June 2016 TABLE D

Non domestic work - Extensions and New Building VAT included – VAT not charged for Regularisation

Industrial and Storage Full Application Regularisation Category of work / Description Inspection charge Plan charge £ Charge £ £ 1 Floor area not exceeding 10m2 90.00 210.00 336.67 2 Floor area exceeding 10m2 but not 110.40 255.60 411.48 exceeding 40m2 3 Floor area exceeding 40m2 but not 120.00 279.60 448.89 exceeding 100m2 4 Floor area exceeding 139.20 326.40 523.70 100m2 but not exceeding 200m2

Schools, Colleges, etc. If the work is non-traditional construction or the estimated cost exceeds £100,000 please contact this office Full Application Regularisation Category of work / Description Inspection charge Plan charge £ charge £ £ 1 Estimated Cost of Work 0 to £5,000 132.00 198.00 371.25 2 Estimated Cost of Work 198.00 264.00 519.75 £5,001 to £10,000 3 Estimated Cost of Work 264.00 396.00 742.50 £10,001 to £20,000 4 Estimated Cost of Work 528.00 792.00 1485.00 £20,001 to £100,000

All other use Uses Full Application Regularisation Category of work / Description Plan charge £ Inspection charge charge £ £ 1 Floor area not exceeding 10m2 159.60 373.20 598.52 2 Floor area exceeding 10m2 but not 199.20 465.60 748.16 exceeding 40m2 3 Floor area exceeding 40m2 but not 229.20 535.20 860.37 exceeding 100m2 [Type4 Floor text] area exceeding 259.20 606.00 972.59 100m2 but not exceeding 200m2