SFRA Appendix 7

Total Page:16

File Type:pdf, Size:1020Kb

SFRA Appendix 7 Appendix 7 – Par Docks Report Cornwall Local Plan Strategic Flood Risk Assessment 2 for Site Allocations at West Carclaze/Baal and Par Docks Cornwall Council January 2015 INTRODUCTION The Cornwall Local Plan will set out a vision for growth and identify the quantity and broad location and key sites, for new housing, community facilities, shops and employment. The Local Plan includes two strategic allocations for development. An Allocations DPD is being prepared to accompany the Local Plan which will include further specific site allocations. This report sets out the requirements of the Flood Risk Sequential Test and where appropriate the Exception Test with regards to the sites allocated with the Cornwall Local Plan. NATIONAL PLANNING POLICY ON FLOOD RISK The National Planning Policy Framework (NPPF) advises that “Local Plans should take account of climate change over the longer term, including factors such as flood risk, coastal change, water supply and changes to biodiversity and landscape” (paragraph 99 NPPF 2012). It goes on to advise that “Inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at highest risk, but where development is necessary, making it safe without increasing flood risk elsewhere…..Local Plans should apply a sequential, risk-based approach to the location of development to avoid where possible flood risk to people and property and manage any residual risk taking account of the impacts of climate change, by: • Applying the Sequential Test; • If necessary, applying the Exception Test; • Safeguarding land from development that is required for current and future flood management; • Using opportunities offered by new development to reduce the causes and impacts of flooding; and • Where climate change is expected to increase flood risk so that some existing development may not be sustainable in the long‐ term, seeking opportunities to facilitate the relocation of development, including housing, to more sustainable locations.” (paragraph 100 NPPF 2012) SEQUENTIAL TEST The Sequential Test is a decision making tool designed to ensure that areas at little or no risk of flooding are developed in preference to areas of higher risk. The aim should be to keep development out of medium and high flood risk areas (Flood Zone 2 and 3) and other areas affected by other sources of flooding where possible. 2 The NPPF advises that “the aim of the Sequential Test is to steer new development to areas with the lowest probability of flooding. Development should not be allocated or permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower probability of flooding. The Strategic Flood Risk Assessment will provide the basis for applying this test. A sequential approach should be used in areas known to be at risk from any form of flooding.” (paragraph 101 NPPF 2012) The following diagram sets out the application of the Sequential Test for Local Plan Preparation it is taken from the National Planning Practice Guidance. EXCEPTION TEST The NPPF at paragraph 102 allows the application of the Exception Test by local planning authorities where, following the application of the Sequential Test, it is not possible, consistent with wider sustainability objectives, for development to be located in zones with a lower risk of flooding. The Exception Test therefore provides a method of managing flood risk while still allowing development to occur. 3 There are two elements to the Exception Test both of which need to be passed paragraph 102 of the NPPF states “if, following application of the Sequential Test, it is not possible, consistent with wider sustainability objectives, for the development to be located in zones with a lower probability of flooding, the Exception Test can be applied if appropriate. For the Exception Test to be passed: • it must be demonstrated that the development provides wider sustainability benefits to the community that outweigh flood risk, informed by a Strategic Flood Risk Assessment where one has been prepared; and • a site-specific flood risk assessment must demonstrate that the development will be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall. Both elements of the test will have to be passed for development to be allocated or permitted.” (paragraph 102 NPPF 2012) NPPF PRACTICAL GUIDANCE The NPPF Practical Guidance provides further assistance to applying the test to Local Plan allocations. With regard to the first part of the test it advises that “evidence of wider sustainability benefits to the community should be provided, for instance, through the sustainability appraisal. If a potential site allocation fails to score positively against the aims and objectives of the sustainability appraisal, or is not otherwise capable of demonstrating sustainability benefits, the local planning authority should consider whether the use of planning conditions and/or planning obligations could make it do so. Where this is not possible the Exception Test has not been satisfied and the allocation should not be made”. (NPPF Practical Online Guidance Paragraph: 024 Reference ID: 7-024-20140306) With regards to the second part of the test it advises “wider safety issues need to be considered as part of the plan preparation. If infrastructure fails then people may not be able to stay in their homes. Flood warnings and evacuation issues therefore need to be considered in design and layout of planned developments. In considering an allocation in a Local Plan a level 2 Strategic Flood Risk Assessment should inform consideration of the second part of the Exception Test”. (NPPF Practical Online Guidance Paragraph: 025 Reference ID: 7-025-20140306) CORNWALL COUNCIL FLOOD RISK POLICY AND GUIDANCE 4 Cornwall Council (CC) together with its partners including the Environment Agency (EA) and the private sector has undertaken work with regards to flood risk specifically • Strategic Flood Risk Assessment Level 1 for Cornwall was published in November 2009. • As identified in the SFRA level 1, surface water flooding is a significant problem for Cornwall. To help address this, the Council has adopted guidance on standards and methods for surface water drainage in its Drainage Guidance for Cornwall Council document published January 2010. • Cornwall and Isles and Scilly Shoreline Management Plan (SMP) 2 was finalised in February 2011. • The EA in partnership with CC carried out further fluvial flood risk modelling as part of SFRA2 on watercourses at St Austell, including the White River, Gover Stream, Polgooth Stream, Pentewan Stream, Sandy River and Tregrehan Stream and surface water flood risk within St Austell. The ‘St Austell Flood Risk Mapping Study’ report was finalised in August 2011. • Where appropriate site specific data including mapping and specific Flood Risk Assessments these include – o Par Docks Initial Flood Risk Assessment (Imerys 2008) o Fowey/Par Bulk Transport Study Final Report (CC 2009) o EIA Scoping Request PREAPP10/03698 (Eco-bos 2010) o Coastal Wave Modelling and Extreme Still Water Level Reports and Information (Eco-bos 2011) o Working draft Flood Risk Assessment (Eco-bos 2012) o Working draft Sandy River Hydraulic Modelling Study Technical Report (Eco-bos 2012) In proposing allocations the Council has had regard to the advice of the NPPF, the National Planning Practice Guidance and its own policy and guidance. CORNWALL LOCAL PLAN ALLOCATIONS The Cornwall Local Plan sets out the strategic land use policies to meet Cornwall’s economic, environmental and social needs and aims for the future. This document will set the framework for all subsequent development and supplementary planning documents. Therefore only two specific site allocations are proposed within the Local Plan any further allocations will be made through the Allocations DPD which will follow the adoption of the Local Plan. The two proposed allocations are for mixed use communities at West Carclaze/Baal to the north of St Austell and Par Docks. The remainder of 5 this report will focus on these allocations and the application of the sequential and exception tests. LOCAL PLAN ALLOCATIONS SEQUENTIAL TEST West Carclaze/Baal Aerial photograph of West Carclaze The entire site at West Carclaze and Baal is located with Flood Zone 1 and therefore the sequential test is passed for this site. A SFRA 2 assessment has been completed for this site and is attached in Appendix 1 it sets out the known flooding related issues at the site. 6 Par Docks Aerial photograph of Par Docks The site contains a mix of flood risk designations comprising flood zones 1, 2 and 3a and therefore a sequential test is required for this site. 7 Par Docks Sequential Test Local Plan PP9 allocates an eco-community of 500 dwellings. Allocation This is envisaged to be a mixed use development. Site description The site is a former China Clay workings and tidal- dependent dock access to St Austell Bay. The site is no longer in active operation and comprises redundant industrial equipment, including settlement tanks, hardstanding and large industrial buildings. The use of the buildings finished in 2006 and the port in 2007. The site is adjacent to the marine area of Par Sands in St Austell Bay. The site is bounded to the west by Carlyon Bay golf course and the Penzance to London Paddington railway runs adjacent to the northwest boundary. There are existing china clay industrial operations situation to the north eastern boundary of the site that are being retained. The topography of the site is varied although relatively flat for the majority of the centre of the site, levels vary from 3m Above Ordnance Datum (AOD) in the lower eastern part of the site up to 24m AOD in the west. The site is considered to be previously developed or ‘brownfield’ land. Flood Risk Mix of flood risk designations comprising flood zones designations 1, 2 and 3a (See plan above) Flood Risk The existing docks are protected by a breakwater, Overview dating from the 19th century, which has been reinforced and extended in recent years and is protected by a rocky foreshore.
Recommended publications
  • Fowey Parish
    FOWEY PARISH DRAFT NEIGHBOURHOOD DEVELOPMENT PLAN 2019-2030 Contents 1 Introduction ................................................................................................................................. 3 2 Fowey Parish NDP – The Preparation Process Getting this far ........................................................ 5 3 NDP Sustainability Appraisal ......................................................................................................... 6 4 Fowey NDP - Supporting Documentation....................................................................................... 6 5 Fowey NDP: The Vision ................................................................................................................. 7 6 Objectives of Fowey Parish NDP .................................................................................................... 9 7 Fowey Parish Housing Statement ................................................................................................ 10 8 Objective 1 General Development ............................................................................................... 12 Policy 1: Sustainable Development ........................................................................................... 12 Policy 2: Design and Character of Fowey Parish ....................................................................... 14 9 Objective 2: Housing ................................................................................................................... 16 Policy 3: Housing within
    [Show full text]
  • ENVIRONMENTAL PROTECTION St Austell River and South Cornwall
    NM 5o Jrt-i UXeAt 2.73. ENVIRONMENTAL PROTECTION NRA National Rivers Authority South Wast Region St Austell River and South Cornwall Coastal Streams River Water Quality Classification 1990 NOVEMBER 1991 WQP/91/019 B L MILFORD GORDON H BIELBY BSc Regional General Manager C V M Davies Environmental Protection Manager ACKNOWLEDGEMENTS The Water Quality Planner acknowledges the substantial contributions made by the following staff: R. Broome - Co-ordinator and Editor A. Burrows - Production of Maps and editorial support P. Grigorey - Production of Maps and editorial support B. Steele - Production of Forepage C. McCarthy - Administration and report compilation Special thanks are extended to A. Burghes of Moonsoft, Exeter for computer support and the production of statistical schedules. The following NBA sections also made valuable contributions: Pollution Control Field Control and Wardens Water Resources Thanks also to R. Hamilton and J. Murray-Bligh for their contributions. Suggestions for improvements that could be incorporated in the production of the next Classification report would be welcomed. Further enquiries regarding the content of these reports should be addressed to: Freshwater Scientist, National Rivers Authority, Manley House, Kestrel Way, EXETER, Devon EX2 7LQ ENVIRONMENT AGENCY 0 4 7 3 4 1 RTVER WATER QUALITY IN THE ST. AUSTELL RIVER AND SOUTH CORNWALL STREAMS C A T C B M E U r LIST OF OONTQJTS Page No. 1 Introduction 1 2 St. Austell River and South Cornwall Streams Catchment 1 3 National Water Council's River Classification
    [Show full text]
  • CORNWALL. [.I.Jlllly'
    1264. r.AB CORNWALL. [.I.JllLLY'. FARMERs-continued. Matthew Thos. Church town, Tresmere, Meager H.St. Blazey, Par Station R.S.O Martin John, Kingscombe, Linkinhorne, Launceston Meager S. St. Blazey, Par Station RS.O Callington RS.O Matthews Thomas & Son, Blerrick, MeagerTbos. Pengilly, St. Erme, Truro Martin J. Lanyon, Loscombe, Redruth Sheviock, Devonport Medland Mrs. Mary & Sons, Beer, MartinJ.Latchley,Gunnislake,Tavistock Matthews E.Mtdlawn,Pensilva,Liskeard Marhamchurch, Stratton R. S. 0 Martin John, Newton, Callington R.S.O l\Iatthews Mrs.E.Trannaek,Sncrd.Pnznc Medland Henry, Burracott,Poundstock, Martin J.Summercourt,Grampound Rd Matthpws Mrs.George Henry, Chenhale, Stratton R.S.O Martin John, Treneiage, St. Breock, St. Keverne, Helston Medland J. Combe, Herodsfoot, Liskrd )\Tadebridge RS.O Matthews Henry, Winslade, Stoke Medland Richard, Court barton, Mar- Martin J. Trewren, Madron, Penzance Climsland, Callington R.S.O hamchurch, Stratton R.S.O MartinJ.We. moor,Whitstone,Holswrthy Matthews Jas. Nancrossa, Carnmenellis, Medland Thomas, Crethorne, Pound- Martin John, Wishworthy," Lawhitton, Penryn stock, Stratton RS. 0 Launceston MatthewsJohn, Antony, Devonport Medland William, Whiteley, Week St. Martin John Lewis, Treneddon, Lan- Matthews John, Goongillings, Constan- Mary, Stratton RS.O sallos, Polperro RS.O tine, Penryn Medland William, Woodknowle, Mar- Martin In. Symons, Tregavetban, Truro Matthews John, ReJeatb, Camborne hamcburcb, Stratton RS.O Martin J. Albaston,GunnisJake,Tavistck Matthews John, Trendeal, Ladock, Medlen J.Coombe,Duloe,St.KeyneRS.O Martin Joseph, Carnsiddia,St.Stythians, Grampound Road Medlen John, Tbe Glebe, Duloe RS.O Perran-Arworthal R.~.O Mattbews In. Trevorgans, St. Buryan, Medlin M. Cbynoweth, MaOO, Pelll'yn Martin Joseph, Nanpean, St.
    [Show full text]
  • Environmental Protection Final Draft Report
    Environmental Protection Final Draft Report ANNUAL CLASSIFICATION OF RIVER WATER QUALITY 1992: NUMBERS OF SAMPLES EXCEEDING THE QUALITY STANDARD June 1993 FWS/93/012 Author: R J Broome Freshwater Scientist NRA C.V.M. Davies National Rivers Authority Environmental Protection Manager South West R egion ANNUAL CLASSIFICATION OF RIVER WATER QUALITY 1992: NUMBERS OF SAMPLES EXCEEDING TOE QUALITY STANDARD - FWS/93/012 This report shows the number of samples taken and the frequency with which individual determinand values failed to comply with National Water Council river classification standards, at routinely monitored river sites during the 1992 classification period. Compliance was assessed at all sites against the quality criterion for each determinand relevant to the River Water Quality Objective (RQO) of that site. The criterion are shown in Table 1. A dashed line in the schedule indicates no samples failed to comply. This report should be read in conjunction with Water Quality Technical note FWS/93/005, entitled: River Water Quality 1991, Classification by Determinand? where for each site the classification for each individual determinand is given, together with relevant statistics. The results are grouped in catchments for easy reference, commencing with the most south easterly catchments in the region and progressing sequentially around the coast to the most north easterly catchment. ENVIRONMENT AGENCY 110221i i i H i m NATIONAL RIVERS AUTHORITY - 80UTH WEST REGION 1992 RIVER WATER QUALITY CLASSIFICATION NUMBER OF SAMPLES (N) AND NUMBER
    [Show full text]
  • SMP2 6 Final Report
    6 ACTION PLAN 6.1 Coastal risk management activities The Action Plan for the Cornwall & Isles of Scilly Shoreline Management Plan review provides the basis for taking forward the intent of management which is discussed and developed through Chapter 4 - and summarised through the preferred policy choices set out in Chapter 5. The SMP guidance states that the purpose of the Action Plan is to summarise the actions that are required before the next review of the SMP however in reality the Action Plan is looking much further into the future in order to provide guidance on how the overall management intent for 100 years may be taken forward. For Cornwall and the Isles of Scilly SMP the Action Plan is a critical element, because there are various conditional policies for later epochs which need to be more firmly established in the future based on monitoring and investigation. The Action Plan can set the framework for an on-going shoreline management process in the coming years, with SMP3 in 5 to 10 years time as the next important milestone. This chapter therefore attempts to capture all intended actions necessary, on a policy unit by policy unit basis, to deliver the objectives at a local level. It should also help to prioritise FCRM medium and long-term planning budget lines. A number of the actions are representative of on-going commitments across the SMP area (for example to South West Regional Coastal Monitoring Programme). There are also actions that are representative of wide-scale intent of management, for example in relation to gaining a better understanding of the roles played by the various harbours and breakwaters located around the coast in terms of coast protection and sea defence.
    [Show full text]
  • Appendix: Cornwall Annual Monitoring Report 2017
    Appendix: Cornwall Annual Monitoring Report 2017 Supporting documents and analysis for the Cornwall Annual Monitoring Report 2017 Date: 14/12/2017 Version: 1 Cornwall Council CORNWALL MONITORING REPORT 2017 ‐ OVERVIEW TABLE No. INDICATOR TRENDS/TARGETS Reported? OVERALL JUDGEMENT NOTES 2.1 Number of new jobs created Provision of 38,000 full time jobs within the plan period. Current trends indicate a small shortfall 704,000 sqm of employment floorspace over the plan period (359,583 sqm to be B1a and B1b On track for industrial target but trailing for 2.2 Amount of net additional B Class employment floorspace provided office use, 344,417 sqm to be B1c, B2 and B8 industrial premises). Delivery in accordance with Office target sub area targets. Delivery of purpose built student accommodation that meets the needs generated through 2.3 Net additional purpose built student accommodation Projections indicate 58% PBSA by 2030 the expansion of the university in Falmouth and Penryn. Net additional Gypsy Traveller pitches provided by: (i) Residential Pitches; (ii) Transit Delivery of 318 residential pitches; 60 Transit pitches; and 11 Show People pitches in the plan 2.4 Currently behind on residential target. Pitches; (iii) Showpeople period. Delivery of 2,550 bed spaces in communal establishments (defined as Residential Care and or ® Under review as alternative provision is 2.5 Net additional communal nursing and specialist accommodation for older persons Nursing Homes). becoming favoured. Housing Trajectory including: To deliver a minimum
    [Show full text]
  • River Water Quality 1992 Classification by Determinand
    N f\A - S oo-Ha (jO$*\z'3'Z2 Environmental Protection Final Draft Report RIVER WATER QUALITY 1992 CLASSIFICATION BY DETERMINAND May 1993 Water Quality Technical Note FWS/93/005 Author: R J Broome Freshwater Scientist NRA CV.M. Davies National Rivers A h ority Environmental Protection Manager South West Region RIVER WATER QUALITY 1992 CLASSIFICATION BY DETERMINAND 1. INTRODUCTION River water quality is monitored in 34 catchments in the region. Samples are collected at a minimum frequency of once a month from 422 watercourses at 890 locations within the Regional Monitoring Network. Each sample is analysed for a range of chemical and physical determinands. These sample results are stored in the Water Quality Archive. A computerised system assigns a quality class to each monitoring location and associated upstream river reach. This report contains the results of the 1992 river water quality classifications for each determinand used in the classification process. 2. RIVER WATER QUALITY ASSESSMENT The assessment of river water quality is by comparison of current water quality against River Quality Objectives (RQO's) which have been set for many river lengths in the region. Individual determinands have been classified in accordance with the requirements of the National Water Council (NWC) river classification system which identifies river water quality as being one of five classes as shown in Table 1 below: TABLE 1 NATIONAL WATER COUNCIL - CLASSIFICATION SYSTEM CLASS DESCRIPTION 1A Good quality IB Lesser good quality 2 Fair quality 3 Poor quality 4 Bad quality The classification criteria used for attributing a quality class to each criteria are shown in Appendix 1.
    [Show full text]
  • St Austell, St Blazey and China Clay Area Schedule
    This schedule contains the infrastructure requirements for 3 CNAs combined: the China Clay CNA, the St Austell CNA and the St Blazey, Fowey and Lostwithiel CNA. These three CNAs are taken together as a result of the combined planning framework for the area as set out in the St Austell, St Blazey and China Clay area Regeneration Plan and as reflected in the Core Strategy. Core Strategy Council priority: St Austell and the China Clay Eco Communities is one of the council’s two priority areas for regeneration. The China Clay area received national endorsement as the location for an eco ‘town’ (eco communities), forming part of a Government supported project to create a number of eco ‘towns’ communities creating outstanding places to live and work that meet high environmental and social standards. Core Strategy The Core Strategy identifies the area as a key transformational area and sets the strategic framework for transformational developments in the area. The Core Strategy seeks developments that address local needs to achieve high social standards, lead the way in achieving high quality, high environmental performance and to support the development of environmental technologies and industries. The Core Strategy key objectives for the China Clay; St Austell; St Blazey, Fowey & Lostwithiel CNAs: 1,500 homes in St Austell Elsewhere in the St Austell CNA 250 homes to support sustainable development of established communities 800 homes to the China Clay villages (collectively). 800 homes to St Blazey, Fowey & Lostwithiel CNA, distributed between the main settlements 5,000 homes in the three CNAs through transformational regeneration projects.
    [Show full text]
  • St Dennis and St Stephen-In-Brannel
    SHEET 12, MAP 12 Electoral Divisions in St Dennis and St Stephen-in-Brannel 0 Pendine 3 Ruthvoes A Tregoss Tregoss Moor Water ST COLUMB MAJOR ED Water Tregoss Moor Screech Owl Sanctuary ST COLUMB MAJOR CP Water Rive r Fal Tregoss Mill way Water Rail Water ntled isma D Water Rive r Fal Goss Moor ROCHE CP St Dennis Water Junction AD RO ND LA OR MO D ism an Goss Moor tle d Goss Moor Ra ilw ay Toldish Water Industrial Park y a Gilley Mill w l i a Farm R d e l t n a R i m v s e i r D Enniscaven F a l Trerank Moor 30 R Retillick Farm i A ve r Tip F a (dis) l No Window Gaverigan Manor Electricity Sub Station Quarry (dis) B 3 2 Goss Moor 7 9 Penrose-Vean Penrose Veor Gilleys Mica Dam B 32 Farm G (disused) 79 O T Research & H E Development R ST ENODER ED S Establishment R (China Clay) O A ST ENODER CP Gaverigan Bridge D D Gothers Tin OMEL Boundary LICK H Workings ILL ST DENNIS CP Farm (disused) DOMELLICK Domellick Farm CORNER Cleers Carnegga Farm St Denys L Church L I H S R C E A E R L NE C H I LL ROCHE ED S Roseveare Clay Pit T Mica Dam A Cemetery Mobile Home M (disused) Park P S l B a St Dennis H F 3 Tip I r 2 Community L e v 7 L i 9 Primary School R Tip Works (dis) St Dennis Playing (disused) Field ay ilw Carsella a D d R A tle Farm O an R m S Dis R Infant E TH O Sch G Boscawen Park Football Pitches Trerice Bridge Water Sewage D T St Dennis e i R ac s E rr Works m L Reservoir e Recreation AV T a O (covered) ce n Ground U i t R r l re e R T d O A R D a Works i l w a BR y EW ERS Mine HILL (dis) Whitemoor Littlejohns China Clay Works CROW Infant
    [Show full text]
  • First Penzance
    First Penzance - Sheffield CornwallbyKernow 5 via Newlyn - Gwavas Saturdays Ref.No.: PEN Service No A1 5 5 A1 5 5 A1 5 A1 A1 A1 M6 M6 M6 ! ! ! ! ! ! ! ! ! Penzance bus & rail station 0835 0920 1020 1035 1120 1220 1235 1320 1435 1635 1740 1920 2120 2330 Penzance Green Market 0838 0923 1023 1038 1123 1223 1238 1323 1438 1638 1743 1923 2123 2333 Penzance Alexandra Inn 0842 - - 1042 - - 1242 - 1442 1642 1747 1926 2126 2336 Alverton The Ropewalk - 0926 1026 - 1126 1226 - - - - - - - - Lansdowne Estate Boswergy - - - - - - - 1327 - - - - - - Newlyn Coombe - - - - - - - 1331 - - - - - - Newlyn Bridge 0846 0930 1030 1046 1130 1230 1246 1333 1446 1646 1751 1930 2130 2340 Gwavas Chywoone Roundabout - 0934 1034 - 1134 1234 - 1337 - - - 1951 2151 0001 Gwavas Chywoone Crescent - - - - - 1235 - 1338 - - - 1952 2152 0002 Gwavas Chywoone Avenue Roundabout - 0937 1037 - 1137 1237 - 1340 - - 1755 1952 2152 0002 Gwavas crossroads Chywoone Hill 0849 - - 1049 - - 1249 - 1449 1649 1759 - - - Lower Sheffield - 0941 1041 - 1141 1241 - 1344 - - - - - - Sheffield 0852 - - 1052 - - 1252 - 1452 1652 1802 1955 2155 0005 Paul Boslandew Hill - 0944 1044 - 1144 1244 - 1347 - - - 1958 2158 0008 ! - Refer to respective full timetable for full journey details Service No A1 5 A1 5 5 A1 5 5 A1 A1 A1 A1 M6 M6 M6 ! ! ! ! ! ! ! ! ! ! Sheffield 0754 - 1025 - - 1225 - - 1425 1625 1825 1925 1955 2155 0005 Lower Sheffield - 0941 - 1041 1141 - 1241 1344 - - - - 1955 2155 0005 Paul Boslandew Hill 0757 0944 - 1044 1144 - 1244 1347 - - - - 1958 2158 0008 Gwavas crossroads Chywoone Avenue
    [Show full text]
  • Community Network Member Electoral Division
    Community Electoral Organisation / Grant Network Member Division Project Grant Description Amount Year St Stephen-In- China Clay McLening M Brannel Foxhole Stars Juniors Defibrillator £180.00 2018/19 China Clay Saunders S Bugle Luxulyan Parish Council Defibrillator training £200.00 2018/19 St Stephen-In- China Clay McLening M Brannel Foxhole Village Green Dog Show £140.61 2018/19 St Stephen-In- China Clay McLening M Brannel St Stephen Horse Show 2018 Horse Show £100.00 2018/19 St Stephen-In- Coombe Community China Clay McLening M Brannel Trust 2018 Horse Show £100.00 2018/19 China Clay Saunders S Bugle St Austell Bay CIC Whitegold Festival 2018 & Whitegold Project £150.00 2018/19 China Clay Wood J Roche Surf Life Saving GB Plastic Free - Surf Life Saving Championships 2018 £40.00 2018/19 China Clay Saunders S Bugle Imerys Bowling Club Computer update £100.00 2018/19 China Clay Wood J Roche Roche Brass New instruments for Junior Band £1,000.00 2018/19 Penwithick & China Clay Luke M Boscoppa Wheal Martyn Imerys Pensioners Christmas Party £200.00 2018/19 China Clay Saunders S Bugle Wheal Martyn Imerys Pensioners Christmas Party £300.00 2018.19 St Stephen-In- St Stephen Community China Clay McLening M Brannel Association Replacement security door at Community Centre £150.00 2018/19 China Clay Wood J Roche Lions Club of Roche Senior Citizens Christmas Party £200.00 2018/19 St Stephen-In- St Stephen Sunshine China Clay McLening M Brannel Club Entertainment for Christmas Party £40.00 2018/19 Greenslade St Dennis & St Dennis Over 70's China Clay
    [Show full text]
  • Planning Future Cornwall
    Cornwall Local Development Framework Framweyth Omblegya Teythyek Kernow Planning Future Cornwall Growth Factors: St Blazey, Fowey & Lostwithiel Network Area Version 2 February 2013 Growth Factors – St Blazey, Fowey & Lostwithiel Community Network Area This ‘Profile’ brings together a range of key facts about the St Blazey, Fowey & Lostwithiel Community Network Area that will act as an evidence base to help determine how much growth the area should accommodate over the next twenty years to maintain to enhance its viability and resilience. Please note that the strategic growth for the settlement of St Blazey/Par has been incorporated in the growth factors analysis for St Austell as they have been explored together as part of the preparation of the regeneration plan. Each ‘Profile’ is split into three sections: Policy Objectives, Infrastructure & Environmental Considerations and Socio-Economic Considerations. Summaries have been provided to indicate what the key facts might mean in terms of the need for growth – and symbols have been used as follows to give a quick overview: Supports the case for future No conclusion reached/ Suggests concern over growth neutral factor/further future growth evidence required St Blazey, Fowey & Lostwithiel Overview: The St Blazey, Fowey & Lostwithiel Community Network Area contains 11 parishes and a range of settlements. St Blazey/Par, Fowey and Lostwithiel are the key settlements within this area, and acts as the local service centres to the smaller settlements surrounding them. Larger villages in the area include Tywardreath and Luxulyan. Most of the CNA is an area of 'conservative' farming landscapes, dominated by anciently enclosed land, medieval field systems, scattered settlements with just a few larger villages, and several large, old-established estates with houses and parks (Boconnoc, Menabilly, and Lanhydrock) 1.
    [Show full text]