revision 040416 Supervisory Page 1 CORE CURRICULUM
    [Show full text]
  • Ultra-Deepwater Advisory Committee (UDAC) Risk Assessment Technical Support
    (U N C L A S S I F I E D ROUGH DRAFT FOR DISCUSSION PURPOSE ONLY) Risk Informed Decision Support for UDW Drilling Ultra-Deepwater Advisory Committee (UDAC) Risk Assessment Technical Support Dasari V. Rao, Division Leader, Decision Applications Division Chris Smith and Elena Melchert, DOE Program Oversight (U N C L A S S I F I E D) Operated by the Los Alamos National Security, LLC for the DOE/NNSA Summary of LANL AnalysesU N C L A S S I F I E D Status update and a review of preliminary findings • Over the past three decades there has been a steady decrease in ‘major’ kick frequency; more recently, frequency is about 1 in 10 wells. A majority of the kicks occur in the shallower regions where the primary hazard is the release of natural gas, some condensates and synthetic mud to the environs. A small fraction (1 in 100 wells) kick while drilling and cementing in the target region where oil and other condensates present blowout hazard. • Ultra-deep water formations stratigraphy and reservoir properties are significantly different compared to previous operational experience. • Our modeling efforts included development of accident progression event trees that enumerated an exhaustive list of possible accident sequences; barrier analyses that quantified reliability of each barrier; and physics-based well dynamics models that explicitly captured timing of events. We have used a generic well design and well operations that are consistent with IADC and API guidance. • Important barriers in place to mitigate a kick (e.g., Lower Marine Riser connection (LMRP), Blowout Preventer (BOP) and Drill Pipe Safety Valves) are vulnerable to control system and design deficiencies.
    [Show full text]
  • Future Supply of Oil and Gas from the Gulf of Mexico
    Future Supply of Oil and Gas From the Gulf of Mexico U.S. GEOLOGICAL SUltyEY PROFESSIONAL PAPER 1294 Future Supply of Oil and Gas From the Gulf of Mexico By E. D. Attanasi and]. L. Haynes U.S. GEOLOGICAL SURVEY PROFESSIONAL PAPER 1294 An engineering-economic costing algorithm combined with a discovery process model to forecast long-run incremental costs of undiscovered oil and gas UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1983 UNITED STATES DEPARTMENT OF THE INTERIOR JAMES G. WATT, Secretary GEOLOGICAL SURVEY Dallas L. Peck, Director Library of Congress Cataloging in Publication Data Attanasi, E. D. Future supply of oil and gas from the Gulf of Mexico. (U.S. Geological Survey professional paper ; 1294) Bibliography: p. 1. Petroleum in submerged lands Mexico, Gulf of. 2. Gas, Natural, in submerged lands Mexico, Gulf of. I. Haynes, J. (John), 1954- . II. Title. III. Series: Geological Survey professional paper ; 1294. TN872.A5A87 1983 553.2'8'0916364 83-600030 ____ ____________ For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402 CONTENTS Page Abstract 1 Introduction 1 Engineering-economic model 3 Methodology 3 Engineering data and assumptions 5 Field classification 5 Field design 6 Production schedules of oil and nonassociated gas wells 7 Economic assumptions and variables 8 Field development costs 8 Production costs and production related taxes 9 Assumptions for after-tax net present value calculations 10 Exploration costs 10 Industry behavior and market conditions 10 Forecasting future discoveries 11 Discovery process model 11 Estimated marginal cost functions for undiscovered recoverable oil and gas resources in the Gulf of Mexico 12 Conclusions and implications 16 References cited 16 Appendix A 17 Appendix B 20 ILLUSTRATIONS FIGURE 1.
    [Show full text]
  • Manufacturer Annular BOP: Choke and Kill Valves: Wellhead Connector
    Rig Name: Equipment Owner: The purchaser or renter of the equipment to be installed onto the Equipment User: The company that owns the well, wellhead or wellhead assembli Name: Person(s) Completing Name: Document: Name: Name: Time to Complete Document (hours): Number of Shear Rams: Number of Sealing Shear Rams: Test Ram Installed: BOP Classification Size Manufacturer Ram Type BOP: Annular BOP: Choke and Kill Valves: Wellhead Connector: LMRP Connector: Choke Manifold: e wellhead or wellhead assemblies. ies on which the equipment is to be installed. Title: Title: Title: Title: Press. Rating Model 1 Scope 1.1 Purpose 1.1.1 The purpose of this standard is to provide requirements on the installation and testing of blowout prevention equipment systems on land and marine drilling rigs (barge, platform, bottom-supported, and floating). Blowout preventer equipment systems are comprised of a combination of various components. The following components are required for operation under varying rig and well conditions: a) blowout preventers (BOPs); b) choke and kill lines; 1.1.2 c) choke manifolds; d) control systems; e) auxiliary equipment. 1.1.3 The primary functions of these systems are to confine well fluids to the wellbore, provide means to add fluid to the wellbore, and allow controlled volumes to be removed from the wellbore. Diverters, shut-in devices, and rotating head systems (rotating control devices) are not addressed in this standard (see API 64 and API 16RCD, respectively); their primary purpose is to safely divert or direct flow rather than to confine fluids to the 1.1.4 wellbore. 1.2 Well Control 1.2 Procedures and techniques for well control are not included in this standard since they are beyond the scope of equipment systems contained herein.
    [Show full text]
  • Oil and Gas Operator Representative Workover and Intervention Well Control
    Oil and Gas Operator Representative Workover and Intervention Well Control Curriculum, Course Delivery Requirements, and Related Learning Objectives Form WSP-02-WS-OGO Revision 0 27 September 2017 © IADC 2017 COPYRIGHT PROTECTED DOCUMENT All rights reserved. No part of this document may be distributed outside of the recipient’s organization unless authorized by the International Association of Drilling Contractors. Related Learning Objectives for WellSharp® Oil and Gas Operator Representative-Workover/Intervention Well Control Contents 1.0 Oil and Gas Operator Representative Course Overview........................................................................................................................................ 3 2.0 Curriculum .............................................................................................................................................................................................................. 5 2.1 Risk Awareness and Management ................................................................................................................................................................. 5 2.2 Organizing a Well Control Operation ............................................................................................................................................................. 7 2.3 Well Control Principles & Calculations ........................................................................................................................................................... 7 2.4
    [Show full text]
  • The Economic Impacts of the Gulf of Mexico Oil and Natural Gas Industry
    The Economic Impacts of the Gulf of Mexico Oil and Natural Gas Industry Prepared For Prepared By Executive Summary Introduction Despite the current difficulties facing the global economy as a whole and the oil and natural gas industry specifically, the Gulf of Mexico oil and natural gas industry will likely continue to be a major source of energy production, employment, gross domestic product, and government revenues for the United States. Several proposals have been advanced recently which would have a major impact on the industry’s activity levels, and the economic activity supported by the Gulf of Mexico offshore oil and natural gas industry. The proposals vary widely, but for the purpose of this report three scenarios were developed, a scenario based on a continuation of current policies and regulations, a scenario examining the potential impacts of a ban on new offshore leases, and a scenario examining the potential impacts of a ban on new drilling permits approvals in the Gulf of Mexico. Energy and Industrial Advisory Partners (EIAP) was commissioned by the National Ocean Industry Association (NOIA) to develop a report forecasting activity levels, spending, oil and natural gas production, supported employment, GDP, and Government Revenues in these scenarios. The scenarios developed in this report are based solely upon government and other publicly available data and EIAP’s own expertise and analysis. The study also included profiles of NOIA members to demonstrate the diverse group of companies which make up the offshore Gulf of Mexico oil and natural gas industry as well as a list of over 2,400 suppliers to the industry representing all 50 states.
    [Show full text]
  • Wild Well Global Services Brief
    GLOBAL SERVICES BRIEF 2021 wildwell.com V. 04 LOCATIONS Corporate Office Drilling Technology Center 2202 Oil Center Court Houston, Texas 77073 USA Regional Response Locations UNITED STATES Houston, Texas Odessa, Texas Greeley, Colorado Roaring Branch, Pennsylvania INTERNATIONAL Aberdeen, Scotland Dammam, Kingdom of Saudi Arabia Dubai, UAE Kuala Lumpur, Malaysia Port Harcourt, Nigeria Stavanger, Norway Singapore Well Control Training Centers UNITED STATES Houston, Texas Corpus Christi, Texas Odessa, Texas Tyler, Texas Lafayette, Louisiana Oklahoma City, Oklahoma Casper, Wyoming Williston, North Dakota Canonsburg, Pennsylvania Global Services Brief +1.281.784.4700 // wildwell.com TABLE OF CONTENTS Corporate Overview ..................................................................1 Forensic Studies .....................................................................12 Emergency Response Services ............................................5 Design to Industry Standards ..................................................12 Blowout & Well Control Response ............................................5 Fitness for Purpose Assessment .............................................12 Pressure Control ......................................................................5 Risk Management Services ................................................13 Well Control Engineering Services .......................................6 Well Control Emergency Response Plans ................................13 Blowout Rate Modeling (Worst Case Discharge Analysis)
    [Show full text]
  • How to Solve Your Long Lateral Problems
    A Deep Well Services White Paper in Conjunction with SPE Penn State How to Solve Your Long Lateral Problems Trevor Heyl, Senior Petroleum and Natural Gas Engineering Student at The Pennsylvania State University & Matt Tourigny, VP of Marketing at Deep Well Services www.deepwellservices.com Table of Contents Executive Summary..……………...……………………………………….……….…..….. 2 Challenges with Longer Laterals ……………………………………….…………..……. 2 Existing Solutions ……………………………..…………………………………….….….. 3 Coiled Tubing …….………….….……….…….……………………………………..… 3 Rig-Assist Snubbing Units.……………..………..................................................… 4 Hydraulic Completion Units..….………………………………………………….……..… 5 Cost Comparison ……………………………………………………………………..... 7 HCU Technologies …………………………………………………………………....... 8 Case Studies ……………………………..……..……..………………………….……….. 11 What to Look for in a Solution …….………………………………...…………….…….. 17 Conclusion …………..……………..…..…..….……….……………………………..….... 17 Deep Well Services ………….……..…...……..………………………………………….. 18 Page | 1 Executive Summary Longer laterals impose challenges with current completion methods. The low-price environment in the oil and gas field forces operators to focus on cost-saving methods anywhere practical. Wells with longer laterals have become more prominent in the industry due to their additional contact with the formation, increased productivity and the ability to save money. However, conventional completion methods are a limiting factor due to their decreasing efficiencies with respect to lateral length and problems that thereby
    [Show full text]
  • Oil and Gas Technologies Supplemental Information
    Quadrennial Technology Review 2015 Chapter 7: Advancing Systems and Technologies to Produce Cleaner Fuels Supplemental Information Oil and Gas Technologies Subsurface Science, Technology, and Engineering U.S. DEPARTMENT OF ENERGY Quadrennial Technology Review 2015 Oil and Gas Technologies Chapter 7: Advancing Systems and Technologies to Produce Cleaner Fuels Oil and Gas in the Energy Economy of the United States Fossil fuel resources account for 82% of total U.S. primary energy use because they are abundant, have a relatively low cost of production, and have a high energy density—enabling easy transport and storage. The infrastructure built over decades to supply fossil fuels is the world’s largest enterprise with the largest market capitalization. Of fossil fuels, oil and natural gas make up 63% of energy usage.1 Across the energy economy, the source and mix of fuels used across these sectors is changing, particularly the rapid increase in natural gas production from unconventional resources for electricity generation and the rapid increase in domestic production of shale oil. While oil and gas fuels are essential for the United States’ and the global economy, they also pose challenges: Economic: They must be delivered to users and the markets at competitive prices that encourage economic growth. High fuel prices and/or price volatility can impede this progress. Security: They must be available to the nation in a reliable, continuous way that supports national security and economic needs. Disruption of international fuel supply lines presents a serious geopolitical risk. Environment: They must be supplied and used in ways that have minimal environmental impacts on local, national, and global ecosystems and enables their sustainability.
    [Show full text]
  • Study on Wellhead Growth in Deep Well
    MATEC Web of Conferences 77, 06003 (2016) DOI: 10.1051/matecconf/20167706003 ICMMR 2016 Study on Wellhead Growth in Deep Well Gao Baokui, Ren Jingweiand Gao Liang Department of Petroleum Engineering, China University of Petroleum Beijing, Beijing, 102249, China Abstract. Wellhead growth has occurred in many deep wells in China recently. In the paper, casing axial force and wellhead movement are calculated and compared in regard to moments that free sections of surface casing appear. The parameters considered include preliminary casing tension, free section length and change in wellbore temperature. The moment that surface casing free section comes into being has great influence on wellhead movement, so it is discussed in detail. According to comprehensive investigation on deep well and ultra-deep well accidents, wellhead growth is based on the fact that before production the cement sheath of surface casing has already failed, and during production wellhead grows up due to wellbore temperature increases. The most possible reason of surface casing cement sheath failure is bad cement job quality. Bad cement sheath cannot support casing axial loads and separates from casing. The free section of surface casing will experience large axial force cycle which is harmful to wellbore integrity. Effective measures to remedy wellhead growth is supporting the wellhead with a large base set on ground, rather than pads fixed on conductor. 1 Introduction 2 Models of wellhead growth Wellhead growth is usually occurred in thermal wells and offshore self standing platform wells. In a normal thermal 2.1 Wellbore structure of deep wells well, only production casing is connected with wellhead A typical wellbore sketch of deep well in China is drawn and in most cases the well is cemented to surface.
    [Show full text]
  • Dynamic Kill of Underground Blowouts
    DYNAMIC KILL OF UNDERGROUND BLOWOUTS ALVARO F. NEGRÃO, PETROBRAS VICTOR GERARDO VALLEJO-ARRIETA, PEMEX ADAM T. BOURGOYNE, JR. LSU JOHN ROGERS SMITH, LSU Table of Contents Non - Newtonian Kill Fluids ................................................. 47 EXECUTIVE SUMMARY ............................... 3 Reservoir Model..................................................................... 53 Formation Fluid Rate Determination.................................... 54 Global Solution Scheme......................................................... 56 INTRODUCTION ............................................ 4 CONCLUSIONS......................................................................... 67 NOMENCLATURE ................................................................... 67 CONCEPT................................................................................... 4 SUMMARY ................................................................................. 8 STEADY-STATE DYNAMIC KILL COMPUTER MODEL FOR DYNAMIC KILL COMPUTER PROGRAM ............................. 71 OF AN UNDERGROUND BLOWOUT COMPUTER PROGRAM IMPLEMENTING THE CONSIDERING FRACTURE PROCEDURE............................................................................. 71 PROPAGATION ............................................. 9 Work Sheet Descriptions...................................................... 71 Input Data................................................................................ 73 INTRODUCTION.......................................................................
    [Show full text]
  • HPHT Production in the Gulf of Mexico
    OCS Report BOEM 2020-060 HPHT Production in the Gulf of Mexico Estimated Lead Agency Total Costs Associated with Developing and Producing This Report: $42,000 U.S. Department of the Interior Bureau of Ocean Energy Management New Orleans Office OCS Report BOEM 2020-042 HPHT Production in the Gulf of Mexico Edited by Bureau of Ocean Energy Management New Orleans Office Published by U.S. Department of the Interior Bureau of Ocean Energy Management New Orleans New Orleans Office August 2020 HPHT Production in the Gulf of Mexico iii TABLE OF CONTENTS Page LIST OF FIGURES................................................................................................................................. v ABBREVIATIONS AND ACRONYMS ................................................................................................. vii 1 HPHT RESERVOIRS IN THE GULF OF MEXICO ........................................................................... 1 1.1 Introduction ................................................................................................................................ 1 1.2 What is HPHT? .......................................................................................................................... 1 1.3 Where in the GOM are Formations that may have HPHT Characteristics? ............................. 2 1.4 Have Exploratory Wells been Drilled into HPHT Reservoirs in the GOM? ............................... 3 1.5 What are the Challenges for Production from a Subsea HPHT Well? ..................................... 5
    [Show full text]