WEEKLY TRAFFIC ADVISORY 13 of 52

Total Page:16

File Type:pdf, Size:1020Kb

WEEKLY TRAFFIC ADVISORY 13 of 52 TRAFFIC ADVISORY Media Contact: Mario Diaz 305-637-3277 x 2140 Office 305-801-8458 Mobile [email protected] MDX TRAFFIC ADVISORY – December 8, 2011 SR 874/Don Shula Expressway Lane Closure The right lane on northbound SR 874 will be closed just north of the SW 104th Street/Killian Parkway bridge for drainage improvements. The closure will take place for 2 hours on Friday, December 9 from 10 a.m. to noon. FDOT Ramp Closures As part of the Florida Department of Transportation’s (FDOT) SR 826/Palmetto Expressway Project, the following closures will impact the MDX system at the merger of SR 874 with the SR 826/Palmetto Expressway: The ramp from northbound SR 874 to SW 40th Street/Bird Road will be closed and traffic will be detoured from 11 p.m. to 5:30 a.m., through Saturday, December 10, for bridge work. Detour: Drivers going north on SR 874 who want to exit at Bird Road will go north on SR 826 to SW 24th Street/Coral Way, go east on Coral Way to SW 67th Avenue and go south on SW 67th Avenue to Bird Road. The ramp to southbound SR 874 from SW 40th Street/Bird Road will be closed and traffic will be detoured from 11 p.m. to 5:30 a.m., Friday, December 9, for a minor traffic shift. The alternate night for this closure will be Sunday, December 11. Detour: Drivers who want to go south on SR 874 from Bird Road will go south on SR 826 to SW 72nd Street/Sunset Drive, go west on Sunset Drive to SW 87th Avenue/Galloway Road, go south on Galloway Road to SR 878/Snapper Creek Expressway and go west on SR 878 to southbound SR 874. -more- Page 1 of 2 The ramp to southbound SR 826/Palmetto Expressway and southbound SR 874 Expressway from SW 40th Street/Bird Road will be closed from 11 p.m.to 5:30 a.m., Friday, December 9, through Wednesday, December 14, for overhead sign installation. Detours: Drivers who want to go south on SR 826 from Bird Road will proceed to SW 87th Avenue/Galloway Road, go south on Galloway Road to SW 56th Street/Miller Drive, and go east on Miller Drive to the southbound SR 826 entrance ramp. Drivers who want to go south on SR 874 from Bird Road will proceed to SW 87th Avenue/Galloway Road, go south on Galloway Road, past SW 72nd Street/Sunset Drive, to westbound SR 878/Snapper Creek Expressway, and go west on SR 878 to southbound SR 874. Please note that this schedule may change due to bad weather or other unforeseen conditions. For more information about these closures or construction-related activities, please call Tish Burgher at 305-640-7460 or email her at [email protected]. Please visit www.fdotmiamidade.com for more information about this and other FDOT construction projects in Miami-Dade and Monroe County. Drivers are encouraged to call 511 before they drive, or log on to www.fl511.com for real-time traffic and lane closure information. # # # About MDX The Miami-Dade Expressway Authority (MDX) operates and maintains five expressways: SR 112/Airport Expressway, SR 836/Dolphin Expressway, SR 874/Don Shula Expressway, SR 878/Snapper Creek Expressway, and SR 924/Gratigny Parkway. MDX is funded almost entirely by toll revenue and is dedicated to moving Miami- Dade County forward by making your commute safer and more efficient. Please note scheduled activities are subject to change due to weather or other unforeseen circumstances. For additional information regarding closures and MDX construction activities, please visit www.mdxway.com or contact the public information office at 786-552-0000. Real- time traffic and lane closure information are also available by calling 511 or www.fl511.com. PLEASE ADVISE US IF YOU WISH FOR YOUR NAME TO BE REMOVED FROM THIS DISTRIBUTION LIST. THANK YOU. Page 2 of 2 .
Recommended publications
  • US 1 from Kendall to I-95: Final Summary Report
    STATE ROAD (SR) 5/US 1/DIXIE HIGHWAY FROM SR 94/SW 88 STREET/ KENDALL DRIVE TO SR 9/I-95 MIAMI-DADE COUNTY, FLORIDA FDOT FINANCIAL PROJECT ID: 434845-1-22-01 WWW.FDOTMIAMIDADE.COM/US1SOUTH March 2019 Final Summary Report ACKNOWLEDGMENTS Thank you to the many professionals and stakeholders who participated in and contributed to this study. From the communities along the corridor to the members of the Project Advisory Team, everyone played a crucial role in forming the results and conclusions contained in this study. 2 STATE ROAD (SR) 5/US 1/DIXIE HIGHWAY FROM SR 94/SW 88 STREET/KENDALL DRIVE TO SR 9/I-95 This report compiles the results of the State Road (SR) 5/US 1/ Dixie Highway from SR 94/SW 88 Street/Kendall Drive to SR 9/I-95 Corridor Study and includes: › Findings from the study › Recommendations for walking, bicycling, driving, and transit access needs along US 1 between Kendall Drive and I-95 › Next steps for implementing the recommendations This effort is the product of collaboration between the Florida Department of Transportation District Six and its regional and local partners. FDOT and its partners engaged the community at two critical stages of the study – during the identification of issues and during the development of recommendations. The community input helped inform the recommended strategies but the collaboration cannot stop here. Going from planning to implementation will take additional coordination and, in some instances, additional analysis. FDOT is able and ready to lead the effort but will continue seeking the support of community leaders, transportation and planning organizations, and the general public! To learn more, please read on and visit: www.fdotmiamidade.com/us1south WWW.FDOTMIAMIDADE.COM/US1SOUTH 3 CONTENTS 1.
    [Show full text]
  • Carlos Lopez-Cantera, Statewide Chair 150 Alhambra Circle, Suite 925 Coral Gables, FL 33134 [email protected]
    Carlos Lopez-Cantera, Statewide Chair 150 Alhambra Circle, Suite 925 Coral Gables, FL 33134 [email protected] Southern District Manny Kadre, Conference Chair 133 Sevilla Avenue Coral Gables, FL 33134 (305) 567-3582 Ext. 224 [email protected] Georgina A. Angones University of Miami School of Law 1203 Santona Street Coral Gables, FL 33146 (305)284-6470 [email protected] Ellyn Setnor Bogdanoff Becker & Poliakoff 1 East Broward Blvd. Suite 1800 Ft. Lauderdale, FL 33301 (954)987-7550 [email protected] Reginald J. Clyne Quintairos, Prieto, Wood & Boyer, P.A. 9300 South Dadeland Boulevard, 4th Floor Miami, FL 33156 (305)670-1101 [email protected] Kendall B. Coffey Coffey Burlington 2601 South Bayshore Drive Miami, FL 33133 (305)858-2900 [email protected] 1 Vivian de las Cuevas-Diaz Holland & Knight 701 Brickell Avenue Suite 3000 Miami, FL 33131 (305) 789-7452 [email protected] Renier Diaz de la Portilla 1481 NW 22nd Street Miami, FL 33142 (305) 325-1079 [email protected] Albert E. Dotson, Jr. Bilzin Sumberg Baena Price & Axelrod LLP 1450 Brickell Avenue, 23rd Floor Miami, FL 33131 (305) 350-2411 [email protected] Peter M. Feaman 3695 West Boynton Beach Blvd., Suite 9 Boynton Beach, FL 33436 (561) 734-5552 [email protected] Robert H. Fernandez, Esq. Partner Zumpano Castro 500 South Dixie Highway Suite 302 Coral Gables, FL 33146 (305) 503-2990 [email protected] 2 Daniel Foodman Waserstein Nunez & Foodman 1111 Brickell Ave Suite 2200 Miami, FL 33131 (305) 760-8503 [email protected] Philip Freidin Freidin, Dobrinsky, Brown & Rosenblum P.A.
    [Show full text]
  • Sunset M Edical
    NSE MEDICAL SPACE SU T IMMEDIATELY AVAILABLE 6262 SUNSET DRIVE | MIAMI, FLORIDA M L E DIC A Christopher Dubberly D 305.808.7318 C 561.962.1365 [email protected] Downtown MiamiDowntown - Brickell Miami - Brickell Coral Gables Coral Gables NSE SU T Metrorail StationMetrorail Station Sunset ClubSunset Club M L City Hall & PoliceCity Hall & Police APARTMENTSAPARTMENTS 6262 SUNSET6262 DRIVEE SUNSETDIC A DRIVE THE OFFERING THE OFFERING SOUTH SOUTHSOUTH MIAMI MIAMIMIAMI BAPTIST HOSBAPTIST PITA L HOS PITA L HEALTH BAPTISTHEALTH HOS PITA L HEALTH Hospital Campus RARE MEDICAL SPACE AVAILABLE EFFICIENT OPERATIONS – SEPARATE ELECTRIC METER Vacancy of 43,064 SF now available for the first time in a decade. Utilities are separately metered allowing tenants to control their power usage and cost and pay directly to utility provider. BUILDING ANCHORED BY CREDIT TENANT GENERATORS & ON HOSPITAL POWER GRID Prime location at the confluence of the prestigious South Miami/Coral Gables markets. Ensuring secure power and business continuity. MEDICAL TENANCY OPPORTUNITY AFFLUENT DEMOGRAPHICS OF CHOICE Location adjacent to the South Miami Hospital campus and at the core of the South Miami medical 3-Mile Average Household Income: $134,215 | 3 Mile Population: 111,078 residents market. Convenient walking distance to the Larkin Hospital. Ideal population depth, expanding to 353,074 residents with an AHHI of $105,440 within 5 miles. GARAGE PARKING EXTENSIVE NEARBY AMENITIES Competitive advantage of a 3.78/1,000 parking garage, with ample on-street parking as well. Direct The immediate area offers an extraordinary depth of dining and shopping options. entry from garage to floors 1 though 6 – design preferred by tenants.
    [Show full text]
  • SUNSET ISLANDS BRIDGES Nos. 1. 2 and 4
    ' I ' SUNSET ISLANDS BRIDGES Nos. 1. 2 AND 4 MIAMI BEACH HISTORIC STRUCTURES DESIGNATION REPORT Sunset Islands Bridge#1, constructed in 1929. Prepared By: City of Miami Beach Planning, Design and Historic Preservation Division August 1996 CITY OF MIAMI BEACH HISTORIC DISTRICT DESIGNATION REPORT FOR SUNSET ISLANDS BRIDGES #1, 2 AND 4 MIAMI BEACH HISTORIC STRUCTURES DESIGNATION Prepared by: CITY OF MIAMI BEACH PLANNING, DESIGN AND HISTORIC PRESERVATION DIVISION AUGUST 1996 ~I I~ Railing Detail, Sunset Islands Bridge# I MIAMI BEACH CITY COMMISSION Seymour Gelber, Mayor Commissioners: Sy Eisenberg Susan F. Gottlieb Neisin 0. Kasdin Nancy Liebman David T. Pearlson Martin Shapiro Jose Garcia- Pedrosa, City Manager MIAMI BEACH HISTORIC MIAMI BEACH PRESERVATION BOARD PLANNING BOARD Robert H. Schuler, Chairman Joy Alschuler, Chairwoman VictorDiaz Jonathan Beloff Sarah E. Eaton Marvin Green William B. Medellin Henry Kay Jose A. Gelabert-Navia Clark Reynolds Anthony Noboa Jose Smith Linda Polansky Todd Tragash Herb Sosa MIAMI BEACH DEVELOPMENT, DESIGN AND HISTORIC PRESERVATION SERVICES DEPARTMENT Harry Mavrogenes, Director Dean J. Grandin, Jr.,-Deputy Director PLANNING, DESIGN AND HISTORIC PRESERVATION DIVISION Janet Gavarrete, Director PRINCIPAL AUTHORS William H. Cary, Historic Preservation Coordinator Frank G. DelToro, AICP, Planner Special Contributor Janus Research St. Petersburg, Florida SUNSET ISLANDS BRIDGES #I. 2 AND 4 HISTORIC DESIGNATION SUNSET ISLANDS BRIDGES # 1, 2 AND 4 MIAMI BEACH HISTORIC STRUCTURES DESIGNATION REPORT TABLE OF CONTENTS
    [Show full text]
  • FDOT Overpass Studies for Bird Rd
    Non-Motorized Overpass at SR 5/US1 And SR 976/SW 40th Street (Bird Road) Executive Summary 6.0’ March 9, 2017 Prepared By: MARLIN Engineering Inc 1700 NW 66th Avenue, Ste. 106 Plantation, FL 33313 P: 305.477.7575 www.marlinengineering.com Non-Motorized Overpass at SR 5/US1 and SR 976/SW 40th Street (Bird Road) (FM No. 421053-3-12-01) EXECUTIVE SUMMARY Project Description: Concept and Feasibility Analysis for a non-motorized overpass for pedestrian and bicycles to support the Underline adjacent to US-1 at SW 40th Street (Bird Road). Purpose: The Department requested a conceptual and feasibility analysis to identify, evaluate, and recommend potential alignments for a non-motorized overpass. This conceptual analysis consisted of: Typical Section Analysis Horizontal and Vertical Geometric Analysis Traffic Control Analysis Background: The study was conducted at US 1 at 40th Street adjacent to the Underline, a proposed 10 mile signature linear park and urban trail. The Underline will serve as a gateway to the adjacent communities, by improving physical access from north to south running from underneath the Metrorail line and parallel to US1. Need: At this specific location, the traffic congestion is impacting the safety of pedestrians and bicyclists crossing SW 40th Street. Methodology: The feasibility study included the following tasks; Field review of existing conditions Analyze existing Right of Way Maps and Survey (topography) Obtain aerial images of the proposed study area Performed horizontal and vertical geometric analysis Coordination with local companies that manufacture pre-fabricated bridges to obtain preliminary cost estimates and engineering specifications Performed a conceptual Right of Way cost analysis of the adjacent properties within the study area Development of design criteria Development of concept alternatives including typical section, plan and profile.
    [Show full text]
  • On the Move... Miami-Dade County's Pocket
    Guide Cover 2013_English_Final.pdf 1 10/3/2013 11:24:14 AM 111 NW First Street, Suite 920 Miami, FL 33128 tel: (305) 375-4507 fax: (305) 347-4950 www.miamidade.gov/mpo C M On the Y CM MY Move... CY CMY K Miami-Dade County’s Pocket Guide to Transportation Metropolitan Planning Organization (MPO) 4th Edition Table of Contents Highway Information Florida Department of Transportation (FDOT) p. 1 FDOT’s Turnpike Enterprise p. 2 Florida Highway Patrol p. 2 95 Express Lanes p. 3 Miami-Dade Expressway Authority (MDX) p. 4 SunPass® p. 5 511-SmarTraveler p. 5 Road Rangers p. 5 SunGuide® Transportation Management Center p. 6 Miami-Dade Public Works and Waste p. 7 Management Department Department of Motor Vehicles (DMV) p. 8 Driving and Traffic Regulations p. 8 Three Steps for New Florida Residents p. 9 Drivers License: Know Before You Go p. 9 Vehicle Registration p. 10 Locations and Hours of Local DMV Offices p. 10-11 Transit Information Miami-Dade Transit (MDT) p. 12 Metrobus, Metrorail, Metromover p. 12 Fares p. 13 EASY Card p. 13 Discount EASY Cards p. 14-15 Obtaining EASY Card or EASY Ticket p. 15 Transfers p. 16-17 Park and Ride Lots p. 17-18 Limited Stop Route/Express Buses p. 18-19 Special Transportation Services (STS) p. 20 Special Event Shuttles p. 21 Tax-Free Transit Benefits p. 21 I Transit Information (Continued) South Florida Regional Transportation Authority p. 22 (SFRTA) / TriRail Amtrak p. 23 Greyhound p. 23 Fare & Schedule Information p. 24 Local Stations p.
    [Show full text]
  • Continuing Engineering Services for Traffic Roadway and Civil Projects
    Broward County Board of PNC2119168P1 County Commissioners Bid Tabulation Packet for Solicitation PNC2119168P1 Continuing Engineering Services for Traffic, Roadway, and Civil Projects Bid Designation: Public B~~ ARD COUNTY FLOR I DA Purchasing Division www.broward.org/purchasmg Broward County Board of County Commissioners 9/11/2019 BidSync p. 1 Broward County Board of PNC2119168P1 County Commissioners .LPOH\ Horn and Associates, Inc. %LG&RQWDFW Amy McGreger $GGUHVV 1920 Wekiva Way amy.mcgreger@kimley -horn.com Suite 200 Ph 561 -845 - West Palm Beach, FL 33411 ,WHP /LQH,WHP Notes 8QLW3ULFH 4W\8QLW 7RWDO3ULFH $WWFK 'RFV 31&3--01- &RQWLQXLQJ Supplier Product First Offer - HDFK Y Y Engineering Code: 6HUYLFHV Supplier Notes: Due to space restrictions, not everything has been included on the electronic BidSync forms. Additional information for the respective sections and forms can be found in the attached Evaluation Criteria Response PDF. 6XSSOLHU7RWDO 9/11/2019 BidSync p. 2 Broward County Board of PNC2119168P1 County Commissioners .LPOH\ Horn and Associates, Inc. ,WHP Continuing Engineering Services $WWDFKPHQWV *02&2B%URZDUG&R&RQW(QJIRU7UDIILF-Roadway - Civil_FINAL.pdf 9/11/2019 BidSync p. 3 Broward County Board of PNC2119168P1 County Commissioners BR WARD -. COUNTY FLORIDA Continuing Engineering Services for 7UDIƄF5RDGZD\ DQG&LYLO3URMHFWV Solicitation PNC2119168P1 Kimley>>>Horn 9/11/2019 BidSync p. 4 GMOC26036.19 Broward County Board of PNC2119168P1 CONTINUING County Commissioners Engineering Services FOR 7UDIƄF5RDGZD\ I AND Civil PROJECTS;
    [Show full text]
  • South Florida Transit Resource Guide
    SECOND EDITION Improving the Connection between Transit and Land Use SOUTH FLORIDA TRANSIT RESOURCE GUIDE June 2015 June 15, 2015 Dear Colleague: The South Florida Regional Transportation Authority (SFRTA) is pleased to introduce the second edition of the South Florida Transit Resource Guide, which demonstrates the vital connection between transportation and land use throughout Broward, Miami-Dade, and Palm Beach Counties. The first edition was well received and was awarded an honorable mention in the 2010 Transportation Planning Excellence Awards sponsored by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). Decisions involving transportation and land use directly affect our quality of life and the economic vitality of the region. The choices we make influence how much free time we have, where we live and work, our recreational activities, how we travel, the state of our environment, and so much more. The SFRTA seeks to coordinate, develop and implement, in cooperation with all appropriate levels of government, private enterprise and citizens a regional transportation system in South Florida that ensures mobility, the advancement of sustainable growth and improvement in the quality of life for future generations. Increased development around Tri-Rail stations not only positively impacts Tri-Rail ridership, but can also influence regional growth as it pertains to transportation and land use. Station area- development decisions are governed by the city or county in which each station is located. This publication profiles the many factors which affect how the cities and counties promote station- area development. In summary, we hope this document provides the information needed to help communities and organizations make decisions which can improve the connection between land use and transportation.
    [Show full text]
  • FOR LEASE OPPORTUNITY Office / Medical Space Available for Immediate Occupancy
    FOR LEASE OPPORTUNITY 7500 NW 52ND STREET MIAMI, FLORIDA 33166 Office / Medical Space available for immediate occupancy LOOPNET / COSTAR ID# 12926348 • Class B Medical/Office building with exterior signage HIGHLIGHTS opportunity. • Oversized surface parking lot offering 130 plus Total Space 11,739 RSF parking spaces. • All space can be made contiguous utilizing interior 7,039 RSF of medical space. Offers First floor elevator. exterior green area • Property offers hurricane shutters. Second floor 4,700 SF of office space • Easy access to the Palmetto Express Way. • Close proximity to the Palmetto Metro Rail Station. Open surface parking (5/1000) Parking Spaces included. Additional parking available $27.50/SF net of electric and janitorial Asking Rental Rate services Lease Term 3 + years CLICK ICON FOR VIRTUAL CLICK ICON FOR VIRTUAL TOUR OF 1ST FLOOR TOUR OF 2ND FLOOR FLOOR PLANS & INTERIOR PHOTOS PlanFloor Plan First Floor PlanFloor Plan Second Floor LOGISTICS IN PRIME LOCATION AIRPORT WEST SUBMARKET This property benefits from a strategic location in Miami’s Airport West submarket. This location can be reached by multiple highways, including the Palmetto Expressway and Florida Turnpike. The Palmetto Expressway is western Miami-Dade’s main North/South arterial highway, and can be reached through NW 36th Street and NW 58th Street. Another main access point when coming from South West Broward and South Miami-Dade is the Florida Turnpike, one of the state’s primary roadways. It connects Miami-Dade with Broward and Palm Beach counties. ACCESS TO AMENITIES There are multiple retail and shopping corridors found on NW 87th Avenue (Galloway Road) and NW 36th Street.
    [Show full text]
  • ENRIQUE (Rick) ESPINO, PE
    ENRIQUE (Rick) ESPINO, PE EDUCATION Louisiana State University, 1965 - B.S. in Civil Engineering University of Illinois, 1966 - M.S. in Civil Engineering PROFESSIONAL REGISTRATIONS Professional Engineer - Florida, Louisiana Registered Land Surveyor - Louisiana G.C. License - Florida, North Carolina, Alabama, South Carolina, West Virginia General Eng.Contractor License – Miami-Dade County PROFESSIONAL AFFILIATIONS Florida Transportation Builders Association Engineering Contractors Association of South Florida Latin Builders Association American Segmental Bridge Institute, Architectural Precast Association EXPERIENCE : 45 years in the construction industry Listing of highway projects from 1988 – Present: I-195 from NW 10th Ave. to to Biscayne Bay - Widening and bridge repair. Palmetto Expwy Section 5 SR826/SR836 Extension Design Build – Improvements and reconstruction of the SR826/Flagler Street and SR836/NW 72nd Avenue Interchanges. Palmetto Expwy Section 2 at Bird Rd/SR-874/Miller Drive – Design Build – Improvements of one general use lane in each direction; auxiliary use lanes between all interchanges, interchange improvements and operational and safety improvements along the mainline and ramps. SR874 – Killian Parkway Interchange - The work consist of providing all labor, maintenance of traffic schemes, materials, equipment and incidentals necessary for the widening, surfacing, and reconstruction of State Road 874 from North of Southwest 117th Avenue to South of Kendall Drive and the roadway and bridge improvements to the Killian Parkway Interchange in Miami-Dade County, Florida. MDX Kendal Ramp @ SR874 (Shula) - This project is to construct a major bridge from Kendall Drive (SW 88th St) over the existing SR 878 and tie back into the Northbound SR 874. Due to the confined project area, one of the challenges will be to build this project in a predominantly residential area and between two existing highways.
    [Show full text]
  • Mpo Governing Board
    MEETING OF THURSDAY, JUNE 20, 2013 AT 2:00 PM MPO GOVERNING BOARD STEPHEN P. CLARK CENTER III NW FIRST STREET MIAMI, FLORIDA 33128 COUNTY COMMISSION CHAMBER Chairwoman Rebeca Sosa AGENDA Vice Chairman Oliver G. Gilbert, III 1. ROLLCALL Voting Members 2. PLEDGE OF ALLEGIANCE Bruno A. Barreiro Steven C. Bateman 3. APPROV AL OF AGENDA Lynda Bell Esteban Bovo Jf. 4. ACTION ITEMS Matti Herrera Bower Jose "Pepe" Diaz A. PUBLIC HEARING ITEMS Audrey M. Edmonson Maritza Gutierrez 1. 2035 LONG RANGE TRANSPORTATION PLAN AMENDMENTS: Perla T. Hantman ADVANCEMENT OF THE GOLDEN GLADES INTERCHANGE Carlos Hernandez RAMP IMPROVEMENTS INTERIM PROJECT Sally A. Heyman RESOLUTION APPROVING AN AMENDMENT TO THE 2035 LONG Barbara J. Jordan RANGE TRANSPORTATION PLAN (LRTP) TO ADVANCE THE Jean Monestime GOLDEN GLADES INTERCHANGE RAMP IMPROVEMENTS Dennis C. Moss INTERIM PROJECT (ROLL CALL REQUIRED) Javier D. Souto Francis Suarez 2. 2035 LONG RANGE TRANSPORTATION PLAN (LRTP) AND FY Xavier L. Suarez 2013 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Juan C. Zapata AMENDMENTS: MODIFICATION OF SR 93/1-75 MANAGED LANE PROJECT SEGMENTS RESOLUTION APPROVING AMENDMENTS TO THE 2035 LONG Non-Voting Members RANGE TRANSPORTATION PLAN (LRTP) AND THE FY 2013 (FDOT District VI) TRANSPORT ATION IMPROVEMENT PROGRAM (TIP) TO MODIFY Gus Pego, P.E. THE STATE ROAD 93/INTERSTATE-75 MANAGED LANE PROJECT Harold Desdunes, P.E. SEGMENTS FM #421707-2, FM #421707-8 AND FM #421707-9 (ROLL CALL REQUIRED) 3. 2035 LONG RANGE TRANSPORTATION PLAN (LRTP) MPO Secretariat AMENDMENT: ADV ANCEMENT OF MIAMI-DADE Interim Director EXPRESSW A Y PROJECTS #10022, 10023 AND #10024 Irma San Roman RESOLUTION APPROVING AN AMENDMENT TO THE 2035 LONG RANGE TRANSPORT ATION PLAN (LRTP) TO INCLUDE AS PRIORITY I OF THE PLAN THREE MIAMI-DADE EXPRESSWAY AUTHORITY PROJECTS #10022, #10023 AND #10024 (ROLL CALL REQUIRED) Contact Information 4.
    [Show full text]
  • Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
    Florida Gas Transmission 18-Inch Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65th Street to the intersection of Galloway Road with North Kendall Drive Miami-Dade County City of Doral February 2, 2021 Today’s Outline ❖Who is Florida Gas Transmission (FGT)? ❖Why is FGT testing? ❖What is the test exactly? ❖When will the test occur? ❖Where will the test take place? ❖How will the test be conducted? ❖How will the test affect me? 2 Florida Gas Transmission Company ❖Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf ❖Provide all of the natural gas for power generation in Miami-Dade County ❖18-inch diameter Mainline in South Florida ❖Customers include: ▪ Electric utility companies ▪ Local distributors ▪ Industrial clients 3 Need for the Test ❖The U.S. Department of Transportation regulates all interstate pipelines ❖Testing is federally mandated ❖Best practice to confirm the safety and reliability of the pipeline ▪ Safety is our #1 priority ▪ Ensure continued superb client service 4 Nature of the Test ❖Hydrostatic Test ▪ Remove the natural gas from the line • Controlled release vents harmlessly into atmosphere • Service is maintained on another system ▪ Test the integrity of the pipeline by filling the line with water • Put the water under pressure for a fixed period of time 5 Background ❖Hydrotesting the 18-inch Mainline system ❖Standard, common pipeline test procedure ❖Recent, successful hydrotests were completed in: ▪ Pinellas ▪ St. Lucie ▪ Broward ▪ Hillsborough ▪ Martin ▪ Miami-Dade ▪ Polk ▪ Palm Beach ❖Began Miami-Dade testing February 2011 6 Project Process Prepare Begin Obtain Conduct End System for Project Permits Hydrotest Project Testing Public Awareness Campaign 7 Project Schedule TASK DATE Community Awareness November 2020 – April 2021 Permit Applications December 2020 – January 2021 System Preparation January – February 2021 Test Preparation February – March 2021 Conduct Hydrotest 8 March 2021 ❖Test window is set: ▪ Monday, 8 March 2021 ▪ Early morning, midnight – 4:00 a.m.
    [Show full text]