NOTICE

The U.S. Army Corps of Engineers at Granger Lake is seeking your opinion!

Within the next three years construction of the Brazos River Authority East Williamson County Water Treatment Plant, Raw Water Intake will occur in Wilson H. Fox Park. Construction will occur in two phases. Phase 1 will be the trench excavation, placement and assembly of the water pipelines from the entry of the day use area to the intake site at the cul-de-sac near campsites 19 and 20. Estimated time of construction for phase 1 is between 1 and 3 months with a target winter season timeframe (Oct-Feb). Phase 2 will be the construction of the raw water intake structure. Estimated time of construction for this phase is 18 months (year round). Impacts of construction on day use and boat ramp facilities are considered to be minimal, however, work vehicles, trucks and heavy equipment will be moving from park entrance through the camping area, resulting in increased traffic and noise levels, as well as dust and possible road repairs. How would you like to see the U.S. Army Corps of Engineers operate Wilson H. Fox Park and Taylor Park during these construction phases?

Granger Lake Public Opinion Survey

Yes No Undecided

For phase one of construction, would you prefer to camp in Wilson H. Fox Park with construction in progress and keep Taylor Park closed? For phase one of construction, would you prefer to camp in Taylor Park with the Wilson H. Fox Park camp area closed? If phase one construction is delayed until the summer months (Mar-Sept), would you prefer we leave the camping area at Wilson H. Fox Park open with construction in progress? For phase two of construction, would you prefer to camp in Wilson H. Fox Park with construction in progress? For phase two of construction, would you prefer to camp in Taylor Park or Willis Creek Park and close Wilson H. Fox Park camping area? Radio Newspaper Website Other(please list) If temporary closures of recreation facilities are needed, through

which media outlets would you likely find out about them?

Please note additional comments and/or suggestions in regard to how we operate our parks during the various construction phases:

Please return this survey by mail or e-mail to: U.S. Army Corps of Engineers ATTN Granger Lake Manager 3100 Granger Dam Rd Granger, TX 76530 mailto:[email protected]