Coast Guard, DHS § 110.30

Total Page:16

File Type:pdf, Size:1020Kb

Coast Guard, DHS § 110.30 Coast Guard, DHS § 110.30 § 110.26 Marblehead Harbor, Marble- from a point on the Tobin Bridge at head, Mass. latitude 42°23′08.5″ N. 071°02′48.2″ W. to a ° ′ ″ The area comprises that portion of point at latitude 42 23 06.4 N. ° ′ ″ the harbor lying between the extreme 071 02 43.7 W.; thence northwest to a ° ′ ″ low water line and southwestward of a point at latitude 42 23 09.1 N. ° ′ ″ line bearing 336° from Marblehead Neck 071 02 43.2 W. along the shoreline to Light to a point on Peach Point at lati- the western side of Tobin Bridge, tude 42°31′03″, longitude 70°50′30″. thence to the point of origin. (c) Mystic River, west side of Tobin NOTE: The area is principally for use by Bridge. Beginning at a line running yachts and other recreational craft. Tem- from a point on the Tobin Bridge at porary floats or buoys for marking anchors ° ′ ″ ° ′ ″ are allowed. Fixed mooring piles or stakes latitude 42 23 08.8 N. 071 02 48.6 W. to a are prohibited. All moorings shall be so that point at latitude 42°23′10.5″ N. 071°05′52″ no vessel, when anchored, shall at any time W.; thence northwest to the southeast- extend beyond the limits of the area. The an- erly corner of the pier at latitude choring of vessels and the placing of tem- 42°23′13.4″ N. 071°02′57.1″ W. along the porary moorings are under the jurisdiction pier to the shoreline to the eastern side and at the direction of the local of Tobin Bridge, thence to the point of harbormaster. origin. [CGFR 68–96, 33 FR 12550, Sept. 5, 1968; CGFR (d) Boston Inner Harbor A. (1) The wa- 68–157, 34 FR 1380, Jan. 29, 1969] ters of the western side of Boston Inner Harbor north of the entrance to the § 110.27 Lynn Harbor in Broad Sound, Mass. Fort Point Channel bound by the fol- lowing points beginning at latitude ° North of a line bearing 244 from the 42°21′32″ N., longitude 071°02′50″ W; tower of the Metropolitan District thence to latitude 42°21′33″ N., lon- Building, extending from the shore to a gitude 071°02′44″ W.; thence to latitude point 100 feet from the east limit of the 42°21′26″ N., longitude 071°02′36″ W.; ° channel; east of a line bearing 358 , ex- thence to latitude 42°21′26″ N., lon- tending thence to a point 100 feet east gitude 071°02′53″ W.; thence to point of of the northeast corner of the turning origin. [NAD83]. ° basin; south of a line bearing 88 , ex- (2) The area is principally for use by tending thence to the shore; and south yachts and other recreational craft. and west of the shoreline to its inter- Temporary floats or buoys for marking section with the south boundary. anchors will be allowed. Fixed mooring [USCG–2009–0416, 74 FR 27439, June 10, 2009] piles or stakes are prohibited. The an- choring of vessels and placing of tem- § 110.29 Boston Inner Harbor, Mass. porary moorings will be under the ju- (a) Vicinity of Pleasant Park Yacht risdiction, and at the discretion of the Club, Winthrop. Southerly of a line Harbormaster, City of Boston. All bearing 276° from a point on the west moorings must be so placed that no side of Pleasant Street, Winthrop, 360 vessel, when moored, will at any time feet from the southwest corner of its extend beyond the limits of the area. intersection with Main Street; west- NOTE TO PARAGRAPH (d): Administration of erly of a line bearing 186° from a point Special Anchorage Area is exercised by the on the south side of Main Street 140 Harbormaster, City of Boston, pursuant to feet from the southwest corner of its local ordinances. The City of Boston will in- intersection with Pleasant Street; stall and maintain suitable navigational aids northerly of a line bearing 256° from a to mark the limits of Special Anchorage point on the west side of Pleasant areas. Street 550 feet from the southwest cor- [USCG–2009–0416, 74 FR 27439, June 10, 2009] ner of its intersection with Main Street and easterly of a line bearing 182° from § 110.30 Boston Harbor, Mass. a point on the south side of Main (a) Vicinity of South Boston Yacht Street 640 feet from the southwest cor- Club, South Boston. Northerly of a line ner of its intersection with Pleasant bearing 96° from the stack of the heat- Street. ing plant of the Boston Housing Au- (b) Mystic River, east side of Tobin thority in South Boston; easterly of a Bridge. Beginning at a line running line bearing 5° from the west shaft of 429 VerDate Mar<15>2010 11:33 Sep 02, 2014 Jkt 232135 PO 00000 Frm 00439 Fmt 8010 Sfmt 8010 Q:\33\33V1.TXT 31.
Recommended publications
  • Fort Point Channel Watersheet Activation Plan
    Fort Point Channel Watersheet Activation Plan APPENDICES Appendix F: Interim Presentation Slides Goody, Clancy & Associates 1 Fort Point Channel Watersheet Activation Plan Introductiiion to the Plllanniiing Process Presentation: Boston Publlliiic Liiibrary, Copllley Square GC March 31, 2001 &A 1 2 3 4 5 • Complete the vision • Strengthen the working partnership • Provide a strong planning framework and tools 6 7 Fort Point Channel Watersheet Activation Plan Preliminary Findings and Analysis May 3, 2001 Boston Redevelopment Authority Fort Point Channel Working Group Fort Point Channel Abutters Group Goody, Clancy & Associates Goals for This Meeting • Review of Progress to Date • Presentation of Preliminary Findings •Recommendations for Next Steps 1 Review of Progress to Date • Baseline Plan • Interviews/Working Group Meetings • Waterfront Center Presentation at Boston Public Library • Public Charrette at Federal Reserve Bank Baseline Plan – Basic Facts • Channel is approximately 1 mile long • Approximately 1000 linear feet of public access now • 3500 linear feet of additional public access within 2-3 years; substantial opportunities for further major increases in access • Link of Harborwalk to future South Bay Harbor Trail creates promise of linking the water to inland neighborhoods 2 Baseline Plan --2 • Potential uses of basins shaped by public accessibility, water depths, bridge constraints (varying from 4-16 feet at MHW) • Uses of water linked to water quality—MWRA CSO project will improve Channel water quality with initial benefits
    [Show full text]
  • 2020 Coastal Massachusetts COASTSWEEP Results (People
    COASTSWEEP 2020 - Cleanup Results Town Location Group Name People Pounds Miles TOTALS 703 9016.2 151.64 Arlington Mystic River near River Street 1 2 Arlington Mystic River 1 2.12 1.20 Barnstable Sandy Neck Beach Take Care Cape Cod 4 27.5 3.95 Barnstable Jublilation Way, Osterville 1 0.03 Barnstable Sandy Neck Beach Take Care Cape Cod 2 10.13 0.53 Barnstable Sandy Neck Beach Take Care Cape Cod 1 8 Barnstable Sandy Neck Beach Take Care Cape Cod 2 8.25 1.07 Barnstable Sandy Neck Beach Take Care Cape Cod 3 14.25 1.16 Barnstable Oregon Beach, Cotuit 6 30 Barnstable KalMus Park Beach 2 23.63 0.05 Barnstable Dowes Beach, East Bay Cape Cod Anti-Litter Coalition 4 25.03 0.29 Barnstable Osterville Point, Osterville Cape Cod Anti-Litter Coalition 1 3.78 0.09 Barnstable Louisburg Square, Centerville 2 Barnstable Hathaway's Ponds 2 4.1 0.52 Barnstable Hathaway's Ponds 2 5.37 0.52 Barnstable Eagle Pond, Cotuit Lily & Grace Walker 2 23.75 3.26 Beverly Corning Street SaleM Sound Coastwatch 2 0.02 Beverly Corning Street SaleM Sound Coastwatch 1 0.07 0.02 Beverly Corning Street SaleM Sound Coastwatch 1 0.03 0.02 Beverly Corning Street SaleM Sound Coastwatch 1 0.11 0.02 Beverly Corning Street SaleM Sound Coastwatch 1 0.18 0.01 Beverly Dane Street Beach SaleM Sound Coastwatch 1 0.36 0.04 Beverly Clifford Ave 2 11.46 0.03 Beverly Near David Lynch Park 1 0.43 0.03 Beverly Rice's Beach SaleM Sound Coastwatch 3 28.61 0.03 Beverly Rice's Beach SaleM Sound Coastwatch 3 1.61 Beverly Rice's Beach SaleM Sound Coastwatch 1 0.07 COASTSWEEP 2020 - Cleanup Results Town
    [Show full text]
  • Boston Harbor South Watersheds 2004 Assessment Report
    Boston Harbor South Watersheds 2004 Assessment Report June 30, 2004 Prepared for: Massachusetts Executive Office of Environmental Affairs Prepared by: Neponset River Watershed Association University of Massachusetts, Urban Harbors Institute Boston Harbor Association Fore River Watershed Association Weir River Watershed Association Contents How rapidly is open space being lost?.......................................................35 Introduction ix What % of the shoreline is publicly accessible?........................................35 References for Boston Inner Harbor Watershed........................................37 Common Assessment for All Watersheds 1 Does bacterial pollution limit fishing or recreation? ...................................1 Neponset River Watershed 41 Does nutrient pollution pose a threat to aquatic life? ..................................1 Does bacterial pollution limit fishing or recreational use? ......................46 Do dissolved oxygen levels support aquatic life?........................................5 Does nutrient pollution pose a threat to aquatic life or other uses?...........48 Are there other water quality problems? ....................................................6 Do dissolved oxygen (DO) levels support aquatic life? ..........................51 Do water supply or wastewater management impact instream flows?........7 Are there other indicators that limit use of the watershed? .....................53 Roughly what percentage of the watersheds is impervious? .....................8 Do water supply,
    [Show full text]
  • Larson Fisher Associates, Inc
    Larson Fisher Associates, Inc. Historic Preservation and Planning Services P.O. Box 1394 Woodstock, N.Y. 12498 845-679-5054 www.larsonfisher.com COASTAL ZONE HISTORIC RESOURCE SURVEY Marblehead, Essex County, Massachusetts Final Report 18 September 2016 Abstract The project conducted an intensive-level survey of historic resources within the coastal zone established by the Town of Marblehead. This project was the top priority in the Town’s Historic Resource Survey Master Plan (2013) as historic properties on the coastline are considered to be most vulnerable to change. The goal of the survey is to promote the preservation of these valuable properties by raising public awareness of their significance through detailed and cogent narratives of their individual histories and their role as landmarks in the evolving physical and cultural character of their neighborhoods. In addition, the local Marblehead Historical Commission (LHC) desired to upgrade existing levels of documentation and provide information useful in the evaluation of significance for preservation planning and the town’s review of permit applications involving historic properties. The LHC has no direct jurisdiction in project review but hopes survey documentation will lead to informed decisions where significant historic resources are involved. This project recorded architectural, historical and photographic documentation for 186 properties in the coastal zone on survey forms for individual properties and areas provided by the Massachusetts Historical Commission (MHC). Individual properties and historic districts that appear eligible for listing on the National Register of Historic Places have been identified. Due to the large number of properties documented, exceeding the contractual obligation of 120 properties, those on Marblehead Neck were deferred to a later project with one exception.
    [Show full text]
  • Massachusetts Ocean Management Plan
    Massachusetts Ocean Management Plan Volume 2 Baseline Assessment and Science Framework December 2009 Introduction Volume 2 of the Massachusetts Ocean Management Plan focuses on the data and scientific aspects of the plan and its implementation. It includes these two separate documents: • Baseline Assessment of the Massachusetts Ocean Planning Area - This Oceans Act-mandated product includes information cataloging the current state of knowledge regarding human uses, natural resources, and other ecosystem factors in Massachusetts ocean waters. • Science Framework - This document provides a blueprint for ocean management- related science and research needs in Massachusetts, including priorities for the next five years. i Baseline Assessment of the Massachusetts Ocean Management Planning Area Acknowledgements The authors thank Emily Chambliss and Dan Sampson for their help in preparing Geographic Information System (GIS) data for presentation in the figures. We also thank Anne Donovan and Arden Miller, who helped with the editing and layout of this document. Special thanks go to Walter Barnhardt, Ed Bell, Michael Bothner, Erin Burke, Tay Evans, Deb Hadden, Dave Janik, Matt Liebman, Victor Mastone, Adrienne Pappal, Mark Rousseau, Tom Shields, Jan Smith, Page Valentine, John Weber, and Brad Wellock, who helped us write specific sections of this assessment. We are grateful to Wendy Leo, Peter Ralston, and Andrea Rex of the Massachusetts Water Resources Authority for data and assistance writing the water quality subchapter. Robert Buchsbaum, Becky Harris, Simon Perkins, and Wayne Petersen from Massachusetts Audubon provided expert advice on the avifauna subchapter. Kevin Brander, David Burns, and Kathleen Keohane from the Massachusetts Department of Environmental Protection and Robin Pearlman from the U.S.
    [Show full text]
  • Marblehead Reconnaissance Report
    MARBLEHEAD RECONNAISSANCE REPORT ESSEX COUNTY LANDSCAPE INVENTORY MASSACHUSETTS HERITAGE LANDSCAPE INVENTORY PROGRAM Massachusetts Department of Conservation and Recreation Essex National Heritage Commission PROJECT TEAM Massachusetts Department of Conservation and Recreation Jessica Rowcroft, Preservation Planner Division of Planning and Engineering Essex National Heritage Commission Bill Steelman, Director of Heritage Preservation Project Consultants Shary Page Berg Gretchen G. Schuler Virginia Adams, PAL Local Project Coordinator Rebecca Curran, Town Planner Local Heritage Landscape Participants Wayne Butler Rebecca Curran Bill Conly Charlie Dalferro Joseph Homan Bette Hunt Judy Jacobi John Liming Frank McIver Ed Nilsson Miller Shropshire William Woodfin May 2005 INTRODUCTION Essex County is known for its unusually rich and varied landscapes, which are represented in each of its 34 municipalities. Heritage landscapes are places that are created by human interaction with the natural environment. They are dynamic and evolving; they reflect the history of the community and provide a sense of place; they show the natural ecology that influenced land use patterns; and they often have scenic qualities. This wealth of landscapes is central to each community’s character; yet heritage landscapes are vulnerable and ever changing. For this reason it is important to take the first steps towards their preservation by identifying those landscapes that are particularly valued by the community – a favorite local farm, a distinctive neighborhood or mill village, a unique natural feature, an inland river corridor or the rocky coast. To this end, the Massachusetts Department of Conservation and Recreation (DCR) and the Essex National Heritage Commission (ENHC) have collaborated to bring the Heritage Landscape Inventory program (HLI) to communities in Essex County.
    [Show full text]
  • Ocm17241103-1896.Pdf (5.445Mb)
    rH*« »oo«i->t>fa •« A »iri or ok. w Digitized by tine Internet Arciiive in 2011 witii funding from Boston Library Consortium IVIember Libraries littp://www.arcliive.org/details/annualreportofbo1896boar : PUBLIC DOCUMENT .... .... No. 11. ANNUAL REPORT Board of Harboe and Land Commissioners Foe the Yeab 1896. BOSTON WRIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1897. ,: ,: /\ I'l C0mm0ixixr^aIt{? of P^assar^s^tts* REPORT To the Honorable the Senate and House of Representatives of the Common- wealth of Massachusetts. The Board of Harbor and Land Commissioners, pursuant to the provisions of law, respectfully submits its annual re- port for the year 1896, covering a period of twelve months, from Nov. 30, 1895. Hearings. The Board has held one hundred and sixty-six formal ses- sions during the year, at which one hundred and eighty-three hearings were given. One hundred and twenty-one petitions were received for licenses to build and maintain structures, and for privileges in tide waters, great ponds and the Con- necticut River ; of these, one hundred and fifteen were granted, four withdrawn and two denied. On June 5, 1896, a hearing was given at Buzzards Bay on the petition of the town of Wareham that the boundary line on tide water between the towns of Wareham and Bourne at the highway bridge across Cohasset Narrows, as defined by the Board under chapter 196 of the Acts of 1881, be marked on said bridge. On June 20, 1896, a hearing was given in Nantucket on the petition of the local board of health for license to fill a dock.
    [Show full text]
  • Coastal Resources Technical Report
    South Station Expansion Project Appendix 6 – Coastal Resources Technical Report October 2014 Coastal Resources Technical Report This Page Intentionally Left Blank October 2014 South Station Expansion Massachusetts Department of Transportation Coastal Resources Technical Report Table of Contents List of Figures ............................................................................................................................................... iii List of Tables ................................................................................................................................................ iv 1. Introduction .......................................................................................................................................... 1 2. Summary of Findings ............................................................................................................................. 1 3. Regulatory Context ............................................................................................................................... 3 3.1. Introduction .................................................................................................................................. 3 3.2. Massachusetts Coastal Zone Management Federal Consistency Review .................................... 4 3.3. Massachusetts General Law Chapter 91 ....................................................................................... 5 3.4. Municipal Harbor Planning ..........................................................................................................
    [Show full text]
  • Official Transportation Map 15 HAZARDOUS CARGO All Hazardous Cargo (HC) and Cargo Tankers General Information Throughout Boston and Surrounding Towns
    WELCOME TO MASSACHUSETTS! CONTACT INFORMATION REGIONAL TOURISM COUNCILS STATE ROAD LAWS NONRESIDENT PRIVILEGES Massachusetts grants the same privileges EMERGENCY ASSISTANCE Fire, Police, Ambulance: 911 16 to nonresidents as to Massachusetts residents. On behalf of the Commonwealth, MBTA PUBLIC TRANSPORTATION 2 welcome to Massachusetts. In our MASSACHUSETTS DEPARTMENT OF TRANSPORTATION 10 SPEED LAW Observe posted speed limits. The runs daily service on buses, trains, trolleys and ferries 14 3 great state, you can enjoy the rolling Official Transportation Map 15 HAZARDOUS CARGO All hazardous cargo (HC) and cargo tankers General Information throughout Boston and surrounding towns. Stations can be identified 13 hills of the west and in under three by a black on a white, circular sign. Pay your fare with a 9 1 are prohibited from the Boston Tunnels. hours travel east to visit our pristine MassDOT Headquarters 857-368-4636 11 reusable, rechargeable CharlieCard (plastic) or CharlieTicket 12 DRUNK DRIVING LAWS Massachusetts enforces these laws rigorously. beaches. You will find a state full (toll free) 877-623-6846 (paper) that can be purchased at over 500 fare-vending machines 1. Greater Boston 9. MetroWest 4 MOBILE ELECTRONIC DEVICE LAWS Operators cannot use any of history and rich in diversity that (TTY) 857-368-0655 located at all subway stations and Logan airport terminals. At street- 2. North of Boston 10. Johnny Appleseed Trail 5 3. Greater Merrimack Valley 11. Central Massachusetts mobile electronic device to write, send, or read an electronic opens its doors to millions of visitors www.mass.gov/massdot level stations and local bus stops you pay on board.
    [Show full text]
  • CPB1 C10 WEB.Pdf
    338 ¢ U.S. Coast Pilot 1, Chapter 10 Chapter 1, Pilot Coast U.S. 70°45'W 70°30'W 70°15'W 71°W Chart Coverage in Coast Pilot 1—Chapter 10 NOAA’s Online Interactive Chart Catalog has complete chart coverage http://www.charts.noaa.gov/InteractiveCatalog/nrnc.shtml 71°W 13279 Cape Ann 42°40'N 13281 MASSACHUSETTS Gloucester 13267 R O B R A 13275 H Beverly R Manchester E T S E C SALEM SOUND U O Salem L G 42°30'N 13276 Lynn NORTH ATLANTIC OCEAN Boston MASSACHUSETTS BAY 42°20'N 13272 BOSTON HARBOR 26 SEP2021 13270 26 SEP 2021 U.S. Coast Pilot 1, Chapter 10 ¢ 339 Cape Ann to Boston Harbor, Massachusetts (1) This chapter describes the Massachusetts coast along and 234 miles from New York. The entrance is marked on the northwestern shore of Massachusetts Bay from Cape its eastern side by Eastern Point Light. There is an outer Ann southwestward to but not including Boston Harbor. and inner harbor, the former having depths generally of The harbors of Gloucester, Manchester, Beverly, Salem, 18 to 52 feet and the latter, depths of 15 to 24 feet. Marblehead, Swampscott and Lynn are discussed as are (11) Gloucester Inner Harbor limits begin at a line most of the islands and dangers off the entrances to these between Black Rock Danger Daybeacon and Fort Point. harbors. (12) Gloucester is a city of great historical interest, the (2) first permanent settlement having been established in COLREGS Demarcation Lines 1623. The city limits cover the greater part of Cape Ann (3) The lines established for this part of the coast are and part of the mainland as far west as Magnolia Harbor.
    [Show full text]
  • ENF Northern Avenue Bridge Replacement Project BOSTON
    Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office Environmental Notification Form For Office Use Only EEA#: MEPA Analyst: The information requested on this form must be completed in order to submit a document electronically for review under the Massachusetts Environmental Policy Act, 301 CMR 11.00. Project Name: Northern Avenue Bridge Replacement Project Street Address: Northern Avenue Bridge Municipality: Boston Watershed: Boston Harbor Universal Transverse Mercator Coordinates: Latitude: 42.354484° N 331212.55 E 4691169.61 N, Zone 19T Longitude: -71.049435° W Estimated commencement date: 01/2020 Estimated completion date: 2022 Project Type: Bridge Replacement Status of project design: 25 %complete Proponent: City of Boston Public Works Department Street Address: Boston City Hall, One City Hall Square, Room 710 Municipality: Boston State: MA Zip Code: 02110 Name of Contact Person: Para Jayasinghe Firm/Agency: Boston Public Works Department Street Address:1 City Hall Square, Room 710 Municipality: Boston State: MA Zip Code: 02110 Phone: (617) 635-4968 Fax: E-mail: [email protected] Does this project meet or exceed a mandatory EIR threshold (see 301 CMR 11.03)? Yes No If this is an Expanded Environmental Notification Form (ENF) (see 301 CMR 11.05(7)) or a Notice of Project Change (NPC), are you requesting: a Single EIR? (see 301 CMR 11.06(8)) Yes No a Special Review Procedure? (see 301CMR 11.09) Yes No a Waiver of mandatory EIR? (see 301 CMR
    [Show full text]
  • Federal Register/Vol. 77, No. 177/Wednesday, September 12
    Federal Register / Vol. 77, No. 177 / Wednesday, September 12, 2012 / Rules and Regulations 56115 must be transferred to the other SUPPLEMENTARY INFORMATION: The the National Harbor Access Channel at petitioners, not the party filing the Northern Avenue Bridge, across the Fort Oxon Hill in Prince Georges County, petition; although, in his or her Point Channel, mile 0.1, has a vertical Maryland. This safety zone is intended discretion, the ruling official may use clearance in the closed position of 7 feet to protect the maritime public in a the actual petitioner as an intermediary at mean high water and 17 feet at mean portion of the Potomac River. for transferring the amounts authorized low water. The existing drawbridge DATES: This rule is effective from 8:30 as a remission to the other petitioners. operation regulations are listed at 33 p.m. on September 12, 2012, through 11 Dated: August 23, 2012. CFR 117.599. p.m. on September 13, 2012. The waterway has seasonal Eric H. Holder, Jr., ADDRESSES: Documents mentioned in recreational vessels of various sizes. Attorney General. this preamble are part of docket USCG– The owner of the bridge, the City of 2012–0818. To view documents [FR Doc. 2012–21943 Filed 9–11–12; 8:45 am] Boston, requested a temporary deviation BILLING CODE 4410–09– 4410–02; 4410–FY; 4410–14; P mentioned in this preamble as being to facilitate the replacement of deck available in the docket, go to http:// support. The bridge cannot open while www.regulations.gov, type the docket the stringers are unsecured.
    [Show full text]