Z-015 Temporary equipment – check list U03 - Tanks

Rev. 3, june 2004

Contractor: Contact person contractor/telephone:

Container/equipment ID number: Approve for location in zone: (Zone 1, Zone 2 or non-hazardous area) Company/installation container intended for: Contact person/requisitioner in the company:

Person in the company responsible for prior approval, see 4.8.3: Name: Telephone: Date approval received:

Status: OK=Approved, NA=Not Applicable, NC=Not Checked, D=Defective or missing Ref. Status Receiving Remarks Z-015 supplier control (company) 1-MECHANICAL 1.1 Signs tagging/labelling 4.6 1.2 Annual control (lifting equipment, cert.) 4.4.1 1.3 Mech. cond. (lifting eyes/points, structure) 4.4.1 3-ELECTRICAL 3.1 Cables, nipples, equipment etc. 4.4.6.1 3.2 Insulation resistance - megging 4.8.1 3.3 Earthing (NB bonding of structure) 4.4.6.3 3.4 All external installation Ex-proof 4.4.6.2 4-HOOK-UP TO INSTALLATION 4.1 Power supply (voltage, freq., plugs) 4.7 5-EQUIPMENT 5.12 Safety valve 4.3.5 6-DOCUMENTATION 6.1 Lifting certificate 4.8 6.2 Other technical doc. (drawings, data) 4.8 6.3 Certificate for equip. with special requ. 4.8 6.4 Maintenance programme 4.8 6.5 Maintenance journal 4.8 6.6 User manual 4.8

Side 1 of 2 Z-015 Temporary equipment – check list U03 - Tanks

Competent Supplier Company person for lifting gear/mechanical electrician receiving control devices Date: Date: Date: Signature Signature Signature

Name in capitals Name in capitals Name in capitals

General commentary:

Side 2 of 2