Acceptance and Installation Phase Checklist
Total Page:16
File Type:pdf, Size:1020Kb
Yes No N/A Establish Test for Production Environment SDM Reference Comments 1. All requirements specified were delivered and Establish Test for Production validated according to the specifications. Environment (9.1) 2. Any changes to the original specifications are Establish Test for Production documented in the System Architecture document. Environment (9.1) 3. All documentation has been maintained in the project Establish Test for Production folder. Environment (9.1) Yes No N/A Perform Test for Production Activities SDM Reference Comments 1. Test for Production was performed prior to the Perform Test for Production installation activities. Activities (9.2) 2. The test production environment installation and Perform Test for Production configuration was met. Activities (9.2) Yes No N/A Perform Installation Activities SDM Reference Comments 1. If a current system exists, the system and data Perform Installation Activities (9.3) conversion has been performed in accordance with the Conversion Plan. 2. At each installation site, the facility has been Perform Installation Activities (9.3) inspected to ensure that the site preparation is complete and in accordance with the Installation Plan. 3. The installation has been coordinated with the project Perform Installation Activities (9.3) sponsor, user representatives, operations staff, and other affected organizations. 1. Any necessary modifications to the physical Perform Installation Activities (9.3) installation environment are complete. 2. The hardware has been inventoried and tested. Perform Installation Activities (9.3) 3. If the software requires an initial data load or data Perform Installation Activities (9.3) conversion, the tested programs are installed and executed. 4. The software has been installed on the hardware Perform Installation Activities (9.3) platform and tested according to the Installation Plan. 5. The Deployment Playbook captured the installation Perform Installation Activities (9.3) activities and is maintained in the project folder.
SDM Acceptance and Installation Phase Checklist Page 1 of 3
SDM Acceptance and Installation Phase Checklist Page 2 of 3
6. At end of transition period, a formal transfer of all Transition to Operational Status (9.7) responsibilities to the maintenance staff is conducted. 7. All project file materials, operating documents, and Transition to Operational Status (9.7) other pertinent records have been turned over to the maintenance staff and are maintained in the project folder. 8. Access rules have been modified to provide access Transition to Operational Status (9.7) to the system by the maintenance staff and remove project team and other temporary user access from further access to the system. 9. Programs, files, and other support software are in the Transition to Operational Status (9.7) production library and have been deleted from the test library, where appropriate. 10. For major software systems involving multiple Transition to Operational Status (9.7) organizations and interfaces with other systems, a formal announcement of the transition to production has been done. 11. Complete all reviews to ensure functionality before Transition to Operational Status (9.7) the system is placed into operational status. Yes No N/A Conduct Phase Review SDM Reference Comments 1. Requirements management activities are reviewed Conduct Peer Reviews (9.8.1) with the project manager/project sponsor both Conduct Phase Review (9.8) periodically and as needed 2. In-Phase Assessments of requirements management Conduct In-Phase Assessment activities and outputs are performed. (9.8.3) 3. The project team reviews all established Conduct Structured Walkthroughs requirements. (9.8.2) 4. The technical accuracy and completeness of outputs Conduct Structured Walkthroughs and deliverables were reviewed. (9.8.2) 5. Concurrence to proceed to next phase was given. Conduct Phase Exit (9.8.4)
SDM Acceptance and Installation Phase Checklist Page 3 of 3