BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 53C0589 Los Angeles 0.1 MI W/O VALYERMO RD BIG ROCK CREEK County BOBS GAP RD
Plan of Action Date of Completed By: Completion:
1. SCOUR VULNERABILITY RATING
Scour Evaluation Summary:
Scour History:
a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date:
Structural Assessment:Done By: Date: Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______
2. NBIS CODING INFORMATION Most Recent Inspection date 5/11/04 Item 113 Scour 3 Item 60 Substructure 7 Item 61 Channel & Channel Protection 4 Item 71 Waterway Adequacy 5 3. COUNTERMEASURE RECOMMENDATION A. Completed Countermeasures:
B. Proposed Countermeasures:
Countermeasures Not Required. (Please explain)
Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank
$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring
$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$
Close Bridge (See 6)
4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project
Advertised Date:
Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:
Monitoring Authority:
Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly
Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:
Other Monitoring Program Type: Visual Instrument Portable Geophysical Sonar Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN
Bridge ADT: 1500 Built: 1927 % Trucks: 1 Bridge Length (ft): 161.1 Closure Plan Summary
Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure:
Contact People (Name & Phone No.):
Responsible for re-opening after inspection:
7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.
Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 53C0620 Los Angeles 4 MI S MALIBU CYN RD MALIBU CREEK County VENTURA FWY
Plan of Action Date of Completed By: Completion:
1. SCOUR VULNERABILITY RATING
Scour Evaluation Summary:
Scour History:
a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date:
Structural Assessment:Done By: Date: Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______
2. NBIS CODING INFORMATION Most Recent Inspection date 3/10/03 Item 113 Scour 3 Item 60 Substructure 7 Item 61 Channel & Channel Protection 7 Item 71 Waterway Adequacy 7 3. COUNTERMEASURE RECOMMENDATION C. Completed Countermeasures:
D. Proposed Countermeasures:
Countermeasures Not Required. (Please explain)
Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank
$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring
$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$
Close Bridge (See 6)
4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project
Advertised Date:
Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:
Monitoring Authority:
Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly
Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:
Other Monitoring Program Type: Visual Instrument Portable Geophysical Sonar Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN
Bridge ADT: 19578 Built: 1953 % Trucks: 2 Bridge Length (ft): 216.9 Closure Plan Summary
Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure:
Contact People (Name & Phone No.):
Responsible for re-opening after inspection:
7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.
Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 53C0828 CITY OF 1.5 MI S LINDERO TRIUNFO CANYON WESTLAKE VENTURA FWY CANYON ROA CREEK VILLAGE
Plan of Action Date of Completed By: Completion:
1. SCOUR VULNERABILITY RATING
Scour Evaluation Summary:
Scour History:
a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date:
Structural Assessment:Done By: Date: Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______
2. NBIS CODING INFORMATION Most Recent Inspection date 7/22/04 Item 113 Scour 2 Item 60 Substructure 7 Item 61 Channel & Channel Protection 7 Item 71 Waterway Adequacy 8 3. COUNTERMEASURE RECOMMENDATION E. Completed Countermeasures:
F. Proposed Countermeasures:
Countermeasures Not Required. (Please explain)
Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank
$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring
$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$
Close Bridge (See 6)
4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project
Advertised Date:
Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:
Monitoring Authority:
Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly
Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:
Other Monitoring Program Type: Visual Instrument Portable Geophysical Sonar Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN
Bridge ADT: 8700 Built: 1970 % Trucks: 2 Bridge Length (ft): 186.0 Closure Plan Summary
Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure:
Contact People (Name & Phone No.):
Responsible for re-opening after inspection:
7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.
Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 53C1004 Los Angeles 0.25 MI S OF CRAGS DRIVE TRIFUNO CREEK County MULHOLLAND W
Plan of Action Date of Completed By: Completion:
1. SCOUR VULNERABILITY RATING
Scour Evaluation Summary:
Scour History:
a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date:
Structural Assessment:Done By: Date: Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______
2. NBIS CODING INFORMATION Most Recent Inspection date 12/3/01 Item 113 Scour 3 Item 60 Substructure 7 Item 61 Channel & Channel Protection 6 Item 71 Waterway Adequacy 8 3. COUNTERMEASURE RECOMMENDATION G. Completed Countermeasures:
H. Proposed Countermeasures:
Countermeasures Not Required. (Please explain)
Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank
$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring
$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$
Close Bridge (See 6)
4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project
Advertised Date:
Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:
Monitoring Authority:
Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly
Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:
Other Monitoring Program Type: Visual Instrument Portable Geophysical Sonar Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN
Bridge ADT: 1000 Built: 1951 % Trucks: 1 Bridge Length (ft): 164.1 Closure Plan Summary
Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure:
Contact People (Name & Phone No.):
Responsible for re-opening after inspection:
7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.
Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code