Project : “Holiday Inn City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

APPENDIX I

(See paragraph – 6) FORM 1

I. Basic Information S. No Item Details 1. Name of the Project/s : “Hotel Holiday Inn Jaipur City Centre (Expansion & Modernization)” Promoted by: ACCIL Corporation Pvt. Ltd

(Granted Environmental Clearance for existing project vide letter dated 07.09.2012) (Copy enclosed as Annexure I). 2. S. No. in the schedule : 8(a) {Building and Construction projects ≥ 20,000 sq. m. and <1,50,000 sq. m. of built-up area } 3. Proposed capacity/ area/ length/ : Total plot area : 5250 sq. m. tonnage to be handled/ Built up area : 26,895.08 sq. m. command area/ lease area/ (Existing: 24,118.05 sq. m.; Proposed: 2777.03 sq. m.) number of wells to be drilled The proposed project involves expansion & modernization of the existing operational Hotel project. The project will constitute of 192 guest rooms (Existing: 147 nos.; Proposed: 45 nos.) along with ancillary facilities such as restaurant, bar, banquet hall, meeting rooms, etc. The same is tabulated as

under:

S. N. Particulars Existing Proposed Total 1. Total plot area 5250 sq. m. -- 5250 sq. m. 2. FAR area 9006.86 sq. m. (1.72) 2570.61 sq. m. 11,577.47 sq. m. 3. Built up area 24,118.05 sq. m. 2777.03 sq. m. 26,895.08 4. Ground coverage 1736.06 sq. m. 317.54 sq. m. 2053.60 sq. m. 5. Guest rooms 147 nos. 45 nos. 192 nos. 6. Restaurant 2 nos. (110 pax) 1 no. (75 pax) 3 nos. (185 pax) 7. Bar 115 pax -- 115 pax 8. Banquet Hall 230 pax 400 pax (8th Floor) 630 pax 9. Meeting rooms, Seating Capacity: 200 No change Seating Capacity: 200 conference halls 10. Office area (2nd Floor) 293.60 1903.82 2197.42

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

4. New/Expansion/Modernization : Expansion & Modernization 5. Existing capacity/area etc : Built up area : 24,118.05 sq. m. (Other facilities detailed at point 3 above) 6. Category of project i.e. 'A' or 'B' : Category- B2 7. Does it attract the general : General conditions not applicable on projects listed condition? If yes, please specify. under Item 8 of Schedule of EIA Notification, 2006 and its subsequent amendments thereof. 8. Does it attract the specific : Specific conditions are not applicable on projects condition? If yes, please specify. listed under item 8 of the schedule- EIA notification, 2006 and its subsequent amendments thereof. 9. Location Plot/Survey/Khasra no. : Plot no.1, Sardar Patel Marg Village : - Tehsil : Jaipur District : : 10. Nearest Railway station/ Airport : As under: along with distance in kms. Nearest Name Distance (aerial) & Direction Railway Station Jaipur RS 2 km towards NNW Airport Jaipur 7.8 km towards SSE International Airport

11. Nearest Town, City, District : Nearest city : Within Jaipur city Headquarters along with Nearest District Headquarter: Collectorate– 2.7 kms distance in kms. towards N. 12. Village Panchayat, Zilla : The proposed project site is under the jurisdiction of Parishad, Municipal Jaipur Development Authority, Jaipur. Corporation, Local body Address: (Complete postal address with Jaipur Development Authority telephone no. to be given) Jawaharlal Nehru Marg Near Birla Mandir, Jaipur -302015 (Raj) Phone : 0141-2566449

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

13. Name of the applicant : ACCIL Corporation Pvt. Ltd 14. Registered address : ACCIL Corporation Pvt. Ltd Plot No -1, Sardar Patel Marg, Near Nehru Sahkar Bhawan C- Scheme,22 Godam Circle, Jaipur - 302001 (Raj) 15. Address for correspondence: Name : Mr. Abhay Singh Designation (Owner/Partner/CEO) : Project Manager Address : ACCIL Corporation Pvt. Ltd Plot No -1, Sardar Patel Marg, Near Nehru Sahkar Bhawan C-Scheme, 22 Godam Circle, Jaipur Pin Code : 302001 E-mail [email protected] [email protected] Telephone no. : 0141-4222444 Fax No. : 0141-4222455 16. Details of alternative sites examined, : No alternative site was examined. if any. Location of these sites should be shown on a Toposheet. 17. Interlinked projects : No 18. Whether separate application of : No interlinked project has been submitted? 19. If yes, date of submission : No 20. If no, reason : There is no interlinked project. 21. Whether the proposal involves : Nahargarh WS is at a distance of 4.4 kms towards approval/ Clearance under: if yes, NE from the project boundary. However, the details of the same and their status to project site is not coming under eco-sensitive zone be given. defined for Nahargarh WS. a. The Forest (Conservation) Act, (1980)? b. The Wildlife (Protection) Act,

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

1972? c. The C.R.Z. Notification, 1991? 22. Whether there is any Government : No Order/ Policy relevant/ relating to the site 23. Forest land involved (hectares) : No 24. Whether there is any litigation : No litigation is pending against the project in any pending against the project and/or court of law. land in which the project is propose to be set up? a. Name of the Court b. Case No. c. Orders/directions of the court, if any and its relevance with the proposed project.

II. Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No confirmation No rates, wherever possible) with source of information data 1.1 Permanent or temporary No Land-use: change in land use, land cover No additional land is required for the expansion or topography including project (Since the expansion is within the existing increase in intensity of land Hotel premises). use (with respect to local land Yes Land cover: use plan) There will be increase in the ground coverage due to proposed expansion from existing 1736.06 sq. m. to 2053.60 sq. m.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

1.2 Clearance of existing land, No No clearance of existing land, vegetation or vegetation and buildings? building is envisaged for the expansion project. 1.3 Creation of new land uses? No There will be no change in land use. However, the internal land use pattern will be as under:

S. N. Particulars Existing (sq. m.) Proposed (sq. m.) Total (sq. m.) 1. Total plot area 5250 No change 5250 a. Ground coverage 1736.06 (33.07%) +317.54 2053.60 (6.05%) (39.11%) b. Landscape area 328.97 (6.27%) -- 328.97 (6.27%) c. Paved area (including driveways 3184.97 (60.66%) (-)317.54 2867.43 & pathways, parking area) (54.62%)

1.4 Pre-construction No There will be no physical impacts on the locality due investigations e.g. bore to the soil testing or other pre-construction houses, soil testing? investigations. 1.5 Construction works? Yes The proposed expansion will envisage a built up area of 2777.03 sq. m. (total after expansion: 26,895.08 sq. m.) The impact on physical environment will be temporary in terms of fugitive emissions. Best construction practices will be adhered to minimize the impacts. The same is tabulated as under:

S. N. Guidance on Practices to reduce emission 1. Design  Travelled distances will be minimized for delivery of materials  Green building materials viz. fly ash bricks, RMC’s, etc. will be used to the best possible extent. 2. Vehicles &  Engines & exhaust systems will be properly maintained. Equipments  Low sulphur diesel (HSD) will be used.  Idling time will be eliminated/ reduced to the maximum 3. Material Handling &  Foam suppression systems will be utilized. Transfer systems  PM emissions from spills will be prevented.  Material handling operations will be minimized.  Separate service entry for vehicles carrying construction materials 4. Road Surfaces  On-site vehicle restrictions will be established.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

1.6 Demolition works? Yes The office structures on the 2nd floor (temporary) as well as existing structures on terrace floor (partial) will be demolished/ dismantled. The demolition waste generated will be managed effectively. 1.7 Temporary sites used for No Local labour will be used for the expansion project, construction works or housing thus, not anticipated. of construction workers? 1.8 Above ground buildings, Yes The height of the project will increase due to structures or earthworks addition of 1 floor. There will be increase in height including linear structures, cut of the building from existing 30 m to 36 m (upto and fill or excavations mumty level). 1.9 Underground works including No Not Applicable mining or tunnelling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production & manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods No During the construction phase, there will be well- or materials? designated confined storage areas, which will not have impact on the physical environment. 1.15 Facilities for treatment or Yes Construction phase: disposal of solid waste or Construction waste generated will be disposed off liquid effluents? through authorized vendors.

Post Construction Phase: Solid waste: The solid waste generated from the project considering full occupancy will be mainly domestic waste and estimated quantity of the same will be approx 726 kg/day (existing 545 kg/day + Proposed 181 kg/day).

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

Liquid effluent:

Total effluent generation: 164 KLD Treatment: STP of capacity 175 KLD The waste management during construction & post construction phase is detailed in CP& EMP. 1.16 Facilities for long term No There will be no facilities for long term housing of housing of operational operational workers. workers? 1.17 New road rail or sea traffic No There will be no new road and rail. during construction or The impact in terms of traffic will be marginal due operation? to the proposed expansion. Details of the total parking facilities envisaged within the project site is given as under: Total ECU required (After expansion): 290 Total ECU provided : 316

S. No. Details Cars Two wheelers Dependable Total ECU 1. Basement-3 64 61 (20 ECU) 46 130 2. Basement-2 53 80(27 ECU) - 80 3. Basement 1 31 79 (26 ECU) 5 62 4 Ground 28 48 (16 ECU) - 44 Total 176 268 (89) 51 316

1.18 New road, rail, air waterborne No There is no new rail, air-borne transport or other transport infrastructure infrastructure required for the project. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No There will be no closure or diversion of existing transport routes or transport routes or infrastructures leading to infrastructure leading to changes in traffic movements due to proposed changes in traffic movements? expansion. 1.20 New or diverted transmission No There will be no new or diverted transmission or lines or pipelines? pipelines due to proposed expansion.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

1.21 Impoundment, damming, No The project will not involve any impoundment, culverting, realignment or other damming, culverting or realignment or other changes to the hydrology of changes to the hydrology of watercourses or watercourses or aquifers? aquifers. 1.22 Stream crossings? No None 1.23 Abstraction or transfers of Yes The fresh water demand to the tune of about 161 water from ground or surface KLD (58,765 cu. m./ annum) will be met through waters? PHED/ tanker water supply/ existing borewells. Particulars Abstraction Annual recharge Existing 136 KLD (49640 cu.m./annum) 2143 cu. m. Proposed 25 KLD (9125 cu.m./annum)

The area is falling under Jhotwara Block which is categorized as Notified for ground water abstraction. 1.24 Changes in water bodies or the Yes Land Surface Run-off: There will be increase in land surface affecting drainage 19% in total surface run-off during post or run-off? construction phase, which will be captured through well designed storm-water pipe network of rain-water harvesting and will be used for recharge of the aquifers. The details are tabulated as under:

Phase Total discharge (m3/ annum) % increase in run-off Pre-construction 1800 +19% Post construction 2143

1.25 Transport of personnel or Yes Construction: materials for construction, There will be movement of personnel, materials operation or decommissioning? and machineries during the construction phase. The impact due to the movement of personnel will

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

be negligible as local people will be deployed. Thus there will be contribution of marginal noise & vehicular emissions which will be mitigated by implementation of effective EMP. The same is elaborated at point1.5 , Form 1 The construction work will be carried out during non-peak seasons. Further, no work will be done during the night hours 1.26 Long-term dismantling or No Restoration works for the project on long-term decommissioning or restoration will be an ongoing activity which will not have works? any impact on physical environment. 1.27 Ongoing activity during No There will be no decommissioning activity related decommissioning which could to the project. have an impact on the environment? 1.28 Influx of people to an area in Yes During the post construction phase, there will be either temporarily or regular influx of visitors, staff related personals. permanently? 1.29 Introduction of alien species? No Only local plant species will be planted for the green belt /landscaping. 1.30 Loss of native species or No -- genetic diversity? 1.31 Any other actions? No None

2. Use of Natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. Information/checklist Yes Details thereof (with approximate quantities/ rates, No. confirmation /No wherever possible) with source of information data 2.1 Land especially undeveloped No The proposed project is an expansion of existing or agricultural land (ha) project thus; no additional land is required for the

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

same. The total plot area envisaged for the project is about 5250 sq. m. (0.52ha). 2.2 Water (expected source & Yes As under: competing users) unit: Demand Quantity Source Fresh water 161 KLD PHED supply/ tanker water supply Recycled water 148 KLD STP treated water Total 309 KLD

2.3 Minerals (MT) Yes Bricks and stone (locally available in the market) 2.4 Construction material – Yes The approximate quantities of construction stone, aggregates, sand/ soil materials (expansion) to be used are as under: (expected source – MT) Material Quantity Source Coarse aggregate 1360 cu. m. Fine aggregate 1440 cu. m. Jaipur Cement (PPC/OPC) 20,000 bags market Bricks 4.22 lacs nos.

2.5 Forests and timber (source – Yes The use of wood in the project has been planned to the MT) minimum extent possible. Wood with recycled content such as MDF boards will be used to the extent possible. 2.6 Energy including electricity Yes Energy: and fuels (source, competing The estimated connected load for the project is users) Unit: fuel (MT), 1272KW, which will be met from JVVNL Supply. energy (MW) The summary of the energy demand is given as under:

S. No. Description 1. Source of supply 11 kV supply 2. Electrical Load Connected load : 1272 KW (Existing: 1147 KW + Proposed: 125KW) Contract demand : 1100 kVA (Existing: 900 kVA + Proposed: 200kVA) 3. Transformer Number 1 nos.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

Capacity 2000 kVA 4. DG Sets Number 3 Cumulative Capacity 1510 kVA (380 kVA: 2 nos. + 750 kVA: 1 no.) Fuel Used HSD (sulphur content: 0.05%) Fuel Consumption 60.8 l/hr / DG and 120 l/hr/DG respectively 5. Boilers Number 2 (1 w + 1 s) Capacity 500 kg/hr each Fuel consumption 25 l/hr each 6. Hot water Number 2 (1 w + 1 s) generators Capacity 4 lac kcal/hr each Fuel consumption 45 l/hr each

2.7 Any other natural resources Yes Solar hot water generators for pre-heating the (use appropriate standard units) boiler feed is being and will be used.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No confirmation No rates, wherever possible) with source of information data 3.1 Use of substances or materials, No There will be no additional DG sets/ boilers/ HWG which are hazardous (as per for the expansion project. There is storage of Low MSIHC rules) to human health Sulphur Diesel (HSD) for the project. or the environment (flora, The significant hazard due to the same will be fauna, and water supplies) negligible as the exposure level will be confined within a small area in the consequence of unforeseen hazard. 3.2 Changes in occurrence of No There will be no release of any hazardous disease or affect disease vectors substance in the construction as well as post- (e.g. insect or water borne construction phase.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

diseases) The waste water generated to the tune of 164 KLD after expansion will be treated in ongoing STP of capacity 175 KLD based on SBR technology. Further, storm water network will be well designed to leave no stagnant water pockets. The biodegradable as well as non- biodegradable waste is being and will be collected at earmarked places and is being/will be sent to the Jaipur Municipal Corporation disposal sites. Proper sanitization will be done to prevent any disease vector. 3.3 Affect the welfare of people No There will be proper treatment of the solid as well e.g. by changing living as liquid waste generated and the waste will not be conditions? dumped in the nearby localities thereby, causing change in the living conditions. The solid waste will be suitably treated, while the liquid effluent will be treated in the sewage treatment plant. 3.4 Vulnerable groups of people No There are many schools and health care centers who could be affected by the within the 2 km. radius from the project site. project e.g. hospital patients, The project planning has been done to avoid any children, the elderly etc., adverse impact by means of proper waste management during construction as well as operation phase. 3.5 Any other causes No No other causes are significant.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No confirmation No rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No Not Applicable

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

wastes 4.2 Municipal waste (domestic and Yes Municipal solid waste to the tune of 726 Kg/day or commercial wastes) (existing 545 kg/day+ proposed 181 kg/day) will be generated during the post construction phase and the details of the various activities generating solid waste, its classification, collection facilities, treatment and disposal is given in CP & EMP. 4.3 Hazardous wastes (as per No Construction Phase: Hazardous Waste Management No hazardous waste as per HWMR will be Rules) generated. Post Construction/ Operational Phase: Spent oil will be generated which will be carefully stored in High Density Polythene (HDPE) drums in isolated covered facility and will be disposed off to the registered actual users. Suitable care will be taken so that spills/leaks of spent oil from storage could be avoided. 4.4 Other industrial process wastes. No There are no industrial process waste 4.5 Surplus product. No No surplus product is anticipated 4.6 Sewage sludge or other sludge Yes About 16 KLD sludge will be generated from STP, from effluent treatment. which will be sent to municipal site. 4.7 Construction or demolition Yes Construction waste: 167 MT wastes. Management of the same is explained in CP & EMP. 4.8 Redundant machinery or No There will not be any redundant machinery or equipment. equipment at site. 4.9 Contaminated soils or other No Proper care will be taken to avoid contaminated materials. soil and if oil spilled soil will be found; the same will be scrapped off and stored at earmarked places and sent to disposal sites. 4.10 Agricultural wastes. No There will be no agriculture waste. 4.11 Other solid wastes. No There will be no other solid waste.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No confirmation No wherever possible) with source of information data 5.1 Emissions from combustion Yes There will be emissions from DG sets (used in the of fossil fuels from stationary case of power cuts or failure only), boilers and hot or mobile sources. water generators. The maximum predicted concentrations from the proposed project considering line (vehicular exhausts) as well as point source emissions will be mitigated as under:

Mitigation measures:  Effective stack height has been provided (as per the norms of CPCB) to contain the emissions within the permissible norms.  Around 328.97 sq. m. is under landscape which will help to contain the emissions within the permissible range.  Effective traffic management plan including guided traffic ways and separate entry/ exits will help to avoid congestions during peak traffic hours. 5.2 Emissions form production No There is no production process in the project. process. 5.3 Emissions from materials Yes The emission expected from construction phase will handling including storage or be dust arising from material handling and vehicular transport emission from transport vehicles. These include the emissions due to idling of the vehicles during loading and unloading activities. Management: The same is explained at point no. 1.5 above 5.4 Emissions from construction Yes The dust emission sources are:

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

activities including plant and  Construction equipment  Material Handling  Finishing

Mitigation:  Enclosures,  Covered transport,  Plantation,  Avoiding idling of vehicles etc. 5.5 Dust or odours from handling Yes The dust etc. emanating from various construction of materials including activities are described along with the impact & construction materials, mitigation measures are given in CP & EMP. sewage and waste. 5.6 Emissions from incineration No There will be no incineration of waste. of waste 5.7 Emissions from burning of No No open burning of waste will be allowed. The civil waste in open air (e.g. slash contractor along with site manager will be materials, construction debris) responsible for the same. 5.8 Emissions from any other No None sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No confirmation No wherever possible) with source of information data 6.1 From operation of equipment Yes Noise may be generated from the construction e.g. engines, ventilation equipment’s.

plant, crushers The following measures will be taken:  No heavy machinery/ noise generating activity will be carried out during night.  Noise barriers will e provided around the construction area(s).

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

 All construction equipment and machineries will be maintained in good conditions.  An area of about 328.97 sq. m. will be under landscape during post construction phase which will help to contain the noise. 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or Yes During construction work D.G. Sets, Pumps, Trucks, demolition vibrators, etc will be the tentative sources of noise. The same will be mitigated by effective EMP such as use of Ready mix concrete to reduce the noise & vibrations due to the operation of concrete mixer truck, etc. 6.4 From blasting or piling No No blasting or piling operations are anticipated for the proposed expansion project 6.5 From construction or Yes There may be marginal increase in the noise levels operational traffic due to constructional /operational traffic arising due to the proposed expansion project, which will be minimized by:  Effective traffic management including sufficient width of driveways to avoid traffic congestions especially during the peak hours.  Provisions of internalized designated parking facilities to ensure smooth traffic movement.  Effective green belt will help in reducing the noise propagation. 6.6 From lighting or cooling No Existing lighting and/ cooling systems will be used for systems the expansion project. 6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No confirmation No rates, wherever possible) with source of information data 7.1 From handling, storage, use No The project will not involve any handling and storage or spillage of hazardous of hazardous material. materials 7.2 From discharge of sewage or No No untreated sewage will be discharged into the open other effluents to water or the surfaces causing the contamination of ground water. land (expected mode and The wastewater generated is being/will be treated in place of discharge) STP based on SBR technology of capacity 175 KLD. Details of STP are enclosed as Annexure. 7.3 By deposition of pollutants No During construction, there will be emissions emitted to air into the land or generated from material transfer, construction into water operations, finishing operations, exhaust from vehicles, and stationary sources, etc. The management of the same has been described at relevant sections. 7.4 From any other sources No There will not be any other sources, which will contaminate land & water resources. 7.5 Is there a risk of long term No No significant contribution of long-term built-up of build-up of pollutants in the pollutants is envisaged from this project. environment from these sources?

8. Risk of accidents during construction or operation of the project, which could affect human health or the environment

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No confirmation No wherever possible) with source of information data 8.1 From explosions, spillages, Yes Spent oil will be generated which will be stored in the fires etc from storage, spent oil tank prior to disposal to actual users at handling, use or production earmarked places. of hazardous substances The fuel is being/will be stored in the storage tanks

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

which will be designed to meet out all safety norms. Proper fire-fighting arrangements has been and will be provided all around the project site (as per the norms of the NBC-2005) 8.2 From any other causes Yes All safety measures will be in place prior to commencement of operations so as to avoid any risk to human life and as per the prevailing local by laws. Sources of Construction & Post Construction Risks along with Impact & Mitigation of the same is given in CP & EMP. 8.3 Could the project be No As under: affected by natural disasters Natural Occurrence Management causing environmental Disasters Probability damage (e.g. floods, Floods As per the  For effective secondary data functioning, pre- earthquakes, landslides, available no such monsoon and post- cloudburst etc)? precedents has monsoon checks of been reported. the drainage However the structures will be possibility of undertaken such incidents  The project has cannot be ruled planned storm water out. layout in regards to the peak intensity of the rainfall so far received as recorded by IMD. Earth- The site is located  The building design quakes in the Seismic will be made with Zone II, as per earthquake resistant the seismic design structure. zoning map of  Structure with ductile given in detailing is BIS code IS: considered as per IS: 1893 (Part1)- 13920-1993.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

2002, which is Low Damage Risk Zone. Landslides No such -- precedent has been reported. Cloudburst No such -- precedent has been reported.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data. 9.1 Lead to development of supporting No The project is coming up within the municipal cities, ancillary development or limits of Jaipur city with well developed development stimulated by the infrastructure around. project which could have impact on the environment e.g.  Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)  housing development  extractive industries  supply industries  other 9.2 Lead to after use of the site, which No No lead to after use of the site, which could could have an impact on have an impact on environment environment 9.3 Set a precedent for later No There are no precedents as similar developments developments are proposed around.

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

9.4 Have cumulative effects due to No There are no similar projects planned as of proximity to other existing or now. planned projects with similar effects.

III. Environmental Sensitivity

S. Areas Name/ Aerial distance (within 15 km.) No Identity Proposed project location boundary 1 Areas protected under international Jantar Mantar 3.8 km NE * conventions, national or local Nahargrh Sanctuary 4.4 Km towards NE

legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or sensitive Nahargarh RF 4.2 Km towards N for ecological reasons -Wetlands, Amer RF 9.8 km towards N watercourses or other water bodies, Bavrikavir Rf 10.6 km towards E coastal zone, biospheres, mountains, Samer RF 11.3 km towards NE Jhalana Bani RF 4 km towards SE forests. Papad ka RF 8.0 Km towards N Kilangarh RF 6.3 Km towards NE Nindar PF 12.9 km towards NNW Muhana RF 12.7 km towards SSW Jal Mahal 8.8 km towards NE Amanisha Nala 2.3 km towards W Bahu Sagar 13.6 km towards NNE

3 Areas used by protected, important or None sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground None -- waters 5 State, National boundaries None --

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

6 Routes or facilities used by the public Particular Distance Direction for access to recreation or other tourist, NH-11 3.5 Km SSW pilgrim areas. NH-12 9.7 km S NH-8 5.9 Km WSW SH-2C 5.3 Km NW Sh-19 12.2 Km NNW

7 Defence installations Khatipura 3.4 Km towards NE Cantonment 8 Densely populated or built-up area Project situated within the Jaipur city 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of Name Distance Direction worship, community facilities) Hospitals Santokba Durlabhji memorial 2.2 Km SSE Hospital Manu Hospital 2.5 Km SSW Adarsh Narsing Home 1.0 Km NNE Aditya Hospital 1.5 Km SSE Aggrawal eye Hospital 0.7 Km NNW Anand Hospital & eye center 0.65 Km N Jaipur Hospital 0.9 Km NNE Schools Kodai International School 2.1 Km SSW Sushil Public School 2.5 Km W Tine Blossom Senior 1.1 Km NW Secondary School St. sildier Public School 1.8 Km NNE Mahaveer Public School 1.9 Km NNE Temples Govindji Temple 4.3 Km NNE Birla Mandir 2.5 Km SE MotiDoongri Temple 2.6 Km S Ram Mandir 0.6 Km SW Ram Krishna Mission 0.8 Km NNE Radha Krishna Temple 0.9 Km NNE Hanuman Mandir 1.2 Km NNW Churches St. Xaviers church 2.2 Km NNE St Andrews church 3.0 Km NNE Roman catholic church 4.2 Km NE Mosques Kidwainangar mosque 1.85 Km S Panchayati Masjid 4.7 Km NNE

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

Community Facility Jaipur Railway Station 2.0 Km NNW Gandhinagar Railway Station 3.3 Km S Jaipur Airport (Sanganer) 8.4 Km S Narayan Singh Circle Bus 2.0 Km SE stand Sindhi Camp Bus Stand 2.5 Km NNE Albert Hall Museum 2.8 Km NNE City Palace 4.0 Km NNE Crystal Palm Mall 0.06 Km N MGF Mall 0.1 Km E Raj Mandir Cinema 2.3 Km E Golcha Cinema 3.3 Km NNE Polo Club 1.2 Km SE

10 Areas containing important, high Jhotwara The entire block is categorized as quality or scarce resources (ground notified for ground water use. water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or None Not Applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard Earthquake The area is classified as Zone II (Least which could cause the project to Zone II to moderate) as per the BIS present environmental problems classification. Suitable seismic (earthquakes, subsidence, landslides, coefficients in horizontal and vertical erosion, flooding or extreme or directions respectively will be adopted adverse climatic conditions) while designing the structures. *(As per secondary source available)

Project : “Holiday Inn Jaipur City Centre” (Expansion & Modernization) Form 1 Promoter : ACCIL Corporation Pvt. Ltd.

"I hereby give an undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any, to the project will be revoked at our risk and cost.” Date: Place: Authorized Signatory ACCIL Corporation Pvt. Ltd. Plot No -1, Sardar Patel Marg, Near Nehru Sahkar Bhawan, C-Scheme 22 Godam Circle, Jaipur-302001, (Raj.)