Local Disaster Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

Local Disaster Management Plan Fraser Coast Local Disaster Management Group Local Disaster Management Plan DOC# 3840957 1 Fraser Coast Regional Council Local Disaster Management Plan ______________________________________________________________________________________________________ Foreword The Fraser Coast region, about 250 klms north Effective disaster management requires a from Brisbane, has a fantastic climate all year collaborative approach with shared around and is blessed with a natural beauty that responsibilities and the effective exchange of includes rainforests, beaches, rolling farmland information through the Fraser Coast Regional and the iconic World Heritage listed K’gari Council, the community and across the various (Fraser Island). levels of the government. The collaborative approach is central to the plan. The ultimate However, our region is not sheltered from the beneficiaries will be the community through the vagaries of natural disasters such as floods, actions taken during and following a disaster cyclones, storm surges and bushfires. event. The events of 2012-2013 highlighted the need There is a need for all of us who reside within for the Fraser Coast Regional Council to have a the fabulous Fraser Coast region to be prepared robust and sustainable Disaster Management and to be resilient when confronting all types of Plan when Mother Nature unleashes her fury. natural disasters and manmade hazards. With this in mind, the Fraser Coast Regional Council Local Disaster Management Plan has I commend this plan to you. been restructured and redeveloped during 2019. The revamp of this plan is focussed on using best practices, coordination, consistency and Cr George Seymour compliance with State guidelines stemming from the 2011 Commission of Inquiry, changes to the Disaster Management Act and Chairperson Regulations, and the Emergency Management Local Disaster Management Group Assurance Framework. Fraser Coast Regional Council This plan is a vital tool in managing disasters, real or potential, with a dedicated commitment towards community safety through Prevention, Preparedness, Response and Recovery. Fraser Coast Regional Council has embraced its’ responsibility for disaster management operations and provides resources and funding to ensure the community is kept informed about any disaster event that may threaten our region. This includes having a disaster response capability, achieved by having a well-structured and organised Council Operations Team. This team can quickly respond to assist the community prior to, during and after a disaster event. 2 Fraser Coast Regional Council Local Disaster Management Plan ______________________________________________________________________________________________________ Table of Contents Authority to Plan .................................................................................. 5 Amendments and Review ...................................................................... 6 Amendment Register ............................................................................ 6 Distribution ......................................................................................... 6 1. Introduction .................................................................................... 7 1.1. Overview ................................................................................... 7 1.2. Purpose of Plan .............................................................................. 8 1.3. Objectives ................................................................................... 8 1.4. Strategic Policy Framework ............................................................. 8 1.5. Priority Areas ................................................................................ 8 1.6. Queensland Disaster Management Act 2003 ...................................... 8 1.7. Scope ................................................................................... 9 2. Governance .................................................................................... 12 2.1. Overview .................................................................................. 12 2.2. Disaster Management System ........................................................ 12 2.3. Fraser Coast Disaster Management Arrangements ............................ 13 2.4. Local Disaster Management Capability ............................................. 13 2.5. Council Operations Team ............................................................... 13 2.6. Authority to Plan ........................................................................... 13 3. Local Disaster Management Group ..................................................... 14 3.1. Establishment of the LDMG ............................................................ 14 3.2. Functions of the LDMG ................................................................... 14 3.3. Reporting .................................................................................. 14 3.4. Membership ................................................................................. 15 3.5. Members Roles and Responsibilities ................................................ 16 3.6. LDMG Business and Meetings ......................................................... 18 4. Disaster Risk Management ............................................................... 19 4.1. Overview .................................................................................. 19 4.2. Community Context ...................................................................... 19 4.3. Community Capacity ..................................................................... 20 4.4. Critical Infrastructure .................................................................... 22 4.5. Essential Services ......................................................................... 24 4.6. Hazardous Sites ............................................................................ 24 5. Public Information ........................................................................... 25 5.1. Overview .................................................................................. 25 5.2. Local Strategies ............................................................................ 25 5.3 Public Education and Engagement .................................................... 25 5.4. Social Media ................................................................................. 26 5.5. Community Coordination Committees .............................................. 26 6. Resilience ....................................................................................... 27 6.1. Role of Fraser Coast Regional Council .............................................. 27 6.2. Role of Business and Individuals ..................................................... 27 6.3. Climate Change Adaptation ............................................................ 27 7. Prevention ...................................................................................... 28 7.1. Hazard Mitigation .......................................................................... 28 7.2. Land use management initiatives (planning) .................................... 28 7.3. Flood Studies ............................................................................... 28 7.4. Risk Reduction Strategies .............................................................. 28 8. Preparedness .................................................................................. 29 8.1. Overview .................................................................................. 29 8.2. Community Engagement ................................................................ 29 8.3. Public Information Campaigns ........................................................ 29 8.4. Social Media ................................................................................. 29 8.5. Planning .................................................................................. 29 3 Fraser Coast Regional Council Local Disaster Management Plan ______________________________________________________________________________________________________ 8.6. Capability Integration .................................................................... 29 8.7. Staff Training ............................................................................... 30 8.8. Training compliance ...................................................................... 31 8.9. Exercises .................................................................................. 31 8.10. Post Disaster Assessment ............................................................. 31 9. Response ....................................................................................... 33 9.1. Overview .................................................................................. 33 9.2. Warning Notifications and Dissemination .......................................... 33 9.3. Public information and warning notification and dissemination ............ 33 9.4. Public Warning Systems ................................................................. 33 9.5. Activation of this plan .................................................................... 34 9.6. Activation .................................................................................. 35 9.7. Activation Triggers ........................................................................ 36 9.8. Declaration of a Disaster Situation .................................................. 37 9.9. Local Disaster
Recommended publications
  • Hervey Bay Bus Timetable
    5172_Hervey Bay_tt_May_2021_D.6.1.indd 1 $ % Fares Travel tips qconnect journey planner How to calculate your fare? 1. Visit www.qconnect.qld.gov.au to use the The qconnect journey planner enables you Hervey Bay Fares are calculated based on the number of qconnect journey planner and access to plan your trip in any Queensland town that zones you travel through during your journey. timetable information. has qconnect bus services. To access the Bus timetable To calculate your fare, subtract the lowest zone 2. Plan to arrive at least five minutes prior to journey planner, visit www.qconnect.qld.gov.au. you have travelled in or through, from the highest departure. Simply enter your trip details and get an instant zone you have travelled in or through, and add 3. Read the number on the approaching bus to trip summary. one zone. check if it is the one you want. This will determine the correct number of zones 4. At designated bus stops, signal the driver you will be charged for. clearly by placing your hand out as the bus journey planner approaches. Keep your arm extended until Urban bus services Fields marked with*must be completed Monday to Saturday Ticket options the driver indicates. Select region qconnect single Select city or town 5. If you have a concession card, have it ready * From: Road Landmark route servicing One - way ticket to reach your destination, to show the driver. Enter Departure Location including transfers within two hours on any 6. Ask for a ticket by destination or by the * To: Road Landmark 705 Maryborough (Monday – Sunday) qconnect service.
    [Show full text]
  • Known Impacts of Tropical Cyclones, East Coast, 1858 – 2008 by Mr Jeff Callaghan Retired Senior Severe Weather Forecaster, Bureau of Meteorology, Brisbane
    ARCHIVE: Known Impacts of Tropical Cyclones, East Coast, 1858 – 2008 By Mr Jeff Callaghan Retired Senior Severe Weather Forecaster, Bureau of Meteorology, Brisbane The date of the cyclone refers to the day of landfall or the day of the major impact if it is not a cyclone making landfall from the Coral Sea. The first number after the date is the Southern Oscillation Index (SOI) for that month followed by the three month running mean of the SOI centred on that month. This is followed by information on the equatorial eastern Pacific sea surface temperatures where: W means a warm episode i.e. sea surface temperature (SST) was above normal; C means a cool episode and Av means average SST Date Impact January 1858 From the Sydney Morning Herald 26/2/1866: an article featuring a cruise inside the Barrier Reef describes an expedition’s stay at Green Island near Cairns. “The wind throughout our stay was principally from the south-east, but in January we had two or three hard blows from the N to NW with rain; one gale uprooted some of the trees and wrung the heads off others. The sea also rose one night very high, nearly covering the island, leaving but a small spot of about twenty feet square free of water.” Middle to late Feb A tropical cyclone (TC) brought damaging winds and seas to region between Rockhampton and 1863 Hervey Bay. Houses unroofed in several centres with many trees blown down. Ketch driven onto rocks near Rockhampton. Severe erosion along shores of Hervey Bay with 10 metres lost to sea along a 32 km stretch of the coast.
    [Show full text]
  • Wambaliman SPRING 2017
    The newsletter of the Wildlife Preservation Society of Queensland Fraser Coast Branch SPRING 2017 Wambaliman since 1967 In the language of the Butchulla people, who are custodians of land that includes the Fraser Coast, ‘wambaliman’ means ‘to carry’, and refers to the messages that the Newsletter is communicating. Editor's Note One of the things that took up some precious time in the preparation period of this issue of Wambaliman was a trip to Mt Larcom for the WILDLIFE PRESERVATION Central Branches Get-together. It was an in- SOCIETY OF QUEENSLAND spiring weekend of discussion and sociability with intelligent and motivated people with wild- known informally as life conservation in their blood. WILDLIFE QUEENSLAND One of the items on the program was Branch Reports, from which it was clear that we all FRASER COAST BRANCH face similar challenges in wildlife conservation. PO Box 7396 Urangan, 4655 One distinct difference between the other Branches and Fraser Coast Branch was that we President: are positively active. Audrey Sorensen This issue of the newsletter doesn’t really do 4125 6891 [email protected] justice to all the positive activities that our Vice President: Branch is involved in, or the efforts of all the people that are driving those activities. Rodney Jones 0423 812 881 A read through our parting President Peter Secretary: Duck’s report and the Branch Activity report Vanessa Elwell-Gavins only skims the surface of all the action. Many 0428 624 366 of our members are fully engaged in the list of Assistant Secretary: activities mentioned in the CEP report.
    [Show full text]
  • Annual Report 2018/ 19
    19 Annual Report 2018/ www.frasercoast.qld.gov.au 2 | Annual Report 2018/19 WELCOME 4 Mayor’s Message 6 CEO’s Message 7 Councillors and Executive Leadership Team 8 Snapshot of Region 10 OUR YEAR IN REVIEW 12 STATUTORY INFORMATION 14 Mayor and Councillors 15 Councillor Remuneration and Expenses 15 Council Meeting Attendance 16 Councillor Conduct 16 Corporate Governance 18 Senior Management Remuneration 18 Administrative Action Complaints 18 Beneficial Enterprises 19 Significant Business Activities 19 Competitive Neutrality Complaints 19 Particular Resolutions 19 Overseas Travel 19 Expenditure on Grants to Community Organisations 20 contents Details of Special Rates and Charges 34 Summary of Concessions for Rates and Charges 34 Changes to Council Tenders 35 Council Registers 35 Internal Audit Function 35 Audit Committee 36 Public Sector Ethics 37 COMMUNITY FINANCIAL REPORT 39 FINANCIAL STATEMENTS 51 Index of Legislative Requirements 112 Glossary of Terms 113 Attachment 1 – Commercial Business Unit report Annual Report 2018/19 | 3 Welcome to the Fraser Coast Our Annual Report provides: Regional Council Annual Report for 2018/19. • an overview of our performance in achieving Council’s Corporate In this report we provide an Plan while providing a glance overview of our performance into Council’s role in serving our in serving the Fraser Coast communities; and community and share some of • an opportunity to report on the challenges, our financial various statutory information performance as well as our pertaining to our financial, as aspirations to continuously strive well as governance obligations. towards our vision of welcome 4 | Annual Report 2018/19 Planning Framework To ensure that Council has a clear understanding of our purpose and how we utilise our resources, we utilise a planning framework that consists of three planning instruments: 1.
    [Show full text]
  • Mary River Environmental Values and Water Quality Objectives Basin No
    ATTACHMENT 4 Attachment 4, Item 3, Planning & Organisation Committee Agenda, 2 February 2016 Environmental Protection (Water) Policy 2009 Mary River environmental values and water quality objectives Basin No. 138, including all tributaries of the Mary River July 2010 Document Set ID: 20002123 Version: 1, Version Date: 21/12/2015 Prepared by: Water Quality & Ecosystem Health Policy Unit Department of Environment and Resource Management © State of Queensland (Department of Environment and Resource Management) 2010 This publication is available in alternative formats (including large print and audiotape) on request. Contact (07) 322 48412 or email <[email protected]> July 2010 Document Ref Number Document Set ID: 20002123 Version: 1, Version Date: 21/12/2015 Main parts of this document and what they contain • Scope of waters covered Introduction • Key terms / how to use document (section 1) • Links to WQ plan (map) • Mapping / water type information • Further contact details • Amendment provisions • Source of EVs for this document Environmental Values • Table of EVs by waterway (EVs - section 2) - aquatic ecosystem - human use • Any applicable management goals to support EVs • How to establish WQOs to protect Water Quality Objectives all selected EVs (WQOs - section 3) • WQOs in this document, for - aquatic ecosystem EV - human use EVs • List of plans, reports etc containing Ways to improve management actions relevant to the water quality waterways in this area (section 4) • Definitions of key terms including an Dictionary explanation table of all (section 5) environmental values • An accompanying map that shows Accompanying WQ Plan water types, levels of protection and (map) other information contained in this document iii Document Set ID: 20002123 Version: 1, Version Date: 21/12/2015 CONTENTS 1 INTRODUCTION ............................................................................................................................
    [Show full text]
  • Mary River Environmental Values and Water Quality Objectives (Plan)
    ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! M A R Y R I V E R , I N C L U D I N G A L L T R I B U T A R I E S O F T H E R I V E! R ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Basin 138 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 152°E 152°20'E ! 152°40'E 153°E ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! H E R V E Y B AY ! ! ! B ! ! ! ! ! ! ! ! ! ! Grego R ! ! ry i ! ! v u er ! ! ! ! ! ! ! r ! ! ! ! CORDALBA ! n ! ! ! ! ! WALKERS ! ! ! ! ! ! ! ! ! ! e ! ! ! POINT ! Environmental Protection (Water) Policy 2009 S ! ! ! ! ! ! ! ! ! ! ! t ! ! ! ! ! ! ! ! ! t t ! ! ! o ! ! Users must refer to plans WQ1372 k c ! ! ! ! ! ! ! ! k ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! e ! y ! ! ! ! ! ! ! ! ! ! R ! r e a and WQ1402 for information on South-east Queensland Map Series ! r ! i d ! ! C v BURRUM
    [Show full text]
  • Wide Bay/Burnett Region
    Wide Bay/Burnett Region Burnett Bridge over Burnett River, Bundaberg Wide Bay/Burnett wide bay/burnett region Wide Bay/Burnett Kalpowar Coominglah Bargara Monto BUNDABERG Gin Gin BUNDABERG Mount REGIONAL COUNCIL Perry HERVEY Childers BAY Cloncose Eidsvold Oakhurst NORTH BURNETT Biggenden MARYBOROUGH REGIONAL COUNCIL Mundubbera Gayndah FRASER COAST REGIONAL COUNCIL Tiaro Rainbow Beach Brovinia SOUTH BURNETT Curra REGIONAL COUNCIL Proston Kilkivan Goomeri GYMPIE CHERBOURG ABORIGINAL GYMPIE SHIRE COUNCIL Cherbourg REGIONAL COUNCIL Legend Durong National road network ³ State strategic road network Kingaroy State regional and other district road Kumbia National rail network 0 50 Km Other railway Local government boundary S:\jobs\CORPORATE PRODUCTS\Annual Report and RIP Maps\RIP Maps\2011\Region RIP Maps\Wide Bay Burnett Region\Wide Bay Burnett Region QTRIP.mxd March 2011 Regional contacts Region Office Street address Postal address Telephone Fax Wide Bay/Burnett Bundaberg 23 Quay Street, Bundaberg, Qld 4670 Locked Bag 486, Bundaberg DC Qld (07) 4154 0200 (07) 4154 3878 Gympie 1-5 Phillip Street,50 River Road, Gympie Qld 4570 PO Box 183, Gympie Qld 4570 (07) 5482 0301 (07) 5482 0465 Divider image: Burnett Bridge over Burnett River, Bundaberg. Photographer or source: MWA Viewfinder. Copyright © The State of Queensland. Regional profile Overview • complete construction of two new passing lanes on • continue and complete the development of Area Transport Bundaberg–Gin Gin Road between Lerches Road and Woods Strategies for the key regional centres of Hervey Bay and The Wide Bay/Burnett Region covers an area of approximately Road Bundaberg. These strategies will investigate the transport 48,599 km2, or around 2.8% of Queensland.
    [Show full text]
  • Bauple Bulletin Proudly Presented by Bulletin Team & Bauple School P&C
    Bauple Bulletin Proudly presented by Bulletin Team & Bauple School P&C Issue No. 236 May 2021 School Phone: 4193 8222 Email: [email protected] May Tiaro Community Centre meeting - 3rd Monday 2pm 22 Bauple Country Markets Community Legal Service - 3rd Thursday - Tiaro Council Office 9:00am 22 BPA General Meeting 1pm Q150 Tiaro R.S.L Sub Branch – Last Monday – 11am – Memorial Hall, Tiaro. 29 Music Night Rec Grounds 3-7pm Opening hours 9am –1pm Fridays June Tiaro & Dist. Chamber of Commerce Mtg - 3rd Tuesday 7:00 pm 4 Bingo Q150 7pm John Horrex Room- Tiaro Community Centre 9 QCWAGootchie High Tea 9.30-11.30am Tiaro School P&C - 2nd Thursday—6:00 pm 12 Teebar Rodeo Asperger's Support Group - Ph 4193 9239 for support July Community Playgroup - last Wed of month Ph 4122 4151 23 Bauple P&C Annual Tombola 6.30pm QCWA Petrie Gardens Visit - 3rd Friday 10am Aug 7 Tiaro SS 150th Celebration MIVA Sept QCWA Meeting – 1st Wednesday – 9:00am 4 Bauple Nut Bash GUNALDA WEEKLY Gunalda, Curra, Glenwood Community Health Clinic – 2nd Wed Yoga exercises & relaxation - Tuesdays 8:30am - Bauple Q150 Rec & GOOTCHIE Wed 9am—Gunalda—Jenny, Thurs 5:45pm - Tiaro Community Centre- QCWA Meeting – 2nd Tuesday - 9:30am Helen 0410288595 Zumba Classes - Fitness- Start back first week FEB Tues– 5:30pm Gold- Mon—9:30am - Bauple Band Hall GUNDIAH Rossendale Tennis Club - Friday 7pm - Ph 4129 2589 Yoga Jenergy - Mon 9-11 -ph 0400 676 287 Bauple Scouts & Cubs - Thursday 4:30 - 6:30pm Gundiah Community Place - 1st & 3rd Sunday Dinner 6pm Bauple Community Shed open - Tuesdays & Saturdays 9am - 3pm Gundiah Rural Fire Brigade training – 1st Monday 7pm at Station Be Connected– Free Technology Tutoring - Tiaro & Dist.
    [Show full text]
  • Social Infrastructure Needs Assessment
    SOCIAL INFRASTRUCTURE NEEDS ASSESSMENT FINAL REPORT A planning study supporting the Fraser Coast 2031: Sustainable Growth Strategy Project Prepared for GHD on behalf of Fraser Coast Regional Council By BRIGGS & MORTAR PTY LTD Phone: (07) 5473 0322 Fax: (07) 5473 0388 Job No. 08223 August 11 Table of Contents Executive Summary ...................................................................................................... 1 1. Introduction............................................................................................................. 7 2. Summary of Literature Review .............................................................................. 7 2.1 Summary of Previously Identified Social Infrastructure Needs...............................7 2.2 Specifically Identified Needs .....................................................................................10 3. Community Profile................................................................................................ 15 3.1 Population Projections ..............................................................................................15 3.2 Age projections ..........................................................................................................16 3.3 Summary Community Characteristics .....................................................................16 3.4 Community Characteristics by Key Catchment Area..............................................19 3.5 Settlement Pattern......................................................................................................24
    [Show full text]
  • Fraser Island and the Great Sandy Region (Australia)
    WORLD HERITAGE NOMINATION - IUCN SUMMARY 630: FRASER ISLAND AND THE GREAT SANDY REGION (AUSTRALIA) Summary prepared by WCMC/IUCN (March 1992) based on the original and the revised nomination submitted by the Government of Australia. This original and all documents presented in support of this nomination will be available for consultation at the meetings of the Bureau and the Committee. 1. LOCATION On the south-eastern coast of Queensland. Fraser Island and the mainland Cooloola sand mass together make up part of the Great Sandy region. 2. JURIDICAL DATA In 1860 the whole of Fraser Island was gazetted as an Aboriginal reserve. Cooloola was declared a forestry reserve in 1881. After the Aborigines were removed from Fraser Island, the remnant Aboriginal reserve was revoked in 1906. In 1908 the central part of Fraser Island was declared a forestry reserve, and by 1925 most of the island had been set aside as state forest. The land is under state, federal and private tenure. 3. IDENTIFICATION Covering approximately 239,OOOha the major geological elements of the region are the sandmasses of Fraser Island and Cooloola. Fraser Island is 122km long, 5-25km wide and reaches 235m, the depth of the sand extending 30-60m below present sea level. Dunes on Cooloola reach 260m, cover 40km of coastline and extend 1 Okm inland. Notable features are the sandmass aquifers, the dune lakes, the Noosa River system and associated plains lakes. The closed forests of Fraser Island and Cooloola, covering some 10,500ha of high dunes, largely distinguish these sandmasses. Aboriginal people are thought to have first occupied the region about 40,000 years ago.
    [Show full text]
  • Wambaliman AUTUMN 2018
    The newsletter of the Wildlife Preservation Society of Queensland Fraser Coast Branch AUTUMN 2018 Wambaliman since 1967 In the language of the Butchulla people, who are custodians of land that includes the Fraser Coast, ‘wambaliman’ means ‘to carry’, and refers to the messages that the Newsletter is communicating. Editor's Note From where I write I can see a clear blue sky with just a few high clouds; the lengthy wet period that has been so welcomed by plants and WILDLIFE PRESERVATION people alike seems to be behind us. SOCIETY OF QUEENSLAND What’s not behind us is the constant struggle to conserve wildlife and associated habitats. known informally as Fortunately, the people who submit articles to WILDLIFE QUEENSLAND this newsletter are among those with some awareness on the issue of conservation. FRASER COAST BRANCH Our President, Audrey, has been observing PO Box 7396 Urangan, 4655 wildlife behaviour for many decades, and gives us an example of that in her article on wildlife President: in her backyard. Audrey Sorensen Both the Activity Report and the EAG Report 4125 6891 [email protected] contain examples of the many activities that Vice President: Branch members are participating in, all of which demonstrate modest gains in the Rodney Jones 0423 812 881 Branch’s stated aims. Secretary: The wonderful Nature Walks continue to pro- Vanessa Elwell-Gavins vide networking and educational opportunities. 0428 624 366 Displays and workshops such as Diane Chris- Assistant Secretary: tensen’s library display and Carol Bussey’s but- terfly workshop offer a tremendous opportuni- Bruce Dick ty for the Branch to reach the general public Treasurer: with information on wildlife conservation.
    [Show full text]
  • Information Sheet on Ramsar Wetlands (RIS)
    Information Sheet on Ramsar Wetlands (RIS) Categories approved by Recommendation 4.7 (1990), as amended by Resolution VIII.13 of the 8th Conference of the Contracting Parties (2002) and Resolutions IX.1 Annex B, IX.6, IX.21 and IX. 22 of the 9th Conference of the Contracting Parties (2005). This Ramsar Information Sheet has been converted to meet the 2009 – 2012 format, but the RIS content has not been updated in this conversion. The new format seeks some additional information which could not yet be included. This information will be added when future updates of this Ramsar Information Sheet are completed. Until then, notes on any changes in the ecological character of the Ramsar site may be obtained from the Ecological Character Description (if completed) and other relevant sources. 1. Name and address of the compiler of this form: FOR OFFICE USE ONLY. Department of Environment and Heritage DD MM YY PO Box 155 BRISBANE ALBERT STREET QLD 4002. 2. Date this sheet was completed/updated: Designation date Site Reference Number May 1999 3. Country: Australia 4. Name of the Ramsar site: The precise name of the designated site in one of the three official languages (English, French or Spanish) of the Convention. Alternative names, including in local language(s), should be given in parentheses after the precise name. Great Sandy Strait (including Great Sandy Strait, Tin Can Bay and Tin Can Inlet). 5. Designation of new Ramsar site or update of existing site: Great Sandy Strait was designated on 14 June 1999 This RIS is for (tick one box only): a) Designation of a new Ramsar site ; or b) Updated information on an existing Ramsar site 6.
    [Show full text]