SRI N. SRINIVASA RAO MINING of GRAVEL LEASE AREA: 1.433 Ha., Mine Address: Sy

SRI N. SRINIVASA RAO MINING of GRAVEL LEASE AREA: 1.433 Ha., Mine Address: Sy

FORM – I For ENVIRONMENTAL CLEARANCE (AMENDMENT) of SRI N. SRINIVASA RAO MINING OF GRAVEL LEASE AREA: 1.433 Ha., Mine Address: Sy. No. 209/17, 209/18 & 209/21 G.Donthamuru (V), Rangampeta (M), East Godavari (Dt.), Andhra Pradesh Prepared & Submitted by SV ENVIRO LABS & CONSULTANTS BLOCK-B, B-1, IDA, AUTONAGAR -12 VISAKHAPATNAM, ANDHRA PRADESH QCI No. 144 1 FORM- 1 (I) Basic Information Sl.No. Item Details 1. Name of the project/s Sri N. Srinivasa Rao Mining of Gravel 2. S. No. in the schedule 1(a) 3. Proposed capacity/area/length/tonnage to Mining of Gravel in 1.433 Ha., be handled/command area/lease Gravel – 73610 m3/annum area/number of wells to be drilled. 4. New/Expansion/Modernization EC Amendment for Survey number 5. Existing Capacity/Area etc. The proposed lease area of 1.433 hectares extent is government waste land and new for mining activity. 6. Category of Project i.e. ‘A’ or ‘B’ Category – B2 7. Does it attract the general condition? If The project doesn’t attract general conditions yes, please specify. as per EIA notification, 2006. As the mine area is not located in whole or in part within 10 km from the boundary of: (i) Protected Areas notified under the Wild Life (Protection) Act, 1972, (ii) Critically Polluted areas as notified by the Central Pollution Control Board, (iii) Notified Eco-sensitive areas, (iv) inter-State and international boundaries. 8. Does it attract the specific condition? If This mining activity doesn’t attract specific yes, please specify. condition as the mining area is not located in Industrial Estate/SEZ as mentioned in specific conditions of EIA Notification, 2006 9. Location Toposheet No: 65 G/16 BP Latitude Longitude Y1 17°00'31.66"N 81°59'35.59"E 2 Y2 17°00'32.79"N 81°59'36.71"E Y3 17°00'32.36"N 81°59'38.03"E Y4 17°00'31.71"N 81°59'38.09"E Y5 17°00'32.26"N 81°59'40.19"E Y6 17°00'29.42"N 81°59'40.69"E Y7 17°00'27.29"N 81°59'36.99"E Plot/Survey/Khasra No. Sy. No. 209/17, 209/18 & 209/21 Village G.Donthamuru Village, Tehsil Rangampeta Mandal, District East Godavari District, State Andhra Pradesh. 10. Nearest railway station/airport along Balabhadrapuram Railway Station at 4.63 kms with distance in kms. 11. Nearest Town, city, district Headquarters Town: Rangampeta at a distance of 7.80 kms along with distance in kms. City: Rajahmundry city at a distance of 20.15 kms. District Headquarters: Kakinada (East Godavari district head quarters) at a distance of 27.00 kms 12. Village Panchayats, Zilla Parishad, Gram Panchayat: G.Donthamuru G .P., Municipal Corporation, Local body Ragampeta Mandal, (complete postal addresses with East Godavari District –533294 telephone nos. to be given) Zilla Parishad: Kakinada Zilla Parishad, Raja Ram Mohan Roy Road, ZP Center, Kakinada East Godavari District - 533001 13. Name of the lease applicant Sri N. Srinivasa Rao 14. Registered Address Sri N. Srinivasa rao, D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, Anaparthi Mandal, East Godavari District, 3 Andhra Pradesh - 533264 15. Address for correspondence: Name Sri N. Srinivasa Rao Designation (Owner/Partner/CEO) Lessee D. No. 8-38/2, Sivalayam Street, Kathukuluru Village, Anaparthi Mandal, East Godavari District, Andhra Pradesh Pin code 533264 E-mail rao1.433ha@gmail.com Telephone No. 9951822228 Fax No. -- 16. Details of Alternative Sites examined, if No alternative sites were examined. The gravel any. Location of these sites should be mineral is site specific. Due to the availability shown on a topo sheet. of gravel deposits in the lease area, this area is selected for mining 17. Interlinked Projects No Interlinked Projects 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves i. The present mine area is a Govt. land, no approval/clearance under: if yes, details forest cover is present within the mine of the same and their status to be given. lease area. Thus, there is no need of i. The Forest (Conservation) Act, 1980? Forest clearance. ii. The Wildlife (Protection) Act, 1972? ii. The project doesn’t require iii. The C.R.Z. Notification, 1991? approval/clearance under The Wildlife (Protection) Act, 1972. iii. The area is not located within CRZ zone. Thus, there is no Need for CRZ clearance 22. Whether there is any Government The DDM&G, Kakinada granted a quarry 4 Order/Policy relevant/relating to the site? lease for Gravel over an extent of 1.433 Ha., in Sy. No. 209/1, 209/18 & 209/21 of G.Donthamuru Village, Ragampeta Mandal, East GodavariDistrict, Andhra Pradesh vide Notice No: 3777/Q1/2018 dated 31.10.2018. The mining plan was approved by the Lr. No: 3777/Q1/2018 dated 29.11.2018. EC was also accorded vide Order No. SEIAA/AP/EG/MIN/03/2019/869-326 dated 31.05.2019 CFE was accorded vide Order No. 6383- KKD/PCB/ZO-VSP/CFE/2019 dated 10.07.2019 But, As per the recent survey & from revenue records the Sy. No. 209/1 was mistyped for original Sy. No. 209/17 & the NOC was issued form Tahisldar Ragampeta. The DDM&G Kakinada issued Errata letter for the AMP for the QL applied area of Sri N. Srinivasa Rao for Gravel mine over an extent of 1.433 Ha. at Sy. No. 209/17, 209/18, 209/21 of G.Donthamuru Village, Rangampeta Mandal, East Godavari District. Now the Mining plan was approved by the Lr. No: 3777/Q1/2018, dated 07.08.2019 23. Forest land involved (hectares) No forest land is involved 24. Whether there is any litigation pending No litigations or court cases pending against against the project and/or land in which the proposed project the project is propose to be set up? 5 a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activities 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in land Yes The applied area is slightly elevated use, land cover or topography including with local plantation on west side increase in intensity of land use (with compared to nearest Road way. respect to local land use plan) After Quarrying Gravel the land will be reclaimed with O.B to make it fit for cultivation or oteher purpose. At presnt the top R.L is 68 M after removing Gravel & after Reclamation the lower R.L will be 63 M It is proposed to quarrying the gravel by digging and scooping method with help of proclainer and JCB. Land scape will be slightly changed due to open cast mining. The formed pits will be utilized for water storage and as rain water harvesting structure at the end of mine life. Greenbelt will be developed within in buffer zone of mining lease area. 6 1.2 Clearance of existing land, vegetation Yes The entire area is Government waste and buildings? Land and proposed to be worked for Gravel quarrying. Since the area belong to gravel area, it doesnot have much vegetation except scattered bushes. Vegetation clearance is unavoidable, wherever mining activity is planned. Greenbelt will be developed within buffer zone of mining lease area. There are no existing buildings in the lease area and hence no proposal of clearance is made. 1.3 Creation of new land uses? Yes A pit formed in the process of Gravel exploitation, which shall be reclaimed as water harvesting structure during quarry closure. 1.4 Pre-construction investigations e.g. bore Yes The mineral reserves were estimated houses, soil testing? through cross sectional method, accordingly 4 sections has drawn perpendicular to the trend direction of the deposit. 1.5 Construction works? Yes No permanent structures will be constructed. Temporary site services like office cum firstaids room, restrooms, shelters will be provided due South-Western side within in the quarry lease applied area. 1.6 Demolition works? No The mine does not contain any temporary / permanent structures. Therefore no demolition work will be carried. 7 1.7 Temporary sites used for construction Yes Temporary structures like office cum works or housing of construction firstaids room, restrooms,shelters will workers? be provided due South-Western side within in the quarry lease applied area. 1.8 Above ground buildings, structures or Yes The project does not involve any earthworks including linear structures, construction activity. Gravel will be cut and fill or excavations excavate through open cast mining method by digging, scooping and loading in to tippers for transportation. 1.9 Underground works including mining or No Opencast method by developing tunneling? benches. Therefore, no underground mining or tunneling is envisaged. 1.10 Reclamation works? No No reclamation works are proposed during this ensuing mining plan. But after completion of mining activity the formed pits will be used as water harvesting structures and green belt will be developed withi buffer zone. The top benches will be applied with fertile soil and plantations works along with grass species development will be carried out. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes The workings will be carried out in the processes? East of the applied area and from there ramps will be connected on both sides.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us