Adani Green Energy (TN) Ltd. 648MWac Plant, Kamuthi

648MWac SOLAR POWER PROJECT 1 (Kamuthi, Tamilnadu) VISION

To be the globally admired leader in integrated infrastructure businesses with a deep commitment to nation building. We shall be known for our scale of ambition, speed of execution and quality of operation.

2 Film

3 Non

"A non renewable resource is a natural resource that cannot be re-made or re-grown at a scale comparable to its consumption”.

Coal Petroleum Natural Gas

Limited Source : Coal, petroleum, and natural gas are considered nonrenewable because they can not be replenished in a short period of time. These are called fossil fuels. As per the increasing energy demand, we have to look after the renewable sources of energy to meet the demand. Environmental hazard : Using these sources of energy causes hazardous damage to the environment leading to effects of global warming ,acid rain, carbon dioxide emission, health hazards and other impacts

4 Hence arrives the need for Renewable Energy Renewable Energy

"Renewable Energy is energy that is derived from natural processes that are replenished constantly. In its various forms, it derives directly or indirectly from the sun.”

Solar Wind Hydro Biomass

Abundant source : These are all natural replenishable sources of energy, so all these sources can be effectively utilized to meet the increasing energy demand.

Eco Friendly : Using these renewable sources of energy leads to pollution free, indefinitely sustainable energy.

5 Solar Power - Inherent Benefits

Free Fuel

Completely Renewable / Environment Non-Exhaustible Energy Friendly /Zero Source Emission

Short Diversification to gestation Renewable Energy project Resources

CDM Benefits Low O&M cost

Feed in Tariff announced by Government

6 PV Solar Technology Classification

PV Solar Technology

CSi Thin Film Technology Technology

Mono Multi Crystalline crystalline

Amorphous Si PV Cells

CdTe CI GS Technology Technology

7 Technology Selection: We have followed a rigorous process to arrive at C-Si as our preferred technology for this project Crystalline Silicon

Solar PV ✓ Relatively inexpensive as compared with thin film ✓ ✓ Reduction in price of Higher current commercial modules (~65% of total efficiency ✓ Capex). Capex have almost Proven track record of over halved in last 5 years 35 years ✓ ✓ Availability of modules & Lower annual degradation technological improvement vis-à-vis thin film leading to efficient & technologies Solar generation higher capacity modules Crystalline technology Silicon

✓ Most promising of the all the renewable Thin film technologies technologies ✓ GoI target of 100 GW by 2022 ✓ Prone to Transparent ✓ Enabling regulations Conductive Oxide (TCO) such as RPO & RGO corrosion & delamination ✓ Climate change Concentrated ✓ Increased BOS cost sensitivities Solar Power (CSP) associated with thin film ✓ is endowed technologies with lot of sunshine ✓ Very high capex vis-à-vis Solar PV retendering it unviable

8 Plant Location – 648 MW Solar Power Plant at Kamuthi, Tamilnadu

648 MW Plant

9 Plant Location – 648 MW Solar Power Plant at Kamuthi, Tamilnadu

10 Unique location with high insolation and land availability

648 MWp Ultra Mega Solar Power project (2 x Project 216 MW + 3 x 72 MW) Sengapaddai, Pudukottai, O Karsilkulam villages, Site Location Kamuthi Taluka, District – Ramanthpuram Nearest Airport Madurai (approx. 90km from Site)

Sayalkudi – Kamuthi – Arruppukottai Road Nearest Road (Adjoining)

Nearest Port Tuticorin Port, approx. 110km

Nearest Railway Tiruchuli, (approx. 25km from site) Station

Seismic Condition Seismic Zone – III

Irradiation 5.44 kWh/Sqm/day

Soil type Black cotton and sandy soil

Owner’s Engineer M/s Sgurr Energy India Pvt. Ltd. 12 13 BASIC BLOCK DIAGRAM

SUN SOLAR STRING COMBINER DC to AC PANELS BOX INVERTER

DISTRIBUTION TRANSFORMER

RMU

33KV SWITCHGEAR

TRANSMISSION 110/230KV POWER SYSTEM OF STATE SWITCHYARD TRANSFORMER GOVT.

648MWac SOLAR POWER PROJECT (Kamuthi, Tamilnadu) 648 MWac is owned 5 separate companies with AGE(TN)L being the holding company

Adani Green Energy (Tamil Nadu) Ltd.

Ramnad Adani Green Energy Kamuthi Solar Kamuthi Ramnad Solar Renewable (TN) Ltd Power Ltd. Renewable . Power Ltd. Energy Ltd. 216MW 216MW 72MW Energy Ltd. 72MW 72MW

15 CLEARANCES / NOC

Sr. No. Clearance OBTAINED 1 CONSENT TO ESTABLISH (CTE) ALL 5 COMPANIES

2 CONSENT TO OPERATE (CTO-air) ALL 5 COMPANIES

3 CONSENT TO OPERATE (CTO-Water) ALL 5 COMPANIES 4 CEIG CLEARANCE ALL 5 COMPANIES APPROVAL ON TRANSMISSION LINE 5 ALL 5 COMPANIES PROFILE 6 GRID TIE UP APPROVAL ALL 5 COMPANIES 7 COMMISSIONING CERTIFICATE ALL 5 COMPANIES 8 BOCW REGISTRATION ALL 5 COMPANIES

9 NOC FROM GRAM PANCHAYATS ALL 5 COMPANIES

10 FACTORY LICENSE ALL 5 COMPANIES

11 NOC FROM FIRE DEPARTMENT ALL 5 COMPANIES

16 Major Suppliers – Solar Modules

Sl No Technology Supplier 1 C-Si Suntech, China

2 C-Si Canadian Solar, China

3 C-Si Trina Solar, China

4 C-Si GCL, China

5 C-Si Hanwha, China

6 Thin Film (CIS) Solar Frontier, Japan

7 Thin Film (Cd-Te) First Solar, USA

8 Bifacial Megacell, Italy

C-Si – Crystalline Silicon, Cd-Te – Cadmium Teluride, CIGS – Copper Indium Gallium Selenide 17 DIFFERENT TECHNOLOGIES

Sr.No Technology Supplier Installed capacity ( MW )

1 Bifacial Modules Megacell - Italy 1.25

2 Thin Film ( CdTe) First Solar – USA 5

3 Thin Film ( CIS ) Solar Frontier 5

4 Seasonal Tilt C-Si Modules 5

5 Single Axis Tracker Smart track 1.25

6 Single Axis Tracker Scorpius 1.25

7 Single Axis Tracker Archtech 1.25

8 Single Axis Tracker Insolar 1.25

9 Single Axis Tracker Meca Solar 1.25

10 Single Axis Tracker Run Sol 1.25

11 Single Axis Tracker Solpower 1.25 Major Suppliers

Sl No Type Supplier Module Mounting Zhongxingbo (Arctech), & Jiangsu Weir, China 1 Structure Ganges International & Satec Envir Engineering, India 2 Inverters Hitachi – Hirel / ABB 3 Transformers ABB / Transformers & Rectifiers / Schneider Electric Switchyard / 4 ABB SCADA System HT Switchgear / 5 RMU Sterlite Industries, KEI Cables, Polycab, Apar 7 Cables Industries 8 DC Combiner Boxes Jakson Engineers / Statcon Power

9 Cable Connectors Bizlink, Taiwan

19 WE SALUTE THE CONTRIBUTIONS MADE BY VARIOUS

STAKEHOLDERS (GoTN, TANGEDCO / TANTRANSCO OFFICIALS

& PARTNERS) AND OUR EMPLOYEES & THEIR FAMILIES FOR

THEIR UNFLINCHING DEDICATION AND COMMITMENT TO

CREATE A MASTERPIECE IN A RECORD TIME OF 8 MONTHS

20 Photographs

21 22 Site photographs: as it was in the beginning

23 24 25 26 27 28 29 30 31 32 33 34 35 36 CdTe – First Solar

37 38 39 Inverter – Transformer Centre

40 MCR BUILDING

41 MCR BUILDING

42 43 44 45 46 47 648MWac SOLAR POWER PROJECT 48 (Kamuthi, Tamilnadu) Security Team at Site

49

Monitoring Performance

Performance Ratio (PR) Three performance parameters may be used to define the overall system performance with respect to the energy production, solar resource, and overall effect of system losses. (IEC 61724)  PV System Yield (Yf) -- Energy Yield : Output (MWh) / Name Plate power (MW)  Reference Yield (Yr) - Actual Irradiation (KWh/m²) / STC irradiation (KW/m²)  Performance Ratio (PR) = Yf / Yr

 What is the PR of a 15 MW Solar-Park produces 75MWh on a day with 6.25 KWh/m² of in-plane insolation? 75/15 X 1/6.25 = 0.8 or 80 % PLF / CUF = 75/( 15*24 ) = 20.8 %

Key Issues: ➢ Calibration of Pyrometer ➢ GHI and Inclined-planed insolation ➢ In-house verification of calibration ➢ Regular cleaning of the glass dome Grass & Weeds inside the Plant

52 Grass & Weeds cutting with machine

53 After Cutting and cleaning

54 Module cleaning : Automatic Dry cleaning with Robots

ECOPIA SOLBRIGHT

55 Module cleaning : Pressurised water with Tankers

56 Module cleaning : Pressurised water with Pipeline network

57 SCADA

58 SCADA

59 SCADA

60 SCADA

61 SCADA

62 SCADA

63 SCADA

64 SCADA

65 SCADA

66 SCADA

67 Generation Trend …Sunny Day

68 Effect of Clouds

69 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY VILLAGES

70 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY

71 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY VILLAGES

72 WE SHARE …….WE LEARN…..INDUSTRIAL VISITS

73 WE SHARE …….WE LEARN….INDUSTRIAL VISITS

74 WE SHARE …….WE LEARN….INDUSTRIAL VISITS

75 WE SHARE …….WE LEARN….INDUSTRIAL VISITS

76 Solar Plant Monitoring by DRONE

Land survey

Project Monitoring

Dust detection

Thermal Imaging

77 Solar Plant Monitoring by DRONE : Thermal Imaging

78 Solar Plant Monitoring by DRONE : Thermal Imaging

79 Solar Plant Monitoring by DRONE : Thermal Imaging

80 Solar – Annual installation and projections

Source: Mercom Installed and Pipeline solar projects ~ 22GW (Top 12 states)

7000

6000

5000

4000

3000

2000

1000

0

Pipeline Installed Demand 2018-19 @ 6.75% RPO Top 10 - Largest Solar players in India

2500

2000

1500

1000

500

0 Adani ReNew Greenko ACME Tata Azure NTPC Essel Suzlon Hero Power Power Future

Pipeline Installed Adani Green Energy ( TN ) Limited

A true Mega Structure

84 9818352204

85