The Vision for the Tidal Thames
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
DRAFT Qualifiers 2021.Xlsx
SATURDAY, 7TH AUGUST 2021 TIMETABLE OF QUALIFYING RACES DORNEY LAKE Boating Time Race Time EVENT CAT Nos min:secs GROUP 1 9.10 to 9.20 10:00 a.m. THE PRINCESS GRACE CHALLENGE CUP W4x 8 6:45 1 lane 9.20 to 9.25 10:08 a.m. THE STONOR CHALLENGE TROPHY W2x 8 6:00 1 lane 9.30 to 9.35 10:15 a.m. THE PRINCESS ROYAL CHALLENGE CUP W1x 8 5:15 1 lane GROUP 2 9.50 to 10.00 10:40 a.m. THE DOUBLE SCULLS CHALLENGE CUP M2x 12 9:45 1 lane 10.00 to 10.10 10:50 a.m. THE SILVER GOBLETS & NICKALLS' CHALLENGE CUP M2- 9 6:45 1 lane GROUP 3 10.20 to 10.40 11:20 a.m. THE THAMES CHALLENGE CUP M8+ 23 12:00 2 lanes GROUP 4 11:00 to 11:10 11:50 a.m. THE PRINCE ALBERT CHALLENGE CUP M4+ 11 5:00 2 lanes 11:10 to 11.20 12:00 p.m. THE DIAMOND JUBILEE CHALLENGE CUP JW4x 14 6:00 2 lanes 11:20 to 11:30 12:10 p.m. THE BRITANNIA CHALLENGE CUP M4+ 5 2:30 2 lanes L U N C H B R E A K GROUP 5 12:40 to 12:50 01:30 p.m. THE PRINCE OF WALES CHALLENGE CUP M4x 12 6:00 2 lanes 12:50 to 1:00 01:40 p.m. THE WARGRAVE CHALLENGE CUP W8+ 8 4:00 2 lanes GROUP 6 1:00 to 1:20 02:00 p.m. -
EPSM2009-1145 WYG Environment Transport
Ref Ecologist Name & Address Applicants Name & Address Site address Site address Site address Site address Site address Site address WYG Environment Transport Planning, MS V Thomas, Mr Philip Boniface, Condover Quarry, Condover, EPSM2009-1145 Avalon Way, Anstey, Leicestershire, LE7 7GR. Shrewsbuy, SY5 7AR. Condover Quarry Condover Shrewsbury Shropshire SY5 7AR Willenhall WYG Environment Transport Planning, MS V Thomas, Mr Ian Merrill, Severn Trent Water, PO Box 51, Sewage EPSM2009-1169 Avalon Way, Anstey, Leicestershire, LE7 7GR. Raynesway, Derby, Derbyshire, DE21 7JA Treatment Works Off Anson Road Willenhall West Midlands WS2 0DH Halcrow Group Ltd, Griffin House, 135 High Street, Mr J Beechey, South East Water, Rochfort Road, Kippings Cross to EPSM2009-1174 Crawley, West Sussex, RH10 1DQ Snodland, Kent, ME6 5AH Pembury Kent The National Trust, Mr Stuart Crow, Tattershall, Tattersfield EPSM2009-1181 Lincolnshire, LN4 4LR Castle Sleaford Tattersfield Lincolnshire LN4 4LR InterRoute, Ms Emma Fisher, InterRoute Area 2, 910 Highways Authority, InterRoute Ms A Roberts, Hempton Court, Aztec West, Almodsbury, Bristol, BS32 InterRoute Area 2, 910 Hempton Court, Aztec Summerlands M4 Marker Post EPSM2009-1184 4SR. West, Almodsbury, Bristol, BS32 4SR. Access Bridge 148/8 Wiltshire Mr James Mitchell, Wessex Water, Claverton Down, Bath, Mr Steve Lanzon, Wessex Water, Claverton Land to the West EPSM2009-1185 BA2 7WW Down, Bath, BA2 7WW Swallet Gate Dauntsey of Swallet Gate Dauntsey Wiltshire Theakston Estates Mr Martin Corney, Elston Hall, Windlestone -
Wehorr Results 2017.Xlsx
Women's Eights Head of the River 2017 Results 09:00 12/3/2017 Finish Start Pennant Crew Name Status Award PenaltiesTime Handicap Time Position No 1 51 Head Leander Club Elite 18:13.1 Cambridge University Womens Boat 2 4 2nd, University Elite University Club A 18:17.7 3 1 3rd, Senior Imperial College Boat Club A Senior 18:36.2 4 10 London, University of, Boat Club A Senior University 5 18:51.1 5 2 Club Molesey Boat Club A Senior Club 18:52.8 Oxford Brookes University Boat Club 6 3 Senior A 18:55.4 University Cambridge University Womens Boat 7 55 Senior University I Intermediate Club B 18:56.1 8 13 Edinburgh University Boat Club A Senior University 19:02.1 9 6 Overseas CUS Milano Elite Overseas 19:02.9 10 11 Intermediate Tideway Scullers School A Intermediate Club 19:04.1 11 16 Exeter University Boat Club A Senior 19:12.9 12 20 Durham University Boat Club A Senior University 19:15.7 Headington School Oxford Boat Club 13 8 School/Junior School/Junior A 19:15.9 Provincial 14 33 Provincial Club Intermediate Cantabrigian Rowing Club A Club 19:18.8 15 7 Newcastle University Boat Club A Senior University 19:19.6 Oxford Brookes University Boat Club 16 26 Intermediate B 19:20.5 17 12 Henley Rowing Club A School/Junior 19:21.3 18 5 Thames Rowing Club A Intermediate Club 19:25.6 19 24 Molesey Boat Club B Intermediate Club 19:33.4 20 32 Glasgow University Boat Club A Intermediate 19:35.5 21 21 London, University of, Boat Club B Intermediate 19:37.5 22 14 Imperial College Boat Club B Intermediate 19:37.6 23 15 Wallingford Rowing Club A Masters A 19:40.2 -
MINUTES of an ORDINARY MEETING of COUNCIL Held on Saturday 20Th September, 2014, at British Rowing HQ, 6 Lower Mall, Hammersmith, London W6 9DJ at 12.30Pm
Updated following amends agreed 29/11/2014 THE COUNCIL OF BRITISH ROWING - MINUTES OF AN ORDINARY MEETING OF COUNCIL held on Saturday 20th September, 2014, at British Rowing HQ, 6 Lower Mall, Hammersmith, London W6 9DJ at 12.30pm. PRESENT AND APOLOGIES BOARD Mrs A Phelps, Chairman * Officer Present G. Harris, Deputy Chairman * Officer Present N. Chugani* Chief Executive Officer - interim Apologies M. Morrice* President, Scottish Rowing Apologies Ms C. Spanton* Chairman, Welsh Rowing Present M.D. Williams* Chairman, Finance Committee Apologies M. Stallard* Chairman, Sport Committee Present A. Crawford* Deputy Chairman, Sport Committee Present P. Hill* Athlete Representative Apologies Ms F. McAnena* Independent Director Present Mrs N. Palios* Independent Director Present NON-VOTING MEMBERS Dame Di Ellis, DBE Honorary President Present C.G.V. Davidge OBE Hon. Life Vice President Apologies M. Brandon-Bravo OBE Hon. Life Vice President Present S. Worley Hon. Rowing Safety Adviser Present REGIONAL CHAIRMEN AND REPRESENTATIVES B. Hawden East Chairman Present A. Blit East Regional Representative Present A. Johnson* East Regional Representative Present G. Nicholls East Midlands Chairman Apologies M. Laing North Chairman Present B. Millns North Regional Representative Apologies C. Edwards North West Chairman Present J.C. Davies North West Regional Representative Present M. Humphrys Thames Chairman Present M. Blandford-Baker* Thames Regional Representative TU-1 Apologies P. Knowles Thames Regional Representative TU-2 Present Mrs. L. Lion Thames Regional Representative TU-3 Present R. West Thames Regional Representative TU-4 Present F. Ljubicic Thames Regional Representative TL-5 Present L. Dillon Thames Regional Representative TL-6 Apologies C. Harrison Thames Regional Representative TL-7 Apologies M. -
Swan Lane Pier, 1 Swan Lane London Ec4r 3Tn Pdf 6 Mb
Committee: Date: Planning and Transportation 6 October 2020 Subject: Public Swan Lane Pier 1 Swan Lane London EC4R 3TN Erection of a new pier within the River Thames at Swan Lane, to comprise a refurbished landside access platform; new canting brow and pontoon; dredging and filling of river bed; repair and reinstatement of campshed and riverbank; replacement of mooring pile and installation of additional mooring pile. Ward: Bridge And Bridge Without For Decision Registered No: 19/00116/FULL Registered on: 28 February 2019 Conservation Area: Listed Building: No Summary The application relates to the redevelopment of Swan Lane Pier. The pier is not in use which currently comprises just the dolphins and has been in its current state since 2012 when the regalia boat was removed from the pier. The pier is located and accessed via Swan Lane, which is south of Lower Thames Street. Planning permission is sought for: Erection of a new pier within the River Thames at Swan Lane, to comprise a refurbished landside access platform; new canting brow and pontoon; dredging and filling of river bed; repair and reinstatement of campshed and riverbank; replacement of mooring pile and installation of additional mooring pile. 836 objections have been received from residents and local occupiers regarding the proposed development. The objections have raised concerns regarding the adverse impact on residential amenity, noise and air pollution from the use of the pier from charter vessels, namely the Ocean Diva. Further concerns relate to the emergency and national safety of vessels, antisocial behaviour, visual amenity and protected views, lack of transparency, highway and walkway congestion and that the proposal is contrary to policy. -
New Grade a Industrial / Distribution Building 47,060
Dartford | M25 Junction 1A NEW GRADE A INDUSTRIAL / DISTRIBUTION BUILDING 47 47,060 SQ FT TO LET DC2 PROLOGIS PARK LITTLEBROOK ON JUNCTION FAST URBAN & 57M YARD CONNECTIVITY LOCATION PORT ACCESS DEPTH & LABOUR prologislittlebrook.co.uk ® 47 DC2 PROLOGIS PARK LITTLEBROOK Off Junction 1A Fast access Rail and fastrack Excellent local Direct urban of the M25 to ports bus services amenities access Location Public Transport Local Amenity Orbital 47 is located at Prologis Park Littlebrook, Bus: Orbital 47 lies within a 10 minute walk of the Littlebrook lies adjacent to The Bridge, a 265 acre north Dartford adjacent to Junction 1A of the M25. Littlebrook Fastrack Bus Stop. Fastrack connects mixed use regeneration joint venture between Littlebrook with Dartford town centre, Greenhithe, Prologis and Dartford Borough Council. Bluewater, and Ebbsfleet International Railway Station. Unrivalled Connectivity Advantages to local occupiers include: The service runs 7 days a week from 6am through By Road: The A2, A20 and A13 dual carriageways to midnight, with services up to every 10 minutes at 1,500 new homes providing a local labour pool. provide excellent access to London the UK’s largest peak times. The service expands the labour catchment Science & Technology education facilities, consumer market. The M20 and M2 lead to the providing a cost effective and convenient mode of with the opportunity to develop relationships. gateway to Continental Europe for road freight - the transport for staff, as well as visitors. Ports of Folkestone, Dover and the Channel Tunnel. Hotel, restaurant, café and shop facilities. Rail: Ebbsfleet International Railway Station has a The M25 offers direct access to the rest of the direct service to London St Pancras with an 18 minute 80 acres of open space and wildlife habitat UK motorway network. -
Port of Tilbury Backs Lower Thames Crossing - but Only with a Junction Into the Expanding Port Area
Port of Tilbury backs Lower Thames Crossing - but only with a junction into the expanding port area Posted: 2017-04-12 The Port of Tilbury, London’s major port and the closest significant transport operation to the proposed new motorway and tunnel, welcomes the Government’s decision today (12th April) on the Lower Thames Crossing. Charles Hammond, Chief Executive of the Forth Ports group (owner of the Port of Tilbury), welcomed the Government's decision on the route of the Lower Thames Crossing, while continuing to make the case for a junction into the Port of Tilbury area: "With Brexit looming, it is imperative that the UK prioritises major infrastructure improvements to key international trading corridors. "This investment is as much about north-south connectivity, as east-west road links on and off the motorway. "It is vital that nationally significant transport operations like the Port of Tilbury have high quality and reliable road connections. That's why we will maintain the case for an all-moves junction off the new motorway into the expanding port area." According to Highways England's latest draft route strategy, the Port of Tilbury has one of the least reliable and least resilient road connections to the national motorway network of any major port. Tilbury supports option C - a new tunnel and motorway connection east of the towns of Gravesend and Tilbury - but with the proviso that the proposed crossing and new road through Thurrock provides a step change in the connectivity to and from the port. Over the next 12-18 months as the details of route and junctions are refined by Highways England, the Port will continue to call for the inclusion of an all-moves junction east of Tilbury with a direct link to the Port of Tilbury area. -
Start Sculler Club Elapsed Adjusted Category Category Pos Notes 252 Robbie Schofield Sheffield, City Of, Rowing Club 18:47.98 M (Club) 1 M (Club) Winner
Start Sculler Club Elapsed Adjusted Category Category Pos Notes 252 Robbie Schofield Sheffield, City Of, Rowing Club 18:47.98 M (Club) 1 M (Club) winner. 409 Thomas Portsmouthf 19:02.65 M (Club) 2 271 Matthew Tapley Sheffield, City Of, Rowing Club 19:28.38 M (Club) 3 248 Pierre Thomas Fulham Reach RC 19:37.69 M (Club) 4 266 Phil Robinson Broxbourne Rowing Club 19:40.71 M (Club) 5 269 James Dickinson Furnivall SC 19:48.43 M (Club) 6 262 Sean Collins Cantabrigian Rowing Club 19:50.92 M (Club) 7 256 Jonathan GarrowGriffen, The, Boat Club 19:53.66 M (Club) 8 267 James Diserens Putney Town RC 20:04.81 M (Club) 9 268 Robert Blair Medway Towns Rowing Club 20:04.86 M (Club) 10 261 Crispin Knill Walton Rowing Club 20:13.07 M (Club) 11 253 Ross Stevenson Lea Rowing Club 20:24.48 M (Club) 12 247 Adam Dingley Bedford Rowing Club 20:25.50 M (Club) 13 251 Hannes Burfeind Cantabrigian Rowing Club 20:30.54 M (Club) 14 273 Kevin Schlegel Wolfson College (Oxford) Boat Club 20:34.81 M (Club) 15 249 M J Cannon Vesta Rowing Club 20:36.23 M (Club) 16 260 Stuart Horn Ipswich Rowing Club 20:43.89 M (Club) 17 255 Antony HoughtonWadham College Boat Club 20:46.48 M (Club) 18 272 Richard Benton Putney Town RC 21:04.28 M (Club) 19 265 Robin Harries Cygnet RC 21:13.49 M (Club) 20 264 Thomas Milne Eton Excelsior Rowing Club 21:14.17 M (Club) 21 270 Kierhan Brown Quintin BC 21:28.07 M (Club) 22 Navigation at the finish (60 seconds) 423 Sam Baker Bedford Rowing Club 21:38.83 M (Club) 23 254 Adel Hussani Lea Rowing Club 22:22.93 M (Club) 24 Navigation at the finish (60 seconds) 2 Jamie Kirkwood Leander Club 18:53.43 M (Elite) 1 M (Elite) winner. -
Biodiversity Offsetting
Bulletin of the Chartered Institute of Ecology and Environmental Management Issue 81 | September 2013 Biodiversity Offsetting In this issue Offsetting and the Repeatability of David Stubbs Awarded Planning System Vegetation Mapping the Institute Medal Welcome Information Biodiversity Needs Powerful Narratives, In Practice No. 81, September 2013 Good Stories and the Right Words ISSN 1754-4882 The recent State of Nature report by 25 conservation and research organisations demonstrates Editor the ongoing losses of biodiversity in the UK. The EU Biodiversity Strategy to 2020 has a target Mr Jason Reeves ([email protected]) of halting the loss of biodiversity and the degradation of ecosystem services by 2020. Three key things are needed to stop the loss of biodiversity and the degradation of ecosystems. Editorial Board 1. A Deliverable Vision and Mechanisms to Deliver the Vision Mr Jonathan Barnes, Mr Matthew Chatfi eld, The overall vision and strategy is John Lawton’s Making Space for Nature report. This recognises Dr Andrew Cherrill, Mr Dominic Coath, the importance of ecosystem services and sets out the future as needing to be coherent and Ms Sally Hayns, Dr William Latimer, made up of resilient ecological networks and More, Bigger, Better and Joined-up sites. Green Mrs Allison Potts, Mr Paul Rooney, and blue infrastructure is a fundamental part of these ecological networks that intersperse and Mr Paul Scott, Miss Katrena Stanhope, join up villages, towns and cities. Miss Emma Toovey, Mr Darren Towers The Landscape Institute (LI) has recently revised its Green Infrastructure position statement. Green and blue infrastructure was the subject of the extremely successful joint CIEEM-LI Opinions expressed by contributors conference in Birmingham in early July. -
Assessment of Current and Future Cruise Ship Requirements in London
London Development Agency June 2009 AN ASSESSMENT OF CURRENT AND FUTURE CRUISE SHIP REQUIREMENTS IN LONDON In conjunction with: 5 Market Yard Mews 194 Bermondsey Street London SE1 3TQ Tel: 020 7642 5111 Email: [email protected] CONTENTS 1. Introduction 3 2. Current cruise facilities in central London 4 3. The organisational and planning context 8 4. The cruise market and future demand 11 5. Views of cruise operators 19 6. Potential for growing cruise calls to London 22 7. Assessment of potential sites 24 8. Lessons from elsewhere 37 9. Conclusions 51 Appendices: Appendix 1: List of consultees Appendix 2: Seatrade cruise market report Appendix 3: Location plan of potential sites Appendix 4: Economic impact study Appendix 5: Overview of costs The Tourism Company – Assessment of current and future cruise ship requirements 2 1. INTRODUCTION This report was commissioned by the London Development Agency (LDA) and Greater London Authority (GLA), with support from the Port of London Authority (PLA) in response to a need for a better understanding of London’s future cruise facility requirements. This need is identified in the London Tourism Vision for 2006-2016, and associated Action Plan 2006-2009, under the theme ‘A Sustainable and Inclusive City’, one of whose objectives is to ‘Increase the profile and usage of services along the Thames’. London currently hosts a relatively small number of cruise ships each year, making use of the informal and basic mooring and passenger facilities at Tower Bridge and Greenwich. The aim of this research is to assess the extent to which the lack of a dedicated, more efficient cruise facility is discouraging operators from bringing cruise ships to London, and if there is latent demand, how might this be accommodated. -
Docklands Revitalisation of the Waterfront
Docklands Revitalisation of the Waterfront 1. Introduction 2. The beginning of Docklands 2.1. London’s first port 2.2. The medieval port 2.3. London’s Port trough the ages 3. The end of the harbour 4. The Revitalisation 4.1. Development of a new quarter 4.2. New Infrastructure 5. The result 6. Criticism 7. Sources 1. Introduction Docklands is the semi-official name for an area in east London. It is composed of parts of the boroughs of Southwark, Tower Hamlets, Newham and Greenwich. Docklands is named after docks of the London port which had been in this area for centuries. Between 1960 and 1980, all of London's docks were closed, because of the invention of the container system of cargo transportation. For this system the docks were too small. Consequently London had a big area of derelict land which should be used on new way. The solution was to build up a new quarter with flats, offices and shopping malls. Map with 4 the parts of London Docklands and surrounding boroughs (Source: Wikipedia.org) 2. The beginning of Docklands 2.1. London’s first port Within the Roman Empire which stretched from northern Africa to Scotland and from Spain to Turkey, Londinium (London) became an important centre of communication, administration and redistribution. The most goods and people that came to Britain passed through Londinium. Soon this harbour became the busiest place of whole Londinium. On the river a harbour developed were the ships from the west countries and ships from overseas met. 2.2. The medieval port From 1398 the mayor of London was responsible for conserving the river Thames. -
GRAHAM Appointed to Deliver New London Port, Tilbury 2
MEDIA RELEASE – For Immediate Release 25 February 2019 GRAHAM appointed to deliver new London port, Tilbury 2 The Port of Tilbury, the UK’s fastest growing port, has appointed GRAHAM to deliver their new multimillion pound port terminal, Tilbury2. The port received development consent from the Secretary of State for Transport to build the new port last week and will now work with GRAHAM to begin construction of the port immediately. The contract will involve the creation of a new port terminal and associated facilities on land at the former Tilbury Power Station on the north bank of the River Thames at Tilbury. When operational in Spring 2020, Tilbury2 will be the UK’s largest unaccompanied freight ferry port, the country’s biggest construction processing hub and the creation of a new significantly larger rail head which can accommodate the longest freight trains of 775m. GRAHAM has been awarded the contract for both the Terrestrial and the Marine Package. The Terrestrial contract incorporates a Roll-On/Roll-Off (RoRo), highway works, the relocation of the existing railhead, and a fixed structural steel bridge to the linkspan. The Marine contract includes works within the tidal estuary beyond the existing sea wall/flood defences, including a floating pontoon, link-span/articulated bridge, associated pilings and river bed preparation for the berth. Charles Hammond, Chief Executive of Forth Ports Group (owners of the Port of Tilbury) said: “Tilbury2 is a significant project for our business and our customers. We are very pleased to have the expertise of GRAHAM to help us create this new port for London and the south east.