Department of Transportation

RON DESANTIS 3400 West Commercial Boulevard KEVIN J. THIBAULT, P.E. GOVERNOR Fort Lauderdale, Florida 33309 SECRETARY

FOR IMMEDIATE RELEASE Contact: Guillermo Canedo Friday, January 17, 2020 (954) 777-4090 [email protected]

FDOT Broward County Traffic Impact Report January 17, 2020 through January 24, 2020

Fort Lauderdale – Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of January 17-24. Weather permitting, work will be done at the following locations throughout the county. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter @MyFDOT_SEFL.

Please note, any full road, ramp or bridge closures have been highlighted below.

CONSTRUCTION PROJECTS

Interstates

1. I-95 from south of Hollywood Boulevard in the City of Hollywood to south of Broward Boulevard in the City of Fort Lauderdale and I-595 from I-95 to SR-7 in the Town of Davie (95 Express Phase 3C) Description: Work on this 9-mile 95 Express project includes extending the existing Express Lanes north from just south of Hollywood Boulevard to just south of Broward Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Other project improvements include construction of I-95/I-595 Direct Connectors between 95 Express Lanes and I-595, as well as reconstruction, milling, resurfacing and widening of I-595 from SR-7 to I-95 and along I-95 from south of Hollywood Boulevard to south of Broward Boulevard. Additional work includes bridge widening along I-95 at several locations, painting of 17 bridges within project limits, I-95/SR 84 interchange modifications, Integrated Intelligent Transportation System (ITS) Installation, including cameras, detectors and dynamic message signs to optimize traffic operations, tolling/gantry construction, ramp signalization implementation at the interchanges, lighting, signage and drainage installation and construction of shoulder–mounted sound walls and retaining walls. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (954) 299-6561 or [email protected]. Cost/Completion: $457 million/ late 2024. Traffic Impact: I-95 Traffic Impact: · I-95 in each direction, from Griffin Road to south of Davie Boulevard, will have two lanes closed, nightly as needed, Sunday through Thursday. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m. · I-95 from Griffin Road to South of Davie Boulevard, will have shoulder closures daily and nightly as needed. I-595 Traffic Impact: · I-595 in each direction, from east of SR-7 to Anglers Avenue, will have two lanes closed, nightly as needed, Sunday through Thursday. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m. · I-595, from I-95 to SR-7, will have shoulder closures daily and nightly as needed. Ramp Impact: · The I-95 northbound exit ramp to I-595 westbound, from the I-95 ramp entrance to Anglers Avenue, will have the inside lane closed, 10 p.m. until 5 a.m., Sunday through Thursday. · The I-95 southbound exit ramp to I-595 westbound, from south of SR-84 to Anglers Avenue, will have the outside lane closed, 10 p.m. until 5 a.m., Sunday through Thursday. · I-95 southbound to the I-595 exit ramp, from the ramp entrance to south of SR-84, will have one lane closed 10 p.m. until 5 a.m., Sunday through Thursday. · I-595 westbound to the I-95 northbound entrance ramp, from south of SR-84 (SW 32nd Street) to north SR-84 (SW 25th Street), will have one lane closed, 10 p.m. until 5 a.m., Sunday through Thursday.

2. I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale (95 Express Phase 3A-1) Description: Work on this 6.7-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other work includes: widening bridges, sound wall construction, installation of Intelligent Transportation System (ITS) and tolling equipment and ramp signaling at the I-95 entrance ramps at Davie Road, Broward Boulevard, Sunrise Boulevard, Oakland Park Boulevard and Commercial Boulevard. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini (954) 299-6561 or [email protected]. Cost/Completion: $150 million / early 2021. Traffic Impacts: • I-95 Northbound Full Closure Advanced Notice: I-95 northbound lanes at Commercial Boulevard will be closed to traffic overnight, 11:30 p.m. until 5:30 a.m., Monday, February 17 and Wednesday, February 19 (February 20 will be a contingency night) for overhead sign structure installation. Traffic will be detoured via the I-95 northbound exit ramp to Commercial Boulevard, North Andrews Avenue and Cypress Creek Road. FHP will be on site to assist motorists. • I-95 Southbound Full Closure Advanced Notice: I-95 southbound lanes at Commercial Boulevard will be closed to traffic overnight, 11:30 p.m. until 5:30 a.m., Tuesday night, February 18 (Thursday night, February 20 will be a contingency night) for overhead sign structure installation. Traffic will be detoured via the I-95 southbound exit ramp to Cypress Creek Road, North Andrews Avenue and Commercial Boulevard. FHP will be on site to assist motorists. • I-95 will have three lanes closed in each direction, 9 p.m. until 5 a.m. Sunday through Thursday. The first two lanes will close at 9 p.m., and the third lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m. • I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly. • Oakland Park Boulevard at I-95 will undergo a full nightly closure for bridge construction, 11 p.m. until 5 a.m., Wednesday, January 22 and Thursday, January 23. Traffic will be detoured via Powerline Road, NW19th Street, Sunrise Boulevard and NW 21st Avenue. FHP will be on site to assist motorists.

• Advanced Notice: Powerline Road at I-95 will undergo a full nightly closure, 11 p.m. until 5 a.m., Monday night, January 27 through Thursday night, February 6. Traffic will be detoured via Commercial Boulevard, N. Dixie Highway and Oakland Park Boulevard.

• Powerline Road at the I-95 overpass will have one lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.

• NW 19th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday. • I-95 northbound, between Sunrise Boulevard and Oakland Park Boulevard has a new traffic pattern to allow for outside shoulder construction. This pattern is anticipated to be in place through April 2020, weather permitting. • NW 6th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 4 p.m., Monday through Friday. • Oakland Park Boulevard at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday. • Broward Boulevard at I-95 will have one outside lane closed, nightly, 10 p.m. until 5 a.m., Tuesday, January 21 through Thursday, January 30. Ramp Impact: • The I-95 northbound entrance ramp from Oakland Park Boulevard will be closed, nightly, as needed, 9 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Commercial Boulevard and Powerline Road. FHP will be on site to assist motorists. • The I-95 northbound exit ramps to Oakland Park Boulevard will be closed as needed 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists. • The I-95 northbound exit ramp to Commercial Boulevard will be closed as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Cypress Creek Road. FHP will be on site to assist motorists. • The I-95 northbound entrance ramp from Commercial Boulevard will be closed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Cypress Creek Road. FHP will be on site to assist motorists. • The I-95 southbound exit ramp to Commercial Boulevard will be closed nightly, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound entrance ramps from Commercial Boulevard will be closed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Sunrise Boulevard. FHP will be on site to assist motorists.

• The I-95 southbound exit ramp to Oakland Park Boulevard will be closed, as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Sunrise Boulevard. FHP will be on site to assist motorists.

• The I-95 northbound exit ramps Sunrise Boulevard will be closed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.

• The I-95 northbound entrance ramp from Sunrise Boulevard will be closed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and Powerline Road. FHP will be on site to assist motorists.

• The I-95 southbound entrance ramps from Sunrise Boulevard will be closed nightly, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound exit ramp to Sunrise Boulevard will be closed nightly,10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Broward Boulevard and I- 95. FHP will be on site to assist motorists; consecutive ramps will not be closed at the same time. • The I-95 northbound exit ramp to Broward Boulevard will be closed nightly, 10 p.m. until 5 a.m., Sunday night, January 12 through Thursday night, February 6. Traffic will be detoured via I-95 and the Broward Park & Ride. FHP will be on site to assist motorists.

• Advanced Notice: The I-95 northbound entrance ramp from Davie Boulevard will be closed nightly, Sunday through Thursday, 10 p.m. until 5 a.m., beginning Monday night, January 27 through Thursday night, February 6. Traffic will be detoured via State Road 7 and Broward Boulevard. FHP will be on site to assist motorists. • The I-95 northbound exit ramp to eastbound Oakland Park Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.

• The I-95 northbound exit ramp to Commercial Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.

• Advanced Notice: The I-595 to I-95 northbound ramp will have one outside lane closed nightly, Sunday through Thursday, 10 p.m. until 5 a.m., Monday, January 27 through Thursday, February 6.

3. I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1) Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or [email protected]. Cost/Completion: $102 million / spring 2022. Traffic Impact:

• I-95 will have three lanes closed in each direction nightly, between SW 10th Street and Glades Road, as needed, Sunday through Thursday, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m. Advanced Notice: I-95 northbound lanes at Hillsboro Boulevard will be closed to traffic overnight, 11:30 p.m. until 5 a.m., Sunday night, January 26 for a traffic shift and new roadway construction. Traffic will be detoured via the I-95 northbound exit ramp to Hillsboro Boulevard west, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists. Please see detour flyer attached.

• Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.

• Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.

• Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.

• Advanced Notice: Camino Real at I-95 will undergo a full overnight closure for new bridge construction, 10 p.m. until 5:30 a.m., Sunday night, January 26 through Thursday night, January 29. Traffic will be detoured via Military Trail, Palmetto Park Road and SW 12th Avenue. Law Enforcement Officers will be on site to assist motorists.

• Advanced Notice: Eastbound Palmetto Park Road at I-95 will undergo a full overnight closure for new bridge construction, 11 p.m. until 5 a.m., Monday night, February 3 and Tuesday night, February 4. Traffic will be detoured via I-95 and Hillsboro Boulevard. Law Enforcement Officers will be on site to assist motorists.

• Advanced Notice: Westbound Palmetto Park Road at I-95 will undergo a full overnight closure for new bridge construction, 11 p.m. until 5 a.m., Wednesday night, February 5 and Thursday night, February 6. Traffic will be detoured via I-95 and Glades Road. Law Enforcement Officers will be on site to assist motorists.

Ramp Impact:

• The I-95 northbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 northbound, Hillsboro Boulevard, and Military Trail. FHP will be on site to assist motorists.

• The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.

• The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.

• The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.

• The I-95 southbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and SW 10th Street. FHP will be on site to assist motorists.

• The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.

• The I-95 northbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.

• The I-95 northbound exit ramp to eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Palmetto Park Road and South Dixie Highway. FHP will be on site to assist motorists. Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.

4. 595 Express Traffic Impact: • One lane on westbound I-595 Express Lanes, 0.7 miles west of Florida’s Turnpike will be closed from 10 p.m. to 5 a.m. beginning Monday, January 20, through Tuesday, January 21, for Bridge 860378 joint repair. • One lane on the northbound Florida Turnpike ramp to eastbound I-595 will be closed from 10 p.m. to 5 a.m. Two lanes on the northbound Florida Turnpike ramp to eastbound I-595 will be closed from 12 a.m. to 5 a.m. beginning Tuesday, January 21 through Wednesday, January 23, for Bridge 860560 joint repair.

Northeast Broward

5. Countywide Lighting Retrofit Improvements Project in Fort Lauderdale, Plantation, West Park, Davie, Hollywood, Miramar and Lauderhill Description: Lighting retrofit improvements include the installation of new light poles, upgrading light poles to LED lighting throughout Broward County in the cities of Fort Lauderdale, Plantation, West Park, Davie, Hollywood, Miramar and Lauderhill. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $977,777 /Winter 2020 Traffic Impact: • One lane in each direction will be closed along SR 7/US 441 from 9 a.m. to 4 p.m., Monday through Friday, at the following intersections to build lighting structures, install conduits and restore the affected areas: 5th Street, 5th Court, Broward Boulevard and North Hospital Drive.

6. SR 7/US 441 Pedestrian Safety Enhancement Project from NW 29th Street to north of SR 816/Oakland Park Boulevard in Lauderdale Lakes Description: Safety enhancements will address pedestrian mobility by constructing a 10-foot shared-use path along the east side of SR 7/US 441 within the project limits. A pedestrian safety barrier will be installed along the existing median to discourage mid-block pedestrian crossings. Improvements will also include a new northbound overhead sign, miscellaneous signage, paving, restriping, landscaping, and curb ramps to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 [email protected] Cost/Completion: $1.4 million / Early 2020 Traffic Impact: • One lane in each direction will be closed intermittently on SR 7/US 441 from NW 29th Street to SR 816/Oakland Park Boulevard, 9 a.m. to 3:30 p.m., Monday through Friday for road widening and median work.

7. Pompano Beach Mobility Improvements Project NE 5th Avenue from NE 10th Street to Copans Road/NE 10th Street from east of Dixie Highway to US 1 in Pompano Beach Description: The project improvements consist of sidewalk and shared-use path construction and reconstruction, milling and resurfacing of existing pathways, driveway reconstruction, concrete curb, patterned pavement, pavers, signage and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $1.5 million / Early 2020 Traffic Impact: • All lanes are open.

8. Federal Highway/US 1 Mobility Improvement Project from Sample Road to the Broward/Palm Beach County Line in Lighthouse Point and Deerfield Beach Description: The project improvements consist of widening the roadway to accommodate 5-foot bike lanes, reconstructing medians, portions of the roadway and sidewalks, milling and resurfacing. Other improvements include installing drainage, curb and gutter, signalization, lighting, signage and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $ 8.2 million/Early 2021 Traffic Impact: • One lane in each direction will be closed intermittently on US 1/Federal Highway from Sample Road to the Broward/Palm Beach County Line, 9 p.m. to 6 a.m., Sunday through Thursday for roadway restriping. • One inside lane in each direction will be closed intermittently (2500 feet at a time) on US 1/Federal Highway from Sample Road to the Broward Palm Beach County Line, 9 a.m. to 5 p.m., Monday through Friday for median widening, beginning on Monday, January 20.

9. Sunrise Boulevard Pedestrian Safety Enhancement Project from NW 15th Avenue to North Flager Drive in the city of Fort Lauderdale Description: This project will address pedestrian safety by constructing a signalized mid-block pedestrian crossing and new light poles to increase visibility. The Construction Open House for the project will be held on Tuesday, January 14, at Fort Lauderdale ArtServe, Larsen Auditorium, 1350 East Sunrise Boulevard, Fort Lauderdale, FL 33304. Cost/Completion: $602,297/Spring 2020 Traffic Impact: • All lanes are open.

Northwest Broward

10. SR 7 Improvements Project from Commercial Boulevard to south of Glades Road in Tamarac, North Lauderdale, Fort Lauderdale, Margate, Coral Springs, Coconut Creek, Parkland and Palm Beach County Commercial Boulevard to Broward / Palm Beach County Line: Description: The improvements under this contract include removing old asphalt, resurfacing the roadway, upgrading pedestrian features, including adding sidewalks on both sides and detectable warning surfaces at crosswalks. Other improvements include installing overhead sign structures, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, installing new bus shelters with bicycle racks, trash receptacles, and benches, upgrading drainage structures, upgrading signalization with pedestrian signals, detectors and vehicle video detection, and upgrading lighting. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $13.4 million/Winter 2020 Traffic Impact: • One lane in each direction of State Road 7 between north of NW 31st Street and south of the Broward/Palm Beach County Line will be closed, 9 a.m. until 3 p.m., Monday through Saturday, for the installation of signalization, roadway lighting, and for road widening operations. • One southbound, outside lane on State Road 7 between Commercial Boulevard and NW 31st Street will be closed, 9 a.m. to 3 p.m., Monday through Saturday, for the installation of underground conduit and roadway lighting. • One alternating lane in each direction along State Road 7 will be closed, 9 p.m. to 6 a.m., Monday through Friday between north of NW 31st Street and south of the Broward/Palm Beach County Line for paving operations. • One alternating lane in each direction on Sample Road will be closed at the Sample Road Bridge and SR 7/US 441 intersection, 9 p.m. to 6 a.m., Monday through Friday for paving operations. One lane in each direction along State Road 7/US 441 will be closed intermittently 10 p.m to 6 a.m., Sunday through Friday, for signalization (traffic control cabinet) operations at the following intersections: Sample Road, Cullum Road, Wiles Road, Winston Park Boulevard, Sawgrass Expressway eastbound entrance, Sawgrass Expressway westbound entrance, Regency Lake Boulevard, Johnson Road, Hillsboro Boulevard, and Loxahatchee Road.

11. Sample Road Bus Queue Jump Project from Rock Island Road to SR 5/US 1 in Coral Springs, Margate, Coconut Creek, Deerfield Beach, and Pompano Beach Description: The implementation of bus queue jump operations will allow public transit buses to receive traffic signal priority at intersections ahead of other vehicles. This includes installation of Intelligent Transportation System devices such as bus queue jump lane detectors, electronic signs and other devices to implement bus queue jump operations. In addition, lighting improvements will be added to 19 intersections along Sample Road. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $1.9 million / Winter 2020 Traffic Impact: • One lane in each direction on Sample Road and Powerline Road will be closed, 9 a.m. to 3:30 p.m., Monday through Friday, for electrical work related to lighting installation.

12. University Drive/Oakland Park Boulevard Mobility Improvements in Lauderhill, Lauderdale Lakes, Wilton Manors, Oakland Park, Fort Lauderdale, Tamarac and Sunrise Description: Project improvements include widening, milling and resurfacing, drainage improvements, bicycle lanes, sidewalks, signalization, signage and pavement marking improvements. There will also be pedestrian lighting and drainage upgrades. Oakland Park Boulevard from University Drive to US 1 will include bus shelters and signalization improvements to provide traffic signal priority for buses. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com Cost/Completion: $6.8 million / Fall 2020 Traffic Impact: • One lane in each direction will be closed between Springtree Drive and NW 57th Street on University Drive, 9:30 a.m. to 2:30 p.m., Monday through Friday, for road widening work and electrical, drainage, concrete and landscaping operations. • One lane in each direction will be closed between Springtree Drive and NW 57th Street on University Drive, 7 p.m. to 6 a.m., Monday through Friday, for roadway and drainage work. • One lane in each direction along Oakland Park Boulevard will be closed between NW 31st Court and NW 23rd Terrace, NW 6th Avenue and NW 9th Avenue/Powerline Road, NE 8th Avenue and NE 6th Avenue, NE 15th Avenue and NE 13th Avenue, 9 a.m. to 3 p.m. and 10 p.m. to 6 a.m., Monday through Friday, for work on bus shelters 1023, 2135, 4273 and 4270.

13. North Broward Mobility Improvements Project in Deerfield Beach and Pompano Beach Description: Project improvements in Pompano Beach include adding pavement markings and missing sidewalk on NE 11th Avenue. Project improvements in Deerfield Beach include milling and resurfacing NE 48th Street/NE 49th Street with minor widening to accommodate bike lanes in both directions, adding pavement markings on SE 2nd Avenue, and milling and resurfacing and adding pedestrian lighting on SW 3rd Avenue. Other improvements include curb and gutter, pavers and reconstructed driveways. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482- 4190 or [email protected] Cost/Completion: $4.1 million / Spring 2020 Traffic Impact: • One lane in each direction of SE 3rd Avenue between Hillsboro Boulevard and SE 10th Street will be closed 9 a.m. to 4 p.m., Monday through Friday, for lighting installation and road widening operations. Flagmen will maintain traffic in each direction. • One lane will be closed along Green Road from Powerline Road to Dixie Highway, 9 a.m. to 4 p.m., Monday through Friday, for road widening operations.

14. Hillsboro Canal Fender Repair Project in Deerfield Beach and Boca Raton Description: Project improvements on the Hillsboro Canal Bridge (No. 860259) Project in the cities of Deerfield Beach and Boca Raton in Broward and Palm Beach counties, will include a full replacement of the existing fender system. Other improvements include installing new navigation signage along the canal. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $436,087/Winter 2020 Traffic Impact: • One lane in each direction will be closed along the Hillsboro Canal Bridge, 7 a.m. to 5 p.m., Monday through Friday, for fender installation. Marine Traffic Impact: • During working hours, Monday through Saturday, 9 a.m. to 4 p.m., the navigable channel/waterway under the bridge will be reduced from 40 feet to 30 feet to accommodate the work.

15. Interstate 95 at Davie Boulevard Interchange Safety Improvement Project in Fort Lauderdale Description: Project improvements will include upgrading the existing signalization and lighting along Davie Boulevard, at the I-95 northbound entrance ramp and the northbound and southbound exit ramps. Other improvements include new I-95 overhead signs and milling and resurfacing Davie Boulevard west and east of the I-95 Interchange and the northbound and southbound I-95 exit ramps. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $3.3 million/Fall 2020 Traffic Impact: • All lanes are open.

16. NE 23rd Avenue Bridge Replacement Project in Lighthouse Point Description: This project consists of replacing the existing two-lane bridge over the Ibis Waterway on NE 23rd Avenue from NE 29th Street to NE 30th Street. Improvements will also include signage, paving, restriping, irrigation, lighting, curb and gutter, and new pedestrian facilities to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $2.4 million/Fall 2020 Traffic Impact: • NE 23rd Avenue from NE 29th Street to NE 30th Street, over the Ibis Waterway, will be closed until project completion, for the reconstruction of the NE 23rd Avenue Bridge. o Detour Route: Traveling north from North Federal Highway o Proceed east along NE 24th Street until NE 24th Street turns into NE 22nd Avenue o Proceed north along NE 22nd Avenue and turn west onto NE 27th Court o Proceed west along NE 27th Court and turn north onto NE 20th Avenue o Proceed north along NE 20th Avenue and turn north onto NE 21st Avenue o Proceed north along NE 21st Avenue to Sample Road (end of detour) Traveling south from Sample Road o Proceed south along NE 21st Avenue and turn west onto NE 20th Avenue o Proceed south along NE 20th Avenue and turn east onto NE 27th Court o Proceed east along NE 27th Court and turn south onto NE 22nd Avenue o Proceed south along NE 22nd Avenue and proceed west along NE 24th Street o Proceed west along NE 24th Street to North Federal Highway (end of detour)

17. Lighting Improvements Project in Coral Springs, Margate, Pompano Beach, Deerfield Beach and Fort Lauderdale Description: This project will take place along four major state roads: SR 817/University Drive, SR 834/Sample Road, SR 845/Powerline Road and SR 814/Atlantic Boulevard. The improvements will upgrade illuminations at signalized intersections with new light poles, new light fixtures and retrofit existing lighting fixtures with LED lights. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $1.4 million/Spring 2021 Traffic Impact: • Intermittent single lane closures in each direction along Powerline Road from McNab Road to West Drive will occur from 9 a.m. to 3:30 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas • Intermittent single lane closures in each direction along Atlantic Boulevard from Powerline Road to SR A1A will occur from 9 a.m. to 4 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas • Intermittent single lane closures will occur along University Drive from Riverside Drive to Sample Road will be closed from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits.

18. Lighting Improvements in Tamarac, Lauderhill, Fort Lauderdale, Oakland Park, Lauderdale-by-the-Sea, Lauderdale Lakes, Sunrise and Wilton Manors Description: This project will take place along two major state roads: SR 870/Commercial Boulevard and SR 816/Oakland Park Boulevard. The improvements will upgrade illuminations at signalized intersections with new light poles, new light fixtures and retrofit existing lighting fixtures with LED lights. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $1.8 million/Spring 2021 Traffic Impact: • Intermittent single lane closures in each direction along Commercial Boulevard from NW 70th Avenue to State Road A1A will occur from 9 a.m. to 3:30 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • Intermittent single lane closures in each direction will occur along Oakland Park Boulevard from Atrium West to State Road A1A will be closed from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits.

19. NW 21st Avenue Mobility Improvement/Bridge Replacement Project in Oakland Park, Tamarac and Fort Lauderdale Description: This project will take place along NW 21st Avenue from SR 870/Commercial Boulevard and SR 816/Oakland Park Boulevard. The project consists of adding 5-foot buffered bike lanes in each direction and replacing the existing bridge over the South Florida Water Management District C-13 Canal. Improvements will also include upgrading signalization at NW 39th Street and NW 44th Street, installation of sidewalks and curb ramps with Americans with Disabilities Act (ADA) improvements, milling and resurfacing, and upgrading signing and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $7.2 million/Winter 2021 Traffic Impact: • One southbound lane will be closed intermittently along NW 21st Avenue from Commercial Boulevard to Oakland Park Boulevard, 9:30 p.m. to 6 a.m., Monday through Friday, for mobilization of equipment to the bridge work area.

20. Lighting Improvements in Fort Lauderdale Description: This project will take place along two major state roads: SR A1A and Sunrise Boulevard. The improvements will upgrade illuminations at signalized intersections with new light poles, new light fixtures and retrofit existing lighting. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com. Cost/Completion: $345,927/Spring 2020 Traffic Impact: • One southbound lane will be closed on US 1 from SR A1A to 24th Street, 9 a.m. to 4 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • One southbound lane will be closed on US 1 from SR A1A to 24th Street, 8 p.m. to 6 a.m., Sunday through Thursday, to build lighting structures, install conduits and restore the affected areas.

21. Lyons Road Mobility Improvement Project from the C-14 Canal to the Sawgrass Expressway in the city of Coconut Creek Description: This project consists of widening the roadway to accommodate new bike lanes. Improvements will also include signalization upgrades, sidewalks, miscellaneous signage, paving, restriping, drainage, lighting, bus shelters, curb and gutter, and driveways to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $11,069,050/Early 2022 Traffic Impact: • One lane in each direction will be closed on Lyons Road from the C-14 Canal (500 feet east of Atlantic Boulevard) to Sample Road, 9 a.m. to 4 p.m., Sunday through Friday, for roadway widening and drainage improvements.

22. SR 7/US 441 Pedestrian Safety Enhancement Project from NW 36th Street to NW 41st Street in the city of Lauderdale Lakes Description: This project will address pedestrian safety by constructing a signalized mid-block pedestrian crossing. The mid-block crossing will serve as a connector to the Middle River Trail on the west and east side of SR 7/US 441 between NW 37th Street and NW 41st Street. Improvements will also include eighteen new 15-foot decorative pedestrian light poles primarily on the east side of the roadway to increase visibility between NW 36th Street and NW 41st Street along SR 7/US 441. Cost/Completion: $500,000/Spring 2020 Traffic Impact: • All lanes are open.

23. All Electronic Tolling (AET) Phase 5A from I-595 to s/o Lantana Road Description: Work consists of providing all labor, materials, equipment, and incidentals necessary to continue with the complete conversion of the Turnpike Mainline to an All Electronic Toll (AET) collection system. The overall AET conversion scope includes: milling and resurfacing, drainage improvements, curb & gutter, lighting, highway signing, guardrail, MSE walls, toll facilities and other construction activities on the Florida’s Turnpike from I-595 (milepost 54) to south of Lantana Toll Plaza (milepost 88) for 34 miles in Broward and Palm Beach Counties. It is anticipated that the project will cost $20.4 million and work will continue through summer 2020. For more information, contact Community Outreach Specialist Fiorella Teodista at (954) 934-1130 [email protected]. Cost/Completion: $20.4 million / summer 2020 Traffic Impact: • Northbound and southbound Florida’s Turnpike between south of Commercial Boulevard and south of Sawgrass Expressway will have overnight single and double lane closures, 10 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. • Southbound Florida’s Turnpike entrance ramp from Commercial Boulevard will have overnight full ramp closures, 9 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Commercial Boulevard traffic wishing to enter southbound Florida’s Turnpike will be directed to continue east on Commercial Boulevard to US 441/SR 7, travel south on US 441/SR 7, to Sunrise Boulevard and travel west on Sunrise Boulevard to access southbound Florida’s Turnpike. • Northbound Florida’s Turnpike entrance ramp from Commercial Boulevard will have overnight full ramp closures, 9 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Commercial Boulevard traffic wishing to enter southbound Florida’s Turnpike will be directed to continue east on Commercial Boulevard to US 441/SR 7, travel south on US 441/SR 7 to Sunrise Boulevard and travel west on Sunrise Boulevard to access southbound Florida’s Turnpike. • Northbound Florida’s Turnpike exit ramp to westbound Commercial Boulevard (Exit 62) will have overnight single lane closures, 10 a.m. to 2 p.m., Tuesday, January 21 and daily through Friday, January 24. • Eastbound and westbound Commercial Boulevard between SR 7/US 441 and the toll plaza will have daytime single lane closures, 9 a.m. to 3:30 p.m., Tuesday, January 21 and daily through Friday, January 24. • Eastbound and westbound Coconut Creek Parkway between Coconut Creek Boulevard and NW 27th Avenue will have daytime single lane closures, 9 a.m. to 3:30 p.m., Tuesday, January 21 and daily through Friday, January 24. • Eastbound and westbound Sample Road between Tradewinds Park Road and NW 27th Avenue will have daytime single lane closures, 9 a.m. to 3:30 p.m., Tuesday, January 21 and daily through Friday, January 24. • Eastbound and westbound Atlantic Boulevard in the vicinity of Florida’s Turnpike will have daytime single lane closures, 9 a.m. to 3:30 p.m., Tuesday, January 21 and daily through Friday, January 24.

24. Turnpike & Sunrise Boulevard (Exit 58) Interchange Modifications Description: Florida’s Turnpike is modifying and improving the interchange with Sunrise Boulevard and implementing All-Electronic Tolling at the interchange. It is anticipated that the project will cost $50 million and work will continue through late 2019. For more information, contact Community Outreach Specialist Fiorella Teodista at (954) 934-1130 or [email protected]. Cost/Completion: $143 million / summer 2022 Traffic Impact: • Northbound and southbound Florida’s Turnpike between Sunrise Boulevard (Exit 58) and Broward Boulevard will have overnight double lane closures, 10 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. A third lane in each direction may close beginning at 11 p.m. All lanes will reopen by 5 a.m. • Southbound Florida’s Turnpike entrance ramp from Sunrise Boulevard will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Sunrise Boulevard traffic wishing to access southbound Florida’s Turnpike will be directed to travel east on Sunrise Boulevard to US 441/SR 7 and travel south on US 441 to westbound I-595 to access southbound Florida’s Turnpike. • Northbound Florida’s Turnpike exit ramp to Sunrise Boulevard West (Exit 58A) will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Northbound Florida’s Turnpike traffic wishing to access westbound Sunrise Boulevard will be directed to exit at Commercial Boulevard (Exit 62), travel east on Commercial Boulevard to US 441/SR 7 and travel south on US 441 to access Sunrise Boulevard. • Northbound Florida’s Turnpike exit ramp to Sunrise Boulevard West (Exit 58B) will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Northbound Florida’s Turnpike traffic wishing to access westbound Sunrise Boulevard will be directed to exit at Commercial Boulevard (Exit 62), travel east on Commercial Boulevard to US 441/SR 7 and travel south on US 441 to access Sunrise Boulevard. • Southbound Florida’s Turnpike exit ramp to Sunrise Boulevard (Exit 58) will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Southbound Florida’s Turnpike traffic wishing to access Sunrise Boulevard will be directed to exit at I-595 (Exit 54), travel east on I-595 to US 441/SR 7 and travel north on US 441/SR 7 to access Sunrise Boulevard. • Northbound Florida’s Turnpike entrance ramp from Sunrise Boulevard will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Sunrise Boulevard traffic wishing to access northbound Florida’s Turnpike will be directed to US 441/SR 7, travel north to US 441 to Commercial Boulevard, and travel west on Commercial Boulevard to access northbound Florida’s Turnpike. • Southbound Florida’s Turnpike entrance ramp from eastbound Sunrise Boulevard will have overnight full ramp closures, 11 p.m. to 5 a.m., Monday, January 20, and nightly through Thursday, January 23. o Detour: Eastbound Sunrise Boulevard traffic wishing to access southbound Florida’s Turnpike will be directed to travel east on Sunrise Boulevard to the signalized intersection of the Florida’s Turnpike & Access Road to access southbound Florida’s Turnpike. • Eastbound and westbound Sunrise Boulevard between NW 47 Avenue and NW 56 Avenue will have overnight single lane closures, 7 p.m. to 6 a.m., Monday, January 20, and nightly through Thursday, January 23. If necessary, a second lane will close beginning at 10 p.m. Both lanes will reopen by 6 a.m. Daytime single lane closures, 9 a.m. to 4 p.m., Tuesday, January 21 and daily through Friday, January 24.

Southeast Broward

25. Hollywood Boulevard Complete Streets Project in Hollywood from east of City Hall Circle to Dixie Highway Description: The improvements under this contract include removing old asphalt, resurfacing the roadway, adding decorative lighting, widening sidewalks and adding decorative pattern, upgrading existing pedestrian signals to countdown timers, constructing new median with parallel parking, replacing the existing water main and connections at various cross streets, and upgrading signs and pavement markings to reflect the new roadway configuration as follows: two lanes in each direction throughout the entire corridor, a four-foot bike lane in each direction separated by a two-foot buffer throughout the entire corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $7,667,258.35 / winter 2020 Completed: January 7, 2020

26. A1A Improvements Project from Sheridan Street to Monroe Street in Hollywood Description: Improvements under this project include removing old asphalt and resurfacing the roadway, widening sidewalks and upgrading ramps to meet ADA requirements, replacing drainage structures and installing flap gates, removing, narrowing, and /or upgrading medians and curb and gutter, adding 4-foot bike lanes from Monroe Street to Arizona Street, adding sharrows (share the road pavement markings) from Arizona Street to Sheridan Street, upgrading and installing new pedestrian signals, and minor signalization and street light improvements. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. For more information about the project and monthly updates, please click the following link: http://d4fdot.com/bcfdot/a1a_improvements_from_sheridan_st_monroe_st_hollywood.asp Cost/Completion: $9,366,292.09 / winter 2020 Traffic Impact: • The Hollywood Boulevard and SR A1A entrance and exit ramps will have intermittent full closures, Monday, January 20 through Thursday, January 23 between 9 a.m. and 3:30 p.m. o Detour: o Southbound SR A1A motorists will be detoured via Hallandale Beach Boulevard. Please see detour flyer attached. o Northbound SR A1A motorists will be detoured via Sheridan Street. Please see detour flyer attached. o Eastbound motorists will be detoured via South 7th avenue to make a U-turn towards US 1. Please see detour flyer attached. • Northbound and southbound SR-A1A, between Sheridan Street to Johnson Street, will continue to have intermittent traffic shifts for asphalt paving, through Friday, January 24.

27. SR A1A/Dania Beach Boulevard Mobility Improvements Project Description: The improvements under this contract include installing a 5-foot sidewalk on the south side of the road, widening the bike lanes to 7 feet on the north side and 5 feet on the south side and milling and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,344,114.70 / early 2020 Traffic Impact: • One eastbound lane and shoulder along Dania Beach Boulevard will have intermittent closures as needed, Monday through Friday, until Monday, January 27 for milling and resurfacing.

28. 14th Avenue Mobility Improvements Project Description: The improvements under this contract include widening the roadway to accommodate bike lanes on 14th Avenue, Arthur Street, and Harding Street; adding shared lane pavement markings along 14th Avenue and Harding Street, to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; and installing a shared-use path (off-road path) on Polk Street and 14th Avenue. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $2,099,354 / spring 2021 Traffic Impact: • All lanes are open.

29. SR 858/Hallandale Beach Boulevard Safety Improvements Project Description: The improvements under this contract include milling and resurfacing the existing pavement along Hallandale Beach Boulevard from the SFRC crossing to west of Ansin Boulevard; widening and resurfacing the I-95 northbound off-ramp to Hallandale Beach Boulevard, to provide an additional right-turn lane; widening and resurfacing the I-95 southbound off-ramp to Hallandale Beach Boulevard, to extend vehicle storage capacity of the right-turn lane; upgrading the existing traffic signals at the intersections of Hallandale Beach Boulevard and the I-95 off-ramps; reconstructing the sidewalks and pedestrian crossings on the I-95 northbound off-ramp to Hallandale Beach Boulevard; and upgrading the existing lighting along the I-95 off-ramps to Hallandale Beach Boulevard and underneath the I-95 bridge to LED lighting. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $2,331,387 / spring 2020 Traffic Impact: • Intermittent lane closures will occur along Hallandale Beach Boulevard, from Ansin Boulevard to the SRFC crossing, Sunday through Thursday between 9:30 a.m. and 3:30 p.m., and 9 p.m. and 6 a.m. • Intermittent lane closures will occur on the I-95 exit ramps to Hallandale Beach Boulevard, overnight Sunday through Thursday between 9 p.m. and 5:30 a.m.

30. SR 824/Pembroke Road at Dixie Highway Intersection Improvements Project Description: The improvements under this contract include upgrading signalized intersections to mast arms, installing crosswalks, pedestrian signal crossings and associated curb ramps, upgrading existing lighting to LED and milling and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $ 815,678 / spring 2020 Traffic Impact: • One lane will be closed along Pembroke Road and the Dixie Highway intersection, Monday through Thursday between 10 p.m. and 5:30 a.m.

31. SR 9/I-95 at SR 824/Pembroke Road Interchange Improvements Project Description: The improvements under this contract include widening the I-95 off-ramps at Pembroke Road to accommodate an additional right turn lane; minor shoulder widening of the I- 95 on-ramps at Pembroke Road; upgrading the existing traffic signals at the intersections of Pembroke Road and the I-95 off-ramps; upgrading the existing lighting along the I-95 on and off-ramps at Pembroke Road to LED lighting; reconstructing the sidewalks and pedestrian crossings at the I-95 off-ramps and the I-95 northbound on-ramp at Pembroke Road; milling and resurfacing within the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,465,257 / spring 2020 Traffic Impact: • Intermittent lane closures on the I-95 exit ramps to Pembroke Road will occur overnight, Sunday through Thursday between 9 p.m. and 5:30 a.m.

32. SR 5/US-1 Bus Shelter Improvements Project Description: The improvements under this contract include installing 11 bus shelters along the project limits; upgrading signalization at 18 intersections to provide traffic signal priority for public transit buses; installing a crosswalk, pedestrian signal crossing; and associated curb ramps on SR 5/US 1 at NE/NW 1st Street in the City of Dania Beach. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,034,836 / spring 2020 Traffic Impact: • One northbound lane will be closed along US-1, from east of Northeast 30th Street to north of the Fort Lauderdale-Hollywood International Airport, Monday through Friday, between 9:30 a.m. and 3:30 p.m. • One northbound lane will be closed along US-1 at East of Coolidge Street in the City of Hollywood, Monday through Friday, between 9:30 a.m. and 3:30 p.m. • One lane in each direction will be closed along US-1 and Northwest 1st Street in the City of Dania Beach, Monday through Friday, between 9:30 a.m. and 3:30 p.m. • One northbound lane will be closed along US-1 at Southeast 9th Street in Hallandale Beach, Monday through Friday, between 9:30 a.m. and 3:30 p.m. • One southbound lane will be closed along US-1 from Southeast 9th Street to Southeast 20th Street, through Wednesday, March 11, 2020, between 9:30 a.m. and 3:30 p.m. • One outside lane in each direction will be closed along US-1 from Southeast 9th Street to Southeast 30th Street, Monday through Friday, between 9:30 a.m. and 3:30 p.m.

33. Hallandale Beach Boulevard and NE 14th Avenue Drainage Improvements Description: The improvements under this Districtwide Drainage contract include curb and sidewalk replacement at the NE, NW, and SW corners of the intersection of Hallandale Beach Boulevard and NE 14th Avenue, and asphalt overbuild throughout the intersection. For more information, contact Michael Miller at (954-777-4657) or [email protected] Traffic Impact: • The northbound through lane on NE 14th Avenue will be closed. All northbound movements will be maintained utilizing the southbound left turn lane. All southbound movements on NE 14thAvenue will be maintained utilizing the shared through/right turn lane. • The sidewalk on the northeast corner of the intersection of Hallandale Beach Boulevard and NE 14th Avenue will be closed. Pedestrians will be detoured around the closure area at SE 16thAvenue to the south sidewalk along Hallandale Beach Boulevard. • The outside through lane on westbound Hallandale Beach Boulevard will be closed. Westbound traffic will be channeled into the two remaining through lanes.

Southwest Broward

34. SR 7 / US 441 Improvements Project from Fillmore Street to south of Stirling Road in Hollywood and the Seminole Indian Reservation Description: Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and add pedestrian countdown timers at Johnson Street, Taft Street, and Sheridan Street, installing new signalized intersection and pedestrian countdown timers at Fillmore Street, improving street lighting along the corridor by installing new lighting system along the west side of SR 7/US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $29.6 million / summer 2019 Traffic Impact: • SR 7/US 441 in each direction, from Fillmore Street to south of Stirling Road, may have an intermittent single lane closed daily and nightly, as needed. • SR 7/US 441 in each direction, from Fillmore Street to South of Stirling Road, may have up to two intermittent lanes closed, as needed, Sunday through Thursday between 10 p.m. and 5 a.m. • SR 7/US 441 in each direction, from Fillmore Street to South of Stirling Road, may have up to two intermittent lanes closed over the weekend, beginning Friday night through Monday morning, from 10 p.m. until 6 a.m.

35. NW 136 Avenue and SR-84 Intersection Improvements Project in Davie, Plantation, and Sunrise Description: Project Improvements include: replacing and widening the existing bridge over the North New River Canal, resulting in an additional southbound through lane and designated bike lanes; adding a designated right-turn lane from westbound SR 84 to northbound NW 136th Avenue; upgrading existing lighting to LED; and milling and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $6.4 million / fall 2020 Traffic Impact: • The southbound bridge of 136th Avenue over the New North River Canal has been closed for reconstruction. Southbound 136th Avenue traffic has been shifted east onto the 136th Avenue northbound bridge until spring 2020. • The outside southbound lane along NW 136th Avenue will be closed Thursday, January 16 between 9 p.m. and 6 a.m. for drill shaft installation. • The eastbound right turn lane along SR 84 will be closed Thursday, January 16 between 9 p.m. and 6 a.m. for drill shaft installation. • The westbound and eastbound U-turn along SR 84, to the west of 136th Avenue may be closed Tuesday, January 21 between 12 p.m. and 4 p.m.

36. I-75 Landscaping Improvements Project in Miramar and Pembroke Pines Description: Project Improvements include installing plants throughout the project limits, including several species of palms and shade trees and a temporary irrigation system. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $2.5 million/ summer 2020 Traffic Impact: • All lanes are open.

37. SR 25/US 27 and SR 93/I-75 Interchange Bridge Maintenance Project Description: Project improvements include steel and concrete painting of two bridges: SR 25/US 27 southbound ramp to eastbound SR 93/I-75 (bridge no. 860337) and SR 25/US 27 northbound ramp to westbound SR 93/I-75 (bridge no. 860338). For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,195,515.30 / spring 2020 Traffic Impact: • The outside northbound and southbound lane of I-75 under the US-27 bridges will be temporarily closed through Friday, January 31 at 7 a.m. for bridge painting.

38. City of Hollywood Mobility Improvements Project Description: Project improvements installing bike lanes along Hollywood Boulevard and Park Road; adding shared lane pavement markings along 35th Avenue, Polk Street, Rainbow Drive, Circle Drive, and Van Buren Street to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; installing sidewalks along Fillmore Street, Hollywood Boulevard, and the intersections of Polk Street and Van Buren Street at 24th Avenue; adding a mid-block crossing on Hollywood Boulevard, east of 28th Avenue; relocating the existing water main on the north side of Hollywood Boulevard; and adding french drains on Hollywood Boulevard between Academy Circle and 35th Street, and on Park Road between Washington Street and Johnson Street. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $3,049,774 / fall 2020 Traffic Impact: • The inside lane will be closed in each direction along Park Road, from Washington Street to Johnson Street, during construction. • The outside westbound lane of Hollywood Boulevard from N 35th Avenue to South Academy Circle will be temporarily closed through March 2020, for water main and drainage installations. • The outside southbound lane will be closed along North Park Road, from Johnson Street to Fillmore Street, through Wednesday, January 15, for widening, milling & resurfacing, and concrete drainage improvements. • The inside southbound lane will be closed along North Park Road, from Fillmore Street to Hollywood Boulevard, through Sunday, August 2, for widening, concrete, milling & resurfacing, signing and pavement markings.

39. I-75 Resurfacing Project Description: Project improvements include milling and resurfacing along SR 93/I-75 from the -Dade/Broward County Line to north of Sheridan Street and installing double-face guardrail between the General Use Lanes and Managed Lanes. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $8.5 million / spring 2020 Traffic Impact: • The I-75 Express Lanes in each direction, from the Miami-Dade County Line to Sheridan Street, will have intermittent single lane closures, nightly as needed, Monday through Friday between 9 p.m. and 6 a.m. for miscellaneous pavement and guardrail installation. • I-75 in each direction, from the Miami-Dade County Line to Sheridan Street, will have up to three intermittent lane closures, nightly as needed, Monday through Friday between 9 p.m. and 6 a.m. The first lane will close at 9 p.m., the second lane will close at 10:30 p.m., and the third lane will close at 12:30 a.m. until 5:30 a.m. All lanes will be open by 6 a.m.

40. Southwest Broward Mobility Improvements Project Description: Project improvements include widening the roadway to accommodate 7-foot buffered bicycle lanes and adding sidewalks to create a continuous facility in each direction of SW 56thAvenue; adding shared lane pavement markings in each direction along SW 62nd Avenue and North 64th Avenue to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; and adding sidewalks to create a continuous facility in each direction of SW 62nd Avenue. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 [email protected]. Cost/Completion: $4,993,116 / summer 2021 Traffic Impact: • Sections of the southbound lane will be closed along SW 62nd Avenue, from the County Line Road to Pembroke Road, Monday through Friday, between 7 a.m. and 3 p.m., for shared lane marking installation. Flaggers will be present to direct motorists around the work zone. • Sections of the southbound lane will be closed along N 56th Avenue, from the Stirling Road to Sheridan Street, Monday through Friday, between 7 a.m. and 3 p.m., for drainage improvements.Flaggers will be present to direct motorists around the work zone.

41. Florida’s Turnpike Widening of The Homestead Extension of (SR 821) from I-75 to Turnpike Mainline (SR 91) Description: The Turnpike will be widened from four to eight lanes. Work includes intersection improvements at Red Road/NW 57th Avenue and University Drive/ NW 27th Avenue. Additionally, sound barrier walls will be constructed along qualifying residential areas. Bridge widening, road milling and resurfacing, signage and traffic signal improvements are planned. Construction began in September 2018 will continue through summer 2022. For more information, contact Community Outreach Specialist Yasir Mercado at (954) 934-1138 or [email protected]. Cost/Completion: $143 million / summer 2022 Traffic Impact:

• Northbound and southbound Florida’s Turnpike between I-75 and NW 27 Avenue will have overnight single lane closures, 9 p.m. to 5 a.m., Tuesday, January 21, and nightly through Thursday, January 23.

• Northbound NW 57 Avenue/Red Road in the vicinity of Florida’s Turnpike will have overnight single lane closures, 8 p.m. to 5 a.m., Tuesday, January 21, and nightly through Thursday, January 23. Overnight double lane closures, 10 p.m. to 5 a.m., Tuesday, January 21, and nightly through Thursday, January 23.

• Northbound and southbound Palm Avenue/NW 47 Avenue in the vicinity of Florida’s Turnpike will have overnight full road closure, 8 p.m. to 5 a.m., Tuesday, January 21, and nightly through Thursday, January 23.

o Detour:

o Northbound Palm Avenue/NW 47 Avenue traffic wishing to continue north will be directed to NW 199 Street, travel west on NW 199 Street to Red Road/NW 57 Avenue, travel north on Red Road to Miramar Parkway and travel east on Miramar Parkway to access Palm Avenue.

o Southbound Palm Avenue/NW 47 Avenue traffic wishing to continue south will be directed to Miramar Parkway, travel west on Miramar Parkway to Red Road/NW 57 Avenue, travel south on Red Road to NW 199 Street and travel east on NW 199 Street to access Palm Avenue.

• Northbound and southbound /NW 37 Avenue in the vicinity of Florida’s Turnpike will have overnight full road closure, 8 p.m. to 5 a.m., Tuesday, January 21, and nightly through Thursday, January 23.

o Detour: o Northbound Douglas Road/NW 37 Avenue traffic wishing to continue north will be directed to NW 199 Street, travel east on NW 199 Street to University Drive/NW 27 Avenue, travel north on University Drive to Miramar Parkway and travel west on Miramar Parkway to access Douglas Road.

o Southbound Douglas Road/NW 37 Avenue traffic wishing to continue south will be directed to Miramar Parkway, travel west on Miramar Parkway to Palm Avenue/NW 47 Avenue, travel south on Palm Avenue to NW 199 Street and travel east on NW 199 Street to access Douglas Road.

42. SR 7/US 441 Landscape Improvements Project Description: Project improvements include installing plants throughout the project limits, including several species of palms, shade trees, shrubs, and installing an irrigation system. The project limits extend from Hallandale Beach Boulevard to South of Stirling Road. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,944,667 / fall 2020 Traffic Impact: • All lanes are open.

Maintenance & Permit Projects:

Traffic Impact: One southbound lane of SR-7 at Oakland Park Boulevard will be closed Monday through Friday between 8 a.m. and 5 p.m. until April 10, 2020. For more information about this work, please contact representative, Ralph J. Viola at (954) 357-6373 or [email protected].

Traffic Impact: Southbound North Federal Highway between Sheridan Street and Taylor Street, in Hollywood, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, January 31, 2020, 1 of 3 lanes closed, for closure to tie into the water main. For more information, please contact Bobby Bucci (954) 931-2712.

Traffic Impact: Northbound State Road 7 between Northwest 34th Street and Northwest 37th Street and Eastbound West Oakland Park Boulevard between Northwest 36 Terrace and Northwest 31 Avenue, in Fort Lauderdale, 10 a.m. until 3:30 p.m. and 10 p.m. until 5 a.m., Monday through Friday, through Friday, January 30, 2020, 1 of 3 lanes closed then 2 of 3 lanes closed, for watermain and sanitary sewer installation. For more information, please contact Kyle Larode (954) 275-0408.

Traffic Impact: Northbound South Ocean Boulevard at 3555 South Ocean Boulevard, in Hollywood, 10 a.m. until 3:30 p.m. and 10 p.m. until 5 a.m., through Friday, March 20, 2020, 2 of 3 lanes closed, for overpass pedestrian bridge for structural repairs and painting. For more information, please contact Shavone Butler (954) 462-2355, Tom Gelsomino (954) 325-6099 or Dave Lovins (973) 262-1354.

Traffic Impact: Southbound shared through lane/right turn lane on NE 14th Avenue will be closed. All southbound movements will be maintained utilizing the southbound left turn lane. Northbound traffic on NE 14th Avenue will not be affected. Pedestrians will be detoured around the closure area to the east sidewalk along NE 14th Avenue. For more information, contact Michael Miller at (954) 777-4657 or [email protected]

Traffic Impact: Northbound US 1 between Hollywood Boulevard and Moffett Street, in Hollywood, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, February 13, 2020, 1 of 2 lanes closed, for new watermain installation. For more information, please contact Christopher Mancini (954) 809-8031. Traffic Impact: Westbound Oakland Park Boulevard and Northbound Northwest 9 Avenue, in Fort Lauderdale, 10 a.m. until 3:30 p.m., Monday through Friday, through Friday, February 7, 2020, 1 of 3 lanes closed, please contact Jerry Bridges (239) 994-4835.

Traffic Impact: One northbound lane will be closed along SR 7 at Riverland Road beginning Tuesday, January 21 through Friday, January 24 between 9 a.m. and 4 p.m. For more information, please contact Timothy Butler [email protected]

Traffic Impact: One lane in each direction will be closed along SR 7 at 5th Street, 5th Court, Broward Boulevard, and N Hospital Drive beginning Tuesday, January 21 through Friday, January 24 between 9 a.m. and 4 p.m. For more information, please contact Timothy Butler [email protected]

Traffic Impact: Northbound I-75 in the Southeast quadrant of I-75/Pines Boulevard high mast 86P220, in Pembroke Pines, 8 a.m. until 4 p.m., one day only, Monday, January 27, 1 of 5 lanes closed, for high mast pole repair. For more information, please contact Miguel Sosa (954) 295- 0125. Traffic Impact: Southbound I-95 just South of Sunrise Boulevard bridge 860263, in Fort Lauderdale, 9 p.m. until 12 a.m., one night only, Tuesday, January 28, 1 of 2 lanes closed, for joint repair. For more information, please contact Miguel Sosa (954) 295-0125. Traffic Impact: Southbound South Federal Highway westside between Southeast 16th Court and Southeast 18th Court also Northbound and Southbound South Federal Highway, in Fort Lauderdale, 9 a.m. until 4 p.m., Monday through Friday, Monday, Jan. 27 through Friday, February 21 and Monday, April 20 through Friday, May 29, 1 of 3 lanes closed, for median reconstruction. For more information, please contact Lynne Holden (954) 325-8582. Traffic Impact: Northbound SR 7 between Northwest 26 Street and Northwest 29 Street, in Lauderdale Lakes, 9 a.m. until 4 p.m., Monday through Friday, Tuesday, January 21 through Friday, January 24, 1 of 2 lanes closed, for aerial placement of over lash to fiber optic cable. For more information, please contact Sherell McKay (754) 221-1314. Traffic Impact: Westbound East Sunrise Boulevard between North Flagler Drive and Northwest 8th Avenue, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, January 21 through Friday, February 7, 1 of 3 lanes closed, for conduit installation. For more information, please contact Jay Fisher (321) 423-3980. Traffic Impact: Intermittent eastbound and westbound lanes along Oakland Park Boulevard over bridge ICW (860941) will be closed Thursday, January 23 between 9 a.m. and 3:30 p.m. For more information, please contact Hernan Garcia [email protected].

Traffic Impact: There will be a flagger operation closure along SR A1A Bridge over Boca Inlet (930060) beginning Friday, January 24 between 9 a.m. and 3:30 p.m. For more information, please contact Hernan Garcia [email protected].

FPL Notifications

Traffic Impact: Florida Power and Light Improvements in Hillsboro beach: one northbound lane on Southwest 34th Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information about this work, please contact Area Wide Protective field supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Dania Beach: one westbound lane on Griffin Road from SW 40th Avenue to SW 45th Street will be closed Monday through Thursday between 9 a.m. and 4 p.m. For More information please contact Area Wide Protective field supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in North Lauderdale: one eastbound lane on South State Road 7 from Cypress Lake Town Center to Kimberly Boulevard/SW 11th Street will be closed Monday through Friday between 9 a.m. and 5 p.m. For More information please contact Area Wide Protective field supervisor Shanika Shorter at (561) 302- 0948 [email protected].

Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one westbound lane on SW 12th Street/Jim Moran Boulevard to NW 6th Street will be closed Monday through Friday between 9 a.m. and 3:30 p.m. For More information please contact Area Wide Protective field supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one eastbound lane on Griffin Road from SW 58th Avenue to SW 55th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. For More information please contact Area Wide Protective field supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on Dixie Highway from NE 13th Street to NE 17th Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For More information please contact Area Wide Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale Florida: one westbound lane on Broward Boulevard from Northwest 22nd Avenue to Northwest 27th Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale Florida: one eastbound lane on Dixie Highway from NE 14th Court to NE 16th Place will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on Federal Highway from SE 7th Street to SE 5th Court will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one northbound Lane will be closed from Hillsboro Boulevard to Avenue of the Lakes Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Hallandale Beach: one westbound lane from Southwest 32nd Avenue to South Peters Road Monday through Thursday between 9 p.m. and 5 a.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound lane on Pembroke Road from SW 68th Avenue to SW 64th Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on US 1 from NE 65th Street to SE 15th Street will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on Powerline Road from SW 14th Street to Isles of Capri Boulevard will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Tamarac: one westbound right lane along W Commercial Boulevard from FL Turnpike overpass entrance into Central Park will be closed Monday through Friday 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Janet Campana at (561) 632-1441 or [email protected] Traffic Impact: Florida Power and Light Improvements in Davie: one eastbound lane along Stirling Rd from Pine Island Road to Davie Road will be closed Monday through Friday 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Janet Campana at (561) 632-1441 or [email protected] Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one eastbound right lane along Sunrise Boulevard from NE 9th Street to NE 10th Avenue will be closed Monday through Friday 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Janet Campana at (561) 632-1441 or [email protected] Traffic Impact: Florida Power and Light Improvements in Davie: one eastbound/westbound along Griffin Road from Davie Road to Walsh Road will be closed Monday through Friday 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Janet Campana at (561) 632-1441 or [email protected] Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one southbound right lane along S Federal Highway from SE 2nd Court to SE 10th Street will be closed Monday through Friday 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Jane Campana at (561) 632-1441 or [email protected] Traffic Impact: Florida Power and Light Improvements in Hollywood: one northbound lane on Sheridan Street from N 29th Avenue to N Park Road will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound Lane on S State Rd 7 from Taft Street to Duval Street will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Miramar: one Southbound Lane on Red Road from Miramar Parkway to Street Miramar Boulevard. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one eastbound right lane in the vicinity of 1714 SR 84 from SW 23rd Terrace to SW 15th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact All American BarricadesField Supervisor Janet Campana at (561) 632-1441 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one southbound lane of Federal Highway from SE 4th Court to SE 10th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two southbound lanes of Federal Highway from SE 4th Court to SE 10th Street will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one southbound lane of University Drive from Griffin Road to Stirling Road will be closed Monday through Friday between 9 a.m. and 4 p.m. Two southbound lanes of University Drive from Griffin Road to Stirling Road will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Plantation: one eastbound lane and one westbound lane of W Broward Boulevard from Holly Lane to NW 69th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of W Broward Boulevard from Holly Lane to NW 69th Avenue will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Coconut Creek: one southbound lane of North State Road 7 from West Hillsboro Boulevard to Holmberg Road will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 [email protected].

Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one southbound lane of Federal Highway from SE 7th Street to SE 10th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one westbound lane of NE 14th Street from NE 27th Avenue to NE 23rd Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Cooper City: one westbound lane of Griffin Road from Palm Avenue to Pine Island Road will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one northbound lane and one southbound lane of N Federal Highway from NE 13th Street to NE 16th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of N Federal Highway from NE 13th Street to NE 16th Street will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one northbound lane and one southbound lane of N Federal Highway from NE 21st Street to NE 17th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of N Federal Highway from NE 21st Street to NE 17 Street will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one northbound lane of S Flamingo Road from Griffin Road to SW 34th Court will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes of S Flamingo Road from Griffin Road to SW 34th Court will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Dania Beach/Hollywood: one eastbound lane of E Dania Beach Boulevard from N Ocean Drive to Fronton Boulevard will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes of E Dania Beach Boulevard from N Ocean Drive to Fronton Boulevard will be closed Sunday through Friday 9 p.m. and 5 a.m. One westbound lane of E Dania Beach Boulevard from N Ocean Drive to Fronton Boulevard will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Dania Beach: one southbound lane and one northbound lane of S Federal Highway from SE 3rd Terrace to SE 4th Terrace will be closed Monday through Friday between 9 a.m. and 4 p.m. One southbound lane and one northbound lane of S Federal Highway from SE 3rd Terrace to SE 4th Terrace will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].