Ac1155a Retaining Wall Full Processing Checklist

Ac1155a Retaining Wall Full Processing Checklist

<p>Retaining wall full processing checklist </p><p>Use this checklist when processing stand-alone applications for retaining walls, note check Schedule 1 for exemptions</p><p>Address: Consent No: </p><p>Processed by: Date: </p><p>Description of work:</p><p>Corrosion zone Wind zone </p><p>Project Processors complexity competency</p><p>Purpose group Application: Building consent Amends</p><p>LBP No: (Eng) LBP No: (Design) </p><p>PIM / PIC (list any non-standard issues raised in the PIM that affect this application to show they have been considered)</p><p>Means of Compliance RBW Yes No</p><p>SED Design memorandum PS1 PS2</p><p>B2 Durability</p><p>Concrete strength (Mpa) Timber treatment Fixings</p><p>17.5 20 25 H3.2 H5 </p><p>Decision Site plan (items must be shown on plans) Reasons for decision / comments N/A Yes RFI N/A</p><p>Siting dimensions shown on site plan </p><p>Datum / contours </p><p>Existing and new building work shown on site plan </p><p>Public drainage shown on site plan </p><p>Location Depth Connections Private drainage </p><p>Location Layout Stormwater run-off Cesspits paved areas >10 m² Cesspit size Cut-off or channel drain into garage, basement or retained areas</p><p>Erosion and sediment control plan provided </p><p>Page 1 of 3 July 2012 AC1155a (v.1) Decision Masonry or concrete retaining wall Reasons for decision / comments N/A Yes RFI N/A</p><p>Retaining wall design construction details </p><p>Footings Depth Size </p><p>Horizontal reinforcing Size C/s </p><p>Vertical reinforcing Size C/s </p><p>Steps in foundations </p><p>Maximum retained height noted </p><p>Vertical reinforcing Size C/s </p><p>Horizontal reinforcing / bond beam</p><p>Size C/s B/B block size </p><p>Masonry type A B C </p><p>Drainage medium Protection </p><p>Tanking Product register checked </p><p>Surcharge </p><p>Barriers (safety from falling) </p><p>Decision Timber retaining wall Reasons for decision / comments N/A Yes RFI N/A</p><p>Pile layout / location plan </p><p>Pile foundations Depth Size C/s </p><p>Maximum retained height noted </p><p>Driven piles SED Condition </p><p>Horizontal palings </p><p>Drainage medium Protection </p><p>Surcharge </p><p>Barriers (safety from falling) </p><p>Producer statements / certificates / other Decision Reasons for decision / comments N/A items required Yes RFI N/A</p><p>Geotechnical / structural </p><p>Pile driving / Masonry </p><p>Smoke alarms if SH purpose group </p><p>Page 2 of 3 July 2012 AC1155a (v.1) Decision Building Act matters Reasons for decision / comments N/A Yes RFI N/A</p><p>S.67 Waivers and modifications </p><p>S.72 Hazards (stability / flooding) Attach checklist Condition Registration on title S.75 Building on 2 or more allotments</p><p>Condition Registration on title</p><p>S.84 Restricted building work </p><p>S.112 Alterations to existing buildings Complies to same extent as before alts Escape paths</p><p>S.113 Specified intended life </p><p>S.115 Change of use </p><p>S.116A Subdivisions </p><p>Decision Requests for further information Date requested Date resolved Signed Yes N/A</p><p>Information requested </p><p>Information requested </p><p>Decision Decision Final check / sign off Final check / sign off Yes N/A Yes N/A</p><p>Agreements to provide PS4 PIM issues resolved</p><p>Document sets collated and stamped RMA issues (Form 4)</p><p>Superseded plans separated / retained Inspection requirements identified </p><p>Other checklists attached LBP register checked N/A</p><p>Plans signed by engineer Conditions completed</p><p>Structural / geotechnical engineering Computer tasks completed </p><p>Public drainage / approvals File handed onto admin / invoicing</p><p>Final sign off (signature) Yes No</p><p>I am satisfied on reasonable grounds that compliance has been established with the Building Code and the building consent / amendment is approved and ready for granting</p><p>Building: Date: </p><p>P & D: Date: </p><p>Supervision sign off (signature) N/A</p><p>Supervisor: Date: </p><p>If supervised, supervision form must be completed and forwarded to: [email protected] </p><p>Page 3 of 3 July 2012 AC1155a (v.1)</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us