Jobs and Economic Development from New Transmission and Generation in Wyoming Eric Lantz and Suzanne Tegen

Total Page:16

File Type:pdf, Size:1020Kb

Jobs and Economic Development from New Transmission and Generation in Wyoming Eric Lantz and Suzanne Tegen Jobs and Economic Development from New Transmission and Generation in Wyoming Eric Lantz and Suzanne Tegen NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Technical Report NREL/TP-6A20-50577 March 2011 Contract No. DE-AC36-08GO28308 Jobs and Economic Development from New Transmission and Generation in Wyoming Eric Lantz and Suzanne Tegen Prepared under Task No. WTQ1.1000 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory Technical Report 1617 Cole Boulevard NREL/TP-6A20-50577 Golden, Colorado 80401 March 2011 303-275-3000 • www.nrel.gov Contract No. DE-AC36-08GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 865.576.8401 fax: 865.576.5728 email: mailto:[email protected] Available for sale to the public, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 phone: 800.553.6847 fax: 703.605.6900 email: [email protected] online ordering: http://www.ntis.gov/help/ordermethods.aspx Cover Photos: (left to right) PIX 16416, PIX 17423, PIX 16560, PIX 17613, PIX 17436, PIX 17721 Printed on paper containing at least 50% wastepaper, including 10% post consumer waste. Acknowledgments This report was commissioned by the Wyoming Infrastructure Authority (WIA) and jointly funded by the WIA and the U.S. Department of Energy (DOE) State Technical Assistance Program. A special thanks to Loyd Drain, executive director of the WIA, for supporting this work throughout. In addition, the authors would like to thank each of the local, state, and industry representatives who were interviewed for this study or otherwise contributed to the development of the data that were used in this analysis. Thanks also to our colleagues who provided review and comments on earlier drafts of this report including Marshall Goldberg (MRG & Associates), David Taylor (University of Wyoming), Delphine Hou (the Brattle Group), David Kline (NREL), Gail Mosey (NREL), and Lynn Billman (NREL) as well as our NREL technical editor, Mary Lukkonen. Of course any remaining errors or omissions are the sole responsibility of the authors. iii Executive Summary Wyoming is a significant energy exporter, producing nearly 40% of the nation’s coal and 10% of the nation’s natural gas (EIA 2010a). However, opportunities to add new energy exports in the form of power generation are limited by insufficient transmission capacity. This report is intended to inform policymakers, local government officials, and Wyoming residents about the jobs and economic development activity that could occur should new investments in transmission, wind generation, and natural gas generation in Wyoming move forward. The analysis and results presented here are not a market projection or a forecast. Instead, the report uses a representative deployment scenario and economic modeling tools to estimate the jobs and economic activity likely associated with these projects if or when they are built. New infrastructure projects considered in this analysis include four high voltage (HV) transmission lines designed for export of electricity out of Wyoming and a network of transmission lines that collect new power generation before export outside the state. The scenario considered here also includes 9 GW of new wind power and 1.8 GW of new natural gas power. This infrastructure is estimated to result in more than $25 billion invested during construction and approximately $380 million invested per year of operations (once all new capacity is in service). The Wyoming share of these investments is estimated at approximately 19%–26% of the total construction investment and 31%–34% of the annual operations period investment. Given today’s economic structure, the investments flowing through the Wyoming economy are estimated to support: • An average (as opposed to peak) of 4,000–5,900 Wyoming jobs per year for 10 years from construction-related activities; 8,000–14,000 Wyoming jobs annually during peak construction activity • Wages and benefits to Wyoming workers averaging $200 million–$330 million per year during the 10-year construction period • 2,300–2,600 Wyoming jobs during the operational period of the infrastructure lifecycle (at least 20 years, based on typical financing for new wind power projects) • Wages and benefits ranging from $100 million–$120 million per year during operations • Economic activity (output) of $1.2 billion in 2016 and $1.4 billion in 2019 (during peak construction) and $380 million per year during operations-only years • Total Wyoming economic output on the order of $12 billion–$15 billion (construction plus 20 years of operations); this represents approximately 30% of the total potential economic activity associated with these projects. Whether this economic potential is ultimately realized or not will depend on a variety of factors. Demand for Wyoming wind energy is critical, but the development of the new transmission infrastructure to export the Wyoming wind and natural gas generation across the West is also important. In addition, should the deployment scenario presented here become a reality, an array of factors will influence whether Wyoming will ultimately capture this level of economic activity. Parallel deployment of wind, transmission, and natural gas generation could limit Wyoming’s ability to contribute local goods and services to these projects at the level they have iv been able to for individual projects in the past and reduce the Wyoming specific economic activity estimated here. Alternatively, the development of a Wyoming labor force that can support this type of infrastructure development, along with a modest amount of Wyoming manufacturing capacity to support these types of projects, could greatly increase the economic activity occurring in Wyoming from these projects. v Table of Contents List of Figures ........................................................................................................................................... vii List of Tables ............................................................................................................................................ viii Introduction ................................................................................................................................................. 1 Methodology ................................................................................................................................................ 3 Background ................................................................................................................................3 Analysis-specific Methodology .................................................................................................4 The Infrastructure Deployment Scenario ................................................................................................. 7 Total Jobs and Economic Development Activity ..................................................................................... 9 Summary of Total Results .......................................................................................................14 Wind Generation ....................................................................................................................................... 15 Modeling Inputs .......................................................................................................................18 Wind Generation Results .........................................................................................................23 Natural Gas Generation ............................................................................................................................ 27 Modeling Inputs .......................................................................................................................27 Natural Gas Generation Results ...............................................................................................29 High Voltage Transmission ...................................................................................................................... 33 Modeling Inputs .......................................................................................................................34
Recommended publications
  • Transmission Projects Ready to Go: Plugging Into America's Untapped Renewable Resources
    TRANSMISSION PROJECTS READY TO GO: PLUGGING INTO AMERICA’S UNTAPPED RENEWABLE RESOURCES Michael Goggin, Rob Gramlich, and Michael Skelly April 2021 Report Authors Report Sponsors Michael Goggin, Vice President, Grid This report was sponsored by Americans for a Strategies LLC Clean Energy Grid, with support from the Macro Grid Initiative. Rob Gramlich, Founder and President, Grid Strategies LLC Michael Skelly, Founder, Grid United Report Design Nicolette Santos, Communications Associate, David Gardiner and Associates About Americans for a Clean Energy Grid coalition focused on the need to expand, integrate, and modernize the North American high voltage grid. Expanded high voltage transmission will make America’s electric grid more affordable, reliable, and sustainable and allow America to tap all economic energy resources, overcome system management challenges, and create thousands of well-compensated jobs. But an insular, outdated and often short- sighted regional transmission planning and permitting system stands in the way of achieving those goals. ACEG brings together the diverse support for an expanded and modernized grid from business, labor, consumer and environmental groups, and other transmission supporters to educate policymakers and About the Macro Grid Initiative The Macro Grid Initiative is a joint effort of the American Council on Renewable Energy and Americans for a Clean Energy Grid to promote investment in a 21st century transmission infrastructure that enhances the American Clean Power Association, the Solar Energy Industries Association, the Advanced Power Alliance and the Clean Grid Alliance to advance our shared goals. Americans for a Clean Energy Grid | cleanenergygrid.org 2 Table of Contents I. Introduction 4 II. Project Descriptions 7 10 Americans for a Clean Energy Grid | cleanenergygrid.org 3 I.
    [Show full text]
  • World-Class Wind, World-Class Science
    News from SWCA Environmental Consultants Volume 15, Number 1 | 2015 Cover story: WORLD-CLASS WIND, WORLD-CLASS SCIENCE THERE’S NO GROUSIN’ ‘BOUT WIND | 6 CAPTURING CARBON IN BIG SKY COUNTRY | 8 RIDERS ON THE STORM | 10 MEXICO’S NEW ENERGY LANDSCAPE | 12 SWCA 2015 | 3 FOCUS By John Thomas, CEO With this edition of The Wire we’re pleased to present a collection “Riders on the Storm” relates another contribution our of articles that showcase SWCA’s contributions to protecting the scientists are making in efforts to balance human and wildlife earth’s environmental resources while also helping our clients needs, this time in the Edwards Aquifer region of drought- meet the needs for energy and water development. stricken Central Texas. This article is the first in a two-part series on our water resources work in the region. SWCA teams Our cover story, “World-class Wind, World-class Science,” are conducting stormwater sampling as part of the Edwards shows how sound science is enabling environmentally respon- Aquifer Habitat Conservation Plan, a comprehensive strategy sible energy production in south-central Wyoming, one of the to ensure compliance with the Endangered Species Act. The country’s windiest locales. Thanks to smart siting and small data we are collecting now will help provide an overall picture turbine footprint, Power Company of Wyoming’s Chokecherry of how the aquifer systems function. Our work with water policy and Sierra Madre Wind Energy Project will have minimal long- leaders and planners is helping protect the local water supply term surface disturbance. When built, the project will reduce and the threatened and endangered species that depend upon CO2 emissions and generate electricity for markets in several the aquifer.
    [Show full text]
  • WESTERN WATERSHEDS PROJECT, ) No
    Case 1:16-cv-00083-EJL Document 1 Filed 02/25/16 Page 1 of 107 Laurence (“Laird”) J. Lucas (ISB # 4733) [email protected] Todd C. Tucci (ISB # 6526) [email protected] Talasi B. Brooks (ISB # 9712) [email protected] Advocates for the West P.O. Box 1612 Boise, ID 83701 (208) 342-7024 (208) 342-8286 (fax) Attorneys for Plaintiffs IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF IDAHO WESTERN WATERSHEDS PROJECT, ) No. 1:16-cv-83 WILDEARTH GUARDIANS, CENTER ) FOR BIOLOGICAL DIVERSITY, and ) COMPLAINT PRAIRIE HILLS AUDUBON SOCIETY, ) ) Plaintiffs, ) v. ) ) JANICE SCHNEIDER, Assistant ) Secretary of Interior; BUREAU OF LAND ) MANAGEMENT; and U.S. FOREST ) SERVICE, ) ) Defendants. ) INTRODUCTION 1. Plaintiffs challenge Defendants’ recent decisions approving amended or revised land use plans for Bureau of Land Management (“BLM”) and U.S. Forest Service lands across the range of the greater sage-grouse (Centrocercus urophasianus) in Idaho and other states, which fail to ensure that sage-grouse populations and habitats will be protected and restored in accordance with the best available science and legal mandates COMPLAINT -- 1 Case 1:16-cv-00083-EJL Document 1 Filed 02/25/16 Page 2 of 107 of federal law including the National Environmental Policy Act (“NEPA”), the Federal Land Policy and Management Act (“FLPMA”), the National Forest Management Act (“NFMA”), and the Administrative Procedure Act (“APA”). 2. In response to potential Endangered Species Act (“ESA”) listing and this Court’s remand order in a related sage-grouse/land use plan case, see W. Watersheds Project v. Salazar, No. 08-cv-516-BLW, 2012 WL 5880658 (D.
    [Show full text]
  • Evaluating Sage Grouse Conservation Efforts Formatted
    Sage Grouse Conservation Efforts and Population Trends A Wyoming Case Study Erik M. Molvar, Sagebrush Sea Campaign Director, WildEarth Guardians A Report from AUGUST 2015 Cover photo: Sage grouse near Ferris Mountains, Wyoming, WildEarth Guardians photo. Inset photos: Main haul road, Pinedale Anticline Gas Field, Wyoming, WildEarth Guardians photo. Drilling in the Lost Creek Uranium Project, Wyoming, Erik Molvar photo. Gas drilling in the Pinedale Anticline Field, WildEarth Guardians photo. Sage Grouse Conservation Efforts and Population Trends A Wyoming Case Study Erik Molvar, Wildlife Biologist, WildEarth Guardians, Laramie, Wyoming EXECUTIVE SUMMARY State and federal protections for greater sage grouse are currently being developed, and the performance of these conservation measures will be a key factor in deciding whether or not to list this bird under the Endangered Species Act. While sage grouse populations have declined over the long term, a recent uptick in sage grouse populations has raised the question of whether federal and/or state sage grouse conservation plans are working. An analysis of Wyoming, where state sage grouse conservation measures have been in effect since 2008, provides an informative case study. In Wyoming, federal agencies withheld approval of virtually all industrial projects intersecting sage grouse “Core Areas” (known elsewhere as “Priority Habitats” and designated for elevated sage grouse protections) –– which delayed the approval of 27,203 oil and gas wells between 2009 and 2015. Only one major industrial project, the Lost Creek uranium mine, was approved in a Core Area and constructed under the terms of Wyoming’s state policy. In this case, the state’s conservation measures failed to protect sage grouse because protections were waived by state officials based on their expert judgment that population declines would not occur, and because state protection levels allowed an intensity of development that resulted in the extirpation, or decline, of all sage grouse lek populations in the Lost Creek project vicinity.
    [Show full text]
  • APPENDIX F Transwest Express Transmission Project Jurisdictional Meeting Materials and Communications
    APPENDIX F TransWest Express Transmission Project Jurisdictional Meeting Materials and Communications Appendix F-1—Jurisdictional Meeting Materials Appendix F-2—Notice of Jurisdiction Appendix F-3—Fee Statement Appendix F-4—2019 Application Submittal Supplemental Information Wyoming Industrial Development Information and Siting Act Section 109 Permit Application – TransWest Express LLC F - 0001 This page intentionally left blank Wyoming Industrial Development Information and Siting Act Section 109 Permit Application – TransWest Express LLC F - 0002 APPENDIX F-1 Jurisdictional Meeting Materials Wyoming Industrial Development Information and Siting Act Section 109 Permit Application – TransWest Express LLC F - 0003 This page intentionally left blank Wyoming Industrial Development Information and Siting Act Section 109 Permit Application – TransWest Express LLC F - 0004 WYOMING INDUSTRIAL SITING DIVISION TransWest Express Transmission Project Jurisdictional Meeting Materials April 20, 2018 F - 0005 This Page Intentionally Left Blank F - 0006 REQUIRED INFORMATION A. Project Name TransWest Express Transmission Project B. Applicant TransWest Express LLC C. Applicant Point of Contact for Application Development Garry L. Miller Vice President, Land and Environmental Affairs TransWest Express LLC 555 Seventeenth Street, Suite 2400 Denver, CO 80202 (303) 299-1546 E-mail: [email protected] D. Applicant’s Wyoming Attorney Hickey & Evans, LLP Paul J. Hickey, Partner 1800 Carey Avenue, Suite 700 Cheyenne, WY 82003 (307) 634-1525 E-mail: [email protected] E. Applicant’s Consultant and Point of Contact SWCA Environmental Consultants David Fetter Project Manager 2120 S. College Ave, Suite 2 Ft Collins, CO 80525 (970) 988-7013 E-mail: [email protected] 1 F - 0007 F. Project Description The TransWest Express Transmission Project (“TWE Project”) is a high voltage transmission system that will extend across four states from south-central Wyoming to Southern Nevada.
    [Show full text]
  • Transwest Express Llc
    TRANSWEST EXPRESS LLC The TransWest Express Transmission Project is a high-voltage interregional electric transmission system developed by TransWest Express LLC. The TWE Project is critical new infrastructure that will deliver electricity generated by renewable resources and will strengthen the power grid that serves the Western United States. The transmission line begins in south-central Wyoming, has a midpoint terminal in Utah, and ends in southern Nevada near Hoover Dam. Delivering renewable energy across the west The TWE Project will provide the Further, multiple third-party studies show time from 1,500 MW to 3,000 MW of transmission infrastructure and capacity the significant economic benefits of transmission capacity. The AC system will be necessary to reliably and cost-effectively tapping Wyoming’s high-capacity wind built at 1,500 MW of capacity. The typical deliver approximately 20,000 GWh/year energy to meet a portion of California’s right-of-way width for the line is 250 feet. of clean and sustainable electric energy renewable energy demand. For example, Transmission structure heights may be up generated in Wyoming to Arizona, Utah, a 2014 National Renewable Energy Lab to 180 feet depending on structure type, Nevada and southern California. Wyoming economic analysis shows that by sourcing terrain, span and line crossings. has a large concentration of high-quality some Wyoming wind, “annual generator renewable resources in the form of wind cost savings (for California) range from Typical structures around $500 million to around $1 billion.” energy. The TWE Project will transmit this In total, the calculated benefits of a direct electric power to the Desert Southwest current line from California to Wyoming region where the demand for renewable outweigh the costs by more than two energy is the greatest.
    [Show full text]
  • TRANSWEST EXPRESS LLC Is Transwest Express LLC?
    WHO is TransWest Express LLC? The Anschutz Corporation, a privately held TransWest Express LLC is a wholly owned affiliate of The Anschutz Corporation, based in Denver, company based in Denver, Colorado, has Colorado. The company was formed in 2008 to continue the development of the TransWest Express been a leader in the natural resources Transmission Project. The TWE Project previously was under development by three collaborating industry for more than 75 years. entities: utilities Arizona Public Service Company and National Grid along with the Wyoming Infrastructure Authority, a quasi-governmental entity created in 2004 to diversify and expand the state’s economy through improvements in Wyoming’s electric transmission infrastructure. As an independent transmission developer, TransWest Express LLC is working to help connect Wyoming’s world-class renewable wind energy supplies with the market demand for renewable energy in California, Arizona and Nevada. Just like railroads are needed to transport Wyoming’s coal to power plants to create electricity for people, transmission lines are needed to transport wind electricity to people. Wyoming has a long history of delivering its energy resources to cities in other states that need bulk supplies of power; according to data from the U.S. Energy Information Administration, more Founded in 1965, the diversified company than two-thirds of all energy generated in Wyoming is exported. today has worldwide investments in energy exploration, production and delivery; real estate, ranching and agriculture; lodging, transportation and telecommunications; newspaper and Internet publishing; and entertainment including sports, film production and movie theaters. Sustainability practices have been incorporated in company operations around the world.
    [Show full text]
  • Tenth Biennial Electric Transmission Final Assessment Report
    FINAL DRAFT Tenth Biennial Transmission Assessment 2018-2027 Staff Report Docket No. E-00000D-17-0001 December 31, 2018 Prepared by Arizona Corporation Commission Staff And ESTA International, LLC 2214 Rock Hill Road, Suite 180 Herndon, Virginia, 20170-4234 Decision No. 76975 [This page intentionally blank for formatting purposes] Biennial Transmission Assessment for 2018-2027 Docket No. E-00000D-17-0001 December 31, 2018 Decision No. 76975 Foreword The Arizona Corporation Commission (“ACC” or “Commission”) performs a biennial review of the ten-year transmission plans filed by parties who are responsible for transmission facilities in Arizona and issues a written decision regarding the adequacy of the existing and planned transmission facilities to reliably meet the present and future transmission system needs of Arizona.1 This report by the Staff of the Commission’s Utilities Division (“ACC Staff” or “Staff”) is the Tenth Biennial Transmission Assessment (“BTA” or “Tenth BTA”) and has been prepared in accordance with a contract agreement between ESTA International, LLC (“ESTA”) and the Commission. It is considered a public document. Use of the report by other parties shall be at their own risk. Neither ESTA nor the Commission accept any duty of care to such third parties. Arizona’s Tenth BTA is based upon the Ten-Year Plans filed with the Commission by parties in January 2018. It also incorporates information and comments provided by participants and attendees in the BTA workshops and report review process. ACC Staff and ESTA appreciate the contributions, cooperation, and support of industry participants throughout the Tenth BTA process. 1 Arizona Revised Statute §40-360.02 Biennial Transmission Assessment for 2018-2027 Docket No.
    [Show full text]
  • ITP Evaluation Process Plan Transwest Express Transmission Project
    ITP Evaluation Process Plan TransWest Express Transmission Project June 14, 2020 The Interregional Transmission Project (ITP) joint evaluation process provides for planning assumptions and ITP technical data coordination for the individual regional evaluations of an ITP. This evaluation process plan was developed through coordination among the relevant planning regions. Its purpose is to document the outcome of the Western Planning Region’s coordination of the basic descriptions, key assumptions, milestones, and key participants in the ITP evaluation process that will be followed in the regional evaluations of the ITP. The information that follows is specific to the ITP listed in the ITP Submittal Summary below. An ITP Evaluation Process Plan is developed for each ITP that has been properly submitted and accepted into the regional process of the Planning Regions to which it was submitted. ITP project sponsors will be provided an opportunity to review this evaluation process plan before it is finalized by the relevant planning regions who developed this evaluation process plan. Once finalized, the Western Planning Regions will post this evaluation process plan on their public websites. ITP Submittal Summary California Independent System Operator (California ISO), Project Submitted To: Northern Tier Transmission Group (NorthernGrid) Relevant Planning Regions1: California ISO, NorthernGrid Cost Allocation Requested From: California ISO The Relevant Planning Regions identified above developed and have agreed to the ITP Evaluation Process
    [Show full text]
  • TWE Project Brochure.Pdf
    About TransWest Express LLC TransWest Express LLC is a wholly owned affiliate of The Anschutz Corporation, a privately held company based in Denver, Colorado. The Anschutz Corporation, through its affiliates, has been actively involved in the West for over 75 years in the fields of ranching, agriculture, and energy development. The Anschutz Corporation’s activity and investments The TransWest Express in the energy field reflect a strong Transmission Project is commitment to responsibly developing and managing natural resources. an extra-high-voltage direct current transmission system. The system will begin in south-central Project Area Map Wyoming near Rawlins, WY extend through northwestern Rock Rawlins Colorado and central Utah, Springs Salt Lake • Cheyenne turn southwest into southern City Nevada, and end near Las Vernal Craig • Vegas. The TWE Project will Denver Price deliver renewable energy Carson City Delta produced in Wyoming to the Grand NV UT JunctionCO Desert Southwest, ultimately helping to contribute to Cedar City a cleaner world and a stronger electrical grid. Las Vegas The dotted line indicates TRANSWEST the approximate route of the EXPRESS LLC TRANSWEST proposed transmission line project. 555 Seventeenth Street, Suite 2400, Denver, CO 80202 EXPRESS LLC The final route may vary. 303.298.1000 www.transwestexpress.net July 2012 What is the timeline? • Engineering/Design and Construction TransWest EIS Public Draft EIS • Other Rights-of-Way Acquisition Acquires TWE Project Scoping Meetings Released Record of Decision 2008 2009 2010 2011 2012 2013 2014 2015 2016 TransWest Files Amended ROW Draft EIS Preparation Final EIS Released Renewable Energy Begins to Flow Application with BLM What benefits will the project bring? Transmission” selected the TWE Project as a priority for What does the project look like? accelerating the federal permitting process – one of seven The TWE Project will provide the transmission projects selected in the U.S.
    [Show full text]
  • Appendix F Notice to Proceed Process and Mitigation and Monitoring
    Appendix F Notice to Proceed Process and Mitigation and Monitoring Requirements TransWest Express Transmission Project December 2016 Record of Decision Appendix F List of Acronyms ACEC Area of Critical Environmental Concern BLM Bureau of Land Management BMP best management practice CDNST Continental Divide National Scenic Trail CFR Code of Federal Regulations CIC compliance inspection contractor EIS Environmental Impact Statement ESA Endangered Species Act HEA Habitat Equivalency Analysis HPTP Historic Properties Treatment Plan NEPA National Environmental Policy Act NPS National Park Service NSHT National Scenic and Historic Trails NST National Scenic Trail NTP Notice to Proceed NTSA National Trails System Act OSNHT Old Spanish National Historic Trail PA Programmatic Agreement PHMA Priority Habitat Management Area POD Plan of Development Project TransWest Express Transmission Project RMPA Resource Management Plan Amendment ROD Record of Decision ROW right-of-way SWPPP Stormwater Pollution Prevention Plan TAG Technical Advisory Group TCP Traditional Cultural Property TWE TransWest Express URMCC Utah Reclamation Mitigation Conservation Commission USDI U.S. Department of the Interior USFWS U.S. Fish and Wildlife Service Western Western Area Power Administration WWEC West-wide Energy Corridor TransWest Express Transmission Project December 2016 Record of Decision Appendix F-i Contents 1.0 Additional Project-Specific Mitigation Measures ....................................................................... F-1 1.1 Notice to Proceed Requirements.........................................................................................
    [Show full text]
  • Transwest Express Project.Pdf
    Western BLM TRANSWEST EXPRESS TRANSMISSION PROJECT January 2011 Introduction The Bureau of Land Management (BLM) in Wyoming received an application for right-of-way across federal land from TransWest Express, LLC (the company). The company proposes to construct and operate a 600-kilovolt (kV) direct current transmission line from south-central Wyoming to southern Nevada (the project). The BLM has determined that this is a major federal action that requires an environmental impact statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) and Council on Environmental Quality regulations (40 CFR 1500-1508). The company and Western Area Power Administration (Western) have entered into a non-binding term sheet through which they are evaluating each holding a 50% joint ownership in the project. The company and Western are developing the terms of their joint ownership, such as construction, operation, and maintenance of the project. Under the American Recovery and Reinvestment Act (ARRA), Western was granted authority to borrow funds from the U.S. Treasury to (among other things) plan, finance, and construct new or upgraded transmission facilities that deliver renewable energy. Western would use this authority for its participation in the project. The BLM and Western are serving as joint-lead agencies in preparing the EIS. Working with other government entities BLM in Wyoming is designated the lead agency for EIS preparation for the BLM. Fifty federal, state, and county governments were invited to participate as cooperating agencies. To date, 33 agencies have accepted the invitation. BLM and Western also notified 45 tribes and pueblos. A list of cooperating agencies is shown below.
    [Show full text]