FORM – I

For

ENVIRONMENTAL CLEARANCE (AMENDMENT)

of

SRI N. SRINIVASA RAO MINING OF GRAVEL LEASE AREA: 1.433 Ha., Mine Address: Sy. No. 209/17, 209/18 & 209/21 G.Donthamuru (V), Rangampeta (M), East Godavari (Dt.),

Prepared & Submitted by

SV ENVIRO LABS & CONSULTANTS BLOCK-B, B-1, IDA, AUTONAGAR -12 VISAKHAPATNAM, ANDHRA PRADESH QCI No. 144

1 FORM- 1

(I) Basic Information

Sl.No. Item Details 1. Name of the project/s Sri N. Srinivasa Rao Mining of Gravel

2. S. No. in the schedule 1(a) 3. Proposed capacity/area/length/tonnage to Mining of Gravel in 1.433 Ha., be handled/command area/lease Gravel – 73610 m3/annum area/number of wells to be drilled. 4. New/Expansion/Modernization EC Amendment for Survey number 5. Existing Capacity/Area etc. The proposed lease area of 1.433 hectares extent is government waste land and new for mining activity.

6. Category of Project i.e. ‘A’ or ‘B’ Category – B2 7. Does it attract the general condition? If The project doesn’t attract general conditions yes, please specify. as per EIA notification, 2006. As the mine area is not located in whole or in part within 10 km from the boundary of: (i) Protected Areas notified under the Wild Life (Protection) Act, 1972, (ii) Critically Polluted areas as notified by the Central Pollution Control Board, (iii) Notified Eco-sensitive areas, (iv) inter-State and international boundaries. 8. Does it attract the specific condition? If This mining activity doesn’t attract specific yes, please specify. condition as the mining area is not located in Industrial Estate/SEZ as mentioned in specific conditions of EIA Notification, 2006 9. Location Toposheet No: 65 G/16 BP Latitude Longitude Y1 17°00'31.66"N 81°59'35.59"E

2 Y2 17°00'32.79"N 81°59'36.71"E Y3 17°00'32.36"N 81°59'38.03"E Y4 17°00'31.71"N 81°59'38.09"E Y5 17°00'32.26"N 81°59'40.19"E Y6 17°00'29.42"N 81°59'40.69"E Y7 17°00'27.29"N 81°59'36.99"E Plot/Survey/Khasra No. Sy. No. 209/17, 209/18 & 209/21 Village G.Donthamuru Village, Tehsil , District , State Andhra Pradesh. 10. Nearest railway station/airport along Balabhadrapuram Railway Station at 4.63 kms with distance in kms. 11. Nearest Town, city, district Headquarters Town: Rangampeta at a distance of 7.80 kms along with distance in kms. City: Rajahmundry city at a distance of 20.15 kms. District Headquarters: Kakinada (East Godavari district head quarters) at a distance of 27.00 kms 12. Village Panchayats, Zilla Parishad, Gram Panchayat: G.Donthamuru G .P., Municipal Corporation, Local body Ragampeta Mandal, (complete postal addresses with East Godavari District –533294 telephone nos. to be given) Zilla Parishad: Kakinada Zilla Parishad, Raja Ram Mohan Roy Road, ZP Center, Kakinada East Godavari District - 533001 13. Name of the lease applicant Sri N. Srinivasa Rao 14. Registered Address Sri N. Srinivasa rao, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, Anaparthi Mandal, East Godavari District, 3 Andhra Pradesh - 533264 15. Address for correspondence: Name Sri N. Srinivasa Rao Designation (Owner/Partner/CEO) Lessee D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, Anaparthi Mandal, East Godavari District, Andhra Pradesh Pin code 533264 E-mail [email protected] Telephone No. 9951822228 Fax No. -- 16. Details of Alternative Sites examined, if No alternative sites were examined. The gravel any. Location of these sites should be mineral is site specific. Due to the availability shown on a topo sheet. of gravel deposits in the lease area, this area is selected for mining 17. Interlinked Projects No Interlinked Projects 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves i. The present mine area is a Govt. land, no approval/clearance under: if yes, details forest cover is present within the mine of the same and their status to be given. lease area. Thus, there is no need of i. The Forest (Conservation) Act, 1980? Forest clearance. ii. The Wildlife (Protection) Act, 1972? ii. The project doesn’t require iii. The C.R.Z. Notification, 1991? approval/clearance under The Wildlife (Protection) Act, 1972. iii. The area is not located within CRZ zone. Thus, there is no Need for CRZ clearance 22. Whether there is any Government  The DDM&G, Kakinada granted a quarry

4 Order/Policy relevant/relating to the site? lease for Gravel over an extent of 1.433 Ha., in Sy. No. 209/1, 209/18 & 209/21 of G.Donthamuru Village, Ragampeta Mandal, East GodavariDistrict, Andhra Pradesh vide Notice No: 3777/Q1/2018 dated 31.10.2018.  The mining plan was approved by the Lr. No: 3777/Q1/2018 dated 29.11.2018.  EC was also accorded vide Order No. SEIAA/AP/EG/MIN/03/2019/869-326 dated 31.05.2019  CFE was accorded vide Order No. 6383- KKD/PCB/ZO-VSP/CFE/2019 dated 10.07.2019 But,  As per the recent survey & from revenue records the Sy. No. 209/1 was mistyped for original Sy. No. 209/17 & the NOC was issued form Tahisldar Ragampeta.  The DDM&G Kakinada issued Errata letter for the AMP for the QL applied area of Sri N. Srinivasa Rao for Gravel mine over an extent of 1.433 Ha. at Sy. No. 209/17, 209/18, 209/21 of G.Donthamuru Village, Rangampeta Mandal, East Godavari District.  Now the Mining plan was approved by the Lr. No: 3777/Q1/2018, dated 07.08.2019 23. Forest land involved (hectares) No forest land is involved 24. Whether there is any litigation pending No litigations or court cases pending against against the project and/or land in which the proposed project the project is propose to be set up?

5 a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project.

(II) Activities 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in land Yes The applied area is slightly elevated use, land cover or topography including with local plantation on west side increase in intensity of land use (with compared to nearest Road way. respect to local land use plan) After Quarrying Gravel the land will be reclaimed with O.B to make it fit for cultivation or oteher purpose. At presnt the top R.L is 68 M after removing Gravel & after Reclamation the lower R.L will be 63 M It is proposed to quarrying the gravel by digging and scooping method with help of proclainer and JCB. Land scape will be slightly changed due to open cast mining. The formed pits will be utilized for water storage and as rain water harvesting structure at the end of mine life. Greenbelt will be developed within in buffer zone of mining lease area.

6 1.2 Clearance of existing land, vegetation Yes The entire area is Government waste and buildings? Land and proposed to be worked for Gravel quarrying. Since the area belong to gravel area, it doesnot have much vegetation except scattered bushes. Vegetation clearance is unavoidable, wherever mining activity is planned. Greenbelt will be developed within buffer zone of mining lease area. There are no existing buildings in the lease area and hence no proposal of clearance is made. 1.3 Creation of new land uses? Yes A pit formed in the process of Gravel exploitation, which shall be reclaimed as water harvesting structure during quarry closure. 1.4 Pre-construction investigations e.g. bore Yes The mineral reserves were estimated houses, soil testing? through cross sectional method, accordingly 4 sections has drawn perpendicular to the trend direction of the deposit. 1.5 Construction works? Yes No permanent structures will be constructed. Temporary site services like office cum firstaids room, restrooms, shelters will be provided due South-Western side within in the quarry lease applied area. 1.6 Demolition works? No The mine does not contain any temporary / permanent structures. Therefore no demolition work will be carried.

7 1.7 Temporary sites used for construction Yes Temporary structures like office cum works or housing of construction firstaids room, restrooms,shelters will workers? be provided due South-Western side within in the quarry lease applied area. 1.8 Above ground buildings, structures or Yes The project does not involve any earthworks including linear structures, construction activity. Gravel will be cut and fill or excavations excavate through open cast mining method by digging, scooping and loading in to tippers for transportation. 1.9 Underground works including mining or No Opencast method by developing tunneling? benches. Therefore, no underground mining or tunneling is envisaged. 1.10 Reclamation works? No No reclamation works are proposed during this ensuing mining plan. But after completion of mining activity the formed pits will be used as water harvesting structures and green belt will be developed withi buffer zone. The top benches will be applied with fertile soil and plantations works along with grass species development will be carried out. 1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing Yes The workings will be carried out in the processes? East of the applied area and from there ramps will be connected on both sides. Further between the quarry working pit to the ground level with convenient /lateral directions. The proposed method of excavation

8 will all design parameters indicated on production plans and sections. The gravel is exposed on the surface with sheet. Hence it is proposed to quarrying the gravel by digging and scooping method with help of proclain and JCB. The JCB is used for dozing gravel and formation of road purpose. 1.14 Facilities for storage of goods or Yes Temporary stocks will be maintained materials? on day to day basis. 1.15 Facilities for treatment or disposal of No No waste/over burden is going to be solid waste or liquid effluents? generated. All the material is consumed for filling of roads and civil construction purposes and also if any rock material will generates, it will be stocked. No liquid effluent shall be generated except domestic effluent of 0.9 KLD which will be treated in septic tank followed by soak pit. 1.16 Facilities for long term housing of No Majority of manpower will be Operational workers? recruited from local villages only. Therefore no housing scheme is proposed. 1.17 New road, rail or sea traffic during No Road Network to reach the Site is Construction or operation? clear from main road. So no proposal for new road is made. 1.18 New road, rail, air waterborne or other No As the project is in small scale, the transport infrastructure including new or existing transport facilities shall meet altered routes and stations, ports, the proposed transportation airports etc? requirements. 1.19 Closure or diversion of existing No The project will not cause any changes

9 transport routes or infrastructure leading in the existing traffic movements. to changes in traffic movements? 1.20 New or diverted transmission lines or No The project does not involve diversion pipelines? of transmission /pipelines. 1.21 Impoundment, damming, culverting, No There is no Impoundment, damming, realignment or other changes to the culverting, realignment needed. hydrology of watercourses or aquifers? The formed mine pits will be used as water harvesting structures, thus cause positive changes in the hydrology of aquifers of that area. 1.22 Stream crossings? No Not applicable, as there are no streams passing in the core zone and immediate buffer zone of the applied area. 1.23 Abstraction or transfers of water form Yes No bore wells are proposed for this ground or surface waters? mine activity. Water requirement of 5.5 KLD will be supplied through water tankers from surrounding village for sprinkling and domestic purpose in the mine. 1.24 Changes in water bodies or the land Yes During mining activities the rain water surface affecting drainage or run-off? runoff will be collected in mine pits or garland drains. The same will be used for dust suppression or green belt development or into nearby water source after sedimentation. 1.25 Transport of personnel or materials for Yes The workers will be used their own construction, operation or conveyance for communicating to the decommissioning? quarry during operation. During operation JCB, trucks, Proclainers will be used. Transportation of personnel will be

10 anticipated until the mine area is completely reclaimed/restored 1.26 Long-term dismantling or No Mine closure plan will be decommissioning or restoration works? implemented. 1.27 Ongoing activity during No Decommissioning for this mine area is decommissioning which could have an taken up to restore the environment impact on the environment? with green belt development. Decommissioning activity which has adverse impact on environment is not proposed. 1.28 Influx of people to an area in either No No influx of people into this area Temporarily or permanently? either temporarily or permanently. Most of the employees will be from local area only. 1.29 Introduction of alien species? No Green belt will be developed with native species only. 1.30 Loss of native species or genetic No Since the area belong to gravel area, it diversity? doesnot have much vegetation except scattered bushes. 1.31 Any other actions? No No other actions which will cause changes in land use, water bodies are not identified in this mine activity.

11

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

Details thereof (with S.No. Information/Checklist confirmation Yes/No approximate quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The mine lease area is Government agricultural land (ha) waste land which is undeveloped and not suitable for agricultural or any other use other than quarrying. 2.2 Water (expected source & competing Yes As per the approved EC the total users) unit: KLD water requirement of the mining operations is about 5.5 KLD. Dust suppression – 2.30 KLD Green belt – 2.0 KLD Domestic – 1.20 KLD Source of water is by water tankers from surrounding villages. 2.3 Minerals (MT) No The present mining activity doesn’t require any minerals for its operation. 2.4 Construction material – stone, Yes Requirement of minor quantities of aggregates, sand / soil (expected source - construction materials are sourced MT) from nearby areas for construction of temporary office and rest shelter. Fertile soil is required for plantation works. 2.5 Forests and timber (source – MT) No Since it is open cast mining acitivity no timber usage is envisaged. 2.6 Energy including electricity and fuels Yes This is open cast semi mechanized 12 (source, competing users) Unit: fuel mining. Diesel will be used for (MT), energy (MW) mining operations. Electricity is not required as the mining operations are carried out in day time only. 2.7 Any other natural resources (use No -- appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No No hazardous waste material use in hazardous (as per Blasting rules) to this project as the project doesnot human health or the environment (flora, need blasting for its process. fauna, and water supplies) 3.2 Changes in occurrence of disease or No There is no change in occurrence of affect disease vectors (e.g. insect or water disease or affect disease vectors due borne diseases) Affect the welfare of to Gravel quarry activity. people e.g. by changing living conditions? 3.3 Affect the welfare of people e.g., by Yes The proposed activity will provide changing living conditions? employment to the local villagers thereby improving their living conditions. 3.4 Vulnerable groups of people who could No The quarry operation will be carried be affected by the project e.g. hospital out in safe and systematic manner patients, children, the elderly etc., as per the approved mining plan. There is no hutment in the lease area. So no person will be affected 13 by the project. Nearest habitation is G.Donthamuru at a distance 1.22 kms. 3.5 Any other causes? No Nil

4. Production of solid wastes during construction or operation or commissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No No waste, intercalated waste is going to be generated. If any incidental negligible waste generated the same will be back filled in the pit. 4.2 Municipal waste (domestic and or No No municipal waste will be commercial wastes) generated during mining operation. 4.3 Hazardous wastes (as per Hazardous Yes Used oil from engines will be used Waste Management Rules) for lubricating the machinery. 4.4 Other industrial process wastes No No industrial process waste will be generated. 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from No No sludge is expected from the effluent treatment mine activity. 4.7 Construction or demolition wastes Yes Small amounts of waste is expected from demolition works at decommissioning stage. The material with resalable value such as asbestos sheets will be sold and other wastes will be disposed safely. 4.8 Redundant machinery or equipment No No redundant machinery will be

14 kept in the quarry premises. 4.9 Contaminated soils or other materials No The repair and service works of these machineries are done outside the quarry lease area. There is no possibility of oil spillage. Even though in rare cases if there is any sudden leakage that waste will be disposed properly into the outside approved sites. 4.10 Agricultural wastes Yes Plant waste while clearing vegetation can be expected during this envisaged mining plan. 4.11 Other solid wastes No Nil

15 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist confirmation Yes/No possible) with source of information data 5.1 Emissions from combustion of fossil Yes The only source of emissions is fuels from stationary or mobile sources combustion of fuels from mining machinery and transport vehicles. The emissions are very minimal and insignificant to cause any adverse effect. However, periodical emission test shall be conducted once in six months for all vehicles working in the quarry. 5.2 Emissions from production processes Yes Fugitive dust will be generated from mining activities. Adequate control measures like water sprinkling will be followed. Regular monitoring and maintenance of equipment will be practiced. Green belt, which act as pollution sink will be developed within buffer zone. 5.3 Emissions from materials handling Yes Emission of air borne dust is including storage or transport envisaged during transport of mineral and movement of vehicles within the mine. Water sprinklers will be provided for dust suppression. Vehicle speed will be restricted to maximum of 15 KMPH.

16 5.4 Emissions from construction activities Yes Fugitive dust will be generated including mine and equipment during mining activity and will be suppressed by water sprinkling. 5.5 Dust or odours from handling of Yes Dust will generated during mining, materials including construction and transportation of materials. materials, sewage and waste However, odor is not envisaged. 5.6 Emissions from incineration of waste No Incineration of waste is not anticipated during mine operation or decommissioning 5.7 Emissions from burning of waste in open No There will be no burning of waste air (e.g. slash materials, construction in open air. debris) 5.8 Emissions from any other sources No No other sources are identified from this mine activity

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist confirmation Yes/No possible) with source of information data 6.1 From operation of equipment e.g. Yes Noise will be generated from engines, ventilation mine, crushers transport vehicles, machinery. The operations will not cause more than 75 dB (A). However, regular monitoring and maintenance will be performed to reduce noise emissions. 6.2 From industrial or similar processes Yes Noise emissions will be within prescribed limits during mining operations. 6.3 From construction or demolition No No demolition or major construction activities are proposed for this mine operation.

17 6.4 From blasting or piling No No blasting is proposed for this mine. 6.5 From construction or operational traffic Yes Noise will be generated from the trucks deployed for transportation of mined material 6.6 From lighting or cooling systems No No lighting or cooling systems will be installed in the mine area 6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage No The repair and service works of of hazardous materials machineries are done outside. There is no possibility of oil spillage. Even though there is any sudden leakage the waste will be disposed properly into the outside approved landfill. 7.2 From discharge of sewage or other No There is no effluent generated from effluents to water or the land (expected project site. The domestic effluent mode and place of discharge) generatedwill be disposed through septic tank followed by soak pit. 7.3 By deposition of pollutants emitted to air No There is no process waste water into the land or into water generated from the project site and domestic effluent generated which is disposed through septic tank followed by soak pit. The project will not have any odors since it is 18 quarry operation. The dust arising on transportation operations will be attenuated by way of water sprinkling on haul roads to avoid dust deposition into nearby lands/water bodies. 7.4 From any other sources? No No other sources are identified 7.5 Is there a risk of long term build up of No There is no risk of long term pollutants in the environment from these buildup of pollutants in the sources? environment, since the mine operations are opencast method.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc. No No blasting. No inflammable from storage, handling, use or production material used for quarrying. of hazardous substances 8.2 From any other causes Yes  Mine Safety precautions should be followed while operating Excavator.  No person should be allowed within the swing area of excavator while loading.  Use of machineries in quarry should be operated by the competent person as per the mine Regulations to avoid break downs and its related

19 accidents.  Benches with safety slopes will be established to avoid slope failures. 8.3 Could the project be affected by natural No The area of project site is not prone disasters causing environmental damage to natural disasters such as (e.g. floods, earthquakes, landslides, flooding, land slides, cloud burst. cloudburst etc)? The area falls under seismic zone III. Benches with safety slopes are maintained to avoid slope failures.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 9.1 Lead to development of supporting Yes The project will lead to improvement facilities, ancillary development or of business opportunities in the development stimulated by the project locality by way of establishment of which could have impact on the shops, garages in near by villages. environment e.g.: Housing development may not • Supporting infrastructure (roads, power required as the workers are recruited supply, Waste or waste water treatment, from local villages and they will etc.) come from their own houses. • Housing development No much industrial development is • Extractive industries anticipated due to mine activity. • Supply industries • Other 9.2 Lead to after-use of the site, which could Yes During quarry closure, exhausted pit

20 have an impact on the environment shall be reclaimed as rain water harvesting structure. Green belt with grasses and trees will be developed within buffer zone. Thus, the modification in land use may lead to positive impact on the environment. 9.3 Set a precedent for later developments No This project may not set any precedence for any later developments. 9.4 Have cumulative effects due to No No other mines exist with in the proximity to other existing or planned 500m radius. So cumulative effect is projects with similar effects not anticipated. Recommended control measures will be followed by the mine management.

(III) Environmental Sensitivity

Name/ Aerial distance (within 15 km.) S.No. Area Identity Proposed project location boundary 1 Areas protected under international No None within 15 km Aerial distance conventions, national or local legislation from proposed mine site. for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Yes Water Bodies: for ecological reasons - Wetlands, Eduru Cheruvu – 3.77 kms – SW watercourses or other water bodies, Chakale Cheruvu – 4.75 kms – SE coastal zone, biospheres, mountains, Lingala Cheruvu – 7.60 kms - SE forests Reserve Forest: None within 10 km radius 3 Areas used by protected, important or No This area not used by protected, sensitive species of flora or fauna for important or sensitive species of flora

21 breeding, nesting, foraging, resting, over or fauna for breeding, nesting, wintering, migration foraging, resting, over wintering and migration. There is no Endangered Species. 4 Inland, coastal, marine or underground No Marine and coastal waters are not waters present within 15 km radius. 5 State, National boundaries No None within 15 km aerial distance from proposed mine. 6 Routes or facilities used by the public for No There are no routes or facilities used access to recreation or other tourist, by the public for access to recreation pilgrim areas or other tourist places in the proposed area. Other routes are present to reach recreation places/pilgrim areas within 15 km radius from the mine area. 7 Defense installations No There is no Defence installation nearby. 8 Densely populated or built-up area Yes Nearest habitation is G.Donthamuru Village situated at 1.22 kms and densely populated area Rangampeta Mandal at a distance of 7.80 kms. 9 Areas occupied by sensitive man-made Yes Hospitals, Schools, community land uses facilities are available at 2.0 kms (Hospitals, schools, places of worship, away from the proposed mine area. community facilities) 10 Areas containing important, high quality No There is no high quality or scarce or scarce resources resources such as ground water (Ground water resources, surface resources, surface resources, forestry, resources, forestry, agriculture, agriculture, fisheries, tourism, rare fisheries, tourism, minerals) minerals near the site. 11 Areas already subjected to pollution or No This area is not already subjected to environmental damage. any pollution or environmental

22 (Those where existing legal damages. environmental standards are exceeded) 12 Areas susceptible to natural hazard No The project area falls under the which could cause the project to present Sesimic Zone-III. No Earth Quake environmental problems history found. The area receives (Earthquakes, subsidence, landslides, moderate rainfall and flooding not erosion, flooding for extreme or adverse anticipated. However, quarry climatic conditions) operations will be suspended during rainy season.

23 STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:-

S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Sri N. Srinivasa Rao Mining of Gravel 2 Name of the organization/owner. Sri N. Srinivasa Rao 3 Address for communication Sri N. Srinivasa Rao Lessee, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, Anaparthi Mandal, East Godavari District, Andhra Pradesh - 533264 4 Telephone numbers 9951822228 5 Email ID of the organization or contact [email protected] person 6 Location of the Proposed project or activity Sy. No. 209/17, 209/18 & 209/21, G.Donthamuru village, Rangampeta Mandal, East Godavari District, Andhra Pradesh - 533294

7 Appraisal Category (B2 or B1) Category ‘B’ (B2) 8 Nearest habitation and distance from the G.Donthamuru village at a distance of project or activity 1.22 kms 9 Installed capacity / Production Capacities Proposed for Mining of Gravel in 1.433 Ha., with maximum capacity of 73610 m3/Annum 10 Specify the Fuel (Coal/ CNG / Diesel based machinery will be used biomass/Others) and quantity required during quarry operations. 11 Details of Land use/Land Cover The applied area is slightly elevated with local plantation on west side compared to nearest Road way.

24 After Quarrying Gravel the land will be reclaimed with top soil to make it fit for cultivation or other purpose. At presnt the top R.L is 68 M after removing Gravel & after Reclamation the lower R.L will be 63 M 12 Occupancy, ownership of the land in which Government waste land. the activity is proposed: The DDM&G Kakinada issued Errata (Government land / Private land / Forest land letter for the AMP for the QL applied area /Revenue land /Temple land /leased land/ of Sri N. Srinivasa Rao for Gravel mine land belongs to other Department) over an extent of 1.433 Ha. at Sy. No. 209/17, 209/18, 209/21 of G.Donthamuru Village, Rangampeta Mandal, East Godavari District. The present Mining plan was approved by the Lr. No: 3777/Q1/2018, dated 07.08.2019 13 If it is a Forest land, the following details No forest area cover under the proposed shall be furnished: site area. Topomap with Reserved forests (Whether it is a Reserved forest / Protected within 10 kms radius of the proposed forest/Demarcated forest/ National mine site is enclosed. Parks/Sanctuaries/any land in possession of Forest Department.)

(The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the project/activity. Rs.45.00 Lakhs a. Funds allocated for EMP (capital cost and Rs.11.59 Lakhs recurring cost per annum) 15 Brief description of the project with special The method of mining shall be opencast reference to specific pollution and its control Semi-mechanized method. Proclains/JCB

25 measures. will be used for excavation . During mining operations fugitive dust emissions will be generated.water sprinklers will reduce the generation of dust. Noise levels will be within prescribed liits as per CPCB norms during mine operations. However, ears plugs wil be provided to the work force. Greenbelt will be developed within buffer zone of the mine lease area. 16 Compliance report on the following : i. Status of compliance of the conditions The project accoreded Environmental and environmental safeguards stipulated Clearance Vide Order No. SEIAA/AP in the earlier clearance letters. /EG/MIN/03/2019/869-326 dated 31.05.2019 CFE was accorded vide Order No. 6383- KKD/PCB/ZO-VSP/CFE/2019 dated 10.07.2019 Now applying for the EC Amendment for the the Survey number The mining plan with the Errata letter was approved vide Letter No: 3777/Q1/2018, dated: 07.08.2019 ii. Details of the court cases, if any, No court case/Litigation is pending pending in any Court of Law against the against the proposed project. project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to the Nil project under Section 5 of the Environmental (Protection) Act, 1986

26 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981. 17 Whether the project attracts the provisions No. laid under the OM dt. 16.11.2012 issued by the MoE&F, GOI, w.r.t. violation of EIA Notification, 2006 and its amendments thereof? (Yes/No) Present stage and status of the project: The Project accoreded EC & CFE. But the Mine management has not commenced mining operations. The Mine will start its operations after obtaining necessary permissions such as EC, CFE,CFO and permits for production with the amended survey number. 18 Name of the Consultant: SV Enviro Labs & Consultants, Visakhapatnam

27 FORM – 4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

1 Details of the Project

a. Name of the Projects (s) Sri N. Srinivasa Rao

Sri N. Srinivasa Rao, Sy. No. 209/17, 209/18 & 209/21, G.Donthamuru village, b. Name of the Company/Organization Rangampeta Mandal, East Godavari District, Andhra Pradesh - 533294 Sri N. Srinivasa rao, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, c. Registered Address Anaparthi Mandal, East Godavari District, Andhra Pradesh - 533264

d. Legal Status of the Company Lessee

e. Joint Venture (Yes/No) No

If Yes,

(i)No. of JV Partners

(multiple entries allowed) Name of the Share of the Address of the JV Email ID Mobile No. JV Partner Partner Partner

2 Address for the correspondence

a. Name of the applicant Sri N. Srinivasa Rao

b. Designation (Owner/Partner/CEO) Lessee

Sri N. Srinivasa rao, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, c. Address Anaparthi Mandal, East Godavari District, Andhra Pradesh

d. Pin code 533264

e. E-mail [email protected]

f. Telephone No. 9951822228

g. Fax No. --

3. Category of the Project/ Activity as per Schedule of EIA Notification,2006

a. Project /Activity 1(a)(i)- Mining of Minerals

b. Category (A/B1/B2) Category – B2

If B1 or B2

We are applying in state level as per NGT order executive application No. Reason for application at Central Level 55/2018 dated 11.12.2018 and MoEF I State level (in case of B and B 1 2 OM dated.12.12.2018 comes under projects) state committee even though our mine extent is less than 5.00 Ha. If Others --

c. Please Specify NA

EAC concerned (for category A Projects only) (Coal Mining/ Non-coal Mining/ d. Thermal /River Valley & Hydro/ NA Industry-I/ Industry-II/ Infrastructure-I /Infrastructure-II/ Nuclear & Defence/ CRZ)

4. Location of the Project

a. Plot/ Survey/ Khasra No. Sy. No. 209/17, 209/18 & 209/21

b. Village G.Donthamuru

c. Tehsil Rangampeta

d. District East Godavari

e. State Andhra Pradesh

f. Pin Code 533294

g. Bounded Latitudes (North) 17°00'31.66"N, 17°00'32.79"N, From 17°00'32.36"N, 17°00'31.71"N, 17°00'32.26"N, 17°00'29.42"N, To 17°00'27.29"N

h. Bounded Longitudes(East) 81°59'35.59"E, 81°59'36.71"E, From 81°59'38.03"E, 81°59'38.09"E, 81°59'40.19"E, 81°59'40.69"E, To 81°59'36.99"E

i. Survey of Topo Sheet No. 65 G/16 5. Details of Environmental Clearance Date of issue of Environmental a. 31.05.2019 Clearance b. MoEF & CC / SEIAA File No. SEIAA/AP/EG/MIN/03/2019/869-326

c. Upload EC letter (PDF Only) Will be attached

6. Details of Consent to Operate Whether Consent to operate obtained (i) NA (Yes/No)? If Yes, NA Upload Copies of all Consent to (ii) operate obtained since inception NA ( Upload pdf only) (iii) Date of Issue NA

(iv) Valid Upto NA

(v) File No. NA

(vi) Application No. NA Upload Copy of Consent to operate (vii) NA valid as on date (Upload pdf only) Amendment sought for: amendment in configuration / Amendments in clearance 7. condition/ others (Specify)

Others (Amendment in Survey Number 209/17, 209/18, 209/21 instead of 209/1, 209/18,

209/21) The mining plan with Errata letter was approved vide 3777/Q1/2018 dated 07.08.2019.

8. Details of the Product (as per approved EC) Mode of Transport / Product/ Activity Quantity Unit Transmission of (Capacity/ Area) Product Gravel 73610 M3/Annum Trucks  Unit:- (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per

Day(KLD), Tons Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km), Million Liters per Day(MLD), Others)

 Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe Conveyor, Arial Ropeway, combination of two or three modes, Others)

9. Details of Configuration (Multiple Entries Allowed) Final Plant / Existing Proposed Configuration Remarks if Equipment / Configuration Configuration after any Facility Amendment

NA NA NA NA NA 10. Reasons for amendment  The project obtained Environmental Clearance in the name of Sri N. Srinivasa Rao for Gravel mine over an extent of 1.433 Ha. at Sy. No. 209/1, 209/18, 209/21 of G.Donthamuru Village, Rangampeta Mandal, East Godavari District as per the Approved Mining Plan  As per the recent survey & from revenue records the Sy. No. 209/1 was mistyped for original Sy. No. 209/17 & the NOC was issued form Tahisldar Ragampeta  The DDM&G Kakinada issued Errata letter for the AMP for the QL applied area of Sri N. Srinivasa Rao for Gravel mine over an extent of 1.433 Ha. at Sy. No. 209/17, 209/18, 209/21 of G.Donthamuru Village, Rangampeta Mandal, East Godavari District.

11. Any other amendment required Reference of Description as per Description as per Remarks if any approved EC approved EC proposal ------

12. Details of EIA Consultant Have you hired Consultant for a. Yes preparing document (Yes /No)? If No, (i)Reason for not engaging the -- Consultant If Yes,

(i) Accreditation No. 144 (ii) Name of the EIA Consultant SV Enviro Labs & Consultants Enviro House, Block-B, IDA, B1, Auto (iii) Address Nagar, Visakhapatnam

(iv) Mobile No. 9440338628

(v) Landline No. 0891-2755528

(vi) E-mail ID [email protected] (vii) Category of Accreditation (Eligible for Category A/ Eligible Category-A for Category B) (viii) Sector of Accreditation 1(a)

(ix) Validity of Accreditation 15.04.2020 (x) Upload Certificate of Accreditation certified by QCI/ Enclosed NABET (Upload pdf only) 13. Documents to be attached Upload addendum to EIA/EMP a. Enclosed Report Upload Copy of revised - Feasibility Report/ Detailed Project Report(DPR) /Detailed b. Engineering Report /Detailed Enclosed Conceptual Plan I Approved Mining Plan (in case of Mining proposals) ( Upload pdf only) Upload Copy of Final Layout Plan c. Enclosed (Upload pdf only) Upload Cover Letter duly signed by the project proponent or d. Enclosed authorized person (upload pdf only) Upload a copy of authorization duly signed by the project proponent in support of the person e. -- making this application on behalf of the User Agency (Upload pdf only) Upload Additional File, if any f. Enclosed (Upload pdf only) 13. Undertaking I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any a. stage the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity I construction I expansion has since been taken up b. Name Sri N. Srinivasa Rao

c. Designation Lessee

d. Company Sri N. Srinivasa Rao Sri N. Srinivasa Rao, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, e. Address Anaparthi Mandal, East Godavari District, Andhra Pradesh - 533264