All data in this document has been validated by developers and is based on the best available Offshore information at the time of publication regarding their respective projects. As such, this information should be regarded as indicative and subject to change RenewableUK over time. The aim of publishing this information is to Wind provide an insight (as of June 2018) into the timelines Project Intelligence of offshore wind projects in the UK out to 2020 and beyond, showing the progression of the UK’s offshore wind programme, and to support the work of the WEB FORECAST BLOG EXCLUSIVE Project Offshore Wind Industry Council. DATABASE REPORTS QUARTERLY UPDATES FOR MEMBERS ONLY Timelines Our Insight Your Advantage

Get insight on component Exclusively for RenewableUK pipelines and install dates for UK/ members EU turbines, cables, foundations, Global data on offshore wind and substations. Our intel will help contracts, project ownership, you stay ahead of the competition. and generator type Regular analysis, forecasts & reports g Access your Intelligence! events.renewableuk.com/gow18 renewableuk.com/intelligence

June 2017 V1 (Data valid at time of publication) Current Capacity Acknowledgements

Wind Projects Currently in Operation With thanks to developers,

Foundation* the Offshore Wind Industry Council,

The Crown Estate, The Crown Estate

7.16GW 3.24GW 11.46GW and La Tene Maps. operating wind farms wind farms with Reference Round Project Current Phase MW Number of Turbines Grid Connection Monopile Jacket Gravity wind farms under construction planning permission

1 1 Blyth Offshore Operational 4 2 • HVAC 2 1 North Hoyle Operational 60 30 • HVAC 3 1 Scroby Sands Operational 60 30 • HVAC 2.4GW 10.24GW 1GW 4 1 Kentish Flats 1 Operational 90 30 • HVAC 5 1 Barrow Operational 90 30 • HVAC wind farms in the wind farms powers 742,524 planning process in development 6 1 Beatrice Demonstrator Operational 10 2 • HVAC homes per annum 7 1 Burbo Bank Operational 90 25 • HVAC 8 1 Lynn & Inner Dowsing Operational 194 54 • HVAC 9 1 Operational 90 25 • HVAC 10 1 Gunfleet Sands 1 Operational 108 30 • HVAC 10 2 Gunfleet Sands 2 Operational 65 18 • HVAC 11 1 Robin Rigg A&B Operational 174 60 • HVAC 12 2 Thanet Operational 300 100 • HVAC 13 2 Walney (Phase 1 & Phase 2) Operational 367 102 • HVAC 14 1 Ormonde Operational 150 30 • HVAC 15 Demo Gunfleet Sands 3 Operational 12 2 • HVAC 16 2 Greater Gabbard Operational 504 140 • HVAC 17 2 Sheringham Shoal Operational 317 88 • HVAC 18 2 Operational 630 175 • HVAC

19 1 Teesside Operational 62 27 • HVAC

20 2 Lincs Operational 270 75 • HVAC

21 2 Gwynt y Môr Operational 576 160 • HVAC

22 2 West of Duddon Sands Operational 389 108 • HVAC

23 2 Westermost Rough Operational 210 35 • HVAC

24 2 Humber Gateway Operational 219 73 • HVAC

25 Demo Levenmouth Turbine Operational 7 1 •

26 Extn Burbo Bank Extension Operational 258 32 • HVAC

27 Extn Kentish Flats Extension Operational 50 15 • HVAC

28 2 Race Bank Operational 573 91 • HVAC Phases of Offshore Development

29 2 Dudgeon Operational 402 67 • HVAC

30 Extn Galloper Operational 353 56 • HVAC Development Pre-Construction CfD Eligible Data Unavailable at this Time Please note that this data should be considered as indicative and 31 3 Rampion Operational 400 116 • HVAC Consent Application Under Construction CfD Secured Financial Investment Decision is likely to change over time. 32 Demo Hywind Operational 30 5 Consent Evaluation In Full Operation Invitation to Tender

33 Demo Blyth Offshore Wind Operational 41.5 5 •

Wind Projects Currently in Development 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

Foundation*

Reference Round Project Current Phase MW Number of Turbines Monopile Jacket Gravity Grid Connection Avg Water Depth (m) Distance to Shore (km) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

34 STW Beatrice Construction 558 84 • HVAC 18–27 35

35 3 East Anglia One Construction 714 102 • HVAC 4–22 32

36 Extn Walney Extension Construction 659 87 • HVAC 27-36 27

37 Demo Aberdeen Bay (EOWDC) Construction 92.4 11 • HVAC 45 18.4

38 3 Hornsea—Project 1 Construction 1218 174 • • HVAC 30 56

39 Demo Kincardine Phase 1 Consented 2 1 60–80 15 Data unavailable at this time

40 Demo Kincardine Phase 2 Consented 48 6 68–80 15 Data unavailable at this time

41 Demo Dounreay Tri Consented 10 2 60–90 7 Data unavailable at this time

42 3 Moray Firth—East Consented 950 100 • • HVAC 42 22

43 STW Neart na Goithe Consented 448 <64 • HVAC 50 18

44 3 Hornsea—Project 2 Consented 1386 165 • HVAC 36 89

45 2 Consented 860 90 • HVAC 15–24 32–49

46 STW Inch Cape Consented <700 40-90 HVAC 36–63 20 47 3 Dogger Bank Creyke Beck A Consented <1200 <200 HVDC 27 150 CfD Eligible—To be determined by developer 48 3 Dogger Bank Creyke Beck B Consented <1200 <400 HVDC 27 140 CfD Eligible—To be determined by developer 49 3 Dogger Bank Teeside A Consented <1200 <200 HVDC 27 215 CfD Eligible—To be determined by developer 50 3 Sofia Consented <1200 <200 HVDC 28 180 CfD Eligible—To be determined by developer 51 3 Firth of Forth 1—Alpha & Bravo Consented 1050 up to 150 55 40 CfD Eligible—To be determined by developer 52 3 East Anglia Three Consented 1200 100–172 35–45 75 CfD Eligible—To be determined by developer

53 3 Hornsea—Project 3 Planning <2400 <300 30–40 130

54 3 Moray Firth - West Development 800 85 35-54 22.5 Subject to timing of CfD R 3 and 4

55 3 Firth of Forth Phase 2 Development 1800 55 50 Data unavailable at this time 56 3 Firth of Forth Phase 3 Development 800 55 50 Data unavailable at this time 57 3 East Anglia One North Development 800 circa 115 33–59 36 58 3 East Anglia Two Development 900 circa 115 30–72 31

59 3 Norfolk Vanguard Development <1800 90-257 36 67–98 Data unavailable at this time

60 Extn Thanet Extension Development <340 <34 • • 22 14 Data unavailable at this time

61 3 Hornsea - Project 4 Development 1200 55 50 Data unavailable at this time 62 3 Norfolk Boreas Development <1800 Data unavailable at this time Design: www.mikelinsey.com

* Where multiple foundation types are indicated, a mixture of foundation types may be considered, or a decision is pending This document shows that the UK’s offshore sector continues to grow. There is now 7.16GW of offshore wind capacity operational Offshore across 33 offshore wind sites. Since the publication of the 2017 edition of the Timelines 1.8GW of Offshore

generation capacity has come on-line. Beyond this sits a longer term

deployment pipeline into the 2020s. The UK offshore wind industry has Wind Wind committed to work with the UK Government on a transformative Sector Deal, which by 2030 could deliver thousands of additional skilled jobs Project in coastal areas, and billions of pounds worth of export opportunities. Projects Timelines

With this deal the industry aims to generate one third of the UK’s

electricity from offshore wind by 2030. This scaled up ambition, 2018

coupled with the Government’s Clean Growth Strategy, means the industry will more than double its capacity from 13GW deployed or contracted today, to 30GW by 2030.

June 2018 V1 (Data valid at time of publication)

This map shows the geographical location, project 1. Operational – The entire project is 4. CfD Secured – Projects that have name, developer and capacity of the UK’s offshore operational and generating power received a Contract for Difference (CfD)

but have yet to begin construction.

wind farm developments. 2018

2. Under Construction – Offshore 5. CfD Eligible – Projects that are deemed

The chart overleaf shows the current expected construction has commenced but has eligible to bid for a Contract for Difference Timelines delivery timeline for every offshore wind project not yet been commissioned (CfD) are those that have received planning in development in the UK. consent and that have a grid connection Project

date agreed with National Grid.

3. Pre-Construction – Project has

received planning permission, but has not Wind

entered into construction 6. In Planning – Project has applied for

planning consent and is being evaluated

Offshore

7. In Development – Development site/ Hexicon 10MW Dounreay Tri 41 area has been awarded to the developer by The Crown Estate

SSE Renewables

SDIC Copenhagen Infrastructure Partners 588MW Beatrice 34

SSE Renewables 10MW Beatrice Demo 6 Talisman Energy

EDPR 800MW Moray Firth Western Development Area 54

Diamond Generating Europe 950MW Moray Firth Eastern Development Area 1 42 © June 2018 RenewableUK RUK18-000-01 EDPR Engie

Equinor, Masdar 30MW Hywind 32

Vattenfall 92.4MW Aberdeen Bay (EOWDC) 37

2MW Kincardine Phase 1 39 KOWL 48MW Kincardine Phase 2 40

SDIC <700MW Inch Cape 46 51 Firth of Forth Phase 1 1050MW SSE Renewables 55 Firth of Forth Phase 2 1800MW EDF Energy 448MW Neart Na Gaoithe 43 Fluor 56 Firth of Forth Phase 3 800MW

Offshore Renewable Energy Catapult 7MW Levenmouth Turbine 25

1200MW Dogger Bank Teesside A 49 E.ON 4MW Blyth Offshore 1 SSE Renewables

1200MW Dogger Bank Creyke Beck A 47 EDF Energy 41.5MW Blyth Offshore Wind Demo 33 1200MW Dogger Bank Creyke Beck B 48

50 Sofia <1200MW Innogy EDF 62MW Teesside 19 E.ON 174MW Robin Rigg A&B 11 Ørsted Marubeni 23 Westermost Rough 210MW Green Investment Group

61 Hornsea Project 4 1200MW Ørsted 659MW Walney Extension 36 Ørsted 13 Walney 1&2 367MW Ørsted, SSE, OPW PKA 44 Hornsea Project 2 1385MW Ørsted PFA 14 Ormonde 150MW Vattenfall, AMF 53 Hornsea Project 3 <2400MW Ørsted 5 Barrow 90MW Ørsted

22 West of Duddon Sands 389MW Ørsted, ScottishPower Renewables 38 Hornsea Project 1 1218MW Ørsted

26 Burbo Bank Extension 258MW Ørsted, PKA, KIRKBI 24 Humber Gateway 219MW E.ON Innogy Green Investment Group Stadtwerke München GmbH 7 Burbo Bank 90MW Ørsted 45 Triton Knoll 860MW Innogy Siemens Financial Services 576MW Gwynt y Môr 21 GIB 270MW Lincs 20 2 North Hoyle 60MW Greencoat UK Wind 28 Race Bank 573MW Ørsted, Macquarie Capital Innogy 90MW Rhyl Flats 9 Green Investment Bank Green Investment Group, Blackrock 194MW Lynn & Inner Dowsing 8 29 Dudgeon 402MW Equinor, Masdar, Greencoat UK Wind China Resources (Holdings) Company Equinor 317MW Sheringham Shoal 17 Green Investment Group <1800MW Norfolk Boreas 62 TRIG Vattenfall Equitix Ltd <1800MW Norfolk Vanguard 59

E.ON 60MW Scroby Sands 3 ScottishPower Renewables

52 East Anglia 3 1200MW

ScottishPower Renewables 900MW East Anglia 2 58 57 East Anglia 1 North 800MW 35 East Anglia 1 714MW

SSE Renewables, Innogy 504MW Greater Gabbard 16 Innogy Green Investment Group 30 Galloper 336MW DBJ, Ørsted, Marubeni 173MW Gunfleet Sands 1&2 10 Macquarie Capital Sumitomo Siemens Financial Services Ørsted 12MW Gunfleet Sands 3 15

18 London Array 630MW E.ON Vattenfall 90MW Kentish Flats 1 4 Ørsted Masdar Vattenfall 50MW Kentish Flats Extension 27 La Caisse

12 Thanet 300MW Vattenfall 60 Thanet Extension <340MW

31 Rampion 400MW E.ON Green Investment Group Enbridge INC

www.RenewableUK.com The UK’s leading renewable energy trade association