G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J17239 2017 IL 9027 Phase II, Java Road, Glass Wall, Glass Canopy and Aluminium Cladding Sanfield 63,825,017.07 Dec 2018 Design North Point, HK to Podium and Retail (Management) Ltd.

J17238 2017 STTL 248, Siu Lek Yuen, Glass Wall, Window Wall, Shop Front, Alum. Sanfield 25,520,985.00 April 2018 Design Shatin, N.T Cladding, Grille, Metal / Glass Canopy to Podium (Management) Ltd.

J17237 2017 Church Lane, Shau Kei Wan, Curtain Wall and Alumnium Works for Podium, Sanfield 43,184,807.00 April 2018 Design Hong Kong Entrance Lobby and Clubhouse (Management) Ltd.

J17236 2017 HVRC 2017 - Grandstand 1F Renovation Works at M3 - 3/F & M2-4/F to 6/F IBI Hong Kong Limited 3,421,891.00 Completed Completed BH & MS III 3F at Happy Valley Racecourse

J17235 2017 STRC 2017 - GS1 1F Member Glass and Metal Works Design Unlimited 4,153,390.00 Dec 2017 WIP Betting Hall in Shatin Company Limited Racecourse

J17233 2017 Happy Valley Clubhouse Curtain Wall Hip Hing Construction 104,000,000.00 Jan 2019 Design Extension at 25 Shan Kwong Co., Ltd. Road, Happy Valley , HK

J17232 2017 Sai Lau Kok Garden Conical Feature Works Junic Construction Co., 1,271,380.00 May 2018 Design Ltd.

J16231 2016 Taikoo Place Phase 2B Demolition and Associated A&A Works Swire Properties 7,642,613.60 Dec 2017 WIP Development at Taikoo Place, Limited Island East, Hong Kong

J16230 2016 NKIL6333 Nam Cheong Station, Covered Walkway at 5/F Podium Sanfield (Management) 11,304,147.44 Oct 2017 WIP Ltd.

J16229 2016 Hermes Hong Kong Elements Internal Façade Hermes Hong Kong 1,207,084.60 Nov 2017 WIP

J16228 2016 Happy Valley Racecourse Glass Wall, Balustrade and Alum. Cladding Hong Kong Jockey 2,865,710.00 Completed Completed Club

- Page 1 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J16227 2016 NKIL 6333, Nam Cheong Design, Supply & Installation of Glass Wall at 5/F Lift Sanfield (Management) 10,534,760.00 Dec 2017 WIP Station, Kowloon Lobby Tower 1-5 and Block L1-L6 Ltd.

J16226 2016 YLTL 507 CDA15, , Design, Supply & Installation of Aluminium Cladding Sanfield (Management) 1,700,000.00 - Completed N.T to Shuttle Lift Lobby Ltd.

J16225 2016 Taikoo Place Phase 2A Design, Supply & Installation of Podium Glass Wall Swire Properties 198,973,020.00 June 2018 WIP Development Limited

J16223 2016 NKIL 6333, Nam Cheong Design, Supply & Installation of Glass Wall, Skylight, Sanfield (Management) 107,118,812.38 Dec 2017 WIP Station, Kowloon Canopy, Cladding & Footbridge Ltd.

J15222 2015 Tseuk Luk Street, San Po Kong, Design, Supply & Installation of Glass Wall, Glass Sanfield (Management) 19,251,457.05 - Completed Kowloon Screen, Glass Balustrade, Glass Cladding, Alum. Ltd. Cladding & Lighting System to Podium

J15221 2015 No. 133, Wai Yip Street, Kwun Supply and Installation of Glazing Works for Show Design Unlimited 2,096,940.00 - Completed Tong Office Company Limited

J15220 2015 Ocean Terminal Extension and External Façade Works Estates 78,708,125.00 - Completed Alteration and Additiona Works Limited to Existing Ocean Terminal, Tsim Sha Tsui, Kowloon

J15219 2015 , Yuen Dismantling, Supply & Installation of Glass Panel to Sanfield (Management) 857,300.00 - Completed Long, N.T Existing Window Wall Ltd.

J15218 2015 Lot 1927, DD107, Sha Po North, Design, Supply & Installation of Glass Wall and Door, Sanfield (Management) 28,191,379.20 - Completed Phase 1B, Canopy and Aluminium Works to Clubhouse Ltd.

J15217 2015 No. 680 Castle Peak Road, Design, Supply & Installation of Curtain Wall, Sanfield (Management) 28,941,013.00 - Completed Kowloon Aluminium Louvres, Windows, Cladding and Glass Ltd. Balustrade to Podium and Tower

- Page 2 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J15216 2015 HVRC Infield Car Park at Happy Design, Supply and Installation of Cladding Wall Hong Kong Jockey 759,691.00 - Completed Valley Racecourse 2015 Club

J15215 2015 Pak Hop Restaurant & Bauhinia Façade Works and Glass Balustrade of Renovation Hong Kong Jockey 550,187.00 - Completed Restaurant at 4/F Grand stand 1 Works Club Shatin Racecourse 2015

J15213 2015 YLTL507, CDA15, Yoho Town Supply & Installation of Glass Wall, Glass Feature Sanfield (Management) 16,602,844.50 - Completed Phase 3, Yuen Long, N.T and Aluminium Fins at 5/F Lobby Limited

J15212 2015 Lot 36, Town, N.T Design, Supply & Installation of Curtain Wall, Glass Sanfield (Management) 47,340,750.00 - Completed Wall and Aluminium Works to Podium Limited

J14211 2014 TKO66A, Lot 113, Tseung Kwan Supply & Installation of Curtain Wall & Aluminium Chun Fai Construction 18,422,522.70 - Completed O, N.T Works at FB2 Company Limited

J14210 2014 TKO66A, Lot 113, Tseung Kwan Supply & Installation of Curtain Wall & Aluminium Chun Fai Construction 33,117,438.00 - Completed O, N.T Cladding at Podium Company Limited

J14209 2014 TKO66C1, Lot 114, Tseung Supply & Installation of Glass Wall & Aluminium Sanfield 8,591,018.60 - Completed Kwan O, N.T Cladding at Podium (Management) Ltd.

J14208 2014 Proposed Hotel Development at Supply & Installation of Curtain Wall and Cladding Sure Luck 10,800,000.00 - Completed 8A - 8B Wing Hing Street, North System Development Limited Point, HK

J14207 2014 YLTL507, CDA15, Yoho Town Supply & Installation of Curtain Wall, Glass Wall, Sanfield (Management) 58,455,000.00 - Completed Phase 3, Yuen Long Skylight & Aluminium Cladding for Footbridge Ltd.

J14206 2014 Sun Yuen Long Centre A&A, Supply & Installation of Curtain Wall, Glass Wall, Sanfield (Management) 55,463,287.25 Sept 2018 WIP Yuen Long, N.T Aluminium Cladding & Louvre Ltd.

- Page 3 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J14205 2014 Sha Po North, Kam Tin, N.T Supply & Installation of Glass Wall, Glass Doors, Chun Fai Construction 46,300,000.00 - Completed Skylight, Aluminium Cladding and Featue to Podium Company Limited

J13203 2013 , Mongkok, Supply & Installation of Curtain Wall at L2 - L12 Sanfield (Management) 11,529,895.76 - Completed Kowloon, HK Ltd.

J13202 2013 22 Chun Cheong Street, Tseung Design, Supply, Delivery and Installation of Glass Towngas 9,980,000.00 - Completed Kwan O Industrial Estate Curtain Wall System Telecommunication Tseung Kwan O - T.K.O.T.L. Fixed Network Limited 39s D ss. 3 & Extension Thereto

J13201 2013 CHANEL, Canton Road, TST, Design, Supply and Installation of Shopfront and Design Unlimited Co., 2,290,140.00 - Completed HK Granite Sub-Frames Ltd.

J13200 2013 YLTL507, CDA15, Yoho Town Supply & Installation of Curtain Wall, Glass Wall, Sanfield 94,076,437.30 - Completed Phase 3, Yuen Long Aluminium Cladding & Louvres for Podium (Management) Ltd.

J13199 2013 G/F - 2/F, 15-21 Fa Yuen Street, Design & Supply of New Façade and Signboards Nike Hong Kong 3,000,000.00 - Completed Mongkok, Kowloon Limited

J13198 2013 Grand Century Place, Mongkok, Supply & Installation of External Louvre, Window and Sanfield 1,359,570.00 - Completed Kowloon Aluminium Cladding at L3 - L4 (A&A Works) (Management) Ltd.

J13197 2013 One & Two Pacific Place Design, Supply and Installation of Glass Wall System Pat Davie Ltd. 15,284,720.00 - Completed

J13196(7) 2013 TKO66B, Tseung Kwan O, N,T Design, Supply & Installation of Glass Wall, Sanfield (Management) 13,900,991.00 - Completed Aluminium Louvre and Cladding to FB7 Ltd.

J13196 2013 TKO66B, Tseung Kwan O, N,T Design, Supply & Installation of Glass Wall System Sanfield (Management) 29,327,788.00 - Completed to Podium Ltd.

43,228,779.00

J13195 2013 DD109, Lot 2099, Ha Ko Po Supply and Installation of Additional Aluminium & Chun Fai Construction 15,936,120.00 - Completed Tsuen, N.T Glass Cladding Company Limited

- Page 4 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J12194 2012 De Ricou Serviced Apartment at Design, Supply and Installation of Glass Wall, HSH Management 2,013,430.00 - Completed 109 Repulse Bay Road, Hong Windows, Doors and Louvres at Tower 2,3 & 4 and Services Ltd. Kong Changing Room Corridor

J12193 2012 FSSTL202, Fanling, N.T Supply & Installation of Curtain Wall, Glass Wall, Sanfield (Management) 12,395,955.90 - Completed Contract No. P120419 Aluminium Grille, Louvre & Cladding for Podium Ltd

J12192 2012 Ocean Gallery and Ocean Glazing and Cladding Works Hsin Chong 30,085,740.00 - Completed Centre, Tsim Sha Tsui, Construction Kowloon (Phase 2) (Engineering) Ltd.

J11191 2011 De Ricou Serviced Aluminium Windows, Doors and Louvre HSH Management 21,500,000.00 - Completed Apartment at 109 Repulse Services Ltd. Bay Road, Hong Kong

J11190 2011 DD109, Lot 2099, Ha Ko Supply & Installation of Glass Wall & Skylight Chun Fai 29,793,380.00 - Completed Po Tsuen, N.T to Podium Façade and Club House Construction Company Limited

J11189 2011 Marco Polo Hong Kong Visual Mock Up Harbour City 548,170.00 - Completed Hotel, Harbour City, Estate Limited Canton Road, Kowloon, HK

J11188 2011 Infinitus Plaza, 199 Des Podium Façade Mock Up LKK Health 1,020,000.00 - Completed Voeux Road, Central, Products Group Hong Kong Ltd.

J11187 2011 Proposed A & A Works at Design, Supply and Installation of Glass Harbour City 5,849,530.00 - Completed B/F - 5/F, Gateway Hotel Box at Entrance of 1/F Hotel Lobby and Management Block C & G/F Gateway II 3/F Restaurant Limited Harbour City, Canton Road, Tsimshatsui, Kowloon

J11186(6) 2011 Footbridge (FB6) for Supply & Installation of Glass and Aluminium Sanfield 19,780,381.00 - Completed TMTL 447, Tuen Mun, Cladding Enclosure, Internal Ceiling, Grilles (Management) N.T. & Glass Balustrade for Footbridge (FB6) Ltd.

J11186(4) 2011 Footbridge 4 for TMTL 447, Supply & Installation Glass Wall, Skylight Sanfield 10,412,048.00 - Completed Tuen Mun, N.T & Cladding for Footbridge (FB4) (Management) Ltd.

J11186(P) 2011 T1 to 8 Tower Entrance Supply and Installation of Podium Façade Sanfield 91,971,000.00 - Completed and Podium Club House (Phase 1) (Management) TMTL Mun, N.T. Limited

J11185 2011 Nike Retail at Nelson Design & Supply of New Façade and Signboards Nike Hong Kong 1,300,000.00 - Completed Street / Fa Yuen Street, Limited Kowloon

- Page 5 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J11183 2011 Term Contract for Glass Wall Design, Supply and Installation of Glass Wall, The Hong Kong 132,000,000.00 - Completed at Happy Valley Racecourse Glass Balustrade and Metal Cladding Jockey Club and Sha Tin Racecourse of the Hong Kong Jockey Club 2011-2014

J10182 2010 Proposed Residential Design, Supply and Installation of Curtain China Overseas 37,545,448.00 - Completed Development at TPTL Wall and Glass Wall Building - Bordon No. 186, Pak Shek Kok Joint Venture Development Area, Phase I, Site B, Tai Po, NT

J10181 2010 Revitalization of CITIC Modification of Curtain Wall and New Martin Construction 4,390,000.00 - Completed Tower at 1 Tim Mei Curtain Wall / Glass Wall Installation Co., Ltd. Avenue, Central, HK

J10180 2010 KIL11195, Larch Street Design, Supply and Installation of Acrylic Sanfield 1,110,200.00 - Completed & Fir Street, , Panel for Swimming Pool (Management) Kowloon Limited

J10179 2010 Provision of a Permanent Design, Supply and Installation of W. Hing Construction 2,900,000.00 - Completed Planning & Infrastructure Moisture Barrier Co., Ltd. Exhibition Gallery at City Hall Annex, Edinburgh Place (Contract No. AL T315)

J10177 2010 Footbridge Lift Shaft for Design, Supply & Installation of Glass Harbour Vantage 2,790,000.00 - Completed Western Harbour Crossing Enclosure Management Ltd. Scheme 4 Traffic Improvement Works

J10176 2010 Nos. 24-32 Ming Yuen Design, Supply and Installation of Bond Star 9,144,920.00 - Completed Western Street, Podium Façade Development North Point, Hong Kong Limited

MOP J10175 2010 Mass Gaming Hall for Design, Supply and Installation of Stained Galaxy 16,300,000.00 - Completed Building C at Galaxy Glass Dome Ceiling Entertainment Resort & Casino at Group Cotai City, Macau

J10173 2010 Pacific Place Mall Design, Supply and Installation of Swire Properties 7,051,950.00 - Completed Contemporisation Pacific Bubble Lift Glass Enclosure and Profile Limited Place, 88 , HK Aluminium Cladding at Mall Spine Mall Interior Improvement Works Mall Spine Bubble Lifts

J10172 2010 Shatin Racecourse for Design, Supply and Installation of Glass The Hong Kong 2,809,060.00 - Completed The Hong Kong Jockey Wall, Glass Balustrade and Aluminium Jockey Club Club Cladding

- Page 6 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J10171 2010 Po Yip Street, Yuen Long Supply & Installation of Glass Wall, Sanfield Engineering 11,352,000.00 - Completed N.T Canopy & Skylight at Podium & Simplex Construction Ltd. Floor

J10170 2010 CDA12, Yoho Town P2, Supply and Installation of Glass Wall, Sanfield 8,924,978.00 - Completed Yuen Long, N.T Alum Features to Podium Façade Engineering Construction Ltd.

J10169 2010 Development at Design, Supply & Installation of Curtain Wall, Yee Fai Construction 1,728,903.00 - Completed NKIL 6308, San Po Kong, Window Wall & Glass Wall Co., Ltd. Kowloon, Hong Kong

J10168 2010 Permanent Planning Design & Build Curtain Wall, Folding Door W. Hing Construction 6,841,070.00 - Completed Infrastructure Exhibition System, Skylight and Glass Balustrade Company Limited Gallery at City Hall Annex, Central

J10166 2010 K-Point Shopping Centre, Supply and Installation of Aluminium Sanfield 2,704,336.00 - Completed Tuen Mun, N.T Cladding & Spider Glass Wall Engineering (屯門錦華廣場) Construction Ltd.

J09165 2009 West Island Line Design, Supply & Installation of Curtain Wall, Sun Fook Kong 12,162,590.00 - Completed Re-Provisioning of HK Canopy, Staircase Glass Enclosure & Construction Limited Central Dental Laboratory Glass Balustrade to the New Wing Building

J09163 2009 CDA12, Yoho Town P2, Supply & Installation of Aluminium Feature Sanfield 13,128,204.00 - Completed Yuen Long, N.T Wall Façade to Podium (Management) (新時代廣場2期) Limited

J09162 2009 YLTL 504, CDA 12, Design, Supply & Installation of Glass Wall, Sanfield 55,369,958.00 - Completed Yoho Town, Phase II Curtain Wall & Cladding Works (Management) Yuen Long Limited (新時代廣場2期) J08161 2008 6/F, 7/F & 8/F of Grandstand Design, Supply and Installation of Glass Wall, The Hong Kong 33,605,529.00 - Completed 1 in Shatin Racecourse Glass Balustrade and Aluminium Cladding Jockey Club (沙田馬場)

J08160 2008 TMTL 447 KCRC Station Design, Supply & Installation of Aluminium Sanfield 12,516,465.00 - Completed Entrance and Footbridge and metal works (Management) Limited

J08159 2008 Pacific Place Mall Supply & Installation of Half Hour FRP Swire Properties 47,569,823.00 - Completed Contemporisation Pacific Walkable Glass Floor Limited Place, 88 Queensway, HK Mall interior improvement works package Avenue of light "AOL"

J08158 2008 "Domani" Italian Restaurant, Supply and Installation of Glass Canopy Swire Properties 4,627,286.00 - Completed Pacific Place Mall Limited Contemorization

- Page 7 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J08157 2008 Hong Kong Jockey Club Glass Wall Extension at Balconies of HVRC Hong Kong 6,417,528.00 - Completed Members Stand 1 Building M1 6/F & 7/F and Glass Canopy Extension Jockey Club at Happy Valley at HVRC M1 5/F Nominated Subcontract for Extension of 6/F & 7/F Owner Box at members stand 1 building at Happy Valley Racecourse

J08156 2008 World Trade Centre at New Façade for Podium Sanfield 15,819,755.00 - Completed 280 Gloucester Road, (Management) Causeway Bay Limited

J07155 2007 Administration Building of Repair Works to Curtain Wall System Architectural 1,530,000.00 - Completed Aberdeen Tunnel, Service Wong Chuk Hang, HK Department

J07154 2007 Atrium Hotel at Pacific Supply & Installation of Operable Hsin Chong 3,187,350.00 - Completed Place, 88 Queensway, Windows to Existing Curtain Wlal Construction (Asia) Hong Kong Limited

J07153 2007 Nike Shop, Canton Road, Supply & Installation of Curtain Wall, Nike Hong Kong 3,195,078.00 - Completed Hong Kong External Signage System and Internal Limited Shopfront

J07152 2007 "Domani" Italian Restaurant, Design, Supply and Install Antique Brass Swire Properties 5,249,971.00 - Completed Pacific Place Mall Cladding, Glass Enclosure and Glass Limited Contemorization Canopy

J07151 2007 Peak One, Shatin Design, Supply and Install Lobbies & Club Sanfield 15,000,000.00 - Completed (一號雲頂) House Glass Wall, Skylights and Metal (Management) Canopies Limited

J07150 2007 Venetian Orient - Parcel Design, Supply & Install of Skylights and Venetian Orient MOP - Suspended 5 & 6 Macau Support Steelwork Limited 66,500,830.00

J07149 2007 , Construction of Curtain Wall MTR Corporation 9,400,572.00 - Completed Tsuen Wan Limited

J07148 2007 San Po Kong - Mock Up Aluminium Works Sun Hung Kai 1,576,730.00 - Completed P07066 Properties Limited

J07147 2007 Rocky Bank Replacement of Glass Balustrade and Swire Properties 2,410,625.00 - Completed Window Pane at House 1 to House 6 Limited

J07146 2007 Flonent Rise Tower, Design, Supply and Installation of Curtain Chun Yip 28,030,000.00 - Completed Cherry Street, West Wall, Glass Wall, Glass & Metal Feature, Construction Co., Ltd. Kowloon Window & Louvers for Podium Works (海桃灣)

- Page 8 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J07145 2007 Coastal Skyline Phase 4 Design, Supply and Install Lobbies Glass Tung Chung Station 10,624,730.00 - Completed Le Bleu Deux Wall, Covered Walkway and Glass Development (藍天海岸4期水藍天岸) Balustrade Company Ltd.

J07143 2007 Existing Buildings and Design, Supply and Install Natural Anodized Swire Properties 15,270,233.00 - Completed New Footbridges for Aluminium Footbridge / Wall Claddings, Management Ltd. the Target Cost Contract Rigidal Aluminium Roof, Glass Wall, for Taikoo Place Linkage Skylight and Glass Balustrade

J07142 2006 Alterations and Additions Design, Supply & Installation of Curtain Walls, Limited 5,498,106.00 - Completed Works at B/F to 3/F(Cinema Glass Walls, Metal Cladding, Louvres & Portion) Silvercord, 30 Associated Works Canton Road, Tsim Sha Tsui, Hong Kong

J06141 2006 Conversion of Existing Design, Supply and Installation of Hong Kong Jockey 1,157,350.00 - Completed Facilities at M2 7/F & 8/F Glass Wall and Glass Balustrade Club and M3 9/F in Happy Valley Racecourse and D710 & D711 at Shatin Racecourse for The Racecourse Club

J06138 2006 Supply and Installation of Billboard Sun Hung Kai 1,660,893.00 - Completed Properties Limited

J06136 2006 Silvercord, 30 Canton Road, Design and Supply of Curtain Wall Silvercord Limited 2,920,150.00 - Completed Tsim Sha Tsui Kowloon, Alterations & Additions Works Phase II

J06135 2006 ICAC Headquarters Building Design, Supply and Install Podium Curtain Shui On 7,837,552.00 - Completed at Java Road, North Point, Wall, Aluminium Claddings and Glass Construction Hong Kong, ASD Contract Canopy Company Limited No. SS M319

J05133 2005 "Champion Circle" - 3/F Design, Supply, Delivery and Installation Hong Kong 2,632,020.00 - Completed Grandstand 1 Shatin of Skylight System Jockey Club Racecourse for The Hong Kong Jockey Club

J05132 2005 Proposed Development at Design, Supply and Installation of Window Global Linkage 2,813,630.00 - Completed 23-29 Wing Fung Street, Wall and Glass Wall Investment Limited Wanchai, Inland Lot 526

J05130 2005 "The Beverly Hills" - Design, Supply and Installation of Glass Wealth Team 1,716,380.00 - Completed Residential Development Wall, Skylight, Trellis, Metal Railing and Development Ltd. at TPTL 161 (Phase 3), Glass Balustrade (Henderson) Tai Po, N.T. Giant House AN102, 103 & 105 & 108

- Page 9 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J05128 2005 HVRC Owner's Design, Supply and Install of Low-E Hong Kong 21,921,289.00 - Completed Redevelopment - Member Laminated Glass Enclosure and Glass Jockey Club Stand I Building (Phase A) Balustrade at Happy Valley Racecourse Hong Kong

J05127 2005 The Peak Tower Design, Supply and Install Glass Walls, Peak Tramways 22,999,378.00 - Completed Revitalisation at 128 Peak Skylight, Metal Canopy and External Glass Company Limited Road, R.B.L. 1104, The Balustrade Peak, Hong Kong

J04121 2004 Stanley Complex Design, Supply and Install Curtain Wall, Nishmatsu 10,623,936.00 - Completed Skylights, Glass Floor, Observation Lift Glass Construction Co Enclosure and Electrical Sunshading Ltd.

J04118 2004 Dr. Stephen Hui Geological Design, Supply and Installation of Window Lisco Engineering 100,000.00 - Completed Museum at PE & 1/F Wall Limited

J04115 2004 "Beverly Hill" - Residential Design, Supply and Installation of Glass Wall, Henderson Real 2,561,066.72 - Completed Development at Tai Po Aluminium window, aluminium sliding door, Estate Agency Town Lot No. 161 Phase 3 glass balustrade, terracotta cladding and Limited House A4N Sam Mun trellis, skylight Tsai Road, Tai Po., N.T

J04110 2004 Proposed Residential Design, supply and installation of Curtain Kerry Properties 8,902,702.00 - Completed Development at 15 Ho Wall, Glass Walls, Canopies, Cladding (HK) Ltd. Man Tin Hill Road, for Podium & Roof Feature Kowloon on KIL No. 3389 R. P.

J04108 2004 Newton Place Hotel - Design, Supply & Installation for the Henderson Real 6,803,415.00 - Completed 165 - 167, Wai Yip Street Curtain Wall, Aluminium Windfow, Louvre Estate Agency 66 How Ming Street, and Cladding Limited Kwun Tong

J04105 2004 "The Arch" - Design, Supply and Install Curtain Wall and Tamworth 7,743,677.00 - Completed Package 3 at KIL 11080 Glass Balustrades at Club House, Tower Development at Club House, Kowloon Lobbies Glazing and Revolving Doors Limited (凱旋門)

J04103 2004 Construction of Design and Build of Covered Walkway Shui On Building 2,000,000.00 - Completed Redevelopment of Lam Tin Contractors Estate Phase 6 Contract No. Limited 68 of 1999

J04102 2004 Dr. Stephen Hui geological Design, Supply and Installation of Window PCMH Limited 1,256,230.00 - Completed Museum at James Lee Cladding Building, The

J03100 2003 The Proposed Main Office Design, Supply and Install Curtain Wall, Penta-Ocean 10,600,000.00 - Completed Building at Container Metal Grille and Skylight Construction Terminal 9 (South) TYL-9 Limited

- Page 10 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J03 95 2003 Wanchai Road / Tai Yuen Design, Supply ad Installation of Curtain W. Hing 4,588,570.79 - Completed Street - H9 at Wanchai, Wall, Skylight, Canopy, Aluminium window Construction Co., Hong Kong & Louvre, Shop Front, Balustrade, Aluminium Ltd. Cladding, FRP Window

J03 93 2003 Contract No. SSH346 - Design, Supply and Installation of Glass Hip Hing - 2,538,591.50 - Completed Police Headquarters Phase Balustrades at ST-14, ESC-1 & ESC-2 China State Joint III Balustrades at ST-14, Venture EST-1 & ESC-2

J03 90 2003 "Sunny Bay Station" - Design, Supply and Install Glass Wall, MTR Corporation 5,690,000.00 - Completed Contract No. 580 Obervation Lift Glass Enclosure and Skylights Limited

J02 89 2002 Enterprise Square III Office Design, Supply and Install Glass Wall, Prismatic Limited 16,200,000.00 - Completed Development at N.K.I.L. Metal Cladding, Metal Grilles, Fire Rated 5877, Kowloon Bay, Glass and Metal Roof at Podium Kowloon

J02 87 2002 "" - K.T.I.L 750 on 416 Design, Supply and Install Glass Wall and Sun Hung Kai 5,710,000.00 - Completed 424 Kwun Tong Road, Skylight to Atrium Properties Ltd. Kwun Tong, Kowloon (Yee Fai Construction Co Ltd.)

J02 86 2002 KCRC CC-230 Light Rail Design, Supply and Install KALZIP Hang Yue 1,011,351.10 - Completed Civil, Permanent Way Standing Seam Metal Roof, Curtain Wall, Engineering Ltd. Traction Power and Windows and Wall Claddings Overhead Line Customer Services Centre, Traffic Office and Cleaner's Room

J02 84 2002 "" - Design, Supply and Install Curtain Wall, E-Man 13,000,000.00 - Completed Residential Development Aluminium Cladding and Glass Balustrade Construction Co. I.L. 8955, Sai Wan Ho, Limited Hong Kong (嘉亨灣)

J02 83 2002 Proposed Commercial Window Wall, Glass Balustrade and W. Hing 1,121,642.00 - Completed Development at J/O Canopy Installation Construction Fu Hing Street & San Company Limited Hong Street, Lot 3597 R.P. In D.D. 91, Sheung Shui, N. T.

J02 82 2002 "The Arch" - Airport Railway Design, Supply and install of Glass Wall YKK AP Hong 4,670,322.13 - Completed Kowloon Station Kong Limited Development KIL 11080, Site C Package 3 Development

J02 79 2002 SSK 432 Primary School Design, supply, installation of glass Citic Cuo Hua 1,850,000.00 - Completed at Sze Mei St, canopy, unitized skylight system on International San Po Kong glass flooring skylight on roof Contracting (Overseas) Ltd.

- Page 11 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J02 78 2002 IFC, Hong Kong Design, Supply and Install Glass IFC Development 7,480,000.00 - Completed Northern Site Footbridge Coverwalkway, Glass Balustrade, Aluminium Limited FB4 Cladding Claddings and Fall Arrested System

J02 77 2002 KCRC East Rail Extensions Design, supply, installation of entrance Gammon - 8,880,000.00 - Completed Contract No. HCC300/302 glaze wall lift shaft glazing and steel Nishimatsu Joint structure, glass balustrade and barrier, Venture polycarbonate shelter, fire rated glazed doors

J01 73 2001 Tung Chung Station Supply and Installation the Glass Wall, S & D Limited 17,931,488.00 - Completed Development Package 2, Skylight, Canopy & Balustrade Hong Kong

J01 71 2001 Police Headquarters Design, Supply and Installation for the Permasteelisa 14,293,447.00 - Completed Phase III, Arsenal Street, Fire Stair Glass Wall, Canopies, Link Hong Kong Wanchai Bridge glass enclosure and roof cladding, Limited Lift glass enclosure and Skylight at 42/FL

J01 70 2001 Footbridge Across Wong Design, Supply and Installation of Curved Kwan Kee 570,000.00 - Completed Chuk Hang Road, Glass Wall at Lift Shaft Construction Ltd. Aberdeen

J01 68 2001 West Rail Contract No. Design, Supply and Installation of AMEC - Hong Kong 14,707,750.00 - Completed CC-202, Yuen Long & Curtain Wall System, Glass Balustrade, Construction Canopy, FRP Glazing & Glass Lift CC-202 Joint Venture Shaft.

J01 67 2001 Entertainment Building Main Entrance Glass Wall and Doors South Eagle 1,185,701.00 - Completed Podium Refurbishment Investments Ltd.

J01 66 2001 Residential / Retail Design, Supply and Installation of YKK AP 2,110,900.00 - Completed Development at Lot No. Glass Wall. Hong Kong Ltd. 266, Sham Tseng, N.T.

J00 63 2000 KCRC West Rail Design, Supply and Install Glass Wall, Penta-Ocean-Kier 7,250,000.00 - Completed Contract No. CC-300 Canopy, Fire Rated Glass & Kiosks Joint Venture Tsuen Wan Station and Approach Tunnels

J00 62 2000 Residential Development Design, Supply and Installation of Henderson Land 1,200,000.00 - Completed at T.P.T.L. 161 Sam Mun Free Standing Glass Light Columns. Development Tsai Road, Tai Po Co. Ltd.

J00 61 2000 Residential Development Design, Supply and Installation of W. Hing 2,732,605.80 - Completed at 47-49 La Salle Road, Skylight, Glass Wall, Point Fixing Construction Kowloon Glass Wall & Glass Balustrade and Co. Ltd. Glazed Lift Shaft.

- Page 12 / 13 - G&M Engineering Company Limited Room 1709, 17/F, Manhattan Centre, No. 8 Kwai Cheong Road, Kwai Chung, Hong Kong Tel: 23990289 Fax: 23990969 Email: [email protected] ISO 9001: 2015 Certificate No.: HKG0991007

JOB REFERENCE

JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT TENTATIVE STATUS SUM COMPLETION

J00 60 2000 Western Kowloon Design, Supply and Installation of tension Waltech Pacific 1,000,000.00 - Completed Reclamation 'A' structure point support glass wall and (Engineering) Ltd. Substation and glass canopy. Maintenance Depot

J00 57 2000 The Chinese University Design, Supply and Installation of The Chinese 2,462,342.00 - Completed of Hong Kong at LG/F., Skylight, glazed Shop front and University of Benjamin Franklin Associated Metal Frame Hong Kong

J00 55 2000 No. 16 Ice House Street Design, supply and installation of Builders Federal 3,720,000.00 - Completed Glass wall, S/S and FRP windows. (HK) Limited

J00 54 2000 CC-602, Kam Tin Station Supply and installation of glazed wall NECSO 5,507,200.00 - Completed system, External fire rated glass screen Entrecanales and glass lift shaft. Cubiertas, S.A.

- Page 13 / 13 -