
<p> Guidance notes (delete column when document has been compiled and change Page Setup from landscape to portrait))</p><p>Insert employer’s logo or delete box Insert name of employer and move column over to left</p><p>Insert project number</p><p>Insert title of project</p><p>Part C1.2 Contract Data </p><p>The Contractor is advised to read the NEC3 Engineering and Construction Subcontract (Third edition of June 2005 with amendments June 2006 – see www.neccontract.com /useful_downloads/ NEC_Amendments_June_2006.asp), published by the Institution of Civil Engineers, in order to understand the implications of this Data which is required to be completed. Copies of this documents may be obtained from the South African Institution of Civil Engineering (telephone 011-805 5947) or Engineering Contract Strategies (telephone 011-803 3008).</p><p>Each item of data given below is cross-referenced to the clause in the NEC3 Engineering and Construction Subcontract to which it mainly applies. Part two - Data provided by the Subcontractor</p><p>10.1 The Subcontractor is (Name): </p><p>Address</p><p>Tel No. </p><p>Fax No. </p><p>Contract 1 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... Email Delete row if email is not permitted as a form of communication</p><p>11.2(8) The direct fee percentage is %</p><p>The subcontracted fee percentage is %</p><p>11.2(18) The subcontract working areas are the Site and </p><p>24.1 The Subcontractor's key persons are: Provide for additional key persons if necessary</p><p>1 Name: </p><p>Job: </p><p>Responsibilities: </p><p>Qualifications: </p><p>Experience: </p><p>2 Name: </p><p>Job </p><p>Responsibilities: </p><p>Qualifications: </p><p>Experience: </p><p>CV's (and further key persons data including CVs) are appended to the Scope of Work.</p><p>11.2(3) The subcontract completion date for the whole of the subcontract works is Delete row if the Subcontractor is not required to decide on a completion date for the whole of the subcontract works</p><p>11.2(14) The following matters will be included in the Risk Register </p><p>11.2(19) The Subcontract Works Information for the Subcontractor’s design is in the document called Part 3: Scope Delete row if the Subcontractor is not required to provide of Work Subcontract Work Information</p><p>31.1 The programme identified in the Subcontract Data is Delete row if the programme is not to be identified in the Subcontract Data</p><p>A Priced contract with activity schedule Delete rows if this Option does not apply Contract 2 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 11.2(20) The activity schedule is in the document called Part C2: Pricing Data </p><p>11.2(30) The tendered total of the Prices is as stated in the Form of Offer and Acceptance</p><p>B Priced contract with bill of quantities Delete rows if this Option does not apply</p><p>11.2(21) The bill of quantities is in the document called Part 2: Pricing Data</p><p>11.2(31) The tendered total of the Prices is as stated in the Form of Offer and Acceptance</p><p>C Target contract with activity schedule Delete rows if this Option does not apply</p><p>11.2(20) The activity schedule is in the document called Part 2: Pricing Data</p><p>11.2(30) The tendered total of the Prices is as stated in the Form of Offer and Acceptance</p><p>D Target contract with bill of quantities Delete rows if this Option does not apply</p><p>11.2(21) The bill of quantities is in the document called Part 2: Pricing Data</p><p>11.2(31) The tendered total of the Prices is as stated in the Form of Offer and Acceptance </p><p>Include where Option A or Option B is used and delete rows Data for the Shorter Schedules of Cost Components (SSCC) where Options C, D or E is used</p><p>41 in The percentage for people overheads is % SSCC</p><p>21 in The published list of Equipment is the last edition of the list published by the Contractor’s Plant Hire SSCC Association in their publication Hire SA in Africa (tel 011-293-7457)</p><p>The percentage for adjustment for Equipment in the published list is % (state plus or minus)</p><p>22 in The rates of other Equipment are: SSCC Equipment Size or Rate capacity</p><p>Contract 3 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 61 in The hourly rates for Defined Cost of design outside the Working Areas are SSCC Category of employee Hourly rate</p><p>62 in The percentage for design overheads is % SSCC</p><p>63 in The categories of design employees whose travelling expenses to and from the Working Areas are SSCC included in Defined Cost are:</p><p>Data for Schedule of Cost Components (SCC) Include where Option C, D or E is used and delete rows where Option A or B is used</p><p>23 in SCC The listed items of Equipment purchased for work on this contract, with an on cost charge, are:</p><p>Equipment Time related charge Per time period</p><p> per </p><p> per </p><p> per </p><p> per </p><p>24 in SCC The rates for special Equipment are:</p><p>Equipment Size or capacity Rate</p><p>44 in SCC The percentage for Working Areas overheads is %</p><p>Contract 4 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... 51 in SCC The hourly rates for Defined Cost of manufacture or fabrication outside the Working Areas are</p><p>Category of employee Hourly rate</p><p>52 in SCC The percentage for manufacture and fabrication overheads is %</p><p>Data for both schedules of cost components Include where Option C, D or E is used and delete rows where Option A or B is used</p><p>61 in SCC The hourly rates for Defined Cost of design outside the Working Areas are & SSCC</p><p>Category of employee Hourly rate</p><p>62 in SCC The percentage for design overheads is % & SSCC</p><p>63 in SCC The categories of design employees whose travelling expenses to and from the Working Areas are & SSCC included as a cost of design of the works and Equipment done outside the Working Areas are:</p><p>Data for the Shorter Schedule of Cost Components Include where Option C, D or E is used and delete rows where Option A or B is used</p><p>41 in The percentage for people overheads is % SSCC</p><p>21 in The published list of Equipment is the last edition of the list published by the Contractor’s Plant Hire SSCC Association in their publication Hire SA in Africa (tel 011-293-7457)</p><p>The percentage for adjustment for Equipment in the published list is % (state plus or minus)</p><p>22 in The rates of other Equipment are: SSCC</p><p>Contract 5 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... Equipment Size or capacity Rate</p><p>X1 Price adjustment for inflation Delete rows if no provision is made for the payment of special materials on a rise and fall basis The variation in cost of special materials is:</p><p>Special material Unit on which variation will be Price for base month ex determined factory, excluding transport, labour or any other costs.</p><p>Containers Delivered in bulk</p><p>Contract 6 of 6 C1.2 Part C1: Agreements and Contract Data Contract Data: Part 2 Reference no ...... </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-