Application for UDC
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Standing Committee on Railways (2009 -10) 6 Fifteenth Lok Sabha
STANDING COMMITTEE ON RAILWAYS (2009 -10) 6 FIFTEENTH LOK SABHA MINISTRY OF RAILWAYS (RAILWAY BOARD) [Action taken by the Government on the recommendations/ observations contained in the 4th Report of the Standing Committee on Railways (Fifteenth Lok Sabha) on ‘Demands for Grants - 2009-10 of the Ministry of Railways’] SIXTH REPORT LOK SABHA SECRETARIAT NEW DELHI April, 2010/ Chaitra, 1932 (Saka) SIXTH REPORT STANDING COMMITTEE ON RAILWAYS (2009-10) FIFTEENTH LOK SABHA MINISTRY OF RAILWAYS (RAILWAY BOARD) [Action taken by the Government on the recommendations/ observations contained in the 4th Report of the Standing Committee on Railways (Fifteenth Lok Sabha) on ‘Demands for Grants 2009-10 of the Ministry of Railways’] Presented to Lok Sabha on 15.04.2010 Laid in Rajya Sabha on 15.04.2010 LOK SABHA SECRETARIAT NEW DELHI April, 2010/ Chaitra, 1932 (Saka) (i) CONTENTS PAGE COMPOSITION OF THE COMMITTEE…………………….………………. (iii) INTRODUCTION …………………………………………………………….… (iv) CHAPTER I Report……………………………………………………… 1 CHAPTER II Recommendations/Observations which have been accepted by the Government …………………………. 16 CHAPTER III Recommendations/Observations which the Committee do not desire to pursue in view of the Government’s replies………………………………………………………………. 34 CHAPTER IV Recommendations/Observations in respect of which Replies of the Government have not been accepted by the Committee and which require reiteration ….…. 35 CHAPTER V Recommendations/Observations in respect of which final replies of the Government are still awaited …………. 37 APPENDIX APPENDIX-I Minutes of the sitting of the Standing Committee on 51 Railways held on 13.04.2010 APPENDIX-II Analysis of Action Taken by Government on the Recommendations/Observations Contained in the 36th Report (14th Lok Sabha) On ‘Demands For Grants (2008-09) Of The Ministry Of Railways’ ………. -
Selection List of Gramin Dak Sevak for Jharkhand Circle Cycle III Vide Notification No.R&E/GDSONLINEENGAGEMENT/2020 DATED 10.11.2020
Selection list of Gramin Dak Sevak for Jharkhand circle Cycle III vide Notification No.R&E/GDSONLINEENGAGEMENT/2020 DATED 10.11.2020 S.No Division HO Name SO Name BO Name Post Name Cate No Registration Selected Candidate gory of Number with Percentage Post s 1 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ SC 1 DR64C3AFC49B84 RAMCHITRA Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak SEMIL- (96.4)-SC 2 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ ST 1 DR32F88D224581 LAL BABU GOND- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak (95.8)-ST 3 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR4DCCF61C7C9 YOGESH KUMAR- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak A (97.2)-OBC 4 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR7FD43E9B3C34 SONU KUMAR- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak (97.2)-OBC 5 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR5B2C28D4C79B MANKU Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak VISHWAKARMA- (97)-UR 6 Dhanbad Bokaro Steel B.S.City R.S. chainpur GDS BPM ST 1 DR2A936C48227A PURNIMA TUDU- City H.O S.O (93.1)-ST 7 Dhanbad Bokaro Steel B.S.City R.S. Kunduari B.O GDS BPM EWS 1 DR8A9C61CE4DC ROHIT RAJ- (95)- City H.O S.O D UR-EWS 8 Dhanbad Bokaro Steel B.S.City R.S. mango GDS ABPM/ SC 1 DR2931978E4BCC NARBEER SINGH- City H.O S.O Dak Sevak (95.4)-SC 9 Dhanbad Bokaro Steel B.S.City R.S. -
Proceedings of 256 Meeting of the Erc-Ncte Held on 30
Proceedings of 256th Meeting of ERC-NCTE held on 30th – 31st May, 2018 PROCEEDINGS OF 256th MEETING OF THE ERC-NCTE HELD ON 30th – 31st May, 2018 The 256th Meeting of the Eastern Regional Committee (ERC), National Council for Teacher Education (NCTE) was held on 30th – 31st May, 2018 at Conference Hall, ERC, NCTE, 15, Neelakantha Nagar, Nayapalli, Bhubaneswar. The Chairperson, Members and Convener as listed below were present at the time of the 256th ERC Meeting. Prof. Shukla Mahanty - Chairperson Prof. (Mrs.) S.M. Sungoh - Member Dr. Pratap Indra Dash - State Representative of Odisha Dr. M. Meenakumari Devi - State Representative of Manipur Prof. Vanlalhruaii - State Representative of Mizoram Shri Vijay Kumar Mishra - State Representative of Bihar Dr. Shanti Ram Adhikari - State Representative of Sikkim Shri Pradeep Kumar Yadav - Regional Director (I/C), ERC & Convener At the outset, the Regional Director welcomed all the members of Committee and apprised them about the provisions of the NCTE Act, Rules, Regulations and Guidelines issued from time to time. With the permission of Chairperson, Shri Pradeep Kumar Yadav (Convener) presented the Agenda before the Committee for its due consideration and appropriate decision. Sl. No. Item No. Content Confirmation of the Proceedings of 255th meeting held on 30th April to 2nd May, 2018 at Bhubaneswar. ER-256.1 Confirmed. ATTENTION! 1. The Committee unanimously decided that the institution may reply in response to the decision of the Committee uploaded on the ERC website without waiting for formal letters from the office of ERC. The replies so received will also be considered by the committee. -
Chancellor Blood Donor List-2
Binod Bihari Mahto Koyalanchal University Dhanbad Website: bbmku.org.in HB/ Age / Blood Sl. No. Name of the Blood Donor College Address Mobile No. Class/Session Roll No. BP/ DoB Group SUGAR 1 ANUSKA RAI PKRM Collge Dhanbad BARTAND 8227841054 18 UG II SEM 57 O+ 18 2 KUSH KUMAR PKRM Collge Dhanbad Dhanbad 8271665783 26 M.A. 26 B+ 15.3 3 SIMA MODAK PKRM Collge Dhanbad BHOWRA 7992304092 21 M.A. 84 O+ 15.2 4 PRIYANKA KUMARI PKRM Collge Dhanbad MICP SEC 3 9955256790 18 B.COM 260 O+ 15.1 5 MD DANISH PKRM Collge Dhanbad GOMOH 8973729781 19 B.COM 184 A+ 15.1 6 BALDEEP PKRM Collge Dhanbad PROFESSOR COLONY 7992453043 21 M.A. 121 O+ 15.1 7 ARUP KUMAR PKRM Collge Dhanbad SINDRI 8757734147 24 M.A. 183 B+ 15.1 8 SHAYAM SUNDAR PANDIT PKRM Collge Dhanbad GOVINDPUR 7004058701 19 B.COM 468 O+ 15 9 SALONI PRIYA PKRM Collge Dhanbad KARMIK NAGAR 7488376596 17 B.COM 331 O+ 14.8 10 ANIL KUMAR PKRM Collge Dhanbad ANUGARAH NAGAR 8581961439 21 BA 293 O+ 14.7 11 ARJUN KUMARI RAWANI PKRM Collge Dhanbad CHIRUDIH PUTKEE DHANBAD 9576283012 19 M.A. 119 O+ 14.7 12 RAGHUNANDAN BAURI PKRM Collge Dhanbad TETULMARI 7717702127 22 M.A. 110 O+ 14.7 13 PRIYA KUMARI PKRM Collge Dhanbad DEBAGRAM 8603676869 22 M.SC. 6 B- 14.6 14 ABHIJEET KR SHARMA PKRM Collge Dhanbad KORIBANDH JHARIA 9905551412 19 UG I SEM 4 B+ 14.5 15 MD SARFARZ ANSARI PKRM Collge Dhanbad GOVINDPUR 9304873258 19 B.COM 198 AB+ 14.3 16 DINESH MAHATO PKRM Collge Dhanbad TUNDI 9102950370 25 M.A. -
A€ (BA96 N a S2e a 5 -A C.:] FEE / -Ltt Ci 6 \J- Z
P= (t, C (n.ot @-q .. - h L*= vE-=oqvcx pe';F jP9';=E c @o SE)Y c-!2 FgEE ".Ei5--oo N b s: g'= (D (D 8S 96 a 6 N N* s>A (5 <-l -:z oO ao m IJ.I UJ >^ qo.q a 'Oor9 (trAcd N troil LH lrlx E qu I c(J ct) e 6bi lz^ o *6 (D !d, Ls Ns l= E -E-A ;e x;xs (U 17, z. EE EE E= a EsEEsH z. 96 s- pd t L-A N o- >- C LL -- )i ()=- o_ L9:! & (J o.o 6l=l N I tL 6 B" 3.\ o_ ., 6) a o E;d (9 @ A€ (BA96 N a s2E a 5 -a C.:] FEE / -ltt ci 6 \J- z. =>Ec(5ULE-A (E l:" .c () (.) ! o =uEaB .h o) o) i:: F. o.- 9CC o'6 ro i,I), E 9 ='EU.6 o '6a q) od tr I E>.(g(s o q \o o) o o 6o_ (E .c o- I C o- o) o >,E € .sl 6 (g f& QE c/) O= <DE=(u c! s o\ (oSo o=-a 50 I\ b ;--- E : E.!)= CO c o- a_ o N o 6{ (D-9 g*Hfdg rr) *-.-.-gcoC)Fo= 1' g $S=E (t (E EoP-'.E cocoiJ5 -o ESaelSF 6 6 33p9 3- -E=(D *'=SqSF +uo -tZii(E ?PE (l) o s s (5 lo) E(D E ffiE lr E -15oc o_ (9 E CC s o)c .c6 ro co) (U.= 6X LL (EE c^- j-.; c.) -= Y=o q .2 El J .o (U O€ E c U< C r.1r C' .e G' EE \t ! :o(E =(U (o o (! :J ;e N€ E o) o E >IT (o F LU (,L o =>b d N 3 >.o (U C (t, L.= O N E <D> C i5 kJ O ,t, =: O d z, .uoo z GI o >oZ e, s,l'5.i E €'-..o E !B- (o 6 oL od 9 N v) 62 t <t) :! SUBTOTAL(103,$D$279:D279) dk;kZy;] ftyk f'k{kk v/kh{kd] cksdkjks] izkFkfed f'k{kdksa dk fofHkUu xzsMksa esa izksUufr gsrq vkSicaf/kd lwph Appointmen Whether Date of Joining if t Through he is Disability if B A/B Inter Dist/Inter Current Date of Optional Subjects in Date of Sl. -
Pre-Feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for Production of 3.0MTPA Hot Metal with Blast
2019 PRE-FEASIBILITY REPORT FOR INTEGRATED STEEL PLANT OF ELECTROSTEEL STEELS LIMITED FOR PRODUCTION OF 3.0 MTPA HOT METAL WITH BLAST FURNACE (1×1050 m3, 1×350 m3, 1×1700 m3) ALONG WITH CPP OF CAPACITY 160 MW M/s ELECTROSTEEL STEELS LIMITED (an enterprise of Vedanta Limited) at Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar , Dist Bokaro, Jharkhand -827013 Pre-feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for production of 3.0MTPA Hot Metal with Blast Furnace (1×1050 m3, 1×350 m3, 1×1700 m3) along with CPP of Capacity 160 MW located at village Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar, Dist Bokaro, Jharkhand-827013 Table of Contents CHAPTER-1............................................................................................................ 7 EXECUTIVE SUMMARY........................................................................................... 7 CHAPTER-2.......................................................................................................... 11 INTRODUCTION OF THE PROJECT......................................................................... 11 2.0 INTRODUCTION ..........................................................................................................11 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT.......................................12 2.2 BRIEF DESCRIPTION AND NATURE OF THE PROJECT...................................................13 2.2.1 Chronology of the Project Implementation..........................................................13 -
1 BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826
BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826 005 (India) Tele-Fax: 0326-2230206 e-mail: [email protected] Tender Notice No. BCCL/ CGM(CMC)/Global/ Amlabad/ 2013/117 Date: 29.01.2013 COMPANY TENDER NOTICE NO. & DATE PROJECT / AREA Amlabad Bharat Coking Coal Limited underground mine, BCCL/ CGM(CMC)/ Global/ EJ Area, BCCL. Amlabad/ 2013/ 117. Date: 29.01.2013 Sealed turn-key tenders are invited for the following work: Name and Description of Work Location Contract period Development of Amlabad under ground mines and Amlabad under The contract period extraction of coal from vergin and remnant area ground mine, EJ start from the date of through existing entries and/or additional drifts, Area, BCCL. signing of the exploitation of the virgin/ developed seams by Mass contract. Period of Production Technology package for a minimum contract shall consist guaranteed production of 3.6 million tonne of coal of Pre-Commercial during commercial production of 9 (nine) years on Production Period turnkey basis. Work includes additional exploration (if and Commercial desired so by the contractor), preparation of Mining production period. Plan, Detailed Project Report & EMP (Environment The Commercial Clearance), obtaining all necessary approvals from Production Period concerned authorities and restoring shaft entries, shall be 9 (Nine) additional drifts/ shafts deepening & widening etc. in production years. order to meet the guaranteed production. 1.1 EARNEST MONEY Rs. 25,00,000 (Twenty five lacs) or equivalent USD as Earnest Money / Bid Security is to be deposited in the form of irrevocable Bank guarantee from any Scheduled Bank payable at its branch at Dhanbad / Kolkata with validity of 28 (Twenty eight) days beyond the validity of the Bid in the format given in the Bid Document. -
List of District Hostpitals in Jharkhand with RKS with Bank Account Numbers BOKARO Name of Bank in Which A/C Is Sl
List of District Hostpitals In Jharkhand with RKS with Bank Account Numbers BOKARO Name of Bank in which A/c is Sl. Name Hospital Management Society A/c No. opened District Hospital Management Society, 1 Canara Bank, Bokaro 22789 Bokaro Hospital Management Society Sub. 2 SBI, Chas 1000050193 Divisional Hospital Chas. Hospital Management Society Sub. 3 SBI Tenughat 1100050222 Divisional Hospital Tenughat. Hospital Management Society Referal 4 SBI, Bokaro Inds, Area, Balidih 30044521098 Hospital Jainamore Hospital Management Society Referal 5 UCO Bank Bermo 19051 Hospital Bermo Hospital Management Society Urban 6 Bank of India, Gomia SB 20601 Family W. Centre Gomia. Hospital Management Society U.F.W. 7 SBI, Chas 1000050194 Centre Bokaro. 8 PHC. Management Society Nawadih PNB Surhi SB 6531 9 PHC. Management Society Bermo UBI Jaridih Bazar SB 12022 10 PHC. Management Society Gomia Bank of India, Gomia SB 20602 Giridih Kshetriya Gramin Bank, 11 PHC. Management Society Paterber 3966 Chandankiary, Paterbar 12 PHC. Management Society Chas SBI, Chas Court Area 1100020181 PHC. Management Society Dhanbad Central Co-opp. Bank 13 3844/18 Chandankiary Chandankiary 14 APHC. Hospital Society Harladih PNB Surhi 6551 Giridih Kshetriya Gramin Bank 15 APHC. Hospital Society Chatrochati 4298 Goima Giridih Kshetriya Gramin Bank 16 APHC. Hospital Society Mahuatanr 4299 Goima 17 APHC. Hospital Society Khairachatar BOI Khairachater 8386 18 APHC. Hospital Society Pathuria SBI , Bokaro Inds. Area, Balidih 30044520844 19 APHC. Hospital Society Tupra SBI, Chas Court Area 1100050179 20 APHC. Hospital Society Pindrajora SBI, Chas Court Area 1100050180 21 APHC. Hospital Society Chas SBI, Chas Court Area 1100050182 Dhanbad Central Co-opp. -
Government of India Press Santragachi, Howrah
GOVERNMENT OF INDIA PRESS SANTRAGACHI, HOWRAH Information as per Clause(b) of Sub-section 1 of Section 4 of Right to Information Act, 2005 (1) IV (1) bi : The particulars of Govt. of India Press, Santragachi, Howrah, Function and duties. In the year 1863 the Govt. of India decided to establish in Calcutta and Central Press in which administration reports, codes and miscellaneous work could be printed. The Secretariate Printing Offices then in existence confining themselves to current despatches and proceedings. In January, 1864, the orders of the various department of Govt. of India and the Acts and Bills of Governor General’s Council which were formerly published in Calcutta Gazette were transferred to a new publication, the Gazette of India to which was appended a supplement containing official correspondence on the subject of interest of officers and to the general public. In 1876 a system of payment of piece rates was introduced in the composing Branch and subsequently in the distributing, printing and book binding Branches. In June, 1885, the presses of the Home and Public works Department were amalgamated with the Central press. The expansion of the Central Press from a strength of 109 employees, 1863, to that 2114 in 1889 necessiated the provision of additional accommodation pending the building of the Secretariate, the press was located from 1882 to 1885 at 165, Dharmatala Street. On completion of the Secretariate Building the Composing, Machine, press and warehouse, with the administration, Accounts and computing Branches were removed to 8, Hastings Street in 1886. During the World War II, work mostly in Connection with the war increased by leaps and bounds and to cope with the increases of volume of work the minimum strength of additional staff was recruited as a temporary measure and Night Shift was started in the year 1944 with the advent of Independence and consequent expansion of Govt. -
GNM Advt. No. 04-2019Rejected List 1 - 7 List of Rejected Candidate for the Post of Staff Nurse, Advt
Office of the Civil Surgeon, West Singhbhum, Chaibasa List of Rejected Candidate for the Post of Staff Nurse, Advt. No. 04/2019 10+2 or Intermediate Technical Qualification JNRC Registration No. Sl. Form Sl. Caste Experience (in Written Name Father's Name Permanent Address Present Address Home District Category Date of Birth Contect No. Remarks No. No. certificat Total Marks Total Marks Registration Month) Marks % % Valid Upto Institute Marks Obtained Marks Obtained No. REJECTED BABITA AT+POST-JAGANNATHPUR, RAM LAL WEST GENERA MINIMUM 1 1 KUMARI DIST- WEST SINGHBHUM, DO NA 5-May-1989 500 251 50.20 #DIV/0! 8340352396 CRITERIA NOT PAN JHARKHAND SINGHBHUM L PAN FULFILLED VILL-BERA, P.O- BERA, P.S- VILL-SERENGHATU, P.O- REJECTED DUE SHILPA SANGEM BERA DIST-WEST TURTA, P.S-SENHA DIST- YES 2 3 LOHARDAGA ST 28-Oct-1992 500 218 43.60 1900 1571 82.68 N-3635 11-Aug-2021 JNRC 30 MONTHS 8709981936 TO OTHER EKKA EKKA SINGHBHUM, JHARKHAND LAHARDAGA, JHARKHAND (SDO) PIN-835202 PIN-835302 DISTRICT REJECTED DUE MALTI SHOBHA VILL-BHUSUR, P.O-SANDI, PS- YES 3 4 SIKIDIRI, DIST- RANCHI DO RANCHI OBC 25-Jun-1994 500 230 46.00 1900 1514 79.68 N-4018 NA JNRC 32 MONTHS 6206956102 TO OTHER KUMARI RAM MAHTO (SDO) JHARKHAND PIN-835219 DISTRICT C/O-SAVIOUR SOKEY, VILL- VILL-BASEN, GODATOLI, P.O- TIRILPIRI, PO- HULHUNDU,P.S- REJECTED DUE ANJNA ANTHRES BASEN P.S-KERSAI DIST- YES 4 5 DHURWA (TUPUDANA) DIST- SIMDEGA ST 20-Jan-1988 500 285 57.00 1900 1360 71.58 T-967 NA JNRC 32 MONTHS 8210522406 TO OTHER SIMDEGA JHARKHAND PIN- KERKETTA KERKETTA RANCHI JHARKHAND PIN- (SDO) -
Bokaro Bokaro
Data as to Rehabilitation under Victim Compensation Scheme Period - 1st Quarter (01.01.2020 to 31.03.2020) (District including Sub Division) Format A Whether Compensation In brief, Quantified Compensation paid Whether please interim or specify the Final Rehabilita compensa tion tion paid Measure Wheth in terms taken/orde er of the Co red under compe order of mpe ten Whether nsatio the nsat schemes of Hon’ble NALSA ( Chargesheet/ n paid ion Whether High specify Final Form by Court or amo name of demand submitted accuse other unt the for fund ( please d/appe Court’s qua scheme made specify the llant/c order ntifi under through Specify (Please which Name and address of the victims with sections, date Specify Interim onvict ed DC, details of Case No. GR Case NO./ ST Case of filing of Interim or specify the but benefit Please case no. as extended/ No./PS Case No. /Comp Case No.(N.B: chargesheet Compensat Specify Final Compens State yet specify ation well as the number of Name of Court Name/Identity of Rape Victim and victim and date of ion Compensation Specify Final of amount to beneficiari the SL with Full under POCSO Act and Juvenile not to be taking quantified, quantified, with paid, with Compensation Jhark quantified be es scheme letterr No. Designation revealed cognizance). with date date date paid, with date hand or paid. paid wise) No. 1. Additional Jagtarani Devi, W/o- C.S. & Sessions Baldev Ram, R/o- BSL, L.H., Cog. Rs. Rs. State Judge-1st - Taken on 20,000/- 20,000/- Street – 2, Qr. -
List of 1836 Radiating Sites in LWE PHASE-I Areas Planned Sites Changed Sites
List of 1836 radiating sites in LWE PHASE-I areas Planned Sites Changed Sites Sl No State Name of District Name of BTS location Name of District Revised Site Name 1 EAST AP GODAVARI(EG) Agraharapu Koderu1121 EG Kanusuluru 2 EAST GODAVARI AP Bhadrachalam_6_1 (Yetapaka) NC NC 3 EAST GODAVARI AP Bhadrachalam_6_2(Vadapalli) EG Gopavaram 4 EAST GODAVARI AP Burakanakota(Durganagar) EG Zaderu 5 WEST AP GODAVARI(WG) Chigurumamidi1041(Bollapalli) WG Bollapalli 6 AP EAST GODAVARI Gundala1389(Pathagundala) NC NC 7 AP EAST GODAVARI Irkampeta EG Durgangar 8 WEST GODAVARI AP Komatlagudem4401 WG Rajivnager 9 WEST GODAVARI AP Pallevada1214-Koida WG Garlagoyyi 10 AP EAST GODAVARI Peddamattapalle1070 NC NC 11 AP EAST GODAVARI Peddarukur1010 NC NC 12 WEST GODAVARI AP Ramavaram1496 WG Bandlaboru 13 WEST GODAVARI Sridhara 2032 Near Kasturiba Girls Residential AP School, R.Sy.No. 149/1 WG Sridhara Velair 14 AP EAST GODAVARI Dutcherthi NC NC 15 AP EAST GODAVARI Gurthedu EG Boduluru 16 AP Visakhapatnam Jammili Village NC NC 17 AP Visakhapatnam Jeypur (Araku-2) Visakhapatnam Lothugedda Village 18 AP Visakhapatnam Kammangi Village NC NC 19 AP Visakhapatnam Lambasingi(New site-Lothugedda) Visakhapatnam Lothugedda Junction 20 AP Visakhapatnam Maddigaruvu Village Visakhapatnam Rudakota 21 AP Visakhapatnam Mampa-Gangavaram NC NC 22 AP Visakhapatnam Modapalli, Paderu NC NC 23 AP Visakhapatnam Pedavalasa NC NC 24 AP Visakhapatnam Rompulaghat near Katragedda NC NC 25 AP Visakhapatnam Tyda Visakhapatnam Damuku Junction 26 AP Vizianagaram Andra NC NC 27 AP Vizianagaram