Bimberamala NP LOCALITY MAP Compartments 93 & 94 Boyne State Forest No.832 SOUTHERN REGION: SOUTH COAST MANAGEMENT AREA Scale: 1:100,000 COCKWHY CREEK

CURROWAN CREEK 94

93 Murramarang NP G

CUMBRALAWAY CREEK

BENANDARAH CREEK

DURRAS LAKE BRIDGE CREEK CYNE MALLOWES CREEK

NELLIGEN CREEK

SHEEP STATION CREEK

Clyde NP

CLYDE RIVER Cullendulla Creek NR BUCKENBOWRA RIVER

MCLEODS CREEK

MUNDARLOW CREEK HANGING ROCK CREEK ! Towns & Localities WATERMFAaLLjo rCR RiEvEKers ® Sealed Road Major Forest Road CATALINA LAKEJOES CREEK DEEP CREEK State Forest National Parks Planning Unit SALTWFAToErmR aGlU RLLYeserve Vacant Crown Land Informal Reserve Non Forest Water Tollgate Islands NR Freehold

G Emergency Meeting Point Á Evacuation Route and Helicopter Landing Site Á Haulage Route Prepared By: Darryl Chaffey Harvest Plan Operational Map

Version: 2 Compartments: 93 & 94

...... R.E....GIO.....NA...... L .M...ANA...... G....ER.... A.....PP....RO....V....AL...... State Forest: Boyne No: 832 APPROVED: Daniel Tuan SOUTHERN REGION - Native Forests DATE: 24/ 02 / 2012 ³ Map Sheet: Currowan 8926-4N & Kioloa 8926-1N

49 250 51 52

Lot 11

Lot 3 H1 Lot 12 Lot 1 61 " 61 SH S"H 3 XX 2

Lot 1

5 H H 4

Lot 2 Lot 3 6a H 10H Lot 4 6 H 32a H Lot 24 _

6060 S" 6060 S" Lot 25 S" 30H Lot 27 7 H Lot 26 C3 8 H H 11 31 Lot 451 HH H 33 32 H 94 Lot 7003 9 29 H 12 H

! H H 13 28 H 25 27 H H H 15 24 H 59 14 H 26 59

H16 22H H 23 ^ H 21 20H

93 Murramarang NP H H H 36 17 19 ú C4 X C2 H 34H 35 X 18H C1

58

C6 A (EPL IHL 2 & TSL) STREAM EXCLUSION ZONES A Feature Filter Strip Protection Zone Operational Zone _ Unmapped NA NA NA C7 1st Order 5m 5m 10m 2nd order 5m 15m 10m 0# A 3rd order 5m 25m 10m G 4th order 5m 45m 10m !!@ 0 125 250 500 750 1,000 Scale:1:15,000 0# Meters Contour Interval 10m _ !@ ª?! 249000E 250 51 52 BOUNDARIES DUMPS & CROSSINGS NON HARVEST AREA FAUNA FEATURES FLORA FEATURES ÉÉÉÉÉÉState Forest Boundary H Temporary Dry Weather Harvesting Protection (FMZ 3A) A 0# East Lynne Midge Orchid ÉÉÉÉÉÉCompartment Boundary Powerful Owl 0# ú Existing Crossing Non Forest Use (FMZ 7) - Overhead Powerlines !@ Masked Owl Leafless Toungue Orchid ROADS X Yellow-bellied Glider Sealed NET HARVEST AREA Rainforest and Buffer (20m) - indicative XX Yellow-bellied Glider (Heard) Major Forest FMZ 4 - Resource Unit 1 Owl Landscape 32> _ Spotted-tailedQuoll Minor Forest STS heavy Cultural Heritage - Tower Creek Mine EPL Standard Existing (Major) FMZ 4 - Resource Unit 2 ^ Gang Gang Cockatoo EPL Standard Existing (Minor) STS light-medium Significant Subterranean Roost (100m Exclusion) EPL Licenced (New Construction) OTHER FEATURES FMZ 4 - Resource Unit 3 EEC - Riverflat Eucalypt Forest on G Emergency Meeting Point/Helicopter Landing SIte Retained BA Exclusion Coastal Floodplains TENURE # Permanent Growth Plot (not avail. to harvest this operation) National Park Estate S" Essential Energy Infrastructure Private Property ! High Voltage Underground Electricity (indicative location) ! Underground Telstra Cable (indicative location) DRAINAGE High Voltage Overhead Powerlines Mapped LIC Drainage

G:\PLANNING\HarvestPlans\South Coast\Boyne\Cpt-93-94\HP_BB_93_94_11\HP_BB_93_94_11v2.mxd Prepared By: Shane Clohesy Harvest Plan Forest Type Map Compartments: 93 & 94 State Forest: Boyne No: 832 SOUTHERN REGION - Native Forests ³ Map Sheet: Currowan 8926-4N & Kioloa 8926-1N

49 250 51 52

61 61

6060 6060

59 59

Cpt 94/7 Rd

58

249000E 250 51 52

BOUNDARIES DRAINAGE BROAD FOREST TYPE ÉÉÉÉÉÉState Forest Boundary Mapped LIC Drainage Spotted Gum ÉÉÉÉÉÉCompartment Boundary Coastal Dry Forest ROADS Coastal Moist Forest Sealed Rainforest Major Forest 32> Minor Forest EPL Standard Existing (Major) EPL Standard Existing (Minor) EPL Licenced (New Construction)

0 125 250 500 750 1,000 Scale:1:15,000 Meters Contour Interval 10m

G:\PLANNING\HarvestPlans\South Coast\Boyne\Cpt-93-94\HP_BB_93_94_11\FTmap_BB_93_94_11.mxd SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

FORESTSNEWSOUTHWALES-SOUTHERNREGION HARVESTINGPLANNATIVEFOREST

BoyneStateForest-Compartments93&94

Certification ThisplanhasbeenpreparedinaccordancewiththeIntegratedForestryOperationsApproval issuedundertheForestryandNationalParkEstateAct1998.TheStandardHarvestPlan ConditionsforNativeForestOperationsinSouthernRegion,SouthCoastapplytothis operation. PreparedBy: Shane EndorsedBy: KevinPetty ApprovedBy: Daniel Harvest Clohesy Planning Regional Tuan Planner Manager Manager Signature Shane Signature KevinPetty Signature Daniel Clohesy Tuan Date 17/12/11 Date 17/12/11 Date 23/12/11

Note:ApprovalincludestheHarvestPlanOperationalMap(HPOM)withthe correspondingapprovaldatedisplayedon themap,verifyingfinalapprovedversion. Othermapsincludedwiththisplanarelocality,foresttype,roadingandcultural heritage(limiteddistribution).

DescriptionofProposal

Harvestingofnativeforest Harvestingofnativeforest,usingSingleTreeSelectionSilviculturesubjecttothe SouthernRegion,IFOArequirementswillbeundertakenwithinthisplanningunit. RoadconstructiononlywillbelicensedundertheEPL. Theprimaryproductoftheharvestingishighqualitylargesawlogs(quotalogs), smallhighqualitysawlogs,veneerlogs,girders,poles&pileswheretimbermarkets areavailable.Partsoffelledlogsthatdonotmeethighqualitylogspecificationsare segregatedandgradedintootherclassificationssuchassalvagesawlogs,pulp logs&miscellaneoustimberse.g.split&roundposts,firewood,miningtimbers& craftwood.Theavailabilityofmiscellaneoustimbersdependsmainlyonforest types,logdefectiveness&marketconditionsatthetimeofharvesting.

Clause22 – IntegratedForestryOperationsApproval(IFOA)Consideration Allrelevantfactorshavebeenreviewedtakingintoaccountthevolumeand monetaryvalueofeachforestproducttosupplyTermAgreementHolders.The harvestingoperationalsocomplieswithClause22oftheIFOA.

Attachment1: SiteSafetyPlanprescribessafetyrequirementsandMedical EmergencyEvacuationPlanforthisharvestingoperation. Attachment2: Roadingplanprescribesroadingrequirementsforthisharvesting operation. Attachment3: BurningPlanprescribesburningrequirementsforthisharvesting operation. Post-harvestburningshouldbeconfinedasfaraspracticabletotheNetHarvestArea. SitespecificburningexclusionsassociatedwithFlora,Fauna,CulturalHeritage,

HP_BB_93_94_11v2 21-12-11 1 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Riparianandotherexclusionzonesareexplainedwithintherelevantsectionsofthis HarvestPlanandindicatedontheHPOM. Wherepracticable,snigtrackpatternsshouldbedesignedtodoubleasbareearth controllinestopreventfireenteringspecifiedburningexclusionzonesandother tenures,i.e.SmokyMouse,SouthernBrownBandicoot&significantCulturalHeritage sites. Wherethisisnotpractical,theContractCoordinatoristoassesstheneedforabare earthbreaktobeconstructedclosetoharvestingexclusionboundariesandseek adviceandapprovalfromtheHarvestingTeamLeaderfortheadditionalearthworks. Specificareasidentifiedduringtheplanningstagewhichrequireamineralearthbreak areidentifiedintheburningplan.

Area IdentificationandYieldEstimates

State Forest Compartment/s Region Management Certification Harvest Area PlanID Boyne 93&94 Southern South AS4708:2007 3852 Coast ISO14001

Cpt 93 Cpt 94 Total Event ID 14826 14827 N/A GrossArea(ha) 203.7 297.8 501.5 NetHarvestArea(ha) 108.9 236.3 345.2 QuotaLogs(HQL) 6.9m³/ha 7.6m³/ha 2,000m³ # HighQualitySmall 1.2m3/ha 1.3m3/ha 350m³ # Salvage 12.5m³/ha 13.3m³/ha 3,500m³ # Pulp 9t/ha(10.8 m3/ha) 22t/ha(26.4m3/ha) 4,800t(5,800m3) # EstimatedTotalYield(m3/ha) 31.4m³/ha 48.6m³/ha N/A EstimatedTotalVolume(m3) 2,650m³ # 9,000m³ # 11,650m³ # #Note – NetHarvestAreamodifiervalueshavebeenappliedtothetotalvolume estimates.

HP_BB_93_94_11v2 21-12-11 2 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ForestsNSW – SouthernRegion HarvestingPlanHP_BB_93_94_11 Compartments93&94

Attachment1–SiteSafetyPlan

SAFETYCONSIDERATIONS

EmergencyPlanInformation

(a) MobilePhonereceptiononworksite: √ Good Poor Nil Nearestreliablereception:Mobilephonereceptionacrossentireofboth compartments.

(b) ForestsNSWRadiofromworksite: ContractorRadioatworksite: ChannelNo: 236 UHFChannelNo: Call to: BatemansBay ContractorRadioNo: Callsignfrom: Yourname CalltoBushBoss:

(c) Emergencymeetingpointforambulance: JunctionofTomboyeRoad&PrincesHighway. 1:100000mapsheet: BatemansBay8926 MGAzone: 56 MGAGridreference: E251283 N6057303 Lat/LongforGPS: 35° 35'48"S 150° 15'16"E

(d) ClosestHelicopterLandingPlace: JunctionofTomboyeRoad&PrincesHighway. 1:100000mapsheet: BatemansBay8926 MGAzone: 56 MGAGridreference: E251283 N6057303 Lat/LongforGPS: 35° 35'48"S 150° 15'16"E

(e) ProcedureforobtainingAmbulanceassistance: Dial"000"ORCallBatemansBayForestryOffice1300880548forAmbulance assistance. Dial “112” onlyasanalternativeto “000” ifyouhaveaGSMdigitalmobilephone andyouareoutsideyourownprovider’sGSMnetworkcoveragearea.

HP_BB_93_94_11v2 21-12-11 3 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

"000"OperatorQuestion. Response 1.Police,Fire,Ambulance? AmbulanceWollongong.

2.Suburb (StateForestname): Boyne (Nearesttownornamed locality): BatemansBay (NearestAmbulancestation): BatemansBay

3.Address: (NearestnamedStateforestroad): BurmaRoad

4.NearestRoadJunction: TomboyeRoad&PrincesHighway

5LocalGovernmentArea: EurobodallaShireCouncil

6.Natureoftheproblem: Give details ofaccident,numberand conditionofcasualties.

7.Whereistheaccident: Worksitelocation – (Centreof Compartments).

MGAGridreference: Zone56 E250316 N6059139

Lat/longforGPS: 35° 34'48"S150° 14'40"E

8.DirectionstonavigatefromAmbulanceStationtomeetingpoint:

DirectionsfromBatemansBay: • HeadNorthonthePrincesHighwayforapprox.15kmtoTomboyeRoad junction.

9.Injuries?: Givedetailedinformationaboutthecondition ofthecasualty.

10.CallbackNo.: GiveyourMobileNumber. orBatemansBayOffice:1300880548.

11.NameofReporter: Giveownname.

SiteSpecificIdentified Hazards

Assessmentofexistinghazardswasundertakenatthetimeofplanning.These hazardsareintheattachedtableandwhereappropriate,controlstrategieshavebeen applied.Wherenocontrolstrategyhasbeendescribed,thecontractormustdevelop appropriatestrategiesaspartofthecontractorsSafetyManagementPlan.Acopyof thehazardassessmentandcontrolstrategiesisprovidedtoassistinthedevelopment ofthecontractorsSafetyManagementPlanforthisharvestingarea.

Identifiedhazards requiringriskassessmentandcontrolstrategyinSafety ManagementPlan

HP_BB_93_94_11v2 21-12-11 4 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

IDENTIFIED HAZARD RISK SUGGESTED CONTROL STRATEGY RATING 1.Adjoiningroadsofvarious 1 Warningsignsatintersections,roadclosureand trafficlevels trafficcontrolmeasures. 60km/hrspeedlimitonallStateForestgravel roadsunlessotherwisesignposted. CompliancewithForestsNSWlightsonpolicy. 2.Overheadpowerlinesor 3-4 RefertoForestsNSWsafetystandard1.3.12. cables Assesseveryindividualtreefordirectionalfelling anddegreeofrisk.Donotfalltreestowards overheadhazardifwithin twotreelengths. 3.Undergroundcables, 6 Minimisegrounddisturbanceacrossoralong pipelines cables&pipelines.Increasedepthofearth coverifrequired. 4.Clifflines&rockyverysteep 3 Operatorstoassessworksitewithintwotree terrain lengths toidentifyimmediatehazards. Communicatetootheroperatorsandmarksites. 5.Mineshafts/quarries 2-3 Assesssnigtrackroutesandtreefellingpaths priortooperating.Identifyandmarksite accordingly. 6.Hazardousordeadtrees 1 RefertoForestsNSWsafetystandard1.3.9. Assessareawithintwotreelengthsofworksite. Assessrisk,markanyDistinctlyDangerous Treeswiththesymbol Ø &ifnecessaryremove hazardormoveworksite.Usemachineryto assistwithhazardremovalifpossible Contractorisresponsibleforimplementing controlstrategiesduringharvesting. 7.Overheadhazards 1 Refer to Forests NSW safety standard associatedwithdumps 1.3.9.Assessoverheadhazardwithintwotree lengthsofthedump.Assessrisk,&ifnecessary removehazardorrelocatedumpsite. Contractorisresponsibleforimplementing controlstrategiesduringharvesting. 8.Dustfrompassingvehicles 2 Restrictspeedtominimisedustgeneration,slow alongdirthaulageroutes downwhenpassingvehicles.Turnondriving andhazardlightstoincreasevisibility. HazardNos.1/2/3/4/5/7/8areshownontheattachedHPOM

Trafficmanagement/roadclosures Theloggingcontractorisresponsiblefortrafficcontrolonallroadswhenfellingiswithin twotreelengthsofthetallesttreetobefelledoftheroadorsniggingonroadsor loadingisoccurringwithin10metresofaroad.Warningoftrucksenteringmustbe displayed200metreseitherside ofallStateForestroadapproachesleadingto areaswhereharvestingoperationsareinprogress.

Inadditiontotheabove,whenharvestingwithintwotreelengthsofDonovanCreek Road this road must be temporarily closed in accordance with “TCP78_DonovanCkRd_Cpt93_94” whichisattachedtothisplan.ForestsNSWwill providesuitablyaccreditedtrafficcontrollerstoimplementthisTrafficControlPlan.

HP_BB_93_94_11v2 21-12-11 5 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Warningoftimberharvestingoperationsmustbe displayed200metreseitherside of allthoroughfareStateForestroadapproachesleadingtoareaswhereharvesting operationsareinprogress.

ThisplanidentifieshaulagefromthecompartmentwillbeeastviaBurma Road/TomboyeRoadandDonovansCreekRoad/OldPrincesHighwayturningleftor rightontoPrincesHighway(100km/hrRoad).TheintersectionofOldPrincesHighway &PrincesHighwayandtheintersectionofTomboyeRoad&PrincesHighwayhave beenassessedasachievingaminimumof200msightdistanceonbothapproaches. ThereforeatthisintersectionadditionalsignageinaccordancewithaTrafficControl Planisnotrequired.

RoadintersectionsoutsidethecontrolofForestsNSWarenotcoveredbythisplanor anyForestsNSWTrafficControlPlan.HaulagecontractorsmustabidebyRTAroad lawsandstandardoperatingproceduresinrelationtohaulageroutesoutsidethe controlofForestsNSW.

Dust,noiseandschoolbusroutes Dustandnoise – Whereloghaulageroutespassclosetoruralhousingalongnatural surface/gravelroadsdustandnoisemustbeminimisedtothegreatestextent practicable.Trucksshouldreducespeed,restrictusetodaylighthoursandminimise theuseofenginebrakesthroughtheseareas.

HP_BB_93_94_11v2 21-12-11 6 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

INSERTTCP78_DonavanCkRd_Cpt93_94

HP_BB_93_94_11v2 21-12-11 7 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

SilvicultureandHarvestingPrescriptions

Compartment93 Year 1968 1975 1978 2002 2009

TSI X X X √ X HRBurning X X X X √ Wildfires √ X X X X Logging m3 0 1717 177 0 0 Ö -applies, X – notapplicable

Compartment94 Year 1953 1968 1975 1987 2009

TSI X X X √ X HRBurning X X X X √ Wildfires X √ X X X Logging m3 380 0 2280 9036 0 Ö -applies, X – notapplicable

Compartment No.ofSweeps BAAverage(m2/ha) BARange(m2/ha) 93 8 31 18-44 94 10 33 20-40

SilviculturalPlanning SingleTreeSelection TheSTStract(395.4ha)isapredominantlymixedagedmatureforestandwillbe harvestedunderalight-moderatetoheavysingletreeselection(STS)regime.The objectivewithinthe345.2hanetharvestareaforthisoperation(ResourceUnits1&2) istoremovecommerciallydefectiveandmaturetreestocreatecanopyopeningsfor regeneration,whilstretainingandminimisingdamagetoyoungregeneratingstems, seedtrees,futuresawlogtrees,habitatandrecruitmenttrees. Itisenvisagedthatthenextharvestingoperationinthiscompartmentwouldbeon average30yearstime. TheSTStractforIFOApurposesincludestheentirenetharvestareainResource Units1,2&3ofcompartments93and94asindicatedontheHPOM. SingleTreeSelection(STS)mustremovenomorethan45%ofthetotalbasal area(BA)withinthetract,whileretainingaminimumBAof10m2 perhectare withinthetract.

HP_BB_93_94_11v2 21-12-11 8 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

1 Overstoreydominated • EntireResourceUnit1 • ResourceUnit1isprimarilymadeup bySpottedgum (C. areahasundergone ofmature/overmaturemixedaged Maculata),Blackbutt multiplepastselective stands. (E.Pilularis) andGrey harvestingoperations. • Asaresultofpastselective ironbark (E. • Themajorityofthe harvestingoperationsandwildfire Paniculata). ResourceUnit1area historydefectivestemsofpoorform wassubjecttoa makeupahighproportionofthe significantwildfire dominantstrata. eventin1968. • Thickregenerationoccurson disturbedareassuchasoldroadand • Lessevidenceof dumps,howevermuchless previousloggingin regenerationoccurselsewhere. steeperareaswhich andarerelatively • ResourceUnit1areaswillbenefit undisturbed. fromaheavySTSharvestregimeto removethehighproportionof • RefertoHPOMfor defectivestemsandpromote location. regeneration.Regenerationfrom 1987harvestisofgenerallygood quality,indicatingmoderate – good sitepotential. 2 Overstoreydominated • EntireResourceUnit2 • ResourceUnit2isprimarilymadeup bySpottedgum (C. hasundergonemultiple ofmature/overmaturemixedaged Maculata) andGrey pastselective stands. ironbark (E. harvestingoperations. • Asaresultofpastselective Paniculata). harvestingoperationsdefectivestems makeupahighproportionofthe dominantstrata,howeverthereisa verygoodearly-maturecomponent. • ResourceUnit2areasweregenerally notimpactedbythe1968fireandare ofhigherqualitythanResourceUnit1 areas.. • ResourceUnit2areaswillbenefit fromalight-moderateSTSregimeto removethedefective,poorformed dominantcomponentsothatgrowthis concentratedonregenerationandthe early-maturecomponent. 3 Overstoreydominated • Themajorityof • AhighproportionofResourceUnit3 byBlackbutt (E. ResourceUnit3has ismadeupofpoorqualitymixedage pilularis), Silvertop undergonepast stands.Thesesectionshavebeen Ash (E.sieberi),Red selectiveharvesting deemedunviabledue to lowvolumes, Bloodwood (C. operations. defectivestemsandundesirable Gummifera),Sydney • Pastwildfireevents species. Peppermint (E. (mostlikely1968)have • PartofResourceUnit3ismadeupof piperita). heavilyimpactedthe moderate-goodqualityadvanced area.Largeproportions regeneration,mostlikelyfromthe ofadvanced 1968wildfire.Theseareaswillbe

HP_BB_93_94_11v2 21-12-11 9 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

regeneration. retainedduringthisharvestingevent • ResourceUnit3also asitisanticipatedthattheseareas includesasectionof willyieldsawlogsinthefuture. HighQualitySpotted • ResourceUnit3alsoincludesa Gum/GreyIronbark sectionofHighQualitySpotted advancedregrowth Gum/GreyIronbarkadvanced thathasundergone regrowththathasundergoneTimber TimberStand StandImprovementtreatment.This Improvement areawillberetainedduetoan treatment. anticipatedhighvalueinthefuture. • ResourceUnit3areaswillalsoactas aBasalAreabanksothatResource Unit1areasmaybeharvestedmore intensively

HarvestingPrescription

Resource Unit % of NHA Silvicultural Treatment (RefertoHPOM fordetail)

1 77% STSheavy: • Retainandprotectfromharvesting/firedamage: -poles/advancedgrowth(<40cmDBHOB)withgoodformand vigour, -habitatandrecruitmenttreesasperTSL, -4seedtrees/ha(canincludeothersuitableretainedtrees). -retainadditionaltreesofgoodformandvigourtoensurethe totalBAremovedacrosstheentiretractisnomorethan45%. • Retainedtreesshouldbeevenlyspacedthroughoutthe resourceunit. • Allotherproductsshouldberemovedmarketspermitting.Ifthis objectivecannotbeachievedthefollowingoptionsshouldbe considered: -rejecttreefelling(ContractCoordinatormustfirstobtain approvalfromharvestingteamleader), -deferharvestinguntilidealmarketconditionsprevail, -considerharvestingunderalightormediumSTSregime. 2 10% STSmedium/light: • Retainandprotectfromfire/harvestingdamage: -poles/advancedgrowth(<40cmDBHOB)withgoodformand

HP_BB_93_94_11v2 21-12-11 10 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

vigour, -habitatandrecruitmenttreesasperTSL, -retainadditionaldominantandcodominanttreesofgood formandvigourtoensurethetotalBAremovedacrossthe resourceunitisnomorethan25-35%. • Retainedtreesshouldbeevenlyspacedthroughoutthe resourceunit. Allotherproductsshouldberemoved. 3 13% • RetainedBA,excludefromharvestduetofactorsdetailedin theabovestanddescription. Note:Theareaofeachsilviculturaltreatmentmustbemappedandrecordedinthe Postlogginginformationsectionofthisplan.

SpecialRequirements

Non-harvestareas TheHPOMindicatesthenon-harvestareasinthecompartments,asdetailedinthe legend.Harvestingdisturbanceisnotpermittedinnon-harvestareasunlessauthorised bytheRegionalManager.

NoxiousWeeds/Disease/PestsHygieneRequirements Therearenoknownnoxiousweeds,pathogensordiseasesinthecompartment. HarvestingMachineryisnotrequiredtobewasheddownpriortoleavingthe compartment.

PermanentGrowthandResearchPlots PermanentGrowthPlots – APGP(PSD229)islocatedeastofdump10(see HPOM).ThePGPistobetreatedthesameasthesurroundingharvestedarea.The ContractCoordinatormustcollectallmetalmeasurementtagsfromtreesfallenduring harvestingandreturnthemtotheResourcesTeamLeaderBatemansBay. Anyotherinventoryplotslocatedduringtheharvestingoperationwhicharenotshown ontheHPOMordescribedabovearetobetreatedthesameasthesurroundingarea.

PrivatePropertyandCriticalBoundaries Privatepropertyoccursadjacenttothenorthernboundaryofthecompartment,as indicatedontheHPOM.Privatepropertyownershavebeennotifiedofthescheduled harvestingandpost-harvestburning.ContactdetailsareavailablefromtheBatemans Bayoffice.Thetablebelowlistsneighbourswhoadjoincompartments93and94: Name Lot Number Lot7003onDP1020467 Lot451onDP715006 Lot27onDP705512 Lot26onDP705512

HP_BB_93_94_11v2 21-12-11 11 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Lot25onDP705512 Lot24onDP705512 Lot4onDP631176 Lot3onDP631176 Lot2onDP631176 Lot1onDP631176 Lots11&12onDP791483 Lot3onDP712931

• Noharvestdisturbanceispermittedonprivateproperty. • Harvestingdebrismustnotbeleftwithinfivemetresoftheboundaryfencelines. • Anydamagetofencesmustberepairedby thecontractor. • Accessroadsmustbemaintainedfreeofdebrisandinatrafficablestate.

OccupationPermits Apiary 7apiarysitesprovidedinthetablebelowarelocatedwithintheplanningunitas detailedinthetablebelow.ContactdetailsareavailablefromtheBatemansBayoffice. Name BoundaryLocation Northern-mostsectionofcompartment94 Westernsectionofcompartment94 Southwesterncornerofcompartment94 Partofcompartments93&94 Southernpartsofcompartments93&94 Easternpartofcompartment93 Easternpartofcompartment93

• TheContractCoordinatormustprovidetheapiarypermitteeswithatleasttwo weeksadvancenoticewhenbeeboxesneedtoberemovedorrelocated. • Apermanentapiarysetdownsiteislocatedinthesoutheastcornerofcompartment 93withinexcludedforest(seeHPOM).

RockyTerrain Rockyterrainmaybeencounteredwithinthenetplannedarea. Constructionofsidecutsnigtracksshouldbeavoidedinareasofrockyterrain.

HP_BB_93_94_11v2 21-12-11 12 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Whereconstructionofsidecutsnigtracksinrockyterrainisunavoidablethelocationof thesidecuttracksmustbeapprovedby theContractCoordinatorpriortoconstruction.

NationalParksandNatureReserves NationalParkoccursadjacenttotheeasternsideofcompartment93.ThePrinces HighwayandassociatedroadreserveformstheboundarybetweenNationalParkand StateForestinthislocation.

TelstraUndergroundCables,EssentialEnergyUndergroundCables Adialbeforeyoudigrequestqueryof theareaindicatesthatTelstraunderground cablesandEssentialEnergyundergroundcablesarepresentatvariouslocations withintheplannedcompartments.Dialbeforeyoudigandfieldmarkers(where located)havebeenusedtoshowtheapproximatelocationofthecablesontheHPOM. Priortoanyharvestingorroadingactivity takingplacein thevicinityofthecables,the ContractCoordinatorshouldinspecttheareaformarkersorotherevidenceandflag withmarkingtape.

Whencarryingoutharvestingorroadmaintenanceactivitiesnearcables,minimise grounddisturbancebycrossingcablesonlyatdesignatedcrossingpoints.Particular caremustbetakenwhen: • workingaroundandconstructingdumps2,3,32a&33; • extractingtimberfromthesouthofdump17; • carryingoutroadmaintenanceworksalongCpt94/9Rd;and • constructingroadsacrossFMZ7areatodumps23&26.

TheContractCoordinatormustmarkalldesignatedcrossingpointsinthefield.Ateach crossingpoint,ensure thataminimumdepthof600mmabovethecablesisachieved byaddingloggingslash/bark,gravel,soil,etcwhererequired.

AnydamagestocablesmustbeimmediatelyreportedtoTelstraon132203or EssentialEnergyon132391.

OtherEssentialEnergy Infrastructure OtherEssentialEnergyinfrastructure(cubicles&groundsubstations)alsooccurs withinthecompartment,alongDonovanCreekRoad.Theapproximatelocationof theseitemsisshownontheHPOM.TheContractCoordinatorandContractormust togetherinspectallEssentialEnergyinfrastructurepriortoharvestingintheirvicinityso thatexactlocationsareknown.Caremustbetakenwhenharvestingwithin2tree lengthsoftheseitemsanddirectionalfellingtechniquesmustbeutilisedtofalltrees awayfromthem.

DamagetoanyEssentialEnergyInfrastructuremustbeimmediatelyreportedto EssentialEnergyon132391.

HighVoltageOverheadPowerlines Overheadpowerlinesarelocatedineachoftheplannedcompartments – referto HPOMforlocations.RefertoForestsNSWsafetystandard1.3.12forguidelineswhen operatinginthevicinityofpowerlines.

HP_BB_93_94_11v2 21-12-11 13 Southern Region – Compartments 93 & 94, Boyne State Forest, South Coast Management Area

High Voltage Overhead Powerlines Overhead powerlines are located in each of the planned compartments – refer to HPOM for locations. Refer to Forests NSW safety standard 1.3.12 for guidelines when operating in the vicinity of powerlines.

Forest Management Zoning

FMZ 3A – Harvesting Protection, FMZ 4 - General Management and FMZ 7 – Other Forest Use areas occur within the compartment. Refer to HPOM for more detail.

FMZ 3A – Harvesting Protection (Wildlife) – Harvesting is not permitted in these areas. Prescribed burning is only permitted where fire does not conflict with underlying protection zones e.g. rainforest, cultural heritage, etc. (Refer to Cultural Heritage and Flora & Fauna sections of this plan and the standard harvest plan conditions for more detail).

FMZ 4 – General Management – Normal harvesting prescriptions apply.

FMZ 7 – Prescribed burning is only permitted if fire does not conflict with the specific non-forest use of the site.

IFOA Required Approval of Forestry Activities

Approvals have not been obtained for snig track construction and/or use and log haulage in FMZ 3A. If the Contract Coordinator identifies the need for harvesting related activities to occur within 3A during the operation, the Harvest Planner must be contacted to seek Regional Manager approval.

All areas of Rainforest require prior OEH approval and Stream Exclusion Zones require prior Regional Manager approval before forest harvesting related activities (eg: road or snig track construction & reopening) can be undertaken. It is the responsibility of the Contract Coordinator to identify any exclusion areas which will need to be crossed during harvesting. The Contract Coordinator should then contact the Harvest Planner to obtain the necessary approval.

Cultural Heritage

Cultural Heritage –

Due to the confidentiality of the Cultural Heritage sites, a Cultural Heritage site map will only be attached to the specific copies of the plan. All 10 metre radius exclusion buffers are to be marked in the field as hard exclusion zones (i.e. pink & yellow tape) where logging and/or road works are scheduled to be undertaken. All operators must be taken to each site within the planned area before any activities are commenced.

HP_BB_93_94_11v2 21-12-11 14 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

RefertoTSLBookletforConditions Mark-UpConditions Duringthepre-harvestmarkuptheSFO/ContractCoordinatormustsearchforand recordthreatenedspecieshabitatfeaturesconsistentwithConditions5.2and8.6ofthe TSL.Searchesforthreatenedspeciesfeaturesmustbeconductedwithinthatportion ofthenetplannedareawhereharvestingwilloccur,andwithin50metresoutsidethis area(egHCVOG,etc)(conditions5.1,5.2oftheTSL). Whereanyofthesefeaturesarefound,thefeaturemustberecorded,theHarvesting Plan,including theHPOM,mustbeamendedaccordinglyandtheappropriatecondition applied.

Speciesadequatelycoveredbygeneralprescriptions: Thefollowingspecieshavebeenrecordedinoraroundthecompartmentsandare adequatelycoveredbythegeneralprescriptions.Nofurtherprotectionmeasuresare requiredforthesespecies: SootyOwl (Tytotenebricosa),GlossyBlack-Cockatoo (Calyptorhynchuslathami),

TreeRetention

Zone

Regrowth <10 <10 Ö Ö Ö TSLcondition 5.6c 5.6d 5.6g 5.6e 5.6f Ö-Conditionapplies

HP_BB_93_94_11v2 21-12-11 15 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Generalexclusionzones GeneralexclusionsaslistedbelowareshownontheHPOM. Feature/Condition TSL OccurswithinPlanning Unit cond’n Rainforest 5.4 Yes Riparian Protection Zones 5.7 Yes Ridge & Headwater Habitat 5.8 Yes(80mtotalwidth) – notshown onHPOMbecauseareaoccurs beneathFMZ3Alayer. Wetlands 5.9 No HeathandScrub 5.10 No RockyOutcropsandCliffs 5.11 No EndangeredEcologicalCommunity NA Yes – Anareaof River-flatEucalypt ForestonCoastalFloodplainsof NSENorthCoast,SydneyBasin& SouthCoastBioregions hasbeen identifiedwithincompartment94 (seeHPOMP). Informecologist immediatelyifadditionalareasof potentialEECareidentifiedwithin compartments93&94.

GeneralThreatenedFloraandFaunaPrescriptions Feature Recordsin93or94 Licenceconditions undertheTSCAct ThreatenedFrogGeneral No 5.12 ProtectionMeasures BirdNestandRoostSite No 5.13 Protection TreeBatRoostProtection No 5.14.1 SubterraneanRoost No 5.14.2 Protection SignificantSubterranean Yes – seeHPOMfor 5.14.3 RoostProtection location Protectionofflying-fox No 5.14.4 Camps Burning Netplannedarea 5.16 GroundHabitatProtection Netplannedarea 5.17

Species&Site-SpecificThreatenedFloraandFaunaPrescriptions

ContractorsandsupervisorystaffmustimmediatelyreportanysightingsofSchedule1 and2speciestotheHarvestingTeamLeader.TheHarvestingPlanmustbeamended toincludeadditionalprescriptionsifnecessary. Thefollowingspecieshavebeenrecordedwithinornearbytheareaandthe associatedprescriptionsmustbeimplemented:

HP_BB_93_94_11v2 21-12-11 16 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Threatened species and habitat features Records in 93 or Licence conditions withintriggerdistance 94 undertheTSCActor relevantSite-specific prescription PowerfulOwl Ninoxstrenua, No 6.4 MaskedOwl Tytonovaehollandie. No SwiftParrot Lathamusdiscolor No 6.5 RegentHoneyeater Xanthomyzaphrygia No Spotted tailed Quoll No 6.10 Dasyurusmaculatus Koala No 6.11 Phascolarctoscinereus Yellow-bellied Glider Yes 6.13 Petaurusaustralis Golden-tipped Bat No 6.14 Kerivoulapapuensis Cryptostylishunteriana No 6.16.2 Genoplesiumvernalis No Large-footedMyotis No 6.15 Myotisadversus Gang-gang Cockatoo Yes RefertoCondition5.13(a), Callocephalonfimbriatum (d)&(f)forGlossyBlack Cockatoo

HP_BB_93_94_11v2 21-12-11 17 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

FisheriesLicenceConditions

Therearenoknownrecordsofthreatenedfishspeciesorclass1or2aquatichabitatrelevantto thisoperation.Theconditionsofthefisherieslicencearenottriggeredforthisoperation.

SoilsandWaterProtection

RefertoEPLBooklet&StandardPlanConditions Site-specificEPLConditions

Elements Conditions UnmappedDrainageLines EPLdoesnotapply:refertodrainage featureprotectionbelow. DrainageFeatureProtection SeeHPOMforwidths InherentHazardClass 2 DispersibleSoils No SeasonalityHarvestingExclusions No SeasonalityBurningExclusions No LogDumps ReferrelevantconditionsforIHL SnigTracks ReferrelevantconditionsforIHL Roads SeeSchedule5ofEPLBooklet Slopelimitsforharvesting RefertoSchedule4B.3ofEPL

DrainageFeatureProtection Filterstrips(EPL),ProtectionZones(EPL),OperationalZones(EPL),ProtectionZones -hard(TSL)andProtectionZones-soft(TSL)mustberetainedalongalldrainagelines, prescribedstreamsandwatercourseswithinthenetplannedareaofthecompartments atminimumwidthsasstatedintheTablebelow.

Stream Order EPL Filter Strip EPL Protection Zone EPL TSLProtection TSLProtection* Operational Zone (hard) (soft) Unmapped N/A# N/A# N/A# 1storder 5 5* 10 2ndorder 5 15* 10 3rd order 5 25* 10 4th orderor 5 45* 10 greater Note:*TSLProtectionzones(hard&soft)arecontainedwithintheEPLFilter strip,whichhavethegreaterlevelofprotection. #forthisoperationForestsNSWhaschosentoharvestthisareawithoutEPL coverage.AllEPLconditionscontinuetoapply except fortherulesapplyingtofilter strips,protectionzonesandoperationalzonesofthe unmappeddrainagelines. RefertoBestManagementPracticesforunmappeddrainagelinesinthestandard

HP_BB_93_94_11v2 21-12-11 18 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea conditions.Harvestingofunmappeddrainagelines,MUSTNOToccurinunmapped drainagelineswhicharerunningorholdingwater.ItistheresponsibilityoftheContract Coordinator toinspecteachunmappeddrainagelinepriortoharvestingit,todetermine ifitisrunningorholdingwater.

LogDumpLocation 36logdumpsareindicatedontheHPOM.Fieldlocationoflogdumpsmustutilisethe mostlevelsiteavailableconsistentwiththelocationindicatedontheHPOM.Inherent hazardlevel2Conditions26,27,28,30,31and33ofSchedule4oftheEPLmust apply.

ExpectedFelling/Extraction&LoadingMethod Theexpectedfellingmethodismechanical,extractionmethodbyskidder,andloading methodisbyexcavator.

DrainageFeatureCrossings Nosnigtrackdrainagelinecrossingsareapprovedforuseondrainagefeatures.(Refer toHPOM).

MassMovement Compartments93&94arenotinanareaidentifiedashavingapotentialformass movement.Nospecificprescriptionsrelatingtomassmovement/sniggingarerequired.

Suitabilityofexistinglogdamsandgullystuffers Therearenoknownlogdamsorgullystuffersonsnigtrackcrossingsinthe compartments. Condition47ofSchedule4oftheEPLmustapply.

RoadWorks TheHPOMindicatesthelocationofexistingroadsandcrossings. Feature Length&/orNumber WorkRequired Existing Roads 15,220m Yes New Roads 590m Yes Existing Crossings 6 Yes New Crossing Nil N/A Borrow & Gravel Pits Nil N/A

RoadingandCrossingdetailsarecontainedwithinAttachment2ofthisPlan. Theroadingandcrossingworksmustbeundertaken,bycontractororForests NSWstaff,priortothecommencementofharvestingactivityintheareaserved bytheroadorcrossing. ForestsNSWwillsuperviseandpayforthemaintenance works. WithinthecompartmentboundaryonlyroadsthatareshownontheHPOMasEPL standardorsealedmaybeusedforhaulage. RefertoEPLSchedule5–Operating ConditionsforRoads.

HP_BB_93_94_11v2 21-12-11 19 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

RoadswithinthecompartmentboundarymaybeusedwithContractCoordinator approvalforsniggingorextractionprovidedtheyaredrainedtoEPLspecifications.

LegalConditions

In2001,theCommonwealthandNSWGovernmentssignedaSouthernRegional ForestAgreementwhich,amongotherthings,allowsforthesupplyof timberfor20 yearsfrompubliclandsunderthefollowingNSWlegislation:

• ForestryAct1916,and • Forestry&NationalParkEstateAct1998

ThelatterActprovidesfortheSouthernForestAgreementandSouthernIntegrated ForestOperationsApproval(IFOA),bothapprovedbyNSWGovernmentMinistersin May2002.Thisharvestplanisissuedundertheauthorityprovidedwithin theIFOA.

TheIFOAalsocontainsthreelicencesissuedunder:

• Section55oftheProtectionoftheEnvironmentAct1997(EPL) • ThreatenedSpeciesConservationAct1995(TSL). • Section220ZWof theFisheriesManagementAct1994(FL).

Thisharvestplanwillbemanagedinthefieldunder:

• LicencesissuedundertheForestryAct(1916) • ForestPracticesCodepart2(TimberHarvestinginNativeForests – 1999) andpart4(ForestRoadsandFireTrails – 1999) • StandardHarvestPlanConditionsforNativeForestOperationsUnderthe IFOA,SouthernRegion-SouthCoastArea.

Harvestingoperationsmustcomplywithallof theaboveLicencesandtheCode (unlessotherwisespecified).

Furtherinformationisavailablefrom http://www.environment.nsw.gov.au/

HP_BB_93_94_11v2 21-12-11 20 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Pre-OperationalBriefing

IacknowledgethatIhavereceivedacopyoftheHarvestingPlanforCompartments93 &94inBoyneStateForestandthatIhavebeenbriefedontheconditionsofthePlan andunderstandthesupervisionandoperationalcontrolrequirementsasexplainedto mebytheHarvestingTeamLeaderorhis/herdelegate.

Position Name Signature Date

DetailstoRecordinContractCoordinator/SFONotes

• Datesofcommencementandcessationoflogging • Recordthecommencementandcompletionofharvestingateachdump • Recordtheoccurrenceoftemporarystoppingofharvestingateachdump. • Situationswheredrainagecouldnotbecompletedduetosaturatedsoilsmustbe recordedinContractCoordinator/SFONotes. • Recordthecommencementandcompletionofeachconstruction,upgradingor maintenanceofdrainagefeaturecrossingsbysnigtracksorextractiontracks. • Bi-weeklychecksofroaddrainagestructuresduringhaulageoperations. • Recordthedateofchecks,drainagestructurecomplianceandtheanyrepairs requiredwithinthespecifiedtimeperiod. • RecordsofThreatenedFloraandFaunaidentifiedduringcompartmentmarkup. • Minorvariationsassociatedwithmovingoraddingdumps. • Dailyeventsofimportanceeg.Instructionstocrew,workactivity.

PostHarvestMappingFeaturesConfirmationChecklist

Feature Planning Reason GIS update Harvesting Comments Updates (Error/New) tool Updates completed? SoilRegolith No MappedDrainage No Rainforest No Rockyoutcrops No Wetlands No CulturalHeritage No ExistingRoads No NewRoads Yes New Yes Heath No Powerlinesetc No CulturalHeritage Yes Error Yes

HP_BB_93_94_11v2 21-12-11 21 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinatorFeatureUsageRecord

Datesofcommencementandcessationoflogging Dateofcommencementoflogging:______Dateofcessationoflogging:______DUMPUSAGERECORD • Recordthecommencementandcompletionofharvestingateachdump • Recordtheoccurrenceoftemporarystoppingofharvestingateachdump.

Dump Start Finish *Track Dateof **Temporarytrack Date number date date drainage temporary drainagecompleted resumed completed cessation within5days within2days (yes/no) (yes/no)

*Atcompletionofsnigtrack/dump,trackdrainagemustbecompletedwithin 2 days unlesssoilissaturated. *Attemporarycessationofsnigtrackuse,trackdrainagemustbecompletedwithin 5 daysunlesssoilissaturated. Situationswheredrainagecouldnotbecompletedduetosaturatedsoilsmustbe recordedinContractCoordinator/SFONotes.

HP_BB_93_94_11v2 21-12-11 22 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinator/SFONotes

Date Event Signed

HP_BB_93_94_11v2 21-12-11 23 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinator/SFONotes(continued)

Date Event Signed

HP_BB_93_94_11v2 21-12-11 24 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinator/SFONotes(continued)

Date Event Signed

HP_BB_93_94_11v2 21-12-11 25 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinator/SFONotes(continued)

Date Event Signed

HP_BB_93_94_11v2 21-12-11 26 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ContractCoordinator/SFONotes(continued)

Date Event Signed

HP_BB_93_94_11v2 21-12-11 27 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ClearanceCertificate

COMPARTMENTS:93&94

BOYNESTATEFOREST,SOUTHERNREGION

To...... SupervisingForestOfficer

Irequestapprovalformetomovemyloggingcrewandallassociatedmachineryfromthe above-mentionedareatothenextcompartmentinaccordancewithSection3.5oftheForest PracticesCode.

Icertifythat: (a) allpermanentroads,trailsandmitredrainshavebeenclearedofharvestingdebris; (b) buttdamagetoretainedtreeshasbeenkepttoacceptablelimits; (c) alltreesmarkedforremovalhavebeenfelled; (d) utilisationlimitshavebeensatisfactorilymet; (e) stumpheightsconformtorequirements; (f) allhangingtreeshavebeenfelledandbroughtdown; (g) alllogdumpsiteshavebeensatisfactorilyrestoredasrequired; (h) harvestingdebrisisnotaccumulatedaroundretainedtrees; (i) allaccumulatedlitterhasbeendisposedofproperly; (j) allfilterandbufferstriprequirementshavebeencompliedwith; (k) allsnigtrack,extractiontrackandtemporaryloggingroaddrainagehasbeen installedsatisfactorilyandotherrequiredrehabilitationworkhasbeencompleted; (l) allnecessaryrepairstodamagedroads,signs,fencesandotherstructureshave beencarriedout. (m) ______(insertquantity)rubberflapshavebeenrecoveredinasatisfactory conditionandreportedtoOperationsBranchforcollection. (n) allmachinery,equipmentandvehicleshavebeencheckedandarefreeofnoxious weeds,diseasesandpests.

IbelievethatIhavemetallmyobligationsundertheconditionsoftheTimberLicence, theEPLandTSLwhichapplytothecompartmentjustcompleted,asstatedinthis HarvestingPlan.

Signature...... Name...... ………...... Date...... Contractor

AsaresultofinspectionsoftheloggingoperationsmadeinaccordancewiththisHarvesting Plan,Iamsatisfiedthat,tothebestofmyknowledge,thecontractorresponsibleforthis harvestingoperationhassatisfactorilycompletedallworkandapprovalisgivenforher/him toremoveher/hismachineryandequipmentandleavethearea/commenceoperationsin anothercompartment.

Thisclearancedoesnotreleasethecontractorfromanyobligationtoundertakeany remedialworkifsubsequentdeficienciesareshowntoresultfrominadequatepractices duringtheharvestingoperation,whicharefoundduringanyinspectionsoftheareamade within12monthsofthedateofthispost-harvestinginspection.

Lastinspectionwasmadeon...... (Date)

Signed...... (Date)... SupervisingForest Officer

HP_BB_93_94_11v2 21-12-11 28 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

PostLoggingInformation

Recordanycircumstancesofsignificancerelatingtotheharvestingofthiscompartment. Pleasedraworincludeanyannotationsontheattachedoperationscalemap.

Summaryofsilviculturaltreatment Treatmenttype Area(ha)subject NumberofAGS Comments to treatment gapscreated (Contract Coordinator estimate) AustralianGroupSelection SingleTreeSelection Thinning/Spacing PostHarvestSilviculture

Actualareaharvested(recordonattachedHPOM)

Givereasonsforharvestableareasthatwerenotharvested(eg.Toosteep,defectivetimber). Makereference tomap.

PostLoggingBasalAreasweeps

DumpNo# Sweep1 Sweep2 Sweep3 Sweep4 Average

PostBA Average m2/ha PreBA Average 32 m2/ha ComplywithmaximumSTSBAremovalof45%orThinningBAremovalof60% Y/N

Possiblenextcut(tickappropriateboxes)

Mainproducttype Anticipatedvolume Time tonextharvest H M L 0 to5years Girders 5 to10years Veneer 10to20years Poles/piles 20to30years Quota 30plusyears Smalls/Thinnings Salvage Pulpwood/chipwood

HP_BB_93_94_11v2 21-12-11 29 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ATTACHMENT2 ROADINGPLAN

SummaryofRoadingRequirements

Lengthofexistingroads/trailstobemaintained 15,140m Lengthofnewroadstobeconstructed 590m Numberofexistingcrossingstobemaintained 6 Numberofnewcrossingstobeconstructed Nil Lengthofroad>10° 20m Massmovementprescriptionsapply No Dispersiblesoilconditionsapply No Seasonalityprovisionsapply No

Note: MaintenanceworksnotcompletedbyOperationsmustberecordedandpassed ontotheContractCoordinatorHarvestingforcompletionanddocumentation. Thestartandfinishdatesofallmaintenanceandconstructionmustberecordedonthe individualroadingsheetsalongwithotherrelevantchangesorexplanations. Allrubberflapsonminorforestroadsmustberemovedandreplacedwithtrafficable rolloverbanksoncompletionofoperation.

HP_BB_93_94_11v2 21-12-11 30 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

CHECKLISTOFWORKSREQUIREDONROADS&CROSSINGS

Road/CrossingName WorksRequired Date Date Signature Started finished JoesNoseRoad Noworksrequired. (3,100mlength) Ops/ContractCoordinator Comments:

NakedGullyRoad Clearvegetationfrompavementand reshapeentirelength. (1,550mlength) Clearupto3meithersideofroad pavement. Reinstatemitredrainswhere required. InstallRubberFlapswhererequired (3RU’srequired). Refertoattachedroadingmap. Ops/ContractCoordinator Comments:

BurmaRoad Reshapeentirelength. (2,740mlength) Somegravellingrecommendedon crossings – refertocrossing diagrams. Checkinletsandoutletsofpipes. Install1xnewpipe. Refertoattachedroadingmap. Ops/ContractCoordinator Comments:

DonovanCreekRoad Noworksrequired. (1,690mlength) Ops/ContractCoordinator Comments:

HP_BB_93_94_11v2 21-12-11 31 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

OldPrincesHighway Noworksrequired. (360mlength) Ops/ContractCoordinator Comments:

TowerCreekRoad Noworksrequired. (1,210mlength) Ops/ContractCoordinator Comments:

TomboyeRoad Reshapeentirelength – grader. (500mlength) Ops/ContractCoordinator Comments:

Cpt93/1Rd Reshapeentirelength. (850mLength) Clearupto3meitherside. Reinstatemitres. Builduproadsurfaceatunderground Telstracablecrossingso thatcable depthisatleast600mm.Usesoil fromlocalroadexcavationor truckin gravel. Ops/ContractCoordinator Comments:

Cpt93/4Rd Reshapeentirelength. (220mLength) Clearupto3meitherside. Installdrainagestructuresasper EPLrequirements. Ops/ContractCoordinator Comments:

Cpt93/4extRd RefertoattachedNewRoad Constructionform. (480mLength) Ops/ContractCoordinator

HP_BB_93_94_11v2 21-12-11 32 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Comments:

Cpt93/5Rd Reshapeentirelength. (100mLength) Clearupto3meitherside. Installdrainagestructuresasper EPLrequirements. Builduproadsurfaceatunderground Telstracablecrossingso thatcable depthisatleast600mm.Usesoil fromlocalroadexcavationor truckin gravel. Ops/ContractCoordinator Comments:

Cpt94/1Rd Reshapeentirelength. (350mlength) Clearupto3meithersideofroad pavement. InstalldrainageasperEPL requirements. Ops/ContractCoordinator Comments:

Cpt94/2Rd Reshapeentirelength. (410mlength) Clearupto3meithersideofroad pavement. InstalldrainageasperEPL requirements. Ops/ContractCoordinator Comments:

Cpt94/3Rd ClearandReshapeentirelength. (400mlength) Clearupto3meithersideofroad pavement. InstalldrainageasperEPL requirements. Ops/ContractCoordinator

HP_BB_93_94_11v2 21-12-11 33 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Comments:

Cpt94/4Rd Clear&reshapeentirelength. (210mlength) Clearupto3meitherside. Replacerolloverswithrubberflapsas perEPL. Reinstatemitres. Estimated2xrubberflapsrequired. Ops/ContractCoordinator Comments:

Cpt94/5Rd Clear&reshapeentirelength. (370mlength) Clearupto3meitherside. InstallrubberflapsasperEPL requirements. Reinstatemitres. Estimated4xRubberflapsrequired. Ops/ContractCoordinator Comments:

Cpt94/6Rd Clearandreshapeentirelengthwith outfall. (620mlength) Clearupto3meitherside. Checkinletandoutletofpipe. Cleanoutmitres. InstalladditionaldrainageasperEPL requirements. Ops/ContractCoordinator Comments:

Cpt94/7Rd Reshapeentirelength. (130mlength) Clearupto3meitherside. Install2xRubberFlaps. RefertoattachedRoadingMap Ops/ContractCoordinator

HP_BB_93_94_11v2 21-12-11 34 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Comments:

Cpt94/8Rd RefertoattachedNewRoad Constructionform. (110mlength) Ops/ContractCoordinator Comments:

Cpt94/9Rd Nilworks. (230mlength) AHighVoltageunderground electricitycableisburiedbeneath theroadpavementatanunknown depth. Donotgraderoadpavement. Donotreinstatemitres. Donotcarryoutanyroadside clearing. Ops/ContractCoordinator Comments:

Cpt94/10Rd Clearandreshapeentirelengthwith outfall. (100mlength) Clearupto3meitherside. Cleanoutmitres. InstalladditionaldrainageasperEPL requirements. Ops/ContractCoordinator Comments:

C1 E249829 Refertoattachedcrossingform. N6068244 Ops/ContractCoordinator Comments:

C2 Refertoattachedcrossingform. E249883 Ops/ContractCoordinator

HP_BB_93_94_11v2 21-12-11 35 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

N6058304 Comments:

C3 Refertoattachedcrossingform. E257279 Ops/ContractCoordinator Comments: N6059736

C4 Refertoattachedcrossingform. E250647 Ops/ContractCoordinator Comments: N6058414

C6 Refertoattachedcrossingform. E250917 Ops/ContractCoordinator Comments: N6057702

C7 Refertoattachedcrossingform. E251102 Ops/ContractCoordinator Comments: N6057516

HP_BB_93_94_11v2 21-12-11 36 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

NEWROADCONSTRUCTION

Cpt93/4extRd(ContractorResponsibility)

Features Road Specifications Additional instructions / Materials RoadLength(m) 480m Max.widthofroadprism(m) 7m Max.roadgrade(lengthroad 6degrees >10degrees?) Max.groundslope(length 5degrees road>30degrees?) Max.heightofcut/fillbatters ~0.5m (m) Maxlengthofbatters(m) ~50m Typeofsedimenttrapping/ Naturalsurrounding ContractCoordinatorto soilerosion/sedimentcontrol vegetationsupplemented monitorduringroad devicetobeusedduring seedandmulchifrequired. construction. construction Recommendedroaddrainage Recommendrubberflapsif Rubberflapsduring type >5degrees.Rolloversor operation.Permanent mitresif

Spacingofroadstructuresto AsperEPLSch.5,Section beinstalled C,Table1 Soilerosion/sedimentcontrol Drainageoutletsmustdrain Seed&mulchasrequired. techniques ontostablesurfacewhich ContractCoordinator to providesefficientsediment monitor. trapping&energy dissipation.Uponharvest completion,loggingdebrisis toberemovedfrom table andmitredrainsso theyare leftineffectiveworking order. Stabilisationassessment AsperEPLSch.5,Clause intervals 5,15,17,19&20 Dropdown&dissipater Notrequired. required Soilstabilisationtechniquesof Seed&mulchasrequired. disturbedareas Massmovement/dispersible Nil soils Finalroaduse Retain StartDate FinishDate Note: MaintenanceworksnotcompletedbyOperationsmustberecordedandpassedon totheContractCoordinator(Harvesting).

HP_BB_93_94_11v2 21-12-11 37 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Cpt94/8Rd(ContractorResponsibility)

Features RoadSpecifications Additionalinstructions/ Materials RoadLength(m) 110m Max.widthofroadprism(m) 7m Max.roadgrade(lengthroad 5degrees >10degrees?) Max.groundslope(length 5degrees road>30degrees?) Max.heightofcut/fillbatters ~0.5m (m) Maxlengthofbatters(m) EntireLength Typeofsedimenttrapping/ Naturalsurrounding ContractCoordinatorto soilerosion/sedimentcontrol vegetationsupplemented monitorduringroad devicetobeusedduring seedandmulchifrequired. construction. construction Recommendedroaddrainage Recommendrubberflapsif Rubberflapsduring type >5degrees.Rolloversor operation.Permanent mitresif

Spacingofroadstructuresto AsperEPLSch.5,Section beinstalled C,Table1 Soilerosion/sedimentcontrol Drainageoutletsmustdrain Seed&mulchasrequired. techniques ontostablesurfacewhich ContractCoordinator to providesefficientsediment monitor. trapping&energy dissipation.Uponharvest completion,loggingdebrisis toberemovedfrom table andmitredrainsso theyare leftineffectiveworking order. Stabilisationassessment AsperEPLSch.5,Clause intervals 5,15,17,19&20 Dropdown&dissipater Notrequired. required Soilstabilisationtechniquesof Seed&mulchasrequired. disturbedareas Massmovement/dispersible Nil soils Finalroaduse Retain StartDate FinishDate Note: MaintenanceworksnotcompletedbyOperationsmustberecordedandpassedon totheContractCoordinator(Harvesting).

HP_BB_93_94_11v2 21-12-11 38 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHROADINGMAP

HP_BB_93_94_11v2 21-12-11 39 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 40 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 41 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 42 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 43 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 44 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

REPLACEPAGEWITHCROSSINGFROM

HP_BB_93_94_11v2 21-12-11 45 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ATTACHMENT3 POST-HARVESTBURNINGPLAN

PlanningInformation

LGA: ??????Shire FuelManagementZone&ProposedBurnSummary

(RefertoSection1&2oftheHarvestPlanfordetails) FuelLoad(t/ha): 50-150tonsperhectareofLoggingSlash-est10t/habetweenfallen tree heads. Season: autumn /winter/spring Zone3B Post-Harvest FuelReductionObjectives:%ofnetplannedareatobeburned: approx75% Reducefuels to: <5t/ha

RegionalBurningGuideline

MaxTemp (°C): 20°C MinRH(%): 40% MaxBKDI: 100 MaxWindSpeed(km/h): 15km/h MaxFDI: 6(CalculateusingMcArthurMeteriffavourableconditionsdeteriorate) MinimumFuelMoistureContent: 12%(16%onedgeofMainDrainagelines,notindryup-slope filterstrips) MaxRateofSpread:1.5m/min(Regulatewithlightingpattern.Eg,Asingle “spotfire” on theup- hillsideofhead,anddon’tlightheadsdirectlybeneathdeliberatelyretained trees) AverageFlameheight:5m (Post-loggingburn treeheaddebrisonly)

ScorchHeight: to15m (ie,scorchheight=approx3 timesflameheight)

EnvironmentalPrescriptions

Flora,Fauna& OtherExclusions (RefertoSections6,7,8,9&10oftheHarvestPlanfordetails)

Soil,Water&AquaticHabitat Preferredmonthsofburn: ApriltoSeptember(Post-Logging)

FilterStripProtection: Fire tobeexcludedfrommaingullyfilterstripsusingfuelmoisture differentials.(RefertoSection11&12ofHarvestPlanfordetails) Soilexposure: Mineralearthexposurelimited tolessthan15%ofundisturbedarea(postharvest burnonly) Aquatichabitatprotection-Fire tobeexcludedfrommaingullyfilterstripsusingfuelmoisture differentials.(RefertoSection12ofHarvestPlanfordetails)

HP_BB_93_94_11v2 21-12-11 46 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

PLANNING INFORMATION

LGA: EurobodallaShire FuelManagementZone&ProposedBurnSummary

Refertoareaidentificationandsilvicultureandharvestingprescriptionsectionsofharvestplan. Season: Winter / Spring Zone3B (Post-Harvest)

REGIONALBURNINGGUIDELINES

MaxTemp (°C): 25 MinRH(%) : 30 MaxWindSpeed(km/h): <20Southerlyaspect <15Northerlyaspect

MaxBKDI:<70 MaxFDI: 7 ( subjecttoareaassessment). ScorchHeight: 0.6xdominanttreeheight – PostLog 10m – BroadArea

MaxFuelMoistureRange: 12-25% MaxRateofSpread: <300m/hr. AverageFlameheight: upto4m – PostLog <1 – 2m – BroadArea

FuelReductionObjectives: 60-80%ofnetareatobeburned. Reducefinefuelsto:manageablelevels-PostLog 4 – 8t/ha – BroadArea

BURNAREAINFORMATION

Fuelloads: 50-150tonsperhectareofloggingslash,10 – 20tonsperhectareinbetweentreeheads.

Fuelarrangement: Multi-tieredstructure(litter,grasses,shrubs,eucalyptregenerationandmaturetrees)

Terrain: Compartment93-0%>30°, 0%@25°-30°,0%@20°-25°, 3%@10°-20°,97%@0°-10° slope. Compartment94-0%>30°,0%@25°-30°, 2%@20°-25°, 29%@10°-20°, 69%@0°-10° slope.

Timesincelastburn: 2Years-HRBurnin2009 IMPORTANTBURNINGPRESCRIPTIONS • Asmalltestburnmustalwaysbelitpriortomainburn.ThiswillassistindeterminingFIREBEHAVIOURandIGNITION PATTERNS. • SeekinformationfromHarvestingContractCoordinatoronregrowthexcludedburnareas. • Sectionswillbelitbydriptorchtoadeterminedignitionpattern. • Areaswillgenerallybeburntfrom ridgetopsdownandintothewind tominimiseexcessivefirebehaviour. • Minimisefireintensityinregrowthstands.

BURNOBJECTIVES

• Toreducefuelloadsto4-8tonnes/ha.(assistingfuturefiresuppression) • Aburncoveragebetween60-80% • Tocontainfirewithindesignatedboundaries. • Toobserveandrecorddata,assistinginfuturehighfuelloadandadvancedregrowthareaburns. • Tominimisecrownscorch;notexceeding10%ofdominantandco-dominantcrowns. • Tominimisedefectdamagetoretainedregrowthstems.

HP_BB_93_94_11v2 21-12-11 47 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ENVIRONMENTALPRESCRIPTIONS

FLORAANDFAUNA:

RefertoFloraandFaunasectionsof theHarvestplandocument.H&Rtreesshouldberakedaroundiftheriskofburningis high.Loggingslashcollectedaroundretainedtreesshouldnotbeburnt.

SOIL,WATER&AQUATICHABITAT: RefertoSoilsandWaterandDrainageFeaturessectionsoftheHarvestplandocument.

• Preferredmonthsofburn – ApriltoSeptember

• Fuelmoisturedifferentialswillbeutilisedtominimiseimpactsupondrainagefeatureswithintheburnarea

• Harvestingofunmappeddrainagelineswasplannedtooccurwithinthesecompartments.Toensurethat>70% groundcoverwithinthemodifiedharvestzoneoftheunmappeddrainagelinesisnotcompromised,theburn supervisorshouldpayparticularattentiontothefuelmoisterdifferentialsmentionedaboveandnotdeliberatelyburn headswithinthemodifiedharvestingzone.

ABORIGINALCULTURALHERITAGE:

RefertotheculturalheritagesectionoftheHarvestplandocument.Significantsites,e.g. scar trees,groovestones,camps shouldberakedaroundtopreventfiredamage.Wherepracticallypossible,burningofscatteredartefactsshouldbeavoided.

CONTROLANDSTRATEGY

CONTROLLINES: EXISTING DescriptionofWorkRequired Completed Descriptionofeachcontrolline Yes/No TomboyeRoad Nil BurmaRoad Nil JoesNoseRoad Nil DonovanCreekRoad Nil TowerCreekRoad Nil DeepCreek Fuelmoisture>16% Checkfor treesthatcouldburndownandfalloveranyboundaryroadsandwetdownor rakearoundasnecessary PROPOSED Description of Work Required Completed Descriptionofeachcontrolline Yes/No Additionalcontrollinesmayberequiredwheresnig TobedeterminedbyContractCoordinator tracknetworkisnotadequatealongboundariesofNHA duringharvesting. (particularlyalongboundarieswithexclusionzonesand PrivateProperty tothenorthernsideofthe compartment).

SMOKEHAZARDANDMANAGEMENT: http://www.bom.gov.au/general/reg/smoke/nsw/index.shtml Smoke /HazardReductionSignsrequired?:……….. YES NO ( ticktoindicate) SmokeDispersionForecastingviaBOMutilised?..... YES NO ( ticktoindicate)

HP_BB_93_94_11v2 21-12-11 48 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Safety Considerations (pre-burn) DAY DAY DAY DAY DAY DAY DAY 1 2 3 4 5 6 7 Personnel Namesoffirecrewdocumenteddaily.

Visitorsonsite Visitoronsiteinductioncarriedout

Neighbours Documentedinplan notified Trafficcontrol Trafficcontrolsignstoregulatetrafficifrequired

Smokemanagement: Assessmentofprevailingwindsatthetimeofburn. Roadsidesignswarningofsmokehazard.

Pre-burn preparation activities and responsibilities. Activity Specificationsandtasks Responsibility Signature (incdate) Fuelmonitoring Regularmonitoringprior toburning

Weathermonitoring Conductedpriortoandduringburningoperations.

Trailpreparation Mineralearthcontrollinespreparedpriortoburningto containfirewithindesignatedburningblock. • D3 • Handtools Neighbourliaison Notificationandcommunicationsdocumented.

Liaisonwithfire& “asabove” emergencyauthorities Mediareleases ToadviselocalcommunityofSFburningactivities.

Radiostationnotifications “asabove”

Equipment Ensureallrequiredequipmentisavailable.

Communications “asabove”

VisitorSafety Burnissignposted.Allvisitorstoreporttoburn supervisorimmediately

Burnapproval Dailyburnapprovalsgivenbydelegatedofficers

Supervisor toinitial

HP_BB_93_94_11v2 21-12-11 49 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

NOTIFICATION&RESOURCEREQUIREMENTS

Neighbours……………. Contractors……………. Lessees………………....

Apiarists…………….…. ShireFCO…………….. GovtAgencies………….

NOTIFICATIONREGISTER

RFS(RuralFireService) Name Position PhoneNumber Notified FCO

NEIGHBOURS:(Refertocompartmentplanningfolderfordetailspriortoburning) Owner Postal Address Lot / Plan Phone Notification Reply Letterssent Received

APIARISTS:(Refer tocompartmentplanningfolderfordetailspriortoburning) Name Site Number/s Phone Number Notified

DAILYCREWSMEACSBRIEFINGSHEET (tickdailywhenbriefed) SITUATION DAY123456 7 - Burnareatobetreated(location,boundaries,controllinetypesandexclusiveareas) ...... £££££££ - Burnareacharacteristics(e.g.terrain,forestcover,sensitiveareas,etc)...... £££££££ - Burnareaaccessbyroadclass(checkedbeforehand,deadends,wateringpointsetc.)...... £££££££ - FuelLoadingsandfirebehaviourprescriptionsfortheHRBarea...... £££££££ - Stagingareas...... £££££££ - Expectedweather...... £££££££ MISSION - Overallaimofthehazardreductionburn...... £££££££ - SitespecificaimsforsectionsoftheHRB(eg,protectionofpatchesofadvancedregrowth, rainforestpockets,buildings,bridges,etc.)...... £££££££ - Secondaryaim/sshouldtheHRBescape...... £££££££ EXECUTION - Plantandmanpower resources (FNSW,RFS,OEH,others)...... £££££££ - Divisionofburnareainto ‘Sections’...... £££££££ - Startingpoints,startingtimes,finishtimes(start ‘downwind’ ifpossible)...... £££££££ - Safe ‘approved’ lightingpatternsanddirections...... £££££££ - Workdown-slope,keepingbelowactivefire(exceptwheregood fuelbreaksoccur)...... £££££££ - Locationandactivityofotherburningcrews...... £££££££ - Personalandcrewsafety-buddysystemwhenlightingup...... £££££££ - Progressreportsatpre-designatedtimes...... £££££££ - Maintainawarenessofotherburningcrews(donotlightupbelowotherburningcrews)...... £££££££ - Expectedfirebehaviour,troublepointsandcontingencyplans...... £££££££ - Actionstobetakenin theeventofanescapee.g.topausethelight-up...... £££££££ - Endofburndebriefe.g.reportingareasrequiring ‘follow-up’ patrolsafterburn...... £££££££

HP_BB_93_94_11v2 21-12-11 50 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

ADMINISTRATION - Reportingfieldfireweather to theofficeatregular times...... £££££££ - Receiving forecastweatherreportsfromoffice...... £££££££ - Logisticalsupport(fuel,food,water,heavyplant,back-upcrewsetc.)...... £££££££ CONTROL,COMMAND,COMMUNICATIONS - Chainofcommand(burnsupervisorandsectorbosses)...... £££££££ - Communicationssystemsforfire-groundandcommand(UHF&VHFradios,mobilephones)...... £££££££ SAFETY - MedicalEmergencyEvacuationPlan&SiteSafetyPlan...... £££££££ - Areasoflikelytreeorlimbfallinghazards(methods toidentify/markhazards)...... £££££££ - Lookupandlookaroundprocedure(forselfandworkmates)...... £££££££ - Locationfirstaidkitsandfirstaiders...... £££££££ - Pre-burnsafetyactionsincluding ‘SmokeHazard’ signlocations,trafficcontrolplanetc...... £££££££ - Locationofsafetyzones,andescaperoutes...... £££££££ - SafeparkingofSFvehicleswithintheburnareaandvehiclespeedsduringtheburn...... £££££££ - Crewvehiclestohaveheadlightsandflashingbeaconsonwherepracticable...... £££££££ - Scheduleadequaterestbreaksandsetappropriateworkpace...... £££££££ - Ensurecrewshaveaccesstosuppliesofdrinkingwater...... £££££££ - VisitorstothesiteareinductedintotheSSP...... £££££££

Day1-BurnSupervisor………………………Date…………..Day2-BurnSupervisor…………………………Date………….. Day3-BurnSupervisor………………………Date…………..Day4-BurnSupervisor…………………………Date………….. Day5-BurnSupervisor………………………Date…………..Day6-BurnSupervisor…………………………Date………….. Day7-BurnSupervisor………………………Date…………..Day8-BurnSupervisor…………………………Date…………..

EMPLOYEEIDENTIFICATION PROOF OF DATE SUPERVISOR OR EMPLOYEE NAME ACCREDITATION RELEVANT (Eg.FNSWRECORDS) AGENCY SIGNATURE IncidentController BurnSupervisor CrewLeader CrewLeader CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember

HP_BB_93_94_11v2 21-12-11 51 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Personnelandequipmentrequirements: Resource StateForests NPWS Brigades SFOSignature IncidentController CrewLeaders CrewMembers Tankers 1 Slip – onUnits 1+ Dozer n/a Helicopter n/a Radios – handheldUHF 1perperson Weathermonitoringequip. 1percrew BurningOperationsRecord ForecastWeatherandIndices (ObtainfromOffice)

SeeattacheddailyweatherforecastsandrelevantindicesobtainedfromtheBureauofMeteorology BurnSiteWeatherReadings Takedailyonsitereadings(hourlyifpossible)andnoteun-forecastweatherchanges. Temp RH Wind WindSp. FDI FMC % COMMENTS Date Time (°C) (%) Direction (km/h)

FIREBEHAVIOUR PREDICTED ACTUAL FlameHeight ROS Assessment FlameHeight ROS Comments Date Time(hrs) (m) (m/hr) Method (average) (m/hr)

HP_BB_93_94_11v2 21-12-11 52 SouthernRegion – Compartments93&94,BoyneStateForest,SouthCoastManagementArea

Ignitiondetails – DATE(s)……………….. Type: Aerial/Ground Method: Contour /Ridge/Roadedge/Topdisposal Pattern: Line/Spots IncendiaryCapsulesused:______(aerialignitiononly)

Ignitiondetails – DATE(s)……………….. Type: Aerial/Ground Method: Contour /Ridge/Roadedge/Topdisposal Pattern: Line/Spots IncendiaryCapsulesused:______(aerialignitiononly)

Ignitiondetails – DATE(s)……………….. Type: Aerial/Ground Method: Contour /Ridge/Roadedge/Topdisposal Pattern: Line/Spots IncendiaryCapsulesused:______(aerialignitiononly)

Ignitiondetails – DATE/s Type: Aerial/Ground Method: Contour /Ridge/Roadedge/Topdisposal Pattern: Line/Spots IncendiaryCapsulesused:______(aerialignitiononly)

POSTBURNASSESSMENT Estimatedburncoverage(%ofnetarea):…………………..%

Estimatedburncoverage:…………………………………….ha

Finefuelreducedtoanaverageof :………………………….t/ha Estimatedareaofcrownscorch :……………………………. % OPERATIONALPERFORMANCEREVIEW Burncomplete? Yes/No Followupactionrequired? Yes/No Burncontainedwithinplannedboundaries? Yes/No Burncoverageobjectivemet? Yes/No

Finefuelreductionobjectivemet? Yes/No Environmentalprescriptionsmet? Yes/No ThreatenedSpeciesLicenseconditionsmet? Yes/No FisheriesLicenseconditionsmet? Yes/No

RemedialActionrequired (ifany):______

Remedialworkscertifiedcomplete.

WorkSupervisor______Date:______

Comments:______Attachadditionalpagesasrequired

HP_BB_93_94_11v2 21-12-11 53