Adani Green Energy (TN) Ltd. 648MWac Solar Power Plant, Kamuthi
648MWac SOLAR POWER PROJECT 1 (Kamuthi, Tamilnadu) VISION
To be the globally admired leader in integrated infrastructure businesses with a deep commitment to nation building. We shall be known for our scale of ambition, speed of execution and quality of operation.
2 ADANI Group Film
3 Non Renewable Energy
"A non renewable resource is a natural resource that cannot be re-made or re-grown at a scale comparable to its consumption”.
Coal Petroleum Natural Gas
Limited Source : Coal, petroleum, and natural gas are considered nonrenewable because they can not be replenished in a short period of time. These are called fossil fuels. As per the increasing energy demand, we have to look after the renewable sources of energy to meet the demand. Environmental hazard : Using these sources of energy causes hazardous damage to the environment leading to effects of global warming ,acid rain, carbon dioxide emission, health hazards and other impacts
4 Hence arrives the need for Renewable Energy Renewable Energy
"Renewable Energy is energy that is derived from natural processes that are replenished constantly. In its various forms, it derives directly or indirectly from the sun.”
Solar Wind Hydro Biomass
Abundant source : These are all natural replenishable sources of energy, so all these sources can be effectively utilized to meet the increasing energy demand.
Eco Friendly : Using these renewable sources of energy leads to pollution free, indefinitely sustainable energy.
5 Solar Power - Inherent Benefits
Free Fuel
Completely Renewable / Environment Non-Exhaustible Energy Friendly /Zero Source Emission
Short Diversification to gestation Renewable Energy project Resources
CDM Benefits Low O&M cost
Feed in Tariff announced by Government
6 PV Solar Technology Classification
PV Solar Technology
CSi Thin Film Technology Technology
Mono Multi Crystalline crystalline
Amorphous Si PV Cells
CdTe CI GS Technology Technology
7 Technology Selection: We have followed a rigorous process to arrive at C-Si as our preferred technology for this project Crystalline Silicon
Solar PV ✓ Relatively inexpensive as compared with thin film ✓ ✓ Reduction in price of Higher current commercial modules (~65% of total efficiency ✓ Capex). Capex have almost Proven track record of over halved in last 5 years 35 years ✓ ✓ Availability of modules & Lower annual degradation technological improvement vis-à-vis thin film leading to efficient & technologies Solar generation higher capacity modules Crystalline technology Silicon
✓ Most promising of the all the renewable Thin film technologies technologies ✓ GoI target of 100 GW by 2022 ✓ Prone to Transparent ✓ Enabling regulations Conductive Oxide (TCO) such as RPO & RGO corrosion & delamination ✓ Climate change Concentrated ✓ Increased BOS cost sensitivities Solar Power (CSP) associated with thin film ✓ India is endowed technologies with lot of sunshine ✓ Very high capex vis-à-vis Solar PV retendering it unviable
8 Plant Location – 648 MW Solar Power Plant at Kamuthi, Tamilnadu
648 MW Plant
9 Plant Location – 648 MW Solar Power Plant at Kamuthi, Tamilnadu
10 Unique location with high insolation and land availability
648 MWp Ultra Mega Solar Power project (2 x Project 216 MW + 3 x 72 MW) Sengapaddai, Pudukottai, O Karsilkulam villages, Site Location Kamuthi Taluka, District – Ramanthpuram Nearest Airport Madurai (approx. 90km from Site)
Sayalkudi – Kamuthi – Arruppukottai Road Nearest Road (Adjoining)
Nearest Port Tuticorin Port, approx. 110km
Nearest Railway Tiruchuli, Tamil Nadu (approx. 25km from site) Station
Seismic Condition Seismic Zone – III
Irradiation 5.44 kWh/Sqm/day
Soil type Black cotton and sandy soil
Owner’s Engineer M/s Sgurr Energy India Pvt. Ltd. 12 13 BASIC BLOCK DIAGRAM
SUN SOLAR STRING COMBINER DC to AC PANELS BOX INVERTER
DISTRIBUTION TRANSFORMER
RMU
33KV SWITCHGEAR
TRANSMISSION 110/230KV POWER SYSTEM OF STATE SWITCHYARD TRANSFORMER GOVT.
648MWac SOLAR POWER PROJECT (Kamuthi, Tamilnadu) 648 MWac is owned 5 separate companies with AGE(TN)L being the holding company
Adani Green Energy (Tamil Nadu) Ltd.
Ramnad Adani Green Energy Kamuthi Solar Kamuthi Ramnad Solar Renewable (TN) Ltd Power Ltd. Renewable . Power Ltd. Energy Ltd. 216MW 216MW 72MW Energy Ltd. 72MW 72MW
15 CLEARANCES / NOC
Sr. No. Clearance OBTAINED 1 CONSENT TO ESTABLISH (CTE) ALL 5 COMPANIES
2 CONSENT TO OPERATE (CTO-air) ALL 5 COMPANIES
3 CONSENT TO OPERATE (CTO-Water) ALL 5 COMPANIES 4 CEIG CLEARANCE ALL 5 COMPANIES APPROVAL ON TRANSMISSION LINE 5 ALL 5 COMPANIES PROFILE 6 GRID TIE UP APPROVAL ALL 5 COMPANIES 7 COMMISSIONING CERTIFICATE ALL 5 COMPANIES 8 BOCW REGISTRATION ALL 5 COMPANIES
9 NOC FROM GRAM PANCHAYATS ALL 5 COMPANIES
10 FACTORY LICENSE ALL 5 COMPANIES
11 NOC FROM FIRE DEPARTMENT ALL 5 COMPANIES
16 Major Suppliers – Solar Modules
Sl No Technology Supplier 1 C-Si Suntech, China
2 C-Si Canadian Solar, China
3 C-Si Trina Solar, China
4 C-Si GCL, China
5 C-Si Hanwha, China
6 Thin Film (CIS) Solar Frontier, Japan
7 Thin Film (Cd-Te) First Solar, USA
8 Bifacial Megacell, Italy
C-Si – Crystalline Silicon, Cd-Te – Cadmium Teluride, CIGS – Copper Indium Gallium Selenide 17 DIFFERENT TECHNOLOGIES
Sr.No Technology Supplier Installed capacity ( MW )
1 Bifacial Modules Megacell - Italy 1.25
2 Thin Film ( CdTe) First Solar – USA 5
3 Thin Film ( CIS ) Solar Frontier 5
4 Seasonal Tilt C-Si Modules 5
5 Single Axis Tracker Smart track 1.25
6 Single Axis Tracker Scorpius 1.25
7 Single Axis Tracker Archtech 1.25
8 Single Axis Tracker Insolar 1.25
9 Single Axis Tracker Meca Solar 1.25
10 Single Axis Tracker Run Sol 1.25
11 Single Axis Tracker Solpower 1.25 Major Suppliers
Sl No Type Supplier Module Mounting Zhongxingbo (Arctech), & Jiangsu Weir, China 1 Structure Ganges International & Satec Envir Engineering, India 2 Inverters Hitachi – Hirel / ABB 3 Transformers ABB / Transformers & Rectifiers / Schneider Electric Switchyard / 4 ABB SCADA System HT Switchgear / 5 Siemens RMU Sterlite Industries, KEI Cables, Polycab, Apar 7 Cables Industries 8 DC Combiner Boxes Jakson Engineers / Statcon Power
9 Cable Connectors Bizlink, Taiwan
19 WE SALUTE THE CONTRIBUTIONS MADE BY VARIOUS
STAKEHOLDERS (GoTN, TANGEDCO / TANTRANSCO OFFICIALS
& PARTNERS) AND OUR EMPLOYEES & THEIR FAMILIES FOR
THEIR UNFLINCHING DEDICATION AND COMMITMENT TO
CREATE A MASTERPIECE IN A RECORD TIME OF 8 MONTHS
20 Photographs
21 22 Site photographs: as it was in the beginning
23 24 25 26 27 28 29 30 31 32 33 34 35 36 CdTe – First Solar
37 38 39 Inverter – Transformer Centre
40 MCR BUILDING
41 MCR BUILDING
42 43 44 45 46 47 648MWac SOLAR POWER PROJECT 48 (Kamuthi, Tamilnadu) Security Team at Site
49
Monitoring Performance
Performance Ratio (PR) Three performance parameters may be used to define the overall system performance with respect to the energy production, solar resource, and overall effect of system losses. (IEC 61724) PV System Yield (Yf) -- Energy Yield : Output (MWh) / Name Plate power (MW) Reference Yield (Yr) - Actual Irradiation (KWh/m²) / STC irradiation (KW/m²) Performance Ratio (PR) = Yf / Yr
What is the PR of a 15 MW Solar-Park produces 75MWh on a day with 6.25 KWh/m² of in-plane insolation? 75/15 X 1/6.25 = 0.8 or 80 % PLF / CUF = 75/( 15*24 ) = 20.8 %
Key Issues: ➢ Calibration of Pyrometer ➢ GHI and Inclined-planed insolation ➢ In-house verification of calibration ➢ Regular cleaning of the glass dome Grass & Weeds inside the Plant
52 Grass & Weeds cutting with machine
53 After Cutting and cleaning
54 Module cleaning : Automatic Dry cleaning with Robots
ECOPIA SOLBRIGHT
55 Module cleaning : Pressurised water with Tankers
56 Module cleaning : Pressurised water with Pipeline network
57 SCADA
58 SCADA
59 SCADA
60 SCADA
61 SCADA
62 SCADA
63 SCADA
64 SCADA
65 SCADA
66 SCADA
67 Generation Trend …Sunny Day
68 Effect of Clouds
69 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY VILLAGES
70 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY
71 CSR ACTIVITIES TAKEN UP BY ADANI GROUP IN NEARBY VILLAGES
72 WE SHARE …….WE LEARN…..INDUSTRIAL VISITS
73 WE SHARE …….WE LEARN….INDUSTRIAL VISITS
74 WE SHARE …….WE LEARN….INDUSTRIAL VISITS
75 WE SHARE …….WE LEARN….INDUSTRIAL VISITS
76 Solar Plant Monitoring by DRONE
Land survey
Project Monitoring
Dust detection
Thermal Imaging
77 Solar Plant Monitoring by DRONE : Thermal Imaging
78 Solar Plant Monitoring by DRONE : Thermal Imaging
79 Solar Plant Monitoring by DRONE : Thermal Imaging
80 Solar – Annual installation and projections
Source: Mercom Installed and Pipeline solar projects ~ 22GW (Top 12 states)
7000
6000
5000
4000
3000
2000
1000
0
Pipeline Installed Demand 2018-19 @ 6.75% RPO Top 10 - Largest Solar players in India
2500
2000
1500
1000
500
0 Adani ReNew Greenko ACME Tata Azure NTPC Essel Suzlon Hero Power Power Future
Pipeline Installed Adani Green Energy ( TN ) Limited
A true Mega Structure
84 9818352204