Miss Alison Biddulph

Total Page:16

File Type:pdf, Size:1020Kb

Miss Alison Biddulph

NIGEL FORRESTER MCIOB ACCREDITED ENERGY ASSESSOR

SAP Energy Rating Survey Checklist

To complete a SAP calculation I need a set of building plans including floor plans, elevations, and sections and also a site plan indicating the orientation of the building in relation to north. I also need information relating to the items listed below, some of which may already be on the plans in which case there is no need to fill in those sections. Some of the information you may not know at the design stage.

If in any doubt please telephone and we can talk through the details.

If the project is at the design stage please indicate your preferred construction details

Project Details Site address…………………………………………………………………………………………………. ……………………………………………………………………………………………………………… ……………………………………………………………………………Post code………………………. Contact details Your name ………………………………………………………………………………………………… Your address ……………………………………………………………………………………………….. ……………………………………………………………………………………………………………… ……………………………………………………………………………Post code………………………. Telephone number………………………………………………………………………………………….. E mail address……………………………………………………………………………………………….

1. Ground floor construction Including insulation type and thickness

2. Main external wall construction Including insulation type and thickness

Ilett House, Smithy Bank, Alton, Staffordshire, ST10 4AD 3. Secondary walls. e.g. - stud walls in habitable roof space - walls adjacent to attached garage

4. Roof construction Including insulation type and thickness (Please state whether flat or sloping ceiling)

5. Window frames (please tick appropriate boxes)

UPVC Timber Metal

If known please state manufacturers declared U Value

6. External doors

UPVC Timber Metal

If known please state manufacturers declared U Value

7. Glazing

Single Double Triple Argon filled

Low ‘E’ soft coat Low ‘E’ hard coat

Air gap - 6mm 12mm 16mm 24mm 28mm

8. Mechanical ventilation - if applicable please give details of any mechanical ventilation (excluding standard extract fans fitted in kitchen, bathrooms, WC’s and utilities etc.

9. Heating system Briefly describe main heating system e.g. boiler and cylinder, combi boiler, wall or floor

Ilett House, Smithy Bank, Alton, Staffordshire, ST10 4AD mounted. If known give exact details of boiler including manufacturer, model number and efficiency etc.

Fuel Type

Underfloor heating - Yes No

10. Secondary heating Briefly describe any secondary heating e.g. wood burning stove, gas fire etc. If known give exact details including manufacturer, model number and efficiency etc.

Fuel type

11. Hot water

Is the hot water produced by the central heating boiler Yes No

Cylinder details if applicable

Capacity (litres) Insulation thickness

12. Renewables

Please give details of any additional energy systems proposed e.g. Solar Panels, Photovoltaic Panels, Wind turbines, Heat Pumps etc.

Ilett House, Smithy Bank, Alton, Staffordshire, ST10 4AD

Recommended publications