Form I

1 FORM 1

I. Basic Information

Sl No Item Details 1 Name of the project/s Developmnet of building space for MSME by INKID at 2 Sl.No. in the schedule 8(a) 3 Proposed capacity/area/length/tonnage It is proposed to develop a total build up area of to be handled/ command area/lease 81217.68 Sq. Mt. area/number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. Nil 6 Category of Project i.e. A or ‘B’ B 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify 9 Location Angamaly Plot/Survey/Khasra No. 266/5 Village Angamaly Tehsil District State 10 Nearest railway station/airport along Railway Station – Angamaly Railway with distance in km Station at a distance 0.35 Km Airport – Cochin International Airport in Nedumbassery at a distance. 8.3 km 11 Nearest Town, city, District Nearest Town-Angamaly, 4.1 km Headquarters along with distance in km. Nearest City-Ernakulam, 29.6 km District Headquarters- 29.2 km 12 Village Panchayats, Zilla Parishad., Angamaly Municipality Municipal Corporation, Local body Angamaly P.O. (complete postal addresses with Ernakulam. telephone nos. to be given Pin: 683572 Tel: 0484-2452551 Email: [email protected] 13 Name of the applicant Mr. Prem Kumar Sankara Panickar 14 Registered address INKID Limited, Door No. 7/473ZA – 5 & 6, 2nd Floor, Ajiyal Complex, Kakkanad, Cochin, Pin: 682030 15 Address for correspondence: INKID Limited, Door No. 7/473ZA – 5 & 6, 2nd Floor, Ajiyal Complex, Kakkanad, Cochin, Name Mr. Prem Kumar Sankara Panickar Designation(Owner/Partner/CEO) Chief Engineer Address INKEL Limited, Door No. 7/473ZA – 5 & 6, 2nd Floor, Ajiyal Complex, Kakkanad, Cochin, Pin Code Pin: 682030 E-mail [email protected] [email protected] Telephone No. 8086833106

2 Sl No Item Details +91-484-6491138 Fax No. 16 Details of Alternative Sites examined, if No alternative sites were examined any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects INKEL Tower I & II is already existing 18 Whether separate application of Separate application is submitted and the project interlinked project has been submitted? was awarded Environmental Clearance. 19 If yes, date of submission 10th June 2014 through letter no: INKEL/ CE/ 14/1311 - Clearence awarded 20 If no, reason 21 Whether the proposal involves Nil approval/clearance under: if yes, details of the same and their status to be given (a)The Forest (Conservation) Act,1980? (b) The Wildlife (Protection) Act,1972? (c) The C.R.Z.Notification,1991? 22 Whether there is any Government GO (P) No 130/2011/ID dated 23rd May 2011, Order/Policy relevant/relating to the attached as Annexure I . site? 23 Forest land involved (hectares) Nil 24 Whether there is any litigation pending Nil against the project and / or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project

3 4 II. Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sl.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The proposed development is dedicated land use, land cover or topography for industrial use. As per GO (P) No including increase in intensity of 130/2011/ID dated 23rd May 2011 land use (with respect to local land attached in Annexure I the proposed site use plan) is demarcated as industrial area by Government of Kerala. Hence there is no change in the land use pattern. 1.2 Clearance of existing land, No Since the site is almost barren land vegetation and buildings? extensive clearing of the vegetation is not required. 1.3 Creation of new land uses? No As per GO (P) No 130/2011/ID dated 23rd May 2011 attached In Annexure I the proposed site is demarcated as industrial area by Government of Kerala. Hence there is no change in the land use pattern. 1.4 Pre-construction investigations e.g. Yes Soil investigation of the site is executed bore houses, soil testing? .The soil investigation map is as attached in Annexure II. 1.5 Construction works? No 1.6 Demolition works? No 1.7 Temporary sites used for No Construction workers will be camped construction works or housing of offsite under contractors scope construction workers? 1.8 Above ground buildings, structures Yes or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No mining or tunneling 1.10 Reclamation works? No 1.11 Dredging? No 1.12 Offshore structures? No 1.13 Production and manufacturing Yes The infrastructure development is meant processes? for non-pollution industries .The list of nonpolluting industries proposed to be housed in the building are listed in Annexure III. 1.14 Facilities for storage of goods or No During the construction phase, facilities materials? for storage of construction material and goods will be required. 1.15 Facilities for treatment or disposal Yes During the construction period the entire of solid waste or liquid effluents? waste generated will be managed under contractor’s scope. During operational phase 100KLD STP plant with provision for augmentation if

5 Sl.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data required will be provided for treating liquid waste. The solid waste management both during construction and operation phase is presented in Annexure. X of form IA. 1.16 Facilities for long term housing of Yes operational workers? 1.17 New road, rail or sea traffic during Yes A new road of 0.83 km from NH construction or operation? 47 to INKEL Tower through the TELK campus is already approved by Government of Kerala for access to the entire INKEL plot 1.18 New road, rail, air waterborne or No other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water Yes form ground or surface waters? 1.24 Changes in water bodies or the land No surface affecting drainage or run- off? 1.25 Transport of personnel or materials Yes During the construction phase there will for construction, operation or be transport of material and workers to the decommissioning? site. During the operational phase there will be influx of people to the site. 1.26 Long-term dismantling or No decommissioning or restoration works? 1.27 Ongoing activity during No decommissioning which could have an impact on the environment 1.28 Influx of people to an area in either Yes There will be enhancement of influx of temporarily or permanently? people to the site either temporarily or permanently during operational phase and the construction phase 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic No diversity?

6 Sl.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.31 Any other actions? No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sl No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No agricultural land (ha)

2.2 Water (expected source & Yes For construction phase, regular supply of competing users) unit: KLD water will be arranged under contractor’s scope if necessary the required water will be used from the already existing water sources (two bore well) within the site. Two bore wells serving Tower I and Tower II are already there in the site. One bore well is at southern side of Tower I and other is at southern side of Tower II. Yield of Tower I and II bore wells are 1000 LPH (Litters Per Hour) and 3000 LPH respectively.

During operational phase the main expected source of water is ground water and rain water Entire strom water from teh site will be collected and recharged to ground 2.3 Minerals (MT) No 2.4 Construction material – stone, Cement 325313 bags aggregates, sand / soil (expected Reinforcement 10763 T source – MT) steel Sand 16932 M3 2.5 Forests and timber (source – MT) No 2.6 Energy including electricity and Yes Total electricity demand during fuels (source, competing users) operational phase is Approx. 5.5 MVA Unit: fuel (MT), energy (MW) which will be sourced from nearby 110Kv station at Kariad. 2.7 Any other natural resources (use No appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sl.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and

7 Sl.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data water supplies) 3.2 Changes in occurrence of disease or No affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes The project will bring a significant benefit changing living conditions? to the public with increase in employment potential both during construction and operational phase. 3.4 Vulnerable groups of people who No The proposed land is vacant and is could be affected by the project e.g. Dedicated for industrial use. hospital patients, children, the elderly etc., 3.5 Any other causes No 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate Sl. quantities/rates, wherever possible) with No. Information/Checklist confirmation Yes/No source of information data 4.1 Spoil, overburden or mine wastes Yes Such materials generated will be used in the site itself for the leveling and construction of internal roads 4.2 Municipal waste (domestic and or Yes During the construction phase commercial wastes) construction waste will be generated at the site and domestic waste will be generated in labor camp. The wastes may also be generated in the form of paper, plastic, cartons etc. The waste generated during construction phase will be properly managed under the scope of contractor. During operational phase a careful management of waste will be followed as explained in Annexure X of Form 1A 4.3 Hazardous wastes (as per No Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Only non-polluting industries are proposed. 4.5 Surplus product No 4.6 Sewage sludge or other sludge from Yes Sludge will be generated during operation effluent treatment phase from the proposed STP and the same will be properly managed. 4.7 Construction or demolition wastes Yes Site clearance will result in minor waste generation. Concrete cuttings, plastic fixtures, wood and other inert materials are some of the waste that could be generated during construction phase. Paper, plastic etc would be recycled. 4.8 Redundant machinery or equipment No 4.9 Contaminated soils or other No materials 4.10 Agricultural wastes No

8 Details thereof (with approximate Sl. quantities/rates, wherever possible) with No. Information/Checklist confirmation Yes/No source of information data 4.11 Other solid wastes No 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Information/Checklist Yes/No Details thereof (with approximate S.No confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes During construction phase air emission fossil fuels from stationary or will be resulted from the mobile sources mobile sources. such as construction machineries and vehicles During operation phase, the vehicle usage along the project area and generator usage during the time of power failures will be the sources of fossil fuel related emissions. As the proposal is dedicated for green and white industries emission from the industry will be negligible. Proper air emission control measures will be adopted as described in the EMP presented in Annexure XVII of form I A. 5.2 Emissions from production No As the proposal is dedicated for green and processes white industries emission from the industry will be negligible. 5.3 Emissions from materials Yes During construction phase, the material handling including storage or transit will lead to dust emissions. transport Proper dust emission control measures will be adopted as described in the EMP 5.4 Emissions from construction Yes Air emission will be resulted from the activities including plant and mobile sources such as construction equipment machineries and vehicles. Proper dust emission control measures will be adopted as described in the EMP presented in Annexure XVII of form I A 5.5 Dust or odours from handling of Yes Handling of construction materials and materials including construction earth excavation could lead to dust materials, sewage and waste emissions. Sufficient mitigation measures will be adopted timely. Sewage and waste handling will be properly managed during construction and operational phase. 5.6 Emissions from incineration of No Incineration of the waste is not proposed waste 5.7 Emissions from burning of waste No Open combustion of the waste during in open air (e.g. slash materials, construction and operation phase will be construction debris) strictly avoided A proper waste management as explained in the Annexure X of form 1A will be followed 5.8 Emissions from any other sources No

9 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Construction machineries and operation engines, ventilation plant, of Crusher (offsite) will generate noise crushers and vibration. Sufficient preventive measures will be incorporated during construction phase in order to reduce the generation of noise ,light and vibration 6.2 From industrial or similar Yes As the development is proposed in an processes industrial area the noise and vibration generated from the industrial process will not be significant. Also the development is dedicated for green and white industries so the generation of noise and vibration will be less. However proper mitigation measures will be adopted as described in EMP presented in Annexure XVII of form I A. 6.3 From construction or demolition Yes Noise will be generated during construction activities. 6.4 From blasting or piling Yes During piling noise will be experienced along project site. However proper mitigation measures will be adopted as described in EMP presented in Annexure XVII of form I A. 6.5 From construction or operational Yes traffic 6.6 From lighting or cooling systems No 6.7 From any other sources Yes Generator will emit noise along the project area during construction and operation phase (only when power failure exists) Generator with acoustic and vibration control as per CPCB guidelines alone will be used 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 7.1 From handling, storage, use or No Oil spillage from construction spillage of hazardous materials machineries will be negligible. The amount of oil contaminated runoff from the construction yard will be detained in temporary ponds during construction phase.

10 Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 7.2 From discharge of sewage or No Provisions for the sanitary facilities will other effluents to water or the provided as an integral part both during land (expected mode and place of construction and operational phase. discharge)

7.3 By deposition of pollutants No emitted to air into the land or into water 7.4 From any other sources No 7.5 Is there a risk of long term build No up of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate S.No Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 8.1 From explosions, spillages, fires No Hazardous substance is not in cooperated etc from storage, handling, use or in building construction production of hazardous substances 8.2 From any other causes No

8.3 Could the project be affected by No The project site has a stable stratography natural disasters causing .The site is Zone III as per earth quake environmental damage (e.g. classification. Structures will be designed Floods, earthquakes, landslides, based on these facts. cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate S. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data 9.1 Lead to development of Yes The project will enhance the employment supporting facilities, ancillary potential of the area. Establishment of development or development industries can also boost employment stimulated by the project which potential and quality of life. Housing could have impact on the development is likely to occur. Supporting environment e.g: Supporting industries are likely to come up depending infrastructure (roads, power on the nature of industries established supply, waste or waste water during the operational phase. treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, No which could have an impact on the environment

11 Details thereof (with approximate S. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data 9.3 Set a precedent for later Yes The proposal will create a positive developments economic activities /projects in line with the proposed development in the vicinity areas. 9.4 Have cumulative effects due to No proximity to other existing or planned projects with similar effects III. Environmental Sensitivity S.No Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary 1 Areas protected under No international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes As presented in Annexure IV sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, No important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No underground waters 5 State, National boundaries No 6 Routes or facilities used by the No public for access to recreation or other tourist, pilgrim areas 7 Defense installations No 8 Densely populated or built-up Yes As presented in Annexure IV area 9 Areas occupied by sensitive man- Yes As presented in Annexure IV made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high Yes As presented in Annexure IV quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No

12 S.No Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

IV. Proposed Terms of Reference for EIA studies

Not Applicable

13 ANNEXURE

14 ANNEXURE I

GO (P) No 130/2011/ID dated 23rd May 2011

15 . '. . .'.':,,;,:(_ <):c,

.,.. ~. ;"'- :

.~.... "'TRue:cOpy

'wr IN. EL Limited

(K. PAD ADASAN) ." Company Secret..9ry .'

16 17 ANNEXURE II

Soil Investigation Report

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ANNEXURE III

List of Probable Industries in Green & White Category to be set up in the Proposal

35 List of Probable Industries in Green Category to be set up in the proposal

The entire proposal is meant for the Green and White Category industries as per the guidelines and the type of industries proposed to be set up are listed below

1.0 Green Industries

SL Industry Sector No. 1 Aluminium utensils 2 Ayurvedic medicines 3 Small Bakery /confectionery 4 PP film 5 Biomass briquettes 6 Melamine resins 7 Brass and bell metal utensils 8 Candy 9 Cardboard / corrugated box 10 Carpentry & wooden furniture 11 Cement products 12 Ceramic colour by mixing 13 Chilling plant and ice making 14 Coke briquetting 15 Small Cotton spinning and weaving 16 Dal Mills 17 Decoration of ceramic cups 18 Digital printing on PVC clothes 19 Handling, storage of food grains 20 Flour mills 21 Electrical Glass , ceramic, earthen potteries 22 Glue from starch 23 Gold and silver smithy 24 Non-polluting Heat treatment 25 Insulation /coated papers 26 Leather foot wear /products 27 Blending of Lubricating oil, greases 28 Pasted veneers 29 Oil mill Ghani 30 Packing materials 31 Phenyl/toilet cleaner 32 Polythene and plastic products 33 Poultry, Hatchery and Piggery 34 Power looms (without dye and bleaching) 35 Puffed rice (muri) (gas or electrical heating) 36 Ready mix cement concrete 37 Reprocessing of waste cotton

36 38 Rice mill (Rice hullers only) 39 Rolling mill ( gas fired) and cold rolling mill 40 Rubber goods (gas operated baby boiler) 41 Saw mills 42 Soap manufacturing 43 Spice Blending 44 Spice grinding 45 Steel furniture 46 Grains processing 47 Tyres /tube retreating 48 Chilling /ice plant 49 CO2 recovery 50 Distilled water 51 Small Hotels 52 Optical lenses 53 Mineralized water 54 Tamarind powder 55 Marble stone 56 Emery powder 57 Flyash export 58 Mineral stack yard 59 Oil and gas transportation pipeline 60 Seasoning of wood 61 Synthetic detergent 62 Tea processing 63 Pulverization of bamboo 2.0 White Industries

Sl. Industry Sector No. 1 Air coolers /conditioners 2 Bicycles ,baby carriages 3 Bailing of waste papers 4 Bio fertilizer /bio-pesticides 5 Biscuits trays 6 Blending / packing of tea 7 Block making of printing 8 Chalk making 9 Compressed oxygen gas 10 Cotton and woolen hosiers 11 Diesel pump repairing 12 Electric lamp ( bulb) and CFL 13 Electrical and electronic item 14 Engineering and fabrication units 15 Flavoured betel nuts 16 Fly ash bricks/ block 17 Fountain pen 18 Glass ampules

37 19 Glass putty and sealant 20 Ground nut decorticating 21 Handloom/ carpet weaving 22 Leather cutting and stitching 23 Coir items from coconut husks 24 Metal caps containers etc 25 Shoe brush and wire brush 26 Medical oxygen 27 Organic and inorganic nutrients 28 Organic manure 29 Packing of powdered milk 30 Paper pins and u clips 31 Repairing of electric motors /generators 32 Rope (plastic and cotton) 33 Scientific and mathematical instrument 34 Solar module non-conventional energy apparatus 35 Solar power generation through solar photovoltaic cell, wind power and mini hydel power (less than 25 MW) 36 Surgical and medical products assembling

38 ANNEXURE IV

Sensitivity Map

39 Application for prior environmental Clearance for proposed building space for MSME by INKID at Angamaly Form I Form I

List Of Environmental Sensitive Features Within 15 Km Areal Distance From the Project Boundary The list of sensitive areas found within 15 Km areal distance from the project boundary is shown in Table 1, Figure 1 and Figure 2 below Table 1. List of Sensitive Features

Sl.No Sensitive Features Aerial Distance (km) 1. Hospitals 1 Carmel hospital, Aluva 10.15 2 Mar Athanasus Hospital, Angamaly south 0.69 3 Sanjo Hospital, 13.38 4 Little Flower Hospital, Angamaly 2.23 5 K. G. Hospital, Chalakudy 13.68 6 PMM hospital, Chengal 7.31 7 M. A. G. J. Hospital, Mookannoor 6.26 8 Sree Narayana Institute of Medical Services, Manjaly 10.08 9 Stella Maris Hospital, Edakunnu 8.02 10 Devamatha Hospital, Koratty 8.99 2. Schools 1. National University for Advanced Legal Studies, Kalammaseery 13.52 2 SCMS School of Engineering and Technology, 10.27 3 School of Management Studies, Cochin University of Science and Technology, Kalammaseery 13.39 4 Rajagiri Public School, South 15 5 Federal Institute of Science And Technology, Mookannoor 6.81 6 U C college, Aluva 7.31 7 Sree Narayana Institute of Medical Sciences, 10.08 8 Adi Shankara Institute of Engineering and Technology, Mattoor 6.42 9 Vidyodaya School, Thevakkal 14.58 10 Infant Jesus Senior Secondary School, Alangad 9.76 11 Newman Academy, Malayattor 14.46 12 St.Joseph's Girls High School, 5.15 13 Viswajyothi Public School, 4.1 14 Carmel High School, Chalakkudy 14.18 15 Little Hearts School, Paravur 15 3. Pilgrimage Centre 1 Kurumbakkavu Bhagavathy Temple, Chengamanadu 3.25

22 40 Application for prior environmental Clearance for proposed building space for MSME by INKID at Angamaly Form I Form I

2 Sree Venugopla Krishna Swami Dewastan, 13.94 3 Siva temple, Aluva 7.3 4 St Dominic Church, Aluva 8.42 5 St. Mary's Church Jacobite Syrian Cathedral, Angamaly 1.59 6 St. George Forane Church, Angamaly 1.45 7 Eravikulangara Temple, Nedumbassery 2.2 8 Karingamthuruth Jn. Mosque, Mannam 12.83 9 Thottumugham East Juma Masjid, Thottumugham 7.1 10 Juma Masjid, Kavarparmbu, Angamaly 2.15 11 International shrine, 14.48 4. Water Bodies 1 Periyar River 7.12 5. Community Facilities 1 Cochin International Airport Limited, Nedumbassery 4 2 Aluva Town Hall 7.75 3 Sreemoolanagaram Vijayan Hall, Nedumbassery 6.13 4 St.Thomas Parish Hall, Malayattoor 14.75 5 Cultural Society of Angamaly, Angamaly 2.36 6 Community Hall, Chendamanagalam 14.99 7 Community Hall, Koratty 9.12 6. Tourist Places 1 Chennamangalam Synagogue, Mala 13.7 2 Mulamkuzhi Waterfalls, Malayattoor 14.8

23 41 42