Guidance notes (delete column when document has been compiled and change Page Setup from landscape to portrait))
Insert employer’s logo or delete box Insert name of employer and move column over to left
Insert project number
Insert title of project
Part C1.2 Contract Data
The Contractor is advised to read the NEC3 Engineering and Construction Subcontract (Third edition of June 2005 with amendments June 2006 – see www.neccontract.com /useful_downloads/ NEC_Amendments_June_2006.asp), published by the Institution of Civil Engineers, in order to understand the implications of this Data which is required to be completed. Copies of this documents may be obtained from the South African Institution of Civil Engineering (telephone 011-805 5947) or Engineering Contract Strategies (telephone 011-803 3008).
Each item of data given below is cross-referenced to the clause in the NEC3 Engineering and Construction Subcontract to which it mainly applies. Part two - Data provided by the Subcontractor
10.1 The Subcontractor is (Name):
Address
Tel No.
Fax No.
Contract 1 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... Email Delete row if email is not permitted as a form of communication
11.2(8) The direct fee percentage is %
The subcontracted fee percentage is %
11.2(18) The subcontract working areas are the Site and
24.1 The Subcontractor's key persons are: Provide for additional key persons if necessary
1 Name:
Job:
Responsibilities:
Qualifications:
Experience:
2 Name:
Job
Responsibilities:
Qualifications:
Experience:
CV's (and further key persons data including CVs) are appended to the Scope of Work.
11.2(3) The subcontract completion date for the whole of the subcontract works is Delete row if the Subcontractor is not required to decide on a completion date for the whole of the subcontract works
11.2(14) The following matters will be included in the Risk Register
11.2(19) The Subcontract Works Information for the Subcontractor’s design is in the document called Part 3: Scope Delete row if the Subcontractor is not required to provide of Work Subcontract Work Information
31.1 The programme identified in the Subcontract Data is Delete row if the programme is not to be identified in the Subcontract Data
A Priced contract with activity schedule Delete rows if this Option does not apply Contract 2 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 11.2(20) The activity schedule is in the document called Part C2: Pricing Data
11.2(30) The tendered total of the Prices is as stated in the Form of Offer and Acceptance
B Priced contract with bill of quantities Delete rows if this Option does not apply
11.2(21) The bill of quantities is in the document called Part 2: Pricing Data
11.2(31) The tendered total of the Prices is as stated in the Form of Offer and Acceptance
C Target contract with activity schedule Delete rows if this Option does not apply
11.2(20) The activity schedule is in the document called Part 2: Pricing Data
11.2(30) The tendered total of the Prices is as stated in the Form of Offer and Acceptance
D Target contract with bill of quantities Delete rows if this Option does not apply
11.2(21) The bill of quantities is in the document called Part 2: Pricing Data
11.2(31) The tendered total of the Prices is as stated in the Form of Offer and Acceptance
Include where Option A or Option B is used and delete rows Data for the Shorter Schedules of Cost Components (SSCC) where Options C, D or E is used
41 in The percentage for people overheads is % SSCC
21 in The published list of Equipment is the last edition of the list published by the Contractor’s Plant Hire SSCC Association in their publication Hire SA in Africa (tel 011-293-7457)
The percentage for adjustment for Equipment in the published list is % (state plus or minus)
22 in The rates of other Equipment are: SSCC Equipment Size or Rate capacity
Contract 3 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 61 in The hourly rates for Defined Cost of design outside the Working Areas are SSCC Category of employee Hourly rate
62 in The percentage for design overheads is % SSCC
63 in The categories of design employees whose travelling expenses to and from the Working Areas are SSCC included in Defined Cost are:
Data for Schedule of Cost Components (SCC) Include where Option C, D or E is used and delete rows where Option A or B is used
23 in SCC The listed items of Equipment purchased for work on this contract, with an on cost charge, are:
Equipment Time related charge Per time period
per
per
per
per
24 in SCC The rates for special Equipment are:
Equipment Size or capacity Rate
44 in SCC The percentage for Working Areas overheads is %
Contract 4 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 51 in SCC The hourly rates for Defined Cost of manufacture or fabrication outside the Working Areas are
Category of employee Hourly rate
52 in SCC The percentage for manufacture and fabrication overheads is %
Data for both schedules of cost components Include where Option C, D or E is used and delete rows where Option A or B is used
61 in SCC The hourly rates for Defined Cost of design outside the Working Areas are & SSCC
Category of employee Hourly rate
62 in SCC The percentage for design overheads is % & SSCC
63 in SCC The categories of design employees whose travelling expenses to and from the Working Areas are & SSCC included as a cost of design of the works and Equipment done outside the Working Areas are:
Data for the Shorter Schedule of Cost Components Include where Option C, D or E is used and delete rows where Option A or B is used
41 in The percentage for people overheads is % SSCC
21 in The published list of Equipment is the last edition of the list published by the Contractor’s Plant Hire SSCC Association in their publication Hire SA in Africa (tel 011-293-7457)
The percentage for adjustment for Equipment in the published list is % (state plus or minus)
22 in The rates of other Equipment are: SSCC
Contract 5 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... Equipment Size or capacity Rate
X1 Price adjustment for inflation Delete rows if no provision is made for the payment of special materials on a rise and fall basis The variation in cost of special materials is:
Special material Unit on which variation will be Price for base month ex determined factory, excluding transport, labour or any other costs.
Containers Delivered in bulk
Contract 6 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ......