Supplier Support Committee (Ssc) Meeting

Total Page:16

File Type:pdf, Size:1020Kb

Supplier Support Committee (Ssc) Meeting

SUPPLIER SUPPORT COMMITTEE APRIL 2006

UNCONFIRMED MINUTES SUPPLIER SUPPORT COMMITTEE (SSC) MEETING 25 APRIL 2006 HOTEL NIKKO NEW CENTURY BEIJING BEIJING, CHINA

These minutes are not final until confirmed by the Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Group and shall not be considered as such by any agency.

1.0 CALL TO ORDER/QUORUM CHECK The meeting was called to order by Louis Tseng, AIDC, Asia Representative to the SSC LT. A quorum was established (minimum 5 SSC members were present).

ATTENDANCE

SSC Members Present Lloyd Barker, Alcoa Yoshiomo Sukesada, Asahi Kinzoku Kogyo Robert Custer, AAA Plating & Inspection Louis Tseng, AIDC Dale Harmon, Cincinnati Thermal Spray Jerry Wahlin, AAA Plating & Inspection

Additional Suppliers Present Yuichi Amada, Mitsubishi Heavy Industries Larry Phipps, AFS Fullerton Andy Bakewell, E M Inspection Co Ltd Dave Serbousek, Olympic Scientific Inc Candy Brown, Cytec Engineered Metals Mayumi Shaji, IHI Andy Dai, SPS China Co., Ltd Alan Shu, AFS Torrance Li Feng, Chengdu Aircraft Industry Corp Jay Song, Sermatech Korea Miguel Gerdel, Thermal Structures Ryan Soule, Alcoa-Howmet Castings Niko Gjaja, The M&P Lab Vern Talmadge, Howmet Thermatech Ctgs Long Guokong, Hongdu Aviation Industry Group Yong Tan, Baimtec Material Co Ltd Hiroki Hashitsume, Mitsubishi Heavy Industries Junji Tsuji, IHI Richard Hill, Praxair Surface Technology Colin Turner, Hawker de Havilland Ain Jin, Hongdu Aviation Industry Group Sofi Wahab, CTRM Aerocomposites Ed Johnson, AFS Corp Guo Xiaodong, Baoti Group Ltd Kiyoshi Kameda, Kameda Sangyo Co Ltd Yao Xin, Chengdu Aircraft Industry Corp Li Li, BIAM Zhang Yansheng, Baoti Group Ltd Yutaka Matsuda, Kawasaki Heavy Industries Toshikumi Yazawa, MHI YosukeMiyazaki, Kawasaki Heavy Industries Li Yongting, Hongdu Group Wu Ning, Hongdu Aviation Industry Group Shinya Zhaoyang, Xian Aero Components Peter Pan, AEF/AIDC Michael Zhou, Smiths Aerospace

Primes Present Shinya Asada, The Boeing Company Arne Logan, The Boeing Company Sam Chen, Honeywell Steve Meyer, Eaton Corp Chetan Date, Honeywell Stephen Pollard, BAE Systems Michael Davis, GE Aviation K.T. Quader, The Boeing Company Li Dougsheng, Honeywell Michael Song, The Boeing Company Miraflor Jacobs, The Boeing Company Peter Torelli, The Boeing Company Serge Labbe, Heroux-Devtek Ian Vitson, BAE Systems Frank Lennert, The Boeing Company Zou Zhongling, Honeywell

SUPPLIER SUPPORT COMMITTEE APRIL 2006

PRI Staff Present John Barrett Miho Mizuno Don Buehler Seema Saleem Jeff Conrad Glenn Shultz Ryuichi Koyama Louise Stefanakis Heather Meyer

1.1 Minutes from the January 2006 SSC meeting at Redondo Beach, CA, US were approved as written by the SSC LT in their 1 March 2006 meeting.

2.0 Introduction to the Supplier Support Committee & Meeting Rules - Yoshiomi Sukesada, Asahi Yoshiomi Sukesada, SSC Leadership Team (SSC LT) Asia Rep reviewed the purpose of the SSC, meeting protocol and introduced SSC LT members. For more details, please see the attached presentation.

Intro & Meeting Protocol.ppt 3.0 NMC Chairman’s Report – Chetan Daté, Honeywell Aerospace Chet Daté presented the NMC Chair report and discussed Nadcap Vision and core strategies, key process improvement initiatives, and benefits of Nadcap that accredited suppliers have reported. For more details, please see the attached presentation.

NMC Chair Report.ppt

4.0 Nadcap Program Status Report – Arshad Hafeez, PRI Arshad Hafeez presented an update on various Nadcap activities. Status of new Nadcap Primes was presented with a look at what stage in the subscription process these companies are in. Audit projections and Auditor capacity was reviewed, as well as a status of activities in the Europe and Asia sectors and plans for the future of these two regions. For more details, please see the attached presentation.

Nadcap Program Status Report.ppt 5.0 SSC Initiatives a.) 2007 Supplier Survey – Bob Custer, AAA Plating & Inspection Bob presented the results of this sub-team from the past quarter. The group has developed an action plan for open activities from the 2005 survey that were assigned to the SSC. For more details, please see the attached presentation.

2007 Survey Report.ppt

b.) Communication Team Report – Liu Le, PRI A review of the PRI Newsletter, Supplier mentoring project, Supplier enhancements to the PRI website and NCSI details were presented. For more details, please see the attached presentation.

Communications Team Report.ppt

SUPPLIER SUPPORT COMMITTEE APRIL 2006

c.) Metrics Team Report – Don Buehler, PRI The Metrics Team presented their quarterly metrics that show supplier involvement in the Nadcap process. The metrics are used by the SSC LT to identify opportunities for improvement. For more details, please see the attached presentation.

Metrics Team Report.ppt d.) SSC Vision – Bob Custer, AAA Plating & Inspection The SSC LT created a 5 year vision, this presentation was an update on the activities the SSC has implemented to help achieve the vision. For more details, please see the attached presentation.

Vision Report.ppt

6.0 New Business – Louis Tseng, AIDC The floor was open to questions and comments from all attendees.

The comment was made that in the NDT Task Group meeting there have been problems with observers during the Nadcap audits. It was reported that observers were not following the requirements of NOP 007. It was suggested that the SSC LT instruct observers to read and follow the requirements of NOP 007 – and that these requirements would be reinforced by the Nadcap system.

Action Item: This issue will be raised to the full SSC LT.

The same individual commented that the STSTG’s did not exist officially in any Nadcap program documents. The response from Don Buehler, PRI was that PRI is aware of that issue and has committed to incorporating the STSTG in the proper program documentation.

(NOTE: It was subsequently explained that as the STSTG’s are not any different that any other Task Group sub team or any SSC sub team – they will not be specifically called out in any Nadcap NOPs.)

A comment was made that suppliers needed to be aware of the ITAR/EAR requirements as they schedule their audit. All suppliers should read the requirements prior to their audits. No response is necessary from the SSC as this was just a statement of fact.

The final comment was that the SSC should consider Regional pre-meetings of STSTG’s to provide opportunity for suppliers to know about Task Group issues prior to the quarterly meeting. Since the SSC is not responsible for the STSTG’s, this issue should be taken to the Task Group level.

7.0 Next meeting: Madrid, Spain - 17-21 July 2006 Auditorium Madrid Hotel Avenida de Aragon, 400 28022 Madrid, Spain Rate: EUR 99 Single Room, EUR 115 Double Room Reservations: +34 91 400 44 50 Reservation cut off date: June 12,2006

8.0 Meeting adjourned at 6:30 PM.

Minutes Prepared by: Name: Jennifer Gallagher, PRI Email: [email protected]

Recommended publications