SPIN No. of Project Remarks / Statu
Total Page:16
File Type:pdf, Size:1020Kb
SETUP 2014 Projects Project Title Name of Cooperator Address of Cooperator Sector Amount of SPIN No. of Remarks / Project (PHP) Project Status* ABRA 1 Off-Season Production of High- SODEC Galicia Farm Galicia, Bangued, Abra Horticulture 189,950.00 14-1907-115- on-going valued vegetables under Micro- c/o: Mrs. Pura Sumangil 14-04-1 climate Controlled System 2 Improving the Production JB Campol’s Furniture Calaba, South, Bangued, Furniture 415,000.00 14-1907-117- Newly approved Capacity and Efficiency of c/o: Mr. John B. Campol Abra 14-02-1 Campol's Furniture Through Equipment Upgrading 3 Off-Season Production of PA’s Farm Barangay Abaquid, Danglas, Horticulture 753,200.00 14-1907-118- Newly approved Dragon Fruit (Hylocereus spp.) Mr. Conrado Sevilleja and Abra 14-04-1 through Photo-Voltaic System Mrs. Anita Sevilleja Technology APAYAO 4 Upgrading of the Facilities for Mark Allen Bagabay Poblacion East, Flora, Food 144,700.00 14-1907-89- On-going Kae Venice Meat Shop and Kae Venice Meat Shop and Apayao 14-01-1 Merchandise Merchandise 5 Upgrading of Facilities of M & Mrs. Norma P. Daquioag Caglayan, Conner, Apayao Food 220,000.00 14-1907-98- Completed N Eatery for the Production of M & N Eatery 14-01-1 Veggie Noodles 6 Upgrading of Facilities of Mr. Paterno M. Bayaua Poblacion, Pudtol, Apayao Metals and 335,000.00 14-1907-99- completed Bayaua's Welding and Bayaua’s Welding and Engineering 14-06-1 Vulcanizing Shop for the Vulcanizing Shop Fabrication and Repair of Farm Implements and Other Metal Products 7 Upgrading of Facilities of Baddo Auto Repair Shop San Francisco, Luna, Metals and 185,628.00 14-1907-111- on-going Baddo Auto Repair Shop for c/o Mr. Benovento A. Baddo Apayao Engineering 14-06-1 the Fabrication and Repair of Farm Implements, Farm Machineries and other Metal Products 8 Upgrading of Facilities of Mrs. Josephine Castro Poblacion, Luna, Apayao Food 107,000.00 14-1907-105- on-going Castro’s Food Products for the Castro’s Food Products 14-01-1 Production of Nutri-Snack Food Products for School Children 9 Upgrading of Facilities of Jozzle Motorcycle Parts and Poblacion, Pudtol, Apayao Metals and 213,000.00 14-1907-112- on-going Jozzle Motorcycle Parts and Accessories Engineering 14-06-1 Accessories Mr. Jozzle John E. Cristobal 10 Upgrading of Facilities of Semana Furniture Shop Poblacion, Pudtol, Apayao Furniture 79,600.00 14-1907-124- Newly approved Semana Furniture Shop Mr. Joselito Semana Jr. 14-02-1 BAGUIO CITY 11 Upgrading of Equipment and Kherya's Bread Hauz 34 Purok, San Carlos Hts., Food 643, 300.00 14-1907-73- completed Product Quality of Kherya's Mrs. Salley Tengay Irisan Baguio City 14-01-1 Bread 12 Upgrading of Equipment and Robee Sweet Delicacies Ms. Diplomat Compound, Food 151,850.00 14-1907-82- completed Product Quality of Robee Rebecca A. Rivera Dominican Hill, Baguio City 14-01-1 Sweet Delicacies 13 Upgrading of Equipment for Mr. Guillermo Calado #42 Bengao, Bakakeng Food 480,870.86 14-1907-87- completed the Production of Jayc Food Jayc Food Products Central, Baguio City 14-01-1 Products Page 1 Project Title Name of Cooperator Address of Cooperator Sector Amount of SPIN No. of Remarks / Project (PHP) Project Status* 14 Upgrading of Equipment for Mrs. Flor Caoili 51 Cypress Point, Irisan, Food 554,000.00 14-1907-91- on-going the Production of Malec’s Malec’s Pastry Baguio City 14-01-1 Pastry 15 Upgrading of Equipment & Mr. Elmer Macalingay #350 Magsaysay Avenue Food 562,500.00 14-1907-92- completed Packaging of Health 100 Health100 Restoreant Corner Private Road, 14-01-1 Baked Products Baguio City 16 Equipment Upgrading for the Mrs. Agustina Ramon and Mr. Kennon Road, Baguio City Furniture 287,322.00 14-1907-100- on-going Production of Win-Art Furniture Rosendo Ramon 14-02-1 and Wood Crafts Win-Art Furniture and Wood Crafts 17 Upgrading of Equipment and RCB Bakery Block 1, Tapao Middle, Food 309,300.00 14-1907-108- on-going Packaging for the Production Mrs. Aida G. Beta- a Quirino Hill, Baguio City 14-01-1 of RCB Baked Products 18 Upgrading of Equipment and Bea Grace General 32 Interior A Balacbac Rd., GDH 659,985.00 14-1907-123- Newly approved Product Quality for the Merchandise Sto. Tomas Proper, Baguio 14-03-1 Production of Bea's Tailoring Mrs. Alona E. Blanco City and Printing Shop 19 Upgrading of Equipment and Elminic Bread Haus 115 Camp 8, Kennon Road, Food 96,000.00 14-1907-125- Newly approved Product Quality of Elminic Mrs. Feliza P. Dela Rosa Baguio City 14-01-1 Bread Haus BENGUET 20 Upgrading of Garden Little less Garden Little Less Bakeshop Nalicob, Madaymen, Food 75, 000.00 14-1907-72- completed Bakeshop Ms. Lennie Ticyoden Kibungan, Benguet 14-01-1 21 Improving the Production Manna Di Cordillera Mr. Nobel JA-187 Upper Cogcoga, Food 405,287.50 14-1907-76- completed Efficiency of the Manna di Cabinta Pico, La Trinidad, Benguet 14-01-1 Cordillera Bakeshop 22 Upgrading of Adler Technical Adler Technical Machine Shop MA 181 Puguis, La Trinidad, Metals and 550,000.00 14-1907-77- completed Machine Shop Mr. Adler Tecne Benguet Engineering 14-06-1 23 Upgrading the Production Dionisio's Fruit and Vegetable OB-022 Boted Tawang, La Food 92,145.00 14-1907-78- completed Efficiency and Market Preserved Food Products Mrs Trinidad, Benguet 14-01-1 Competitiveness of the Mary G. Dionisio Dionisio's Fruit and Vegetable Preserved Food Products 24 Upgrading of the By the Mrs. Brenda Tabingan Madaymen, Kibungan, Food 120,337.50 14-1907-88- on-going Gardens Bakery By the Gardens Bakery Benguet 14-01-1 25 Improving the Production Mr. Mencio C. Oydot Dengsi, Tawang, La Metals and 605,000.00 14-1907-93- completed Capability of Rocky Mountain Rocky Mountain Shop Trinidad, Benguet Engineering 14-06-1 Shop 26 Improving Production Mr. Ariole Cabigting AE-139 Western Buyagan Metals and 1,600,000.00 14-1907-90- on-going Efficiency of the AC Shutters AC Shutters Manufacturers La Trinidad, Benguet Engineering 14-06-1 Manufacturers 27 Improving Kerobee’s Tea Kerobee’s Tea Products Riverside, Ambiong, La Food 1,420,337.50 14-1907-104- on-going Production Process Through Mr. Romeo Kimbungan Trinidad, Benguet 14-01-1 Technology Intervention 28 Upgrading the Production Igoland Weld Bgy. Cruz, La Trinidad, Metals and 1,958,085.00 14-1907-116- Newly approved Capability of Igoland Weld c/o: Mr. Mark C. Bayawa Benguet Engineering 14-06-1 IFUGAO 29 Upgrading of Granary Bakery Granary Bakery Poblacion, Banaue, Ifugao Food 316,950.00 14-1907-85- completed Mrs. Josla B. Bindadan 14-01-1 Page 2 Project Title Name of Cooperator Address of Cooperator Sector Amount of SPIN No. of Remarks / Project (PHP) Project Status* 30 Upgrading of Production Mila’s Bakeshop Poblacion West, Lamut, Food 903,000.00 14-1907-94- on-going Facilities and Improvement Mrs. Karen T. Surla Ifugao 14-01-1 of Product Quality of Mila’s Bakeshop in Lamut, Ifugao 31 Upgrading of Baguiwa's Baguiwa’s Enterprises Poblacion West, Maitab, Food 216,100.00 14-1907-97- on-going Bakery Mrs. Evangeline Baguiwa Lagawe, Ifugao 14-01-1 32 Upgrading of Tonton’s Iron Tonton’s Iron Works & Banting, Mabatobato, Metals and 89,500.00 14-1907-107- on-going Works & Welding Shop Welding Shop Lamut, Ifugao Engineering 14-06-1 Mr. Billy A. Casticimo 33 Upgrading of T&B Machine T & MB Auto Repair Shop Poblacion West, Lamut, Metals and 868,500.00 14-1907-113- on-going Shop Mr. Teodoro U. Bunnag Ifugao Engineering 14-06-1 KALINGA 34 Process Upgrading for Bulaglag's Bakery Ms Purok 2, Bulanao, Tabuk Food 200,000.00 14-1907-81- completed Bulaglag Bakery Fernanda Bulaglag Kalinga 14-01-1 35 Equipment Upgrading of Ivan Ivan Troy's Sili Dangoy, Lubuagan, Kalinga Food 100,000.00 14-1907-86- completed Troy's Sili Myrna A. Dupli 14-01-1 36 Quality and Packaging Shaquil’s Fruit Wine Dagupan, West, Tabuk, Food 107,500.00 14-1907-95- completed Improvement in Shaquil's Fruit Production Kalinga 14-01-1 Wine Production Ms. Brienda A. Gup-ad 37 Improvement in the Arboleda’s Food Products Dagupan West, Tabuk, Food 107,500.00 14-1907-102- completed Manufacturing of Fruit Wine De Ms. Catherine A. Arboleda Kalinga 14-01-1 Kalinga Products 38 Productivity Improvement of N. Sarol Meat Shop & Frozen Mayangao St., Dagupan, Food 499,000.00 14-1907-103- completed N. Sarol’s Products Tabuk City Kalinga 14-01-1 Longganisa Ms. Nellie L. Sarol 39 Equipment Upgrading of Marvie Lou’s Store and Poblacion, Lubuagan, Food 175,000.00 14-1907-106- on going Marvie Lou’s Store and General Merchandise Kalinga 14-03-1 General Merchandise Mrs. Virginia S. Ameling 40 Upgrading Project in Jac Jac Farms' Calagdao, Tabuk City Food 925,000.00 14-1907-110- on going Farms Coffee Processing Mrs. Marietta D. Claver Kalinga 14-01-1 41 Facility Upgrading of Dea’s Dea’s Homemade Products Bulanao, Tabuk City, Food 240,000.00 14-1907-120- On-going Homemade Products Ms. Dea Grace S. Bangguiyac Kalinga 14-01-1 42 Equipment Upgrading of Kalinga Printing Press and Bulanao, Tabuk City, GDH 480,000.00 14-1907-121- On-going Kalinga Printing Press and General Merchandise Kalinga 14-03-1 General Merchandise Mrs. Cresencia S. Regacho 43 Improvement in Magallaya Magallaya Mountain Specialty Gawidan, Bagumbayan, Food 300,000.00 14-1907-126- Newly approved Mountain Specialty Coffee Coffee Tabuk City, Kalinga 14-01-1 Prodcution Mrs.