TANDBERG MPS Pre-Installation Checklist

Total Page:16

File Type:pdf, Size:1020Kb

TANDBERG MPS Pre-Installation Checklist

TANDBERG Gatekeeper Pre-installation Checklist

Address & Location Company Main Phone #: : Contact: Contact Phone #: Address Address 2: 1: City: State: Zip Code: Country: Pager/Ce Contact’s E- ll: mail:

Shipping Address (if different from above) Company Main Phone #: : Contact: Contact Phone #: Address Address 2: 1: City: State: Zip Code: Country: Pager/Ce Contact’s E- ll: mail:

Special notes or instructions:

PROJECT RESOURCES Technical Resources Name Title Phone E-Mail Primary Seconda

Back-up

Additional Resources Name Title Phone E-Mail Primary Seconda

Back-up

RACK SPACE TANDBERG GATEKEEPER - Rack is 19”; 2U

IP NETWORK INFORMATION Control Module Ethernet connection- Switch should be set to 100 Full. IP address Default Gateway Subnet Mask

GATEKEEPER WEBPAGE ACCESS REQUIREMENTS TANDBERG Gatekeeper WEBPAGE controls the MCU for configuration, reservations, and monitoring. It is included with the purchase of the MPS.

PC Requirements (Minimum) Windows 95/97/98/2000/NT/XP Window Explorer 6.0 or higher Connection to MCU over TCP/IP (LAN, Internet, intranet) ADDITIONAL OPTIONS If using TANDBERG MANAGEMENT SUITE (TMS), please contact SKC for customer provided server specifications and Configuration.

Additional checklists will be provided for MCUs, Border Controllers or Gateways.

NOTICE Complete pre-installation checklist, and save the file as a Word document. Attach completed checklist to an e-mail, and send to your SKC account executive, or to [email protected]. Checklist must be e-mailed; faxed checklists cannot be accepted. Installation will not be scheduled until completed Pre-Installation Checklist is received. All equipment must be on-site before the installer arrives.

Installations will be completed, as outlined in the installation agreement, to the best ability of those available resources. In such instances where installations are not completed due to information submitted on this form being inaccurate, or the lack of necessary resources prepared or available in the room where the unit will reside, a second installation date and fee will be required in order to complete the installation. Please be aware of all devices requiring power, and network connections. Submittal of this form is an agreement to the terms stated within the body of this text. Any unauthorized changes to this form will result in the immediate dismissal of the request and will result in delays for installation.

Form Completed By: Printed Name Date Company Name

SKC Use Only Engineering Approval: Scheduled Install Scheduled Install Date: Time: Case Number: Contract Number: Customer Sign Off Form Completed at time of installation

Video Unit Testing Inbound Calls Working Outbound Calls Working Speed

Training I have been trained on the following: Scheduling/Monitoring a Call Participant/Conference Templates Configuration Rebooting the System Changing the Admin Password

Dat Signed e

Printed Name

Company Name

Recommended publications