Section 23 09 00 Building Automation System and Control for Hvac

Total Page:16

File Type:pdf, Size:1020Kb

Section 23 09 00 Building Automation System and Control for Hvac

Disclaimer: These are sample drawings and sequences. Designers are responsible for finalizing the content for their particular projects.

SECTION 23 09 00 – BUILDING AUTOMATION SYSTEM AND CONTROL FOR HVAC

This is supplemental language for a spec. This is not an all inclusive spec. This is language that is intended to be copied and pasted into an existing spec.

PART 1 - GENERAL

PART 2 - PRODUCTS

2.3.1.1 Control Panel Graphical Touchscreen Interface

3.1.1.A. Manufacturer: Siemens 3.1.1.A.1. Basis of design – Siemens Apogee Facility PrimeTM

3.1.1.B. Provide a device that can see system graphics and data without connecting to a BAS Server, Web server, network controller or any intermediary device. The device shall communicate directly with the controller to operate the systems that are on that controller and its sub-networked devices.

3.1.1.C. Provide an iPad and native iPad iOS application to directly communicate with BACnet/IP and/or Siemens APOGEE P2 Ethernet field panels. Software connection through a web browser is not acceptable.

3.1.1.D. IPad and application shall connect to the DDC panel via: 3.1.1.D.1. The site’s WiFi (802.11 a/b/g/n) network (Site Wi-Fi network shall be provided/managed by the Owner) or 3.1.1.D.2. Remote cellular connection via the customer’s VPN access or 3.1.1.D.3. For additional cost, a dedicated WiFi network connected to the DDC controller can be requested by the Owner.

3.1.1.E. The application shall have the following capabilities as a minimum 3.1.1.E.1. Graphical view of real time environmental conditions and linked HVAC equipment 3.1.1.E.2. Graphical animation by displaying different image files for changed object status 3.1.1.E.3. “View only” capability requiring no logon once application has been opened. 3.1.1.E.4. Application can stay open and active without user interaction or time-out. 3.1.1.E.5. A reporting function must capture current information shown on the graphical view and save the image as a PDF file and/or attach it to an email. 3.1.1.E.6. Charts: A Charts tab shall provide key information, such as current or historical values plotted as scatter, bar, or pie charts. 3.1.1.E.7. After proper access credentials are authenticated between the DDC control panel and the User, a User can command points (e.g. data values and device settings) and equipment. Disclaimer: These are sample drawings and sequences. Designers are responsible for finalizing the content for their particular projects. 3.1.1.E.8. Commands logging: The BAS that is supervising the DDC controller must be able to log the User’s activity within the BAS Server, even when commands are made on the iPad Application. 3.1.1.E.9. Users must be able to navigate the graphics using custom links, from a menu list, or by scanning QR codes. 3.1.1.E.10. Alarm Indication and Acknowledgment – must allow for display of points in alarm, both unacknowledged and acknowledged. Acknowledgement of alarm conditions from within the application is required.

3.1.1.F. QR Code Application: The application shall be compatible with a QR Code reading application. QR Code reading shall be able to hyperlink to graphics and data associated with that QR Code.

3.1.1.G. Editing Tool: An optional Editing Tool must be able to be purchased by the Owner. It shall operate within the application to create and manage graphics. The Tool must include the following: 3.1.1.G.1. Graphical elements library including gauges, sensors, trends, point blocks, command buttons, embedded documents, and imported images. 3.1.1.G.2. Ability to import documents, photos, and images to be used in graphics. 3.1.1.G.3. Ability to link elements to graphics by entering point address information or by utilizing browser and auto-discover sequences. 3.1.1.G.4. Capability to transfer graphics to other iPads

3.1.1.H. Contractor shall coordinate with Owner to purchase and load application onto iPad via Owner designated iTunes account per Apple© Terms and Conditions.

3.1.1.I. Contractor shall spend three days with Owner to assist with initial setup, provide initial graphics/monitoring/control functions, and training on all aspects of the application

3.1.1.J. Contractor shall carry the cost of the application, an iPad (wi-fi + cellular) and any interface devices required to communicate with the BAS

3.1.1.K. Cellular data plan shall be provided by Owner as needed

END OF SECTION 23 09 00

Recommended publications