ISO 17078.3 and .4 Meeting Minutes

Total Page:16

File Type:pdf, Size:1020Kb

ISO 17078.3 and .4 Meeting Minutes

ISO 17078.3 and .4 Meeting Minutes Feb. 3 – 4, 2005

Attendees: Ken Decker Decker Technology (Part time) Cleon Dunham Oilfield Automation Consulting Jim Holt Baker Oil Tools Ashby Breaux JMI Mfg. Tommy Hunt JMI Mfg. Eli Jackson Schlumberger Wayne Mabry Schlumberger David McCalvin Schlumberger (Part time) Tyson Messick Schlumberger Carl Guy Weatherford CPS Zlatko Salihbegovic Weatherford CPS

Meeting Venue:  Thursday, Friday, February 3-4, 2005.  Weatherford ALS, Spencer Road, FM 529, Houston, TX.

Next Meetings:  Two days: Monday - Tuesday, April 25-26, 2005 at Schlumberger, 1325 S. Dairy Ashford, Houston, Texas. Mabry cell: 713-724-3238.

 Three days: Tuesday – Thursday, August 23-25, 2005 at Baker Lift Systems, Houston, Texas.

 Two days: Tuesday – Wednesday, November15-16, 2005, Weatherford, Spencer Road, Houston, Texas.

Meeting Minutes:

1. Administrative  The meeting convened at 8:30 am on Thursday, February 3 and adjourned at 3:00 pm on the Friday, February 4, 2005.

2. Review of Action Item  Jim Holt looked into equation for erosional velocity. Ref. Document is API RP 14E.

 Defer following-up on contacts defined at last meeting. To be reviewed at next meeitng. o [Jim Holt] Tools International Corp.: Dodd Foreman. Talked to him. Need feedback. o [Jim Holt] Global: (Ask Jim Kritzler to visit with him.) o [Jim Holt] Baker: Jim Holt can be their rep. ISO 17078 Task Group Meeting Page 2

o [Zlatko] Specialty Machine: They are now part of Weatherford. Zlatko is a rep. for them. o [Wayne] Hunting: Build tools under contract for Schlumberger. Tyson Messick to follow up on this. Jim Tubbs and Frank Jarveaux. o [Wayne] Superior: Vince Steriolli. Wayne follow up on this. o [Murat] Unknown 80o Company o [Later] Wireline Specialists: Carl to follow up with them. o [Later] D&D: Houma Carl to follow up with them – Keith ?. o [Jim Holt] International Lift Systems: Ricky Seagraves, Kelly Raper. o [Murat] Unknown 80o Company Carl to follow up with them. Wireline International LLC Lafayette, Louisiana http://www.wireline-engineering.com

. Follow-up on items defined at last meeting. o Wayne and Cleon address these two items off line. . Consider addition of clause for scaling of design acceptance (as per 6.3.11 in 17078.2). . Consider adding 7.2.2, 7.2.3, and 7.2.4 from 17078.2 to 17078.3.

 Zlatko produce an example scaled drawing using Autocad of the layout drawing as required in the V1 test of a Running Tool.

 Cleon copy interface compatibility testing to pulling tools, KO tools, and latches, with appropriate changes as required.

3. ISO 17078.1  This document is now published. No action at this meeting.

4. ISO 17078.2  This document is now being reviewed by the international committee.

5. ISO 17078.3  Redesigned format for annexes. There is now one annex for each type of device – running tools, pulling tools, kick-over tools, and latches.

 Worked on detailed test plans for Annex F – running tool.

6. ISO 17078.4  No action at this meeting.

Prepared by: Cleon Dunham Oilfield Automation Consulting February 4, 2005

Recommended publications