Ac1155a Retaining Wall Full Processing Checklist

Total Page:16

File Type:pdf, Size:1020Kb

Ac1155a Retaining Wall Full Processing Checklist

Retaining wall full processing checklist

Use this checklist when processing stand-alone applications for retaining walls, note check Schedule 1 for exemptions

Address: Consent No:

Processed by: Date:

Description of work:

Corrosion zone Wind zone

Project Processors complexity competency

Purpose group Application: Building consent Amends

LBP No: (Eng) LBP No: (Design)

PIM / PIC (list any non-standard issues raised in the PIM that affect this application to show they have been considered)

Means of Compliance RBW Yes No

SED Design memorandum PS1 PS2

B2 Durability

Concrete strength (Mpa) Timber treatment Fixings

17.5 20 25 H3.2 H5

Decision Site plan (items must be shown on plans) Reasons for decision / comments N/A Yes RFI N/A

Siting dimensions shown on site plan

Datum / contours

Existing and new building work shown on site plan

Public drainage shown on site plan

Location Depth Connections Private drainage

Location Layout Stormwater run-off Cesspits paved areas >10 m² Cesspit size Cut-off or channel drain into garage, basement or retained areas

Erosion and sediment control plan provided

Page 1 of 3 July 2012 AC1155a (v.1) Decision Masonry or concrete retaining wall Reasons for decision / comments N/A Yes RFI N/A

Retaining wall design construction details

Footings Depth Size

Horizontal reinforcing Size C/s

Vertical reinforcing Size C/s

Steps in foundations

Maximum retained height noted

Vertical reinforcing Size C/s

Horizontal reinforcing / bond beam

Size C/s B/B block size

Masonry type A B C

Drainage medium Protection

Tanking Product register checked

Surcharge

Barriers (safety from falling)

Decision Timber retaining wall Reasons for decision / comments N/A Yes RFI N/A

Pile layout / location plan

Pile foundations Depth Size C/s

Maximum retained height noted

Driven piles SED Condition

Horizontal palings

Drainage medium Protection

Surcharge

Barriers (safety from falling)

Producer statements / certificates / other Decision Reasons for decision / comments N/A items required Yes RFI N/A

Geotechnical / structural

Pile driving / Masonry

Smoke alarms if SH purpose group

Page 2 of 3 July 2012 AC1155a (v.1) Decision Building Act matters Reasons for decision / comments N/A Yes RFI N/A

S.67 Waivers and modifications

S.72 Hazards (stability / flooding) Attach checklist Condition Registration on title S.75 Building on 2 or more allotments

Condition Registration on title

S.84 Restricted building work

S.112 Alterations to existing buildings Complies to same extent as before alts Escape paths

S.113 Specified intended life

S.115 Change of use

S.116A Subdivisions

Decision Requests for further information Date requested Date resolved Signed Yes N/A

Information requested

Information requested

Decision Decision Final check / sign off Final check / sign off Yes N/A Yes N/A

Agreements to provide PS4 PIM issues resolved

Document sets collated and stamped RMA issues (Form 4)

Superseded plans separated / retained Inspection requirements identified

Other checklists attached LBP register checked N/A

Plans signed by engineer Conditions completed

Structural / geotechnical engineering Computer tasks completed

Public drainage / approvals File handed onto admin / invoicing

Final sign off (signature) Yes No

I am satisfied on reasonable grounds that compliance has been established with the Building Code and the building consent / amendment is approved and ready for granting

Building: Date:

P & D: Date:

Supervision sign off (signature) N/A

Supervisor: Date:

If supervised, supervision form must be completed and forwarded to: [email protected]