Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 1 of 22

Document No

Certification Program Plan

Name / Function Date Signature Prepared Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 2 of 22

Verified

Head of Airworthiness Approved Project Engineering Manager

For and on behalf of the Defence Aviation Safety Authority: Approved

Amendment Record

Issue Amendment Description Date 1.0 Initial Issue

Table of Contents Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 3 of 22

1. Introduction

1.1 Certification Project Description

1.2 Applicant Details Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 4 of 22

or Government to Government acquisition), then a Defence PO (as the Applicant) will develop and submit the CPP.> Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 5 of 22

1.3 Points of Contact

Organisation Role POC Name POC Position POC Phone

Design / Certification Verification Engineer> DoSA> Engineering Manager> Manager> Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 6 of 22

2. Certification Project Description

2.1 Certification Project History

2.2 Certification Project Definition

2.3 Design Organisation Resources Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 7 of 22

2.4 Design Subcontractors

2.5 Technologies and Process Description Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 8 of 22

3. Type Certification Basis

3.1 TCB Establishment

3.2 Overall Basis of Certification Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 9 of 22

negotiate additional airworthiness requirements and ultimately result in an agreed TCB. Such an MCRI will be non-enduring and will be closed upon TCB agreement.>

3.3 Exceptions

3.4 Special Conditions

3.5 Elect to Comply Items

3.6 Equivalent Safety Findings

3.7 Compliance Checklist Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 10 of 22

Certification Criteria (EMACC) and show how sections 3.2 to 3.6 above cover all relevant parts of the EMACC.

The CCL shall also record the MoC (refer section 4.1) and the use of prior certification by other NAA/NMAAs (refer section 4.1) for each requirement.>

Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 11 of 22

4. Certification Process

4.1 Means of Compliance Type of Associated Compliance Means of Compliance Compliance Documents MC0: - Compliance statement Type Design documents Engineering - Reference to Type Design Recorded statements evaluation documents - Election of methods, factors, etc. - Definitions Descriptions MC1: Design review Drawings MC2: Calculation/ Analysis Substantiation reports MC3: Safety assessment Safety analysis Tests MC4: Laboratory tests Test programmes Test reports MC5: Ground tests on related product Test interpretations MC6: Flight tests MC8: Simulation Inspection MC7: Design inspection/ audit Inspection or audit reports Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 12 of 22

Equipment qualification is Equipment a process which may MC9: Equipment qualification qualification include all previous means of compliance.

Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 13 of 22

 differences are identified in the CRE delta assessment that compares the CRE assumed by the NAA/NMAA and that of Defence  NAA/NMAA risk treatments require further deliberations in a Defence So Far As Reasonably Practicable framework.>

4.2 Equipment qualification

For equipment to be certified as part of the Product, the Applicant for the MTC/MSTC is responsible for the approval of the equipment as part of the aircraft and its installation. An acceptable means of providing compliance data in support of the equipment and its installation is to show that the equipment meets the appropriate AUSMTSO standard. Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 14 of 22

The Equipment List should also contain information if the equipment is optional and if there any conditions or limitations for installations (e.g. tow hook not compatible with propeller xyz).>

4.3 Compliance Checklist (CCL)

4.4 Final Declaration of Compliance

4.5 Control of Production and Configuration Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 15 of 22

4.6 Approval of Flight Conditions

4.7 Compliance Documentation Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 16 of 22

 the production of the documents is carefully managed for the entirety of the project, in accordance with the milestones defined in the CPP  the various issues of a document are controlled.>

4.8 Master Document List (MDL)

Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 17 of 22 4.9 Certification Schedule Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 18 of 22 Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 19 of 22

5. DASA Level of Involvement

5.1 Initial DASA Level of Involvement Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 20 of 22

requirements. The Authority is presented with Compliance Demonstration evidence and the Authority inspects that evidence on a non-exhaustive basis. A risk-based approach to inspection of Compliance Demonstration evidence is therefore required to treat the risks linked to the non-exhaustiveness of the process.>

5.2 Authority Level of Involvement Changes Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 21 of 22

 such a difficulty or issue is identified by the Authority or the DoSA during the Compliance Demonstration process  a design issue is reported from another NAA/NMAA or other credible source, suggesting that a potentially unsafe condition may exist or an issue has been identified on an in-service product of a similar design.> Certification Program Plan

Document No:

Issue No:

Date: DD Mon YY

Page 22 of 22

6. List of Annexes

A Compliance Checklist

B Master Document List

7. List of Enclosures

1 CRE Delta Assessment (if applicable)