Traffic Engineering Manual Revised 04/2015

Total Page:16

File Type:pdf, Size:1020Kb

Traffic Engineering Manual Revised 04/2015 Traffic Engineering Manual Revised 04/2015 Traffic Engineering Manual Table of Contents I. Administrative Policies AUTHORIZATION FOR 2009 MUTCD .............................................................. 6 AUTHORIZATION FOR TRAFFIC CONTROL DEVICES ............................... 7 PHOTO ENFORCEMENT PERMIT POLICY ..................................................... 8 II. Requirements Section 1A.1 STUDY OF TRAFFIC ENGINEERING LOCATIONS ..................................... 21 Section 1B.1 TRAFFIC ENGINEERING WAIVERS .............................................................. 22 Section 2A.1 SIGNS ................................................................................................................... 23 Section 2A.2 U CHANNEL SIGN POST SPLICE .................................................................... 24 Section 2B.2 USE OF TRUCK ROUTE SIGNS ....................................................................... 25 Section 2B.3 USE OF NO TRUCK SIGNS ............................................................................... 26 Section 2B.4 USE OF WEIGHT LIMIT SIGNS ....................................................................... 28 Section 2B.5 USE OF NO HAZARDOUS CARGO SIGNS .................................................... 29 Section 2B.6 UNMUFFLED COMPRESSION BRAKE PROHIBITED SIGNS .................... 30 Section 2B.7 LOUD MUSIC PROHIBITED SIGNS ................................................................ 33 Section 2B.8 INSTALLATION AND MAINTENANCE OF STOP SIGNS ........................... 35 Section 2B.9 KEEP RIGHT EXCEPT TO PASS/SLOWER TRAFFIC KEEP RIGHT .......... 36 Traffic Engineering Manual Section 2B.10 MOVE ACCIDENTS FROM TRAVEL LANES SIGNS ................................... 37 Section 2B.11 MOVE OVER ....................................................................................................... 39 Section 2C.3 TRAFFIC SIGNAL UNDER STUDY FOR REMOVAL SIGN ......................... 41 Section 2C.4 USE OF SIGNAL AHEAD SIGNS ..................................................................... 42 Section 2C.5 USE OF LOW CLEARANCE SIGNS ................................................................. 43 Section 2C.6 WARNING SIGNS FOR PLAY ACTIVITIES ................................................... 44 Section 2C.7 WARNING SIGNS FOR ANIMALS .................................................................. 45 Section 2C.8 CHURCH WARNING SIGN POLICY ............................................................... 46 Section 2C.9 BRIDGE ICES BEFORE ROAD SIGN POLICY ............................................... 47 Section 2D.2 JURISDICTIONAL BOUNDARY SIGNS ON INTERSTATE AND NON- INTERSTATE HIGHWAYS ............................................................................... 48 Section 2D.3 GATEWAYS INTERSTATE AND NON-INTERSTATE HIGHWAYS .......... 52 Section 2D.4 USE OF HOSPITAL SPECIFIC SERVICE SIGNS ON INTERSTATES/NON- INTERSTATES FOR EMERGENCY SERVICES ............................................. 56 Section 2D.5 USE OF PHARMACY SIGNS ON INTERSTATE HIGHWAYS ..................... 59 Section 2D.6 USE OF SUPPLEMENTAL GUIDE SIGNS ON NON-INTERSTATE HIGHWAYS ........................................................................................................ 61 Traffic Engineering Manual Section 2D.7 DESTINATION SIGNING FOR NON-CONTROL OF ACCESS ROUTES .... 66 Section 2D.8 INSTALLATION AND MAINTENANCE OF LOCAL STREET NAME SIGNS ................................................................................................................... 68 Section 2D.9 LANDSCAPE SPONSORSHIP SIGNS FOR ROUNDABOUTS ...................... 70 Section 2E.2 TOURIST INFORMATION AND WELCOME CENTER SIGNING ............... 72 Section 2F.1 SCENIC RIVER SYSTEM SIGNING ................................................................. 74 Section 2G.1 WATERWAY SIGNING ..................................................................................... 75 Section 2H.1 ACKNOWLEDGEMENT SIGNS OR PLAQUES ............................................. 76 Section 2M.1 MEMORIAL AND DEDICATION SIGNS ........................................................ 77 Section 3B.2 MARKED CROSSWALK GENERAL INFORMATION .................................. 81 Section 3B.3 NO PASSING ZONES ......................................................................................... 87 Section 3C.2 USE OF OBJECT MARKERS ............................................................................ 89 Section 4B.3 REMOVAL OF TRAFFIC SIGNALS ................................................................. 91 Section 4B.4 USE OF NON STANDARD TRAFFIC SIGNAL POLES ................................. 95 Section 4L.1 REMOVAL OF INTERSECTION CONTROL BEACONS ............................... 96 Section 6A.1 QUEUE ANALYSIS FOR LANE CLOSURES ON INTERSTATE .................. 97 Traffic Engineering Manual Section 7A.2 POLICY FOR SCHOOL AREAS ........................................................................ 99 Section 8A.1 DO NOT STOP ON TRACKS ...........................................................................105 Section 8B.1 RAILROAD STORAGE SPACE SIGNS ..........................................................106 Section 9B.2 BICYCLE SHARE THE ROAD ASSEMBLY .................................................107 III. Studies Section 20.1 AJR NETWORK STUDY ..................................................................................111 Section 20.2 SPEED STUDY ..................................................................................................118 Section 20.3 CURVE SPEED STUDY ...................................................................................124 APPENDIX A LIST OF FIGURES AND TABLES ..................................................................128 APPENDIX B MUTCD REFERENCES ....................................................................................131 APPENDIX C LEGAL REFERENCES .....................................................................................162 Traffic Engineering Manual Policies I. Administrative Policies AUTHORIZATION FOR 2009 MUTCD 6 Traffic Engineering Manual Policies AUTHORIZATION FOR TRAFFIC CONTROL DEVICES 7 Traffic Engineering Manual Policies PHOTO ENFORCEMENT PERMIT POLICY 8 Traffic Engineering Manual Policies 9 Traffic Engineering Manual Policies 10 Traffic Engineering Manual Policies 11 Traffic Engineering Manual Policies 12 Traffic Engineering Manual Policies 13 Traffic Engineering Manual Policies 14 Traffic Engineering Manual Policies 15 Traffic Engineering Manual Policies 16 Traffic Engineering Manual Policies 17 Traffic Engineering Manual Policies 18 Traffic Engineering Manual Policies 19 Traffic Engineering Manual Policies II. Requirements The following sections are Traffic Engineering policies that are set by the Department for use when involving signs and pavement markings. Revisions to these policies will be signed by the Chief Engineer and become effective upon receipt. Non-compliance of these policies requires approval from the correct chain of command. 20 Traffic Engineering Manual Policies Section 1A.1 STUDY OF TRAFFIC ENGINEERING LOCATIONS 1A.1.1 PURPOSE If a location has been studied within 2 years of the current date, a new study shall be conducted only if there has been a major traffic generator or traffic volumes added to the area. 1A.1.2 DOCUMENTATION FOR APPROVAL All correspondence to local governments on traffic control changes should include the following verbiage: In accordance with Senate Concurrent Resolution No. 27 of the 2007 Regular Session, the Department will consider requests from the local governing authority if they have concerns regarding any changes to traffic control with their corporate limits based on the following three requirements: 1. A traffic engineering study is conducted by the municipal/parish traffic engineer and a report is prepared which supports the positions of the governing authority. 2. The governing authority of the municipality enacts a local ordinance, which adopts the findings by the local traffic engineering report. 3. The District Traffic Engineer for the Department concurs with the findings of the traffic engineering report. Reports should be sent in on Intradepartmental letterhead with signature blocks for approval. 21 Traffic Engineering Manual Policies Section 1B.1 TRAFFIC ENGINEERING WAIVERS 1B.1.1 DEFINITION A waiver is required when an EDSM or another policy requirements are not met. 1B.1.2 PURPOSE The purpose of this section is to define procedures to get a waiver approved. An intradepartmental memo should state what is being waived, why a waiver is needed and what mitigation will be done. All necessary reports or documentation should be attached to the intradepartmental memo. The intradepartmental memo shall be addressed to the Chief Engineer or the Traffic Engineering Division Administrator depending on who has been designated to approve the specific waiver. There should be a routing slip attached to the memo with the following order of approvals: 1. District Administrator 2. Traffic Engineering Management Administrator 3. Traffic Engineering Division Administrator 4. Chief Engineer 22 Traffic Engineering Manual Signs Section 2A.1 SIGNS 2A.1.1 MUTCD SECTION REFERENCE Chapter 2 Signs 2A.1.2 POLICY Word messages shall not be used if a symbol designs is available in the current DOTD adopted MUTCD. 2A.1.3 EXAMPLES Figure 2A.1.1 Symbol Sign Example 1 Figure 2A.1.2 Symbol Sign Example 2 23 Traffic Engineering Manual Signs Section 2A.2 U CHANNEL SIGN POST SPLICE 2A.2.1 MUTCD SECTION
Recommended publications
  • An Intelligent Transportation Systems (Its) Plan for Canada: En Route to Intelligent Mobility
    Transport Transports TP 13501 E Canada Canada AN INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN FOR CANADA: EN ROUTE TO INTELLIGENT MOBILITY November 1999 TABLE OF CONTENTS EXECUTIVE SUMMARY ..............................................................................................1 1. INTRODUCTION.......................................................................................................5 2. ADDRESSING TRANSPORTATION CHALLENGES.............................................5 3. WHAT ARE INTELLIGENT TRANSPORTATION SYSTEMS?..............................7 4. BENEFITS OF ITS....................................................................................................9 5. AN ITS PLAN FOR CANADA - VISION AND SCOPE ..........................................12 6. MISSION: EN ROUTE TO INTELLIGENT MOBILITY .........................................14 7. OBJECTIVES .........................................................................................................14 8. PILLARS OF THE ITS PLAN.................................................................................17 9. MILESTONES.........................................................................................................27 10. CONCLUSION ......................................................................................................30 APPENDIX A ........................................................................................................... i An ITS Plan for Canada: En Route to Intelligent Mobility An ITS Plan for Canada: En Route to Intelligent
    [Show full text]
  • What to See Where to Stay Where to Eat
    2010 EDition GREA t E R B A t O N R O u GE The Official Visitors Guide PluS is here! What to see Where to stay Where to eat SPONSORED BY: TheMusic Issue Date: Welcome Ad proof #4 • Please respond by e-mail or fax with your approval or minor revisions. • Ad will run as is unless approval or final revisions are received by the close of business today. • Additional revisions must be requested and may be subject to production fees. Carefully check this ad for: CORRECT ADDRESS • CORRECT PHONE NUMBER • ANY TYPOS This ad design © Louisiana Business, Inc. 2009. All rights reserved. Phone 225-928-1700 • Fax 225-926-1329 d o fo a Se & Steak Family owned and operated Fireside dining Can accommodate large parties including rehearsal dinners Fresh homemade yeast rolls will greet you at your table US Highway 190, Livonia, LA 70755 | 225-637-3663 | notyourmamas.net (just 20 minutes west of Baton Rouge and 40 minutes east of Lafayette) Open daily 11-9pm • Fri. and Sat. 11-10pm 3 WELCOME • www.visitbatonrouge.com Issue Date: Welcome Ad proof #2 • Please respond by e-mail or fax with your approval or minor revisions. • Ad will run as is unless approval or final revisions are received by the close of business today. • Additional revisions must be requested and may be subject to production fees. Carefully check this ad for: CORRECT ADDRESS • CORRECT PHONE NUMBER • ANY TYPOS This ad design © Louisiana Business, Inc. 2009. All rights reserved. Phone 225-928-1700 • Fax 225-926-1329 VISIT US AT WWW.HOOTERSLA.COM TO FIND A LOCATION NEAR YOU Hooters Siegen Lane 6454 Siegen Lane Baton Rouge, LA 70809 225-293-1900 Hooters College Drive 5120 Corporate Blvd.
    [Show full text]
  • National Infrastructure Simulation and Analysis Center
    This page intentionally left blank. National Infrastructure Simulation and Analysis Center Risk Development and Modeling Branch Homeland Infrastructure Threat and Risk Analysis Center Office of Infrastructure Protection In Collaboration with The National Incident Management Systems and Advanced Technologies Institute at The University of Louisiana at Lafayette Louisiana Highway 1/Port Fourchon Study July 15, 2011 i This page intentionally left blank. ii Executive Summary Port Fourchon is located at the southern tip of Lafourche Parish, Louisiana, along the coast of the Gulf of Mexico. The port is the southernmost port in Louisiana and centrally located in a large area of the Gulf that is rich in oil and natural gas drilling fields. Shallow water operations are serviced out of many ports along the Gulf Coast, but servicing for deepwater operations is located at select ports due to the use of larger vessels that are required to support deepwater operations. Due to its central location, deep channels, favorable weather conditions, and size, the oil and gas industry has chosen to concentrate its infrastructure for deepwater oil and gas operations support at Port Fourchon. Roughly 270 large supply vessels traverse the channels of Port Fourchon each day. Normally, about 75 percent of these vessels are servicing drilling rigs. Even though there are many more production platforms that require servicing than there are operating drilling rigs, drilling operations require much more material than production requires. The supplies and materials sent to rigs and platforms from Port Fourchon are brought into the port by the 600 eighteen-wheel trucks that travel on Louisiana Highway 1 (LA-1) each day.
    [Show full text]
  • Navigation Signing for Roundabouts
    SAIC N N a a t t Bryan J. Katz, PE, PTOE i i o o n n a a l l R R o o u u n n d d a a b b o o May 24, 2005 Vail, Colorado u u t t C C o o Study Performed for: n n f f e e Roundabouts r r e e n n SAIC c c e e 2 2 0 0 0 0 5 5 TRB National Roundabouts Conference D D Traffic Control Devices Pooled Fund Study Navigation Signing for R R A A Vaughan W. Inman, PhD. F F T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u Problem t t C C o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 rowing and Widespread Adoption of o Standard for Navigation Signing at D D R R Roundabouts Roundabouts G N A A F F • • T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C Approach o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 onduct Laboratory Evaluation of tate of Practice Review Roundabout election of Four Representative D D R R Navigation Signage Signing Approaches for Evaluation Comprehension of Representative Signs C S S A A F F • • • T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u k t t C C r o o n n o f Alternatives f Four Signing e e r r e e n n Y c c e e 2 2 w 0 0 0 0 aryland onventional iagrammatic e 5 5 D D R R C M D A A F F • • • •N T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f e e r r e e n n c c e e 2 2 Conventional 0 0 0 0 5 5 D D R R A A F F T T Route Number Shields on One Assembly, Destination Names on Separate Guide Sign N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f Maryland e e r
    [Show full text]
  • South Gloucestershire Council Public Consultation Cycling City Route
    South Gloucestershire Council Public Consultation Cycling City Route Number 7 – Ring Road Path Background In June 2008 South Gloucestershire Council, jointly with Bristol City Council, were chosen as Britain’s first Cycling City. Government funding totalling £11.4 million has been awarded to the area to transform cycling infrastructure and to pioneer innovative ways of making cycling a real transport option for more residents. This funding will be matched by Bristol and South Gloucestershire councils and their partners creating a total scheme value of £22.8 million. The aim of the Cycling City project is to double the number of cyclists in the Greater Bristol area. To do this we need to promote and encourage cycling through better infrastructure, training and promotion. The Cycling City project will implement safe, continuous, attractive, comfortable and coherent routes across the project area. This route has been designed with the help of the South Gloucestershire cycle forum. The forum is a group of regular cyclists who have worked with engineers to ensure the proposed route is suitable and to overcome current problems on the route. Route Cycling City Route 7 will run predominantly along the A4174 Ring Road off-road cycle path from the Dramway Roundabout (junction with B4465 Shortwood Hill), to the Bristol City Council boundary in the vicinity of Southmead Hospital (i.e. Kenmore Drive). Although the westernmost section of the route is located away from the Ring Road corridor, continuous direction signing as far as Southmead Hospital will be provided as part of the Cycling City route signing proposals. This route will provide a total length of approximately 10km of predominantly off-carriageway cycle facilities.
    [Show full text]
  • 2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020
    2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020 CONNECTICUT DEPARTMENT OF Transportation BUREAU OF POLICY AND PLANNING Office of Roadway Information Systems Roadway INVENTORY SECTION INTRODUCTION Each year, the Roadway Inventory Section within the Office of Roadway Information Systems produces this document entitled "Limited Access - State Numbered Highways," which lists all the limited access state highways in Connecticut. Limited access highways are defined as those that the Commissioner, with the advice and consent of the Governor and the Attorney General, designates as limited access highways to allow access only at highway intersections or designated points. This is provided by Section 13b-27 of the Connecticut General Statutes. This document is distributed within the Department of Transportation and the Division Office of the Federal Highway Administration for information and use. The primary purpose to produce this document is to provide a certified copy to the Office of the State Traffic Administration (OSTA). The OSTA utilizes this annual listing to comply with Section 14-298 of the Connecticut General Statutes. This statute, among other directives, requires the OSTA to publish annually a list of limited access highways. In compliance with this statute, each year the OSTA publishes the listing on the Department of Transportation’s website (http://www.ct.gov/dot/osta). The following is a complete listing of all state numbered limited access highways in Connecticut and includes copies of Connecticut General Statute Section 13b-27 (Limited Access Highways) and Section 14-298 (Office of the State Traffic Administration). It should be noted that only those highways having a State Route Number, State Road Number, Interstate Route Number or United States Route Number are listed.
    [Show full text]
  • "Maggie" Martin for Her Outstanding Service, and Numerous
    2015 Regular Session ENROLLED SENATE RESOLUTION NO. 10 BY SENATOR PEACOCK A RESOLUTION To commend Margaret "Maggie" Martin for her outstanding service, and numerous contributions to her community and her state, and on her many accomplishments. WHEREAS, it is with great pride that the citizens and the Senate of the Legislature of Louisiana recognize Maggie Martin for her many extraordinary accomplishments; and WHEREAS, for fifty years, Maggie Martin's reporting and society column at The Times in Shreveport have told stories of people of all walks of life, with travels along Louisiana Highway 1, Mardi Gras in the Ark-La-Tex and the investigation of the late Public Safety Commissioner George D'Artois, in which a grand jury witness was killed, all leading to The Times being a finalist for a Pulitzer Prize Public Service Award; and WHEREAS, her stories took her around the country, into operating rooms, small homes at the end of dirt roads, through gleaming mansions, and into public offices, prisons, and remote churches, and the most glitzy of society events; and WHEREAS, she has covered fashion, medicine, and education, winning one hundred seven Louisiana Press Women Awards; and WHEREAS, some of her favorite stories inspired the opening of the old Fairgrounds Field Press Box to women, a cattle drive in Cameron Parish, and an interview with a woman who was in the New London, Texas, school gas explosion that killed hundreds and had never discussed her experience; and WHEREAS, Maggie Martin's Rolodex, skinny notebooks with her distinct handwriting, tearsheets, photos, and other items provided a glimpse of her career as part of "50 Years of Journalism: Margaret Martin and The Times" at the Louisiana State Exhibit Museum; and WHEREAS, from the clattering of manual typewriters inside the newsroom to computer keyboards and digital cameras with husband Paul Schuetze by her side, Maggie Martin has adapted to the times; and Page 1 of 2 SR NO.
    [Show full text]
  • FEDERAL REGISTER VOLUME 30 • NUMBER 87 Thursday, May 6,1965 ' • Washington, D.C
    FEDERAL REGISTER VOLUME 30 • NUMBER 87 Thursday, May 6,1965 ' • Washington, D.C. Pages 6325-6376 Agencies in this issue— Agricultural Stabilization and Conservation Service Air Force Department Alien Property Office Army Department Civil Aeronautics Board Civil Service Commission Commodity Credit Corporation Consumer and Marketing Service Delaware River Basin Commission Federal Aviation Agency Federal Communications Commission . Federal Maritime Commission FederalPower Commission Federal Reserve System Fiscal Service Fish and Wildlife Service Food and Drug Administration Forest Service Interior Department Internal Revenue Service interstate Commerce Commission Land Management Bureau Securities and Exchange Commission Detailed list of Contents appears inside. Just Released CODE OF FEDERAL REGULATIONS (As of January 1, 1965) Title26—Internal Revenue (Part 1, § 1.861-End, to Part 19) $1.50 (Pocket Supplement) Title 26—Internal Revenue (Parts 30-39) _ _ $0.50 (Pocket Supplement) Title 35—Panama Canal _ _ $0.40 (Pocket Supplement) Title 49—Transportation (Parts 0-70) _ — $0.40 > (Pocket Supplement) A cumulative checklist of CFR issuances for 1965 appears in the first issue of each month under Title 1. Order from Superintendent of Documents, United-States Government Printing Office, Washington, D.G. 20402 f XPublished VUW6daily,Jf-9 “Tuesday UvwVlUJf ViUV/UgUthrough K/UIVMAMwJSaturday yuv(no publication on Suhdwygr^ , i y M^pal on the day after an official Federal holiday), by the Office of the Federal Reg s > ^ ^ 1 FEDEMLM&REGISTER Archives and Records Service, General Services Administration (mail ada,„ine£j m tbe Area Code 202 Phone 963-3261 Archives Building, Washington, D.C. 20408), pursuant to the authority con Federal Register Act, approved July 26, 1935 (49 Stat.
    [Show full text]
  • Recommended Forestry Best Management Practices for Louisiana
    Recommended Forestry Best Management Practices for Louisiana CONTENTS ABOUT THE MANUAL ............................................................................................ lvii USING THE MANUAL .............................................................................................lviii INTRODUCTION .......................................................................................................1 PLANNING FOR FOREST OPERATIONS...................................................................... 3 FOREST ROADS .........................................................................................................5 Overview ..................................................................................................................5 Permanent Roads ......................................................................................................5 Temporary Roads ....................................................................................................10 TIMBER HARVESTING ..............................................................................................13 Pre-harvest Planning ............................................................................................... 13 Streamside Management Zones .............................................................................. 14 Felling & Skidding Techniques ................................................................................ 19 Landings, Log Decks & Sets ...................................................................................
    [Show full text]
  • Estimation of Pier Scour and Channel Stability for Highway Crossings of the Red River in Louisiana
    ESTIMATION OF PIER SCOUR AND CHANNEL STABILITY FOR HIGHWAY CROSSINGS OF THE RED RIVER IN LOUISIANA By J. Josh Gilbert and Paul A. Ensminger U.S. GEOLOGICAL SURVEY Open-File Report 96-574 Prepared in cooperation with the: LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT Baton Rouge, Louisiana 1996 U.S. DEPARTMENT OF THE INTERIOR BRUCE BABBITT, SECRETARY U.S. GEOLOGICAL SURVEY Gordon P. Eaton, Director For additional information Copies of this report can be write to: purchased from: District Chief U.S. Geological Survey U.S. Geological Survey Branch of Information Services 3535 S. Sherwood Forest Blvd., Suite 120 Box 25286 Baton Rouge, LA 70816 Denver, CO 80225-0286 E-mail: [email protected] Telephone: (504) 389-0281 CONTENTS Abstract.................................................................................................................................................................. 1 Introduction......................................................................................................^^ 1 Purpose and Scope...................................................................................................................................... 2 Description of Study Area.......................................................................................................................... 2 Acknowledgments...................................................................................................................................... f Hydrology and Hydraulics....................................................................................................................................
    [Show full text]
  • Washington, Wednesday, February 27, 1957 TITLE 3—THE PRESIDENT , CONTENTS
    FEDERAL REGISTER VOLUME 22 ' V / . '9 3 4 NUMBER 39 Washington, Wednesday, February 27, 1957 TITLE 3— THE PRESIDENT DONE at the City of Washington this , CONTENTS twenty-ffrst day of February in the year PROCLAMATION 3170 of our Lord nineteen hundred THE PRESIDENT [ seal] and fifty-seven, and of the In­ Pan American D ay and P an American dependence of the United States Executive Order Pa^e W eek, 1957 of America the one hundred and eighty- Further Providing for the Opera­ BY THE PRESIDENT OF THE UNITED STATES first. tions Coordinating Board_____ 1111 OF AMERICA D wight D. Eisenhower Proclamation A PROCLAMATION By the President: Pan American Day and Pan Amer­ ican Week, 1957______________ 1111 WHEREAS on April 14, 1890, the J ohn F oster D ulles, American Republics founded a bureau Secretary of State. EXECUTIVE AGENCIES for inter-American cooperation which [F. R. Doc. 57-1525; Filed. Feb. 25, 1957; now, as the Pan American Union, is an 4:41 p. m.] Agricultural Marketing Service organ and the general secretariat of the Proposed rule making: Organization of American States; and Milk; in marketing areas: WHEREAS the twenty-one Republics New York metropolitan and of the Western Hemisphere wiil cele­ EXECUTIVE ORDER 10700 northern New Jersey_____ 1128 brate April 14, 1957, the sixty-seventh Washington, D. C__________ 1116 anniversary of that historic action, as F urther P roviding for the Operations Watermelons grown in Florida, Pan American Day, at the end of a week Coordinating B oard Georgia, and South Caro­ of commemorative ceremonies; and By virtue of the authority vested in me lina____________________ I__1128 WHEREAS the American Republics by the Constitution and statutes, and as Agriculture Department continue to work together harmoniously President of the Únited States, it is here­ See Agricultural Marketing Serv­ in furtherance of their mutual objective by ordered as follows: ice.
    [Show full text]
  • Lake Ophelia
    U.S. Fish & Wildlife Service Lake Ophelia National Wildlife Refuge The National Wildlife Refuge System Lake Ophelia National Unmatched anywhere in the world the National Wildlife Refuge System is an extensive network of lands and waters Wildlife Refuge is one of This blue goose, protected and managed especially for designed by J.N. wildlife and its habitat and for people over 500 refuges in the "Ding" Darling, to enjoy. has become a symbol of the This unique system encompasses over National Wildlife Refuge National Wildlife 92 million acres of lands and waters Refuge System. from north of the Arctic Circle in System administered Alaska to the subtropical waters of the Florida Keys and beyond to the by the U.S. Fish and Caribbean and South Pacific. Wildlife Service. The mission of the National Wildlife Refuge System is to "administer a national network of lands for the conservation^ management, and where appropriate, restoration Srlimis Swallow Tail Butterfly Introduction of the fish, wildlife, and Established in 1988 to primarily protect waterfowl and its habitat, Lake Ophelia National Wildlife Refuge plant resources and is located in Avoyelles Parish in east central Louisiana. This 18,000 acre their habitats within the refuge is a mix of bottomland hardwood forests, open fields and croplands crisscrossed with United States for the meandering bayous, streams, lakes ponds and the Red River that provides benefit of present and homes for a diversity of wildlife. The refuge is named for its most future generations of prominent water body, the 350 acre Left: Blue-wiitged Teal Lake Ophelia was at one time a Americans!' Carer: Wood Ducks channel of the nearby Red River.
    [Show full text]