WINTER 2000 to Preserve, Protect and Improve the Unique Ecosystems of Merrymeeting Bay

Total Page:16

File Type:pdf, Size:1020Kb

WINTER 2000 to Preserve, Protect and Improve the Unique Ecosystems of Merrymeeting Bay MerrymeetingMerrymeeting NewsNews The Newsletter of Friends of Merrymeeting Bay • P.O. Box 233 • Richmond Maine 04357 WINTER 2000 To Preserve, Protect and Improve the Unique Ecosystems of Merrymeeting Bay. Friends of Merrymeeting Bay is a 501c3 nonprofit organization. Support comes from members' tax- MARK YOUR CALENDAR deductible donations and grants. Feb. 16, Mar 15, April 19 events scheduled for 7:00 p.m., Beam Class- Education room, Visual Arts Center, Bowdoin College, Brunswick Hands Around the Bay, Speaker Se- May 17 event scheduled for 7:00 p.m. at Bridge Academy, Dresden ries, field trips. All events are free to the public, sponsored by Friends of Merrymeeting Bay. Conservation & Stewardship Protecting natural resources through private and public ownership, ease- MARCH 15 A Working Watershed from 1600 to 1950: ments and stewardship. Industry & Agriculture on Merrymeeting Bay Edward Hawes, Consulting Historian Membership Events APRIL 19 A Bird’s Eye View of the Bay: A Look at Swan Island Picnic, paddle tours of the Bay, field trips, conservation meetings, Current Conditions &-Changes Over Time Using potluck suppers and shoreline clean-ups. Aerial Photos Dave Edson, James W. Sewall Co.; Research and Advocacy Alan Haberstock, Kleinschmidt Associates Water quality, data collection, toxics, fisheries restoration. MAY 17 Eagles & Ospreys in Midcoast Maine (Dresden Bridge Academy) 2000 Steering Committee Don Hudson, Chewonki Foundation Frank Burroughs, Bowdoinham May 20 Bowdoinham Public Library 27th Annual Plant Sale Dana Cary, Topsham 9 AM to 4 PM. Jenn Cost, Brunswick For more information call 666-8405 Andy Cutko, Bowdoinham Steve Eagles, Richmond Ed Friedman, Bowdoinham Kathleen Kenny, Dresden GREEN POINT FARM Pat Maloney, Topsham A Christmas card of a few years back easily developable land go the way of Kathleen McGee, Bowdoinham features my twin daughters happily pick- condos and golf courses? Al Mesrobian, Bath ing apples high in an apple tree at Green Thanks to the foresight of the owner, Bill Milam, Woolwich Point Farm in Dresden. When I heard Bob Gleason, and the work of the Maine David Phinney, Bowdoinham that the farm was for sale I thought of Wetlands Protection Coalition, of which Jay Robbins, Richmond the 200 or so housing units proposed Friends of Merrymeeting Bay is a part, near the Cathance in Topsham and won- my children and my grandchildren will On-Line dered if this beautiful farm would suffer be able to explore this land. The 432 http://www.col.k12.me.us/mmb/ the same fate. Would my daughters have acre farm has just been purchased using [email protected] a chance to play in the orchards and fields federal funds from the North American of Green Point Farm again or would this con't on pg 5 Page 2 - Merrymeeting News - Winter 2000 Friends of Merrymeeting Bay A WARM WELCOME AND THANK YOU TO ALL OUR NEW 1999 MEMBERS: Zona King, Joan Llorente, Bill and Paige Ruth, Lester and Nancy Steffens, Mike From Bath: Al Mesrobian, Peter and Mangum, Burnham Martin, Ralph Keyes Steitzer and Susan Chadima, and Denise Sharon Robohm, Stephen and Joyce and C. McKenna, Robert Muller, Rich- and Sheldon Tepler; from Woolwich Wilson; from Bowdoinham: Steve ard and Beverly Nickerson, W.G. Pinfold, Randolph Doak, E. Blaiklock and K. Bernier, Dwight and Heather Blease, Priscilla Seimer, Ann Spencer, John and Madden, Lauren Mofford, James and Hank Ogilby and Susan Drucker, Nancy Sherrye Trafton, Jean and Kenneth Michelle Rines, and Julie Erb and Herb Drucker, Pamela Hanson, Henry and Walbridge and Elihu York; from Dresden: Thomson; Dennis Purington from Joanie Mitchell, Terry Murphy and David Jan Goranson, Peter Lincoln, Shirley Belgrade; Sara Amato from Bowdoin; Phinney; from Brunswick: Daniel Atkins, Watkins, and Keith Reece and Nancy David McKinley and Leslie Badham Susan Blair, D. Nagler and C. Brzoza, Whatley; from Harpswell: Leon and Kay from Dartmouth MA; Jim Gill from E. Beth Bullock, Edgar S. Catlin III, Jenni- Ogrodnik, Jan and Clarence Richards, Winthrop; Hilary Neckles from Hallowell; fer Cost, Will Everitt, Louise Gardiner, and Charles Woodman; from Topsham: Marcus Parsons from Newton MA; Doug Paula Greenlee, Chris and Dianne Christopher Dwinal, Kathleen Greer, Clopp from Portland , David and Marilyn Gutsher, P. D’Alessandro and J. Mont- Michael and Mary Imrie, Lisa Tessler and Tilton from Richmond and Judith and gomery, Craig S. and Suzanne Johnson, Mark Ireland, Karen Peterson, Kathryn Daivd Falk from Washington D.C.. 1999 ACCOMPLISHMENTS We welcome your participation on any of these committees. Education Planning Office to “Assess Merrymeeting 4. Posted fish consumption advisories 1. 1998-1999 Speaker Series com- Bay Aquatic and Upland Habitat Changes around the Bay. pleted, 1999-2000 Speaker Series well Over Time.” Study is nearing final phases. 5. Worked with a new river advocacy underway. Join us at the April speaker series to hear group: Maine Rivers 2. Hands Around the Bay - Held a the results. 6. Co-sponsored a conference on "Merry Meeting on the Bay" day last spring 2. Began a water quality monitoring/ sprituality and environmental stewardship. at the Chop Point School. Over 220 el- testing program at six sites around the Bay. ementary school children from 10 area Partnered with Trout Unlimited to monitor Conservation and Stewardship schools attended. even more sites on the Kennebec above 1. Continued outreach program to 3. Website - continued work on our Augusta. landowners around the Bay. website http://www.col.k12.me.us/ 3. Developed a proposal for contami- 2. Continued work on easements mmb/ nants survey of fine sediments around the around the Bay. bay. Analysis funded [$20,000] through 3. Protected approximately 100 acres Research Surface Water Ambient Toxics Program of to date. 1. Received $24,500 from the Out- Maine DEP. Samples submitted to Maine 4. Helped pass the 50 million dollar door Heritage Fund through the State DEP by FOMB in December. land protection bond. 4. Continued Current Study efforts 5. Worked with Maine Wetland Pro- including attempted completion of 1998 tection Coalition. study, initial data gathering with USGS team, type testing of equipment for pos- Membership and Fundraising sible radio transmitter/drifter study with 1. Published four issues of our news- Winter 2000 aerial tracking. letter. VOL. 10, NO 1 2. Night on the Town Fundraising January, 2000 Advocacy Raffle Completed. 1. EDWARDS DAM REMOVED!!!!!!!! 3. Successful first Annual Appeal Merrymeeting News 2.Testified before the State Legislature [THANK YOU!] is the newsletter of Friends of regarding Toxic Use Reduction, Mercury 4. Merrymeeting Bay Cleanup - All together we have removed over 17,000 Merrymeeting Bay, P.O. Box 233, Reduction and Land Acquisition legisla- pounds of debris from the shores, woods, Richmond, Maine 04357, and is tion. (50 M passed by the voters last No- published seasonally. and roadways over the past four years. vember) 5. Coordinated the local leg of the Merrymeeting News is sent to 3.Continued work with the Maine annual Androscoggin Source to the Sea FOMB members and other friends Toxics Action Coalition. Outreach work Trek and incorporated three days of pad- of the Bay. For information call Ed including informational material to health dling on a segment the Kennebec. Friedman, Chairman 666-3372. care providers on the dangers of eating 6. Hosted the kick-off celebration of toxic Maine fish. Maine Rivers at Chop Point School. Friends of Merrymeeting Bay Winter 2000 - Merrymeeting News - Page 3 ANNUAL MESSAGE FROM YOUR CHAIR Y2K Special: The Bay Continues to Fill and Drain on Schedule As the winter ice finally grips the Bay and our "snow emer- The ad then notes, "Welcome to a place where common gency" ends with the arrival of the first few inches, I feel fortu- sense reigns and lunch is a turkey sandwich…doing it quickly nate to sit by the stove and write just a bit on another successful and efficiently, our manifesto." year for FOMB. This issue, full of some excellent writing, a meri- While Chair of this organization, this place is where I strive torious list of achievements, and a report demonstrating our fis- to keep us. I continue to try and maintain a vision of what is cal responsibility really demonstrates well what we are about. most beneficial for the Bay, a place we all cherish in our own Our sediment samples were collected and submitted for testing, ways [and as Bryce Muir pointed out the other night at our the aquatic vegetation and land use study is well underway, we Speaker Series, is well worthy of sanctification], and lead us to had a great turnout for our Hands Around the Bay day at the ACT as efficiently as possible in support of our mission and that Chop Point School, we've protected more valuable land along vision. It has been a pleasure to work with our dedicated Steer- the Bay, our speaker series continues to be top notch, and we ing Committee and our many volunteers in pursuit of these goals. initiated a rigorous water quality monitoring program. These A special pleasure has been to work with our outgoing Ex- and our other accomplishments [listed on page 2 ] remind me ecutive Director, Betsy Ham, these last three years. While sad to of a recent advertisement that caught my eye enough to tear see her go it is good to know that the rivers of Maine will be out and save. It goes something like this: better off as she takes on her new role of River Advocate at the Paint Job: How to Paint a Fence. 1) Go to hardware store. Natural Resources Council of Maine. 2) Buy white latex paint and a good brush. 3) With cold drink in As we begin to look at applicants for our Executive Director hand, paint.
Recommended publications
  • Section 5-2 Androscoggin River (Friends of Merrymeeting Bay)
    Maine Department of Environmental Protection Androscoggin River (FOMB) 2018 Summary Data Report Section 5-2 Androscoggin River (Friends of Merrymeeting Bay) Androscoggin River The Androscoggin River is the third largest river in the state of Maine. It has a length of 177 miles and drainage area of 3,450 square miles (2,730 sq. mi. in Maine).1 The Androscoggin River’s headwaters are Umbagog Lake in Maine/New Hampshire. From there it flows into New Hampshire and then back into Maine through the towns of Gilead and Bethel. It continues flowing through the towns and cities of Rumford, Mexico, Dixfield, Jay, Livermore Falls, Lewiston, Auburn, Lisbon, Lisbon Falls, Durham, Brunswick, and Topsham where it joins the Kennebec River at Merrymeeting Bay. The Androscoggin River has a long history of industrial and municipal use over the last 200 years.1 Beginning in the early 1800s, many dams were constructed for mills, primarily in the lower part of the river. By the late 1800s, many textile and lumber mills were in operation, mostly from Lewiston to Brunswick. Pulp and paper mills that are still in operation today were established in the late 1800s in New Hampshire, Rumford, and Jay. Beginning in the late 1920s, Central Maine Power built hydroelectric dams that impounded much of the river from Lewiston to Livermore Falls. Some of these uses continue today. “Along its course to the sea, the river is repeatedly dammed. It receives discharges from industrial and municipal sources, as well as polluted runoff from a variety of sources.”2 Specific problems include mill discharges, combined sewer overflows (CSOs), dam impacts (28 dams exist), and historical sediment toxins.
    [Show full text]
  • Kennebec Estuary Focus Areas of Statewide Ecological Significance Kennebec Estuary
    Focus Areas of Statewide Ecological Significance: Kennebec Estuary Focus Areas of Statewide Ecological Significance Kennebec Estuary WHY IS THIS AREA SIGNIFICANT? The Kennebec Estuary Focus Area contains more than 20 percent of Maine’s tidal marshes, a significant percentage of Maine’s sandy beach and associated dune Biophysical Region habitats, and globally rare pitch pine • Central Maine Embayment woodland communities. More than two • Cacso Bay Coast dozen rare plant species inhabit the area’s diverse natural communities. Numerous imperiled species of animals have been documented in the Focus Area, and it contains some of the state’s best habitat for bald eagles. OPPORTUNITIES FOR CONSERVATION » Work with willing landowners to permanently protect remaining undeveloped areas. » Encourage town planners to improve approaches to development that may impact Focus Area functions. » Educate recreational users about the ecological and economic benefits provided by the Focus Area. » Monitor invasive plants to detect problems early. » Find ways to mitigate past and future contamination of the watershed. For more conservation opportunities, visit the Beginning with Habitat Online Toolbox: www.beginningwithhabitat.org/ toolbox/about_toolbox.html. Rare Animals Rare Plants Natural Communities Bald Eagle Lilaeopsis Estuary Bur-marigold Coastal Dune-marsh Ecosystem Spotted Turtle Mudwort Long-leaved Bluet Maritime Spruce–Fir Forest Harlequin Duck Dwarf Bulrush Estuary Monkeyflower Pitch Pine Dune Woodland Tidewater Mucket Marsh Bulrush Smooth Sandwort
    [Show full text]
  • American Eel Distribution and Dam Locations in the Merrymeeting Bay
    Seboomook Lake American Eel Distribution and Dam Ripogenus Lake Locations in the Merrymeeting Bay Pittston Farm North East Carry Lobster Lake Watershed (Androscoggin and Canada Falls Lake Rainbow Lake Kennebec River Watersheds) Ragged Lake a d a n Androscoggin River Watershed (3,526 sq. miles) a C Upper section (1,363 sq. miles) South Twin Lake Rockwood Lower section (2,162 sq. miles) Kokadjo Turkey Tail Lake Kennebec River Watershed (6,001 sq. miles) Moosehead Lake Wood Pond Long Pond Long Pond Dead River (879 sq. miles) Upper Jo-Mary Lake Upper Section (1,586 sq. miles) Attean Pond Lower Section (3,446 sq. miles) Number Five Bog Lowelltown Lake Parlin Estuary (90 sq. miles) Round Pond Hydrology; 1:100,000 National Upper Wilson Pond Hydrography Dataset Greenville ! American eel locations from MDIFW electrofishing surveys Spencer Lake " Dams (US Army Corps and ME DEP) Johnson Bog Shirley Mills Brownville Junction Brownville " Monson Sebec Lake Milo Caratunk Eustis Flagstaff Lake Dover-Foxcroft Guilford Stratton Kennebago Lake Wyman Lake Carrabassett Aziscohos Lake Bingham Wellington " Dexter Exeter Corners Oquossoc Rangeley Harmony Kingfield Wilsons Mills Rangeley Lake Solon Embden Pond Lower Richardson Lake Corinna Salem Hartland Sebasticook Lake Newport Phillips Etna " Errol New Vineyard " Madison Umbagog Lake Pittsfield Skowhegan Byron Carlton Bog Upton Norridgewock Webb Lake Burnham e Hinckley Mercer r Farmington Dixmont i h s " Andover e p Clinton Unity Pond n i m a a Unity M H East Pond Wilton Fairfield w e Fowler Bog Mexico N Rumford
    [Show full text]
  • Designation of Critical Habitat for the Gulf of Maine, New York Bight, And
    Federal Register / Vol. 81, No. 107 / Friday, June 3, 2016 / Proposed Rules 35701 the Act, including the factors identified Recovery and State Grants, Ecological Public hearings and public in this finding and explanation (see Services Program, U.S. Fish and information meetings: We will hold two Request for Information, above). Wildlife Service. public hearings and two public informational meetings on this proposed Conclusion Authority rule. We will hold a public On the basis of our evaluation of the The authority for these actions is the informational meeting from 2 to 4 p.m., information presented under section Endangered Species Act of 1973, as in Annapolis, Maryland on Wednesday, 4(b)(3)(A) of the Act, we have amended (16 U.S.C. 1531 et seq.). July 13 (see ADDRESSES). A second determined that the petition to remove Dated: May 25, 2016. public informational meeting will be the golden-cheeked warbler from the Stephen Guertin, held from 3 to 5 p.m., in Portland, List of Endangered and Threatened Maine on Monday, July 18 (see Wildlife does not present substantial Acting Director, U.S. Fish and Wildlife Service. ADDRESSES). We will hold two public scientific or commercial information [FR Doc. 2016–13120 Filed 6–2–16; 8:45 am] hearings, from 3 to 5 p.m. and 6 to 8 indicating that the requested action may p.m., in Gloucester, Massachusetts on BILLING CODE 4333–15–P be warranted. Therefore, we are not Thursday, July 21 (see ADDRESSES). initiating a status review for this ADDRESSES: You may submit comments, species. DEPARTMENT OF COMMERCE identified by the NOAA–NMFS–2015– We have further determined that the 0107, by either of the following petition to list the U.S.
    [Show full text]
  • Shorey's Brook Dam to Be Removed in York County
    FALL 2011/ WINTER 2012 THE NEWSLETTER OF MAINE RIVERS Shorey’s Brook Dam to be Removed in York County Much of the 4.3-mile Shorey’s in August 2010. Led by project Brook in South Berwick has manager and stewardship not actually looked like a coordinator Darrell DeTour, typical brook for many years. GWRLT has gathered many !e culprit is a dam perched partners, including the Wells several hundred yards below National Estuarine Research Route 101. Built as early as Reserve, the National the 1630s, it has morphed over Oceanic and Atmospheric the centuries into a decrepit Administration, Conservation hodgepodge of industrial Decrepit and inconspicuous, the Shorey’s Brook dam Law Foundation, the US Fish material, impenetrable by is di!cult to capture in a picture. Right, Tin Smith and Wildlife Service, and anadromous "sh including leads a tour of the restoration site. others, to plan, permit, and alewives, smelt, and Atlantic fund the removal. salmon. A dam removal is currently on track to take place !is project promises to be a success in Maine both for in November to restore the brook. In early October we reconnecting long-fragmented habitat and as a model to toured the dam removal site with members of Great Works inspire other entities—land trusts, municipalities, and Regional Land Trust and other project partners. others—who may be considering a dam removal project !e Great Works Regional Land Trust (GWRLT) acquired but are daunted by the perceived complexity and cost. To the 27-acre Raymond & Simone Savage Wildlife Preserve date this project has drawn little controversy and is on that surrounds Shorey’s Brook in 2008.
    [Show full text]
  • Friends of Merrymeeting Bay P.O
    Friends of Merrymeeting Bay P.O. Box 233 Richmond, ME 04357 www.fomb.org To: Susanne Meidel, Water Quality Standards Coordinator Maine Department of Environmental Protection SHS 17 Augusta, ME 04333 207-441-3612 [email protected] From: Jennifer Brockway, Executive Director Friends of Merrymeeting Bay 207-666-1118 [email protected] E-Filed Subject: Water Re-Classification Proposal River/Sections: Androscoggin from Worumbo Dam to Merrymeeting Bay Proposed Upgrade: C to B Basis for Proposal: Actual conditions exceed those of present classification Documentation: Supporting data from FOMB monitoring program approved by Maine DEP and USEPA Data Collection Periods: DO-1999 to present; Coliform Bacteria-2006 to present Sampling Intervals: Monthly: April-October Proposal Date: November 29, 2017 Dear Ms. Meidel: Please consider this our formal upgrade proposal for the lower section of the Androscoggin River between Merrymeeting Bay at the line from Pleasant Point in Topsham to North Bath extending upriver to Worumbo Dam in Lisbon Falls. As our data show, while classified as C, this section has long been on the cusp of and now is actually meeting, Class B standards. We therefore propose it be upgraded from C to B. FOMB has the most complete set of classification data for the reaches in this proposal. We began our monitoring program in 1999 and continue to this day with over twenty sampling sites on the Androscoggin, Kennebec and around Merrymeeting Bay. FOMB joined the VRMP in 2009 to further support and substantiate water classification upgrades. Because the actual water quality of the lower Androscoggin sections described here exceeds that of their current classification, our request for a reclassification from C to B is supported by the State antidegradation policy as quoted below: 38 M.R.S.A.
    [Show full text]
  • Deparment of Marine Resources Chapter 55
    DEPARMENT OF MARINE RESOURCES CHAPTER 55 - GEAR RESTRICTIONS TITLE INDEX 55.03 Special Area Closures to Fishing 55.04 Maine Gillnet Bait Fishing Regulations 55.05 Use of Purse, Drag or Stop Seines in Certain Waters Prohibited; Regulation of Fishing Therein 55.06 Fish Passage Regulations 55.07 Seasonal Net Restrictions 55.08 Method of Mechanical Harvest Prohibited 55.14 Fishing in the Presumpscot River 55.15 Fishing in the Bagaduce River Upstream of the North Brooksville Sedgwick Bridge 55.30 Fishing in the Sheepscot River, Lincoln County 55.35 Use of draggers in Sheepscot Bay, Lincoln County 55.40 Fishing for cod and other ground fish in Sheepscot Bay, Lincoln County 55.50 Seining in Sasanoa River, Sagadahoc County 55.55 Fishing in Cathance and Abagadasset Rivers, Sagadahoc County 55.56 Fishing for Suckers in the Towns of Bowdoinham and Topsham 55.58 Penobscot River Fishing Closure 55.59 Penobscot River Tributaries Fishing Closures 55.60 Fishing in Narraguagus River, Washington County 55.70 Fishing in Dennys River, Washington County 55.75 York County; otter trawling in Spruce Creek 55.80 Fishing in Bond, Kennebec County 55.85 Fishing in the Damariscotta River 55.93 Fixed Gill nets: Tending Requirements: Kennebec/Androscoggin Rivers 55.94 Use of Gill Nets in the Kennebec and Androscoggin Rivers 55.95 Fishing in Royal River, Yarmouth DEPARTMENT OF MARINE RESOURCES Chapter 55 page 2 55.96 Penobscot River Gear Restrictions. 55.97 Fishing in the Kennebec River above the Gardiner/Randolph Bridge 55.98 Fishing in the Androscoggin River Above the Route #201 Bridge Between Brunswick and Topsham 55.99 Fishing in the Saco River Above the Footbridge Between Saco and Biddeford DEPARTMENT OF MARINE RESOURCES Chapter 55 page 3 DEPARTMENT OF MARINE RESOURCES Chapter 55 - Gear Restrictions 55.03 Special Area Closures to Fishing Except as provided by further regulation of the Commissioner, the following waters are closed to fishing: Dams with fishways.
    [Show full text]
  • Stillwater Recertification Attachments 2015
    Stillwater Hydroelectric Project (FERC No. 2712) Project Description Black Bear Hydro Partners, LLC’s Stillwater Hydroelectric Project is a run-of-river hydroelectric generating facility located on the Stillwater Branch of the Penobscot River in Old Town, Maine with a gross nameplate generating capacity of 4.18 MW. The Stillwater Project Powerhouse A commenced initial commercial operations in 1913. The Licensee applied for an amendment to increase capacity at the Stillwater Project via the construction of an additional powerhouse (Powerhouse B). The Project consists of an existing 1,720-foot-long dam consisting of 13 sections of various height, creating an impoundment with a normal full pond elevation of 94.65 feet National Geodetic Vertical Datum. The Project has two powerhouses. Powerhouse A consists of four generating units a total installed capacity of 1,950 kW and a maximum hydraulic capacity of 1,700 cfs. Powerhouse B consists of three generating units with a total installed capacity of 2,229 kW and a maximum hydraulic capacity of 1,758 cfs. Powerhouse A has 50 ft long aerial transmission lines installed from the powerhouse’s GSU to the existing substation. Powerhouse B has 300 ft long aerial transmission lines installed from the powerhouse’s generating step-up unit (GSU) to the existing, adjacent 12.5 kV distribution system located adjacent to the existing project boundary and along the south side of Stillwater Avenue. The Stillwater Powerhouse B commenced initial commercial operation September, 2013. The Stillwater Project generates clean, renewable electricity while providing recreational opportunities (portage trail, parking areas for river access and hand-carried boat launch), fish passage measures, consistent water levels that enhance habitats for waterfowl, etc., and substantial support of the local community through stable property tax payments, reliable voltage support of the electrical distribution system, etc.
    [Show full text]
  • FALL 1999 to Preserve, Protect and Improve the Unique Ecosystems of Merrymeeting Bay
    MerrymeetingMerrymeeting NewsNews The Newsletter of Friends of Merrymeeting Bay • P.O. Box 233 • Richmond Maine 04357 FALL 1999 To Preserve, Protect and Improve the Unique Ecosystems of Merrymeeting Bay. MERRYMEETING BAY Friends of Merrymeeting Bay is a 1999-2000 SPEAKER SERIES 501c3 nonprofit organization. 7:00 p.m. Beam Classroom, Visual Arts Center, Support comes from members' tax- deductible donations and grants. Bowdoin College, Brunswick (Nov. 17 & May 17 at Bridge Academy, Dresden, Maine) Education OCTOBER 20 Preserving the Bay: The Thorne Head Experience Hands Around the Bay, Speaker Se- Anne W. Hammond, Lower Kennebec Regional Land Trust; ries, field trips. Jack Witham, Holt Research Forest Conservation & Stewardship NOVEMBER 17 Family Farming on Merrymeeting Bay Protecting natural resources through (Dresden Bridge Academy) • 7:30 pm private and public ownership, ease- Jan Goranson & Rob Johanson, Goranson Farm, Dresden; ments and stewardship. Harry & Dave Prout, Prout Farm, Bowdoinham Speakers follow FOMB Annual Meeting and Raffle Draw- Membership Events ing (7:00 p.m.) – public invited, raffle drawing to follow (see Swan Island Picnic, paddle tours of the pg. 2 for details). Bay, field trips, conservation meetings, DECEMBER 15 A Bridge Back to the Year 1000: The Bay at the potluck suppers and shoreline clean-ups. Turn of the Millennium Steve Cox, Maine State Museum Research and Advocacy Water quality, data collection, toxics, JANUARY 19 The Bay as Inspiration for Art fisheries restoration. Bryce Muir, artist; Franklin Burroughs,
    [Show full text]
  • Maine Legacy Spring 2001 First Impressions: Ross Geredien Is a Conservancy Intensifying Our Activities Here
    library Use Only Temcv M a in e * * I Spring 2001 TheNature Conservancy Migrations Merrymeeting Bay/ tel of ice, the geese leapfrog north in a River. When Neil found that the Con­ cycle alternating between rest and servancy was interested in conserving Lower Kennebec Estuary flight. Critical on their migration route his land, he dropped all other offers, White as the blocks of ice below, are areas where they can bulk up on including a proposal to develop a new the geese called back and forth, their foods that provide the necessary calo­ airstrip, and began exploring conser­ voices high-pitched and nasal. The ice, ries to complete the next stage of their vation options. breaking from the shoreline, joined a journey. Snow geese, while very com­ Because a portion of the land was frozen flotilla drifting with the river’s mon in some areas, are still a rare sight­ in the estate of Derril O. Lamb, current, flowing to the ocean. ing along Maine’s coast. founder of Marriner Lumber, selling Although this flock of snow geese the property was necessary for the fam­ his flock of Snow geese had could not know it, the Conservancy has ily, but having the property cleared and T come a long way on its spring spent the better part of the winter mak­ developed was not. As a tribute to migration, and still had a long way to ing sure they and many other species Derril Lamb, the estate and Marriner go. As they had cleared Casco Bay, the will enjoy a safe migration.
    [Show full text]
  • The Maine Rivers Fish Assemblage Assessment: Application to the Presumpscot River in 2006
    THE MAINE RIVERS FISH ASSEMBLAGE ASSESSMENT: APPLICATION TO THE PRESUMPSCOT RIVER IN 2006 Chris O. Yoder, Research Director Lon E. Hersha, Research Associate Center for Applied Bioassessment and Biocriteria Midwest Biodiversity Institute Columbus, OH Edward T. Rankin, Senior Research Associate Voinovich School for Leadership & Public Affairs Ohio University The Ridges Athens, OH 45701 St. John/ Allagash Aroostook Successful IBI DevelopmentThree Requires Linked Projects:2005/6 a Sufficient Regional Database1.Maine rivers fish assemblage assessment (2001-2007) 2.Connecticut R. fish assemblage2004/5 assessment (2008Presumpscot-9).2002 2003 3.Regional EMAP – 2006New England rivers2008/9 assessment 2008/9(2008-9); part based on NRSA probabilistic sites draw. Why Knowledge of the Fish Assemblage is Important Current Issues: • LimitedWe usedKnowledge to sayof Extant this Faunajust about– limited mostlyMaine, to managed but it species applies (especially to the trout rest and salmon); need to document relative abundance ofof co -Newoccurring England. native and alien species and their respective influence. • Naturally Depauperate Fauna – cold water, coastal drainages – “how will these respond?” • Assess Potential Conflicts with High Profile Restoration Goals – do non-native species pose an unintentional deterrent? Kennebec River (2002-6) . Wyman Dam to Merrymeeting Bay (30 sites, 2 test areas) . Follow-up Waterville to Augusta (2002-6) Androscoggin River (2003) . Errol, NH to Merrymeeting Bay (51 sites) 46.00 Sebasticook River (2003) . Douglas Pond to Winslow (9 sites) Penobscot River (2004) . N. Br. To Hamden (40 sites); included W. Br., E. Br., 5 additional 350+ Samples tributaries Northern Maine Rivers (2005-6) . St. John (14 sites), Allagash (8 sites), Aroostook (10 sites), St.
    [Show full text]
  • Maine Revised Statutes 38 §467
    Presented below are water quality standards that are in effect for Clean Water Act purposes. EPA is posting these standards as a convenience to users and has made a reasonable effort to assure their accuracy. Additionally, EPA has made a reasonable effort to identify parts of the standards that are not approved, disapproved, or are otherwise not in effect for Clean Water Act purposes. Maine Revised Statutes 38 §467 Maine Revised Statutes Title 38: WATERS AND NAVIGATION Chapter 3: PROTECTION AND IMPROVEMENT OF WATERS Subchapter 1: ENVIRONMENTAL PROTECTION BOARD Article 4-A: WATER CLASSIFICATION PROGRAM §467. Classification of major river basins All surface waters lying within the boundaries of the State that are in river basins having a drainage area greater than 100 square miles that are not classified as lakes or ponds are classified in this section. [1989, c. 764, §2 (AMD).] 1. Androscoggin River Basin. A. Androscoggin River, main stem, including all impoundments. (1) From the Maine-New Hampshire boundary to its confluence with the Ellis River - Class B. (2) From its confluence with the Ellis River to a line formed by the extension of the Bath-Brunswick boundary across Merrymeeting Bay in a northwesterly direction - Class C. [1989, c. 890, Pt. A, §40 (AFF); 1989, c. 890, Pt. B, §68 (AMD); MRSA T. 38, §467, sub-§1, ¶ A (AMD).] B. Little Androscoggin River Drainage. (1) Little Androscoggin River, main stem. (a) From the outlet of Bryant Pond to the Maine Central Railroad bridge in South Paris - Class A. (b) From the Maine Central Railroad bridge in South Paris to its confluence with the Androscoggin River - Class C.
    [Show full text]