Collective Letter 07_2583 18 October 2007 page 1 of 12

To: ETSI MEMBERS, OBSERVERS AND COUNSELLORS

Subject: Call for Experts for Specialist Task Force STF RQ1 (TISPAN/WG6) on Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks

Dear Madam, Dear Sir,

The ETSI Board has approved the Terms of Reference for the Specialist Task Force (STF) RQ1 on Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks, according to the Terms of Reference in Annex C.

We are recruiting experts to establish the STF, on condition that the budget allocation is confirmed by the ETSI General Assembly (GA#50, 27-28 November 2007).

The project time scale, the qualification required for the candidates and some references for additional information are summarized in Annex A.

The Team will be based at the ETSI Headquarters in Sophia Antipolis, where the Secretariat is offering technical support and co-ordination. The activity will be organized either over long continuous periods or in sessions so that, along the duration of the project, the experts can carry out their normal duties in their respective organisations. The sessions plan will be negotiated during the Preparatory Meeting, to achieve the best compromise between the STF organization and the requirements of the experts and their Companies.

Considering the above information, we kindly ask you to propose candidatures to the ETSI Secretariat before 15 December 2007.

A short list of candidates will be set up in agreement with the TISPAN6 Officials. These candidates will be invited to attend the Preparatory Meeting to set up the STF, which is provisionally scheduled on 9 January 2008, in ETSI Headquarters.

Candidatures must be sent in electronic form to the STF Support Unit Director Mr. Alberto Berrini [email protected], including the Curriculum Vitae of the candidate, in English, and the questionnaire in Annex B1 (and B2 if applicable), duly completed.

Yours faithfully,

Dr. Walter Weigel Encl. ETSI Director General Collective Letter 07_2583 Page 2 of 12

ANNEX A1 PROJECT TIME SCALE AND QUALIFICATION REQUIRED

Target date for the start of work: 19 February 2008

Expected duration: 11 months

Total manpower required: 360 working days in total

Expected number of experts required: 4 - 5

Note: The actual number of experts may depend on the mix of skills in the actual applications received and will be decided when setting up the STF

Qualification required:  knowledge of SIP protocol  practical experience in writing Abstract Test Suites in TTCN3 and experience in one or more of the following fields:  validating Abstract Test Suites  running conformance test campaigns  knowledge of the limits and features of conformance test tools.

ANNEX A2 CONTACTS FOR ADDITIONAL INFORMATION

Mr. Martin Brand TISPAN6 Chairman Tel: + 43 59 059 1 43312 E-mail: [email protected] Ing. Giulio Maggiore Tel: +39 06 3900 9445 E-mail: [email protected] Mr. Stephan Schulz ETSI Technical Officer Tel: +33 4 9294 4964 E-mail: [email protected] Mr. Alain Sultan ETSI TISPAN6 Technical Officer Tel: +33 4 9294 4271 E-mail: [email protected] Mr. Anthony Wiles ETSI CTI Director Tel: +33 4 9294 4387 E-mail: [email protected] Mr. Alberto Berrini ETSI STF Support Unit Director Tel: +33 4 9294 4264 E-mail: [email protected] Mrs. Pascale Georges STF Assistant Tel: +33 4 9294 4348 E-mail: [email protected]

For further information see also: STF home page Collective Letter 07_2583 Page 3 of 12

Terms and conditions for the participation of experts in ETSI STFs Letter of engagement (LoE) Other Open Call for Experts STF working methods and practice Travelling to ETSI Collective Letter 07_2583 Page 4 of 12

ANNEX B1 – Organization proposing the candidature Candidature for Specialist Task Force RQ1(ETSI/TISPAN6) on Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks (C.L.2583) Please return to [email protected], together with the CV of the candidate before 15 December 2007

Candidatures must be proposed by ETSI Members (including Observers and Associate Members) or formally supported by ETSI Members (Annex B2 required). If the candidate is selected, the Letter of Engagement (LoE) will be made with the Organization proposing the candidature, as indicated in this Annex. LoEs can be made only with registered Organizations and Companies, not with individuals.

Please replace the explanatory text with the actual information. Organization proposing the candidature: ETSI Member: exact name, as registered in the ETSI membership list Not ETSI Member: Company Name (and please complete Annex B2)

Person proposing the candidature: Role:

e-mail: (mandatory) The person in the Organization who is responsible to authorize the proposal of the candidate to ETSI if he/she is selected.

Candidate: Title, First name, Last name e-mail: (mandatory) Mobile phone: Nationality: (information required for work permit procedure)

Availability for the duration of this project (see ToR): Indicate the availability of the candidate with respect to the requirements in the ToR, e.g. number of days/months that can be offered, percentage of time, availability to work in sessions, over continuous periods or both, unavailability periods. Availability to work in ETSI premises: STF work is normally done in the ETSI premises of Sophia Antipolis. Please indicate whether you have limitations in the number of days (or percentage of time) you can spend working in the ETSI premises.

Specific experience in relation with this project: Provide information to assess the qualification of the candidate with regard to the specific requirements of the project. In addition to the CV, this element will play an essential role for the pre-selection of the candidates to invite to the Preparatory Meeting.

Experience in standardization areas related to this project: Indicate the candidate’s standardization experience in ETSI and/or other organizations and, in particular, if he/she is actively involved in the work of the reference TB for this STF, its WGs or other related bodies.

Motivation to participate in the project: Indicate the interest of your Organization to be involved in the STF work. Collective Letter 07_2583 Page 5 of 12

Remarks: Provide here any additional information to assess the qualification of the Candidate for this project or any special requirement of the Organization with respect to STF normal working methods. Collective Letter 07_2583 Page 6 of 12

ANNEX B2 – Nomination from ETSI Member (required if the Organization proposing the candidature is not an ETSI Member) Support of Candidature for Specialist Task Force RQ1 (ETSI/TISPAN6) on Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks (C.L.2583) Please return to [email protected] before 15 December 2007

Note: Experts proposed by non-ETSI Member Organizations need to be formally supported by an ETSI Member. ETSI will make the Letter of Engagement directly with the non-ETSI Member Organization proposing the expert, as indicated in Annex B1. The ETSI Member supporting the candidature takes the moral responsibility that the competence of the candidate is suitable for the success of the project.

Please replace the explanatory text with the actual information. ETSI Member supporting the candidature: exact name, as registered in the ETSI membership list Person supporting this application*: Role: e-mail: (mandatory) * If not the Official contact, the ETSI Secretariat will inform the Official contact of the Member Candidate: Title, First name, Last name

Reasons for supporting the candidature: Indicate the motivation of the Member to contribute to this standardization area and provide elements of your assessment of the qualification of the candidate.

Activities performed by the Candidate in relation with the Member: Indicate the activities performed by the candidate or his/her Company in co-operation with or on behalf of the Member, the period of time and the nature of the relationship (employee, sub- contractor, partner, etc.).

Remarks: Provide here any additional information. Collective Letter 07_2583 Page 7 of 12

ANNEX C ToR STF RQ1 (TISPAN WG6) Version: 0.5 - Date: 23 October 2007 Author: Martin Brand Last updated by: A. Berrini page 7 of 12

Terms of Reference for Specialist Task Force STF RQ1 (TISPAN/WG6) for “Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks” Document status

Current status of these ToR Approved by TISPAN and Board#64 Work Items approved Approved

1 Reasons for proposing the Specialist Task Force (STF)

IMS is a key component in the TISPAN NGN architecture. An ETSI SIP conformance test suite has been produced but it is not applicable in the IMS context as only IETF requirements have been considered in its implementation. The basis of this work will be the SIP IMS profile.

TISPAN WG6 has identified an urgent need for IMS specific Session Initiation Protocol (SIP) and Session Description Protocol (SDP) conformance tests which consider all requirements relevant to using SIP in the context of the IMS core network, i.e., ES 283 003, 3GPP 24.229, as well as IETF RFC 3261.

1.1 Overview of the proposal

1.1.1 Purpose of the work

This STF will produce a complete conformance test specifications, i.e., Requirements Catalogue, PICS/PIXIT, conformance TSS&TPs, and ATS for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) In IMS networks.

1.1.2 Relation with the ETSI Strategic Objectives

This STF is directly related to ETSI strategic objective "Major Strategic Topics - NGN"

1.1.3 Relation with other activities within ETSI and/or related organizations

This work is related to:  BOARD IMS-TEST interest group  ITU SG11  3GPP (and indirectly IETF) Collective Letter 07_2583 Page 8 of 12

1.1.4 Priority within the TB

This STF is of high priority within TISPAN. In particular, it should start and end as soon as possible, and preferably be completed in Q4 2008.

1.1.5 Motivation why the STF is urgently needed

 It is essential that this work is done in a timely manner in order to synchronise with global testing activities, especially in the context of IMS (3GPP and TISPAN NGN).  SIP and SDP protocols are currently being deployed in telecoms networks. They must operate alongside and interwork correctly with the existing protocols already installed.  Field trials are currently under way, test platforms are available, and the detailed Abstract Test Specifications are urgently required to complete these field trials.  ETSI members have invested considerable resources in developing the Test Suite Structure and Test Purposes for SIP and this need to be complemented with SDP.  This work compliments and capitalizes on ongoing ETSI IMS testing activities such as the IMS network interoperability event organized by the BOARD IMS-TEST interest group and 3GPP IMS terminal conformance testing.  To complete this work, and capitalise on their investment and field trials, the validated corresponding Abstract Test Suite is urgently needed.  The ETSI members do not have sufficient resources to create an Abstract Test Suite on time, and with the high quality that has been experienced with using STF resources for this purpose in the past.

1.2 Organization of the work

1.2.1 Confirmation of active support from the Members

The following companies are committed to supporting this STF in terms of participation in the STF Steering Group and providing input and review to the STF: Deutsche Telekom, Telekom Austria, Iskratel, BT , HUAWEI and ÖFEG.

1.2.2 Identification of tasks, phases, priorities, technical risk

There are 5 main tasks: Task 1) Analysis of relevant specifications Task 2) Specification of a requirements catalogue Task 3) Specification of PICS document Task 4) Development of conformance TSS&TPs. Task 5) Development and documentation of PIXIT and TTCN-3 ATS.

1.2.3 Outcome of the STF

The outcome of the STF will be three Technical Specifications (TS). DTS/TISPAN-06035-1 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 1: Protocol Implementation Conformance Statement (PICS)

DTS/TISPAN-06035-2 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 2: Test Suite Structure (TSS) and Test Purposes (TP) Collective Letter 07_2583 Page 9 of 12

DTS/TISPAN-06035-3 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 3: Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification

2 Consequences if not agreed:

SIP and SDP protocols are currently being deployed in telecoms networks. Thorough conformance testing will increase the level of confidence that equipment from various suppliers will interwork. This in turn will reduce implementation and rollout times. Not providing timely test specifications, would ultimately delay the deployment of NGN. A second round of validation of the Abstract Test Suite will enhance its quality significantly. This will give a powerful test specification into the hands of test engineers allowing efficient testing without the need of constantly de-bugging the TTCN code.

3 Detailed description:

3.1 Subject title:

Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS networks.

3.2 Reference Technical Body:

TC TISPAN (WG6)

3.3 Other interested TBs (if any):

 3GPP  TC MTS  BOARD IMS-TEST interest group

3.4 Steering Committee

TISPAN WG6 will act as Steering Committee.

3.5 Support from ETSI Members

This STF has strong support from the ETSI membership. See 1.2.1

3.6 Target date for the start of work:

Start: 19 February 2008

3.7 Duration and target date for the conclusion of the work (TB approval):

Duration: 11 Month Conclusion: December 2008 Collective Letter 07_2583 Page 10 of 12

3.8 Resources required

3.8.1 STF resources

The resources required are 216 000 EUR, corresponding to a total of 360 working days, including: Developing the test specifications  IMS specific use of Session  Initiation Protocol (SIP) and Session Description  Protocol (SDP); Requirement Catalogue 30 working days

 IMS specific use of Session Initiation Protocol (SIP)  Session Description Protocol (SDP);  Conformance Testing; Part 1: Protocol Implementation  Conformance Statement (PICS) 10 working days

 IMS specific use of Session Initiation Protocol (SIP)  Session Description Protocol (SDP);  Conformance Testing; Part 2: Test Suite Structure (TSS)  Test Purposes (TP) 80 working days

 IMS specific use of Session Initiation Protocol (SIP)  Session Description Protocol (SDP); Conformance  Testing; Part 3: Abstract Test Suite (ATS)  Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification 120 working days

 IMS specific use of Session Initiation Protocol (SIP)  Session Description Protocol (SDP); Conformance Testing  Executable Test Suite (ETS) (validation of ATS) 100 working days

 Drafting non-published documents: 10 working days  Attending Technical Body and WG meetings: 10 working days

3.9 Experts qualification required, mix of skills

The following experts are required to perform the work. The actual number of experts and mix of skills may depend on the actual applications received and will be decided when setting up the STF.

Number of experts required: 4-5

Relevant expertise required: The skill set for Experts of this STF will be required to include knowledge of SIP, to have experience in writing Abstract Test Suites in TTCN3. It is also desirable that they have experience of having run conformance test campaigns, have experience of the limits and features of conformance test tools, and to have had experience of validating Abstract Test Suites.

3.10 Scope of Terms of Reference:

See section 1.

3.11 Organization of the work in tasks and/or phases:

See section 1.2.3 Collective Letter 07_2583 Page 11 of 12

3.12 Validation

 Level of validation: Level 3 validation  Version of TTCN-3 used: 3.1.1  TT work bench Testing-Tech or other (e.g. Telelogic)  TTCN-3 Compiler Testing-tech or other (e.g. Telelogic)

Activity Responsible Provision of TTCN-3 analyser/compilers ETSI Secretariat Setting-up and maintaining the test platform WG 6 Provision and installation of IUT(s) WG 6 Compilation of the test suite STF Execution of the tests STF Reporting of errors in the platform STF Reporting of errors in the tools STF Reporting of errors in the ATS STF Updating of ATS STF Compilation of validation report STF

 Cost of validation: The cost for validation is included in the overall total of section Error: Reference source not found of these ToR.

3.13 Base documents and their availability

The STF work will be based upon the following documents: ETSI TS 283 003 3GPP IMS Release 7 specifications (3GPP TS 24.229) IETF RFC 3261 as well as other RFCs covering SIP extensions relevant to IMS specific use of SIP

3.14 Work Items from the ETSI Work Programme (EWP) for which the STF is required:

The STF will produce the following deliverables, for TB approval: DTS/TISPAN-06035-1 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 1: Protocol Implementation Conformance Statement (PICS)

DTS/TISPAN-06035-2 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 2: Test Suite Structure (TSS) and Test Purposes (TP)

DTS/TISPAN-06035-3 IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Conformance Testing; Part 3: Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification

3.15 Document history

Version Date Author Status Comments 0.0 Martin Brand Approved TISPAN WG6 14bTD322r2 0.1 5 Sep 07 Berrini Editorials, for info Board#63 0.4 13 Sep 07 Stephan Clarifications Schulz Collective Letter 07_2583 Page 12 of 12

0.5 23 Oct 07 Berrini Approved Board#64 Work Items codes

Recommended publications