M/S Shyam Metalics & Energy Ltd Steel Project Is Located at Pandoloi
Total Page:16
File Type:pdf, Size:1020Kb
M/s Shyam Metalics & Energy Ltd steel project is located at Pandoloi, in Sambalpur district of Odisha. The project site is at latitude 210 40’ 50.43’’ N and longitude 840 02’ 30.63’’ E, MSL 208m. The project is located on state Highway joining Sambalpur-Rourkela, NH-6 and 42 exist at a distance of about 25km from the site. SH-10 is passing by the side of the project. The project is by the side of Railway line of Sambalpur-Jharsuguda section. The nearest railway station Rengali is 8 km away from project site. The company was initially having DRI Kilns, IFs and rolling mill and proposed expansion and granted prior EC to setup1) 4x500 TPD DRI kilns, 2) 2x450m3 MBF, 3)3 Lakh TPA Pellet Plant, 4)1x96m2 Sinter Plant, 5)4x8T, 4x12T IFs, 2x80/90T EAF, 6)6Lakh TPA Rolling Mill, 7)2x6, 2x9 & 3x11 MVA Ferroalloy plant, 8)5Lakh 50 thousand Coke Oven Plant, 9)15Lakh TPA Coal washery, 10) 60,000 TPA Lime Plant, 11)3,53,500 TPA Bloom Caster and 12) 200 MW power Plant. The company started production installing some of the facilities approved under EC within its validity period and has taken validity extended vide F.No. J-11011/495/2006-IA II (I)of MoEFCC, dated 2nd December, 2016. The company mean while intents to setup additional 10 Lakh TPA Iron Ore Pellet Plant with existing approved 3Lakh TPA pellet plant, and to reduce Power generation by 50 MW (from approved EC quantity of 225 MW to 175 MW), so as to keep all emissions and effluents within the approved scope of existing EC, so as to be within the scope of 7(ii) of EIA Notification 2006. The project is “primary ferrous” metallurgical unit belonging to schedule 3(a) category A Water will be drawn from Hirakud Reservoir of river Mahanadi. Fresh water requirement after the proposed change has been estimated to be 55702 KLD against 62612 KLD as approved in EC and there will be a reduction of 6910 KLD. Power requirement after the change has been estimated to be project is estimated to be about 216.12 MW, whereas captive power generation will be reduced from 225 MW to 175 MW. Balance power will be purchased from state supply. In the existing plant, the haulage roads are been installed with sprinklers and road leading to material handling and storage have been concretized for control of fugitive emission. Across the railway siding, 44 nos. of sprinklers are been installed which drastically reduces the fugitive emissions due to transportation and handling. Land The total land required for the project is 294.84 ha out of which 127.05 ha has been acquired and the balance acquisition is in process Manpower The total manpower is different categories were as follows in accorded EC and there will not be any significant change in it with proposed change. Executives = 155 Non-Executives = 2905 Total = 3060 Project cost The estimated expansion project cost in approved EC was 3,868 crore. Now with 50 MW reduction in power plant, there will be significant reduction in equipment cost in the order of about 150 crores, Cost of 9 Lakh TPA Iron ore pellet plant will almost be of the same value, so differential project cost for implementation will be about 25 crores. Hence the total project cost will be around Rs 3893 crores Project completion schedule After getting CTE from SPCB, Odisha, the construction work can be started to complete the project in two years of time. .